08-1177-038GENERAL NOTES: 1. SITE INVESTIGATION: PRIOR TO BIDDING THE CONTRACTOR SHALL VISIT THE JOBSITE AND BECOME ACQUAINTED WITH ALL OF THE EXISTING CONDITIONS WHICH WILL AFFECT HIS WORK. FAILURE TO DO SO WILL NOT BE ACCEPTED AS A REASON FOR REQUESTING EXTRA PAY WHERE THE EXISTING CONDITION RESULTS IN EXTRA MATERIAL OR LABOR. THE CONTRACTOR SHALL SUBMIT IN HIS BID AN AMOUNT THAT WOULD BESET ASIDE FOR UNIDENTIFIED ITEMS. 2. ALL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL CONTRACTOR IN A FIRST CLASS MANNER AND SHALL BE A COMPLETED AND FULLY OPERATIVE TO THE ACCEPTANCE OF THE OWNER, GENERAL CONTRACTOR AND ENGINEER. 3. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY FOR THE COMPLETE INSTALLATION OF THE ELECTRICAL SYSTEMS, ALL IN ACCORDANCE WITH THESE CONSTRUCTION DOCUMENTS. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH THE FLORIDA BUILDING CODE 2005 AND NFPA CODES INCLUDING, BUT NOT LIMITED TO NFPA 70 - (NEC) AND NFPA 72 - (FIRE ALARM). 4. THIS CONTRACTOR SHALL PAY FOR ALL FEES, INSPECTIONS, TESTS, FINES, ETC., AS REQUIRED. 5. MINIMUM STANDARDS: THE MATERIAL, EQUIPMENT, INSTALLATIONS, AND WORKMANSHIP FURNISHED UNDER THIS SECTION SHALL CONFORM AT LEAST TO THE REQUIREMENTS OF THE REGULATING AGENCIES AS LISTED IN ITEM (3) ABOVE. ALL MATERIALS AND EQUIPMENT USED SHALL BE LISTED OR BEAR THE U. L. APPROVAL FOR THEIR INTENDED USE. 6. RESPONSIBILITIES: CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A COMPLETE INSTALLATION OF THE RACEWAY SYSTEM, EQUIPMENT AND WIRING IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 7. GUARANTEE: THE CO NTRACTORISUB-CON TRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL WORK EXECUTED UNDER THIS CONTRACT SHALL BE FREE FROM DEFECTS OF WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE AND THAT HE AT HIS OWN EXPENSE, REPAIR OR REPLACE ALL WORK WHICH BECOMES DEFECTIVE DURING THE TIME OF THE GUARANTEE. 8. ALL EQUIPMENT, SYSTEM AND SYSTEM COMPONENTS SHALL BE FROM THE SAME MANUFACTURER AND SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS AND SPECIFICATIONS. 9. VERIFY ALL DIMENSIONS PRIOR TO ANY FABRICATION OR INSTALLATION. 10. OBTAIN FULL INFORMATION REGARDING PECULIARITIES AND LIMITATIONS OF SPACE AVAILABLE FOR INSTALLATION OF THE EQUIPMENT AND MATERIALS UNDER CONTRACT, AND PROVIDE READY ACCESSIBILITY TO ELECTRICAL EQUIPMENT, INCLUDING ANY PART OF SYSTEM REQUIRED TO BE REACHED FOR MAINTENANCE AND OPERATIONS. 11. PROVIDE AN ACCURATE LAYOUT, GRADES AND ELEVATIONS, TAKE PROPER PRECAUTIONS TO PROTECT WORK AND EQUIPMENT FROM DAMAGE. 12. PROVIDE CODE APPROVED FIRE STOPPING AT ALL CONDUIT, PENETRATIONS THROUGH BUILDING CONSTRUCTION TO MAINTAIN FIRE, SMOKE AND SOUND RATING. FIRE SEAL ALL PENETRATIONS. SEAL TELECOMMUNICATION SLEEVES AFTER CABLES HAVE BEEN INSTALLED. 13. RACEWAYS AND FITTINGS: CONDUIT RUNS SHALL CONCEALED IN CEILING SPACES, AND WALL PARTITIONS, NO CONDUIT SHALL BE EXPOSED IN INTERIOR SPACES EXCEPT FLEXIBLE CONNECTION TO WIRE MOLDS. CONCEALED CONDUITS TO BE EMT. SURFACE MOUNTED RACEWAY (WIRE MOLD) TO BE INSTALLED IN SOLID WALLS ONLY. THE MINIMUM CONDUIT SIZE IS TO BE %2 ". ALL CONDUITS AND RACEWAYS SHALL BE METAL. 14. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH OTHERS AS WELL AS PROVIDING TEMPORARY POWER. 15. VERIFY EQUIPMENT SIZES, VOLTAGE AND CURRENT CHARACTERISTICS, ETC., BEFORE THE ORDERING OF ANY EQUIPMENT AND BEFORE ROUGHING -IN FOR EQUIPMENT TO BE SUPPLIED TO OTHERS. NOTIFY ENGINEER OF ANY CONFLICT. 16. PROVIDE A COMPLETE POWER CIRCUIT WIRING AND CONNECTIONS FOR EACH AND EVERY ITEM OF PERMANENT MECHANICAL EQUIPMENT. PRIOR TO ANY ROUGH -IN COORDINATE WITH HVAC AND PLUMBING EQUIPMENT NAME PLATE TO OBTAIN CORRECT WIRE SIZE AND OVERCURRENT PROTECTION RATING. IF THE NAME PLATE LABEL REQUIRES THE OVERCURRENT PROTECTION DEVICE TO BE FUSES, PROVIDE A FUSED SWITCH WITH PROPER SIZE FUSES AT THE EQUIPMENT LOCATION. 17. CONDUCTOR: ALL CONDUCTOR WIRE AND CABLE SHALL CONSIST OF 98% CONDUCTIVITY COPPER. ALL CABLES SHALL BE SINGLE CONDUCTOR, 600 VOLT, THERMOPLASTIC INSULATION. SUITABLE FOR CONTINUOUS OPERATION AT 75 DEGREES C. CONDUCTOR TEMPERATURE IN BOTH WET AND DRY LOCATIONS. THESE CABLES SHALL BE N.E.C. INSULATION CLASSIFICATION TYPE THWNITHHN. MINIMUM SIZE SHALL BE #12. ALL CONDUCTOR INSULATION SHALL BE COLOR CODED MAINTAINING THE INTEGRITY OF EXISTING INSTALLATION. COLORED INSULATION SHALL BE USED FOR AWG SIZES #10 AND SMALLER AND APPROVED COLOR TAPES SHALL BE USED FOR AWG SIZES #8 AND LARGER. ALL POWER AND CONTROL CIRCUITS SHALL CARRY EQUIPMENT GROUNDING CONDUCTOR SIZED PER NEC 250 -122. 18. THE NATURE OF THIS TYPE OF CONSTRUCTION POSES SPECIAL PROBLEMS FOR THE DESIGN ENGINEER AS WELL AS THE CONTRACTOR. EVERY EFFORT HAS BEEN MADE BY THE ENGINEER TO SHOW AND VERIFY WHERE POSSIBLE THE LOCATION OF THE EXISTING ELECTRICAL SYSTEM, THE MAJOR PORTION OF THE ELECTRICAL SYSTEMS ARE AS SHOWN ON THE DRAWINGS. HOWEVER MINOR DEVIATIONS MAY BECOME EVIDENT AS THE JOB PROGRESSES, NO ADVANTAGE IS TO BE TAKEN BY THE CONTRACTOR BECAUSE OF THESE MINOR DIFFERENCES. 19. CORRECTION OF ANY DEFECTS, REPAIR OR DAMAGE DURING CONSTRUCTION AS WELL AS ANY MINOR CHANGES IN OUTLET LOCATIONS SHALL BE MADE WITHOUT ADDITIONAL COST. 20. GUTTERS, PULL BOXES, ETC., SHALL BE GALVANIZED STEEL SIZED PER NATIONAL ELECTRICAL CODE, ARTICLE 312, MADE OF MATERIAL SUITABLE FOR THE ENVIRONMENTAL CONDITIONS PRESENT. 21. ALL FLOORS, WALLS, AND ROOF PENETRATIONS SHALL BE PROPERLY SEALED -OFF. IF FIRE RATED, AN APPROVED FIRE RETARDANT SEAL SHALL BE USED. 22. ALL WIRING SHALL BE IN RACEWAY. A. INDOORS- USE THE FOLLOWING WIRE METHODS: 1. EXPOSED: EMT 2. CONCEALED: EMT 3. ' CONNECTION TO VIBRATION EQUIPMENT (INCLUDING TRANSFORMERS AND HYDRAULIC, PNEUMATIC, ELECTRIC SOLENOID, OR MOTOR - DRIVEN EQUIPMENT): FMC, EXCEPT IN WET OR DAMP LOCATIONS USE LFMC. 4. DAMP OR WET LOCATIONS: RIGID STEEL CONDUIT. 5. BOXES AND ENCLOSURES: NEMA 250, TYPE I, EXCEPT AS FOLLOWS: A. DAMP OR WET LOCATIONS: NEMA 250, TYPE 3R STEEL. B. DAMP OR WET LOCATIONS: 250, TYPE 4, NONMETALLIC. 6. UNDERGROUND RNC (SINGLE RUN OR GROUPED). B. SEALING FITTINGS SHALL BE INSTALLED AT FOLLOWING POINTS, AND ELSEWHERE AS SHOWN. 1. WHERE REQUIRED BY THE NEC. 23. THESE DRAWINGS ARE A GUIDE FOR THE INSTALLATION OF THE RACEWAY SYSTEM AND EQUIPMENT. THEY ARE INTENDED TO SHOW THE GENERAL ARRANGEMENT, DESIGN AND EXTENT OF THE WORK AND PARTLY DIAGRAMMATIC. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE AND FUNCTIONAL INSTALLATION. 24. CIRCUIT NUMBERS ARE FOR IDENTIFICATION PURPOSES ONLY. THE CONTRACTOR IS RESPONSIBLE FOR CORRECTLY PHASING THE CIRCUITS IN THE PANEL AND SHALL BALANCE THE LOAD ON THE PHASES UNDER NORMAL OPERATING CONDITIONS. PROVIDE TYPE WRITTEN PANEL BOARD DIRECTORIES IN EXISTING PANEL BOARD DIRECTORIES. UPDATE ALL DIRECTORIES IN EXISTING PANEL BOARDS AFFECTED BY THIS PROJECT ELECTRONICALLY TRACING ALL CIRCUITS. 25. ANY DEVIATION FROM THESE DRAWINGS AND SPECIFICATIONS MUST BE AUTHORIZED IN WRITING FROM THE ENGINEERS OFFICE. THE CONTRACTOR SHOULD BE HELD LIABLE FOR ANY DEVIATIONS WITHOUT SUCH AUTHORIZATION. 26. ALL POWER AND LIGHTING CIRCUITS SHALL HAVE A GREEN EQUIPMENT GROUNDING CONDUCTOR SIZED AS PER NEC 250 -122. NEUTRAL CONDUCTOR SHALL BE 10 AWG (MINIMUM CU -THW) IN ALL MULTICIRCUIT BRANCH CIRCUITS. 27. PROVIDE NYLON PULL STRINGS IN ALL EMPTY CONDUITS FOR FUTURE USE. 28. COLOR CODING FOR CONDUCTORS: A. WIRING FOR 120/208 VOLT SYSTEM SHALL BE CODED AS FOLLOWS: PHASE A - YELLOW PHASE B - BROWN PHASE C - ORANGE NEUTRAL - GRAY GROUND -GREEN B. WIRING FOR 2771480 VOLT SYSTEM SHALL BE CODED AS FOLLOWS: PHASE A - YELLOW PHASE B - BROWN PHASE C - ORANGE NEUTRAL - GRAY GROUND - GREEN C. COLORS ON CONDUCTOR 6 AWG AND SMALLER SHALL BE INTEGRAL PART OF INSULATION, ON CONDUCTOR 4 AWG AND LARGER CONDUCTORS, EITHER COLOR CODING . TAPE OR PAINTED WITH TWO COATS OF CORRECT COLOR PAINT AT ALL TERMINALS AND CONNECTION POINTS. * UNLESS OTHERWISE REQUIRED BY APPLICABLE CODE. 29. ANY WORK NOT SHOWN OR SPECIFICALLY MENTIONED ON THESE PLANS BUT CONSIDERED NECESSARY FOR COMPLETION OF WORK IN THE PROPER MANNER SHALL BE PROVIDED BY THE CONTRACTOR WITHOUT ADDITIONAL CHARGE. 30. CONTRACTOR SHALL VERIFY SPACE CONDITIONS AND DIMENSIONS AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF MATERIALS AND EQUIPMENT. ELECTRICAL CONTRACTOR TO COORDINATE HIS WORK WITH THE ARCHITECT BEFORE ROUGH INSTALLATION OF ALL OUTLETS, (LIGHTS, RECEPTACLES, SWITCHES, PULL BOXES, ETC.) FOR EXACT LOCATION. 31. ALL ELECTRICAL EQUIPMENT SUCH AS PANELS, PULL / J- BOXES, FEEDERS, ETC. SHALL BE PROPERLY IDENTIFIED WITH A PERMANENT LABEL AFFIXED TO THE EQUIPMENT. IDENTIFY CIRCUIT IN PANELS BY MEANS OF A TYPED, PLASTIC COVERED DIRECTORY. 32. SPOT PAINT CONDUITS AND BOXES. IDENTIFY CONDUITS WITHIN 6 INCHES (6 ") OF BOX OR ENCLOSURE. USE ONLY COLOR CODE IN COMPLIANCE WITH USER REQUIREMENTS UPON COMPLETION. 33. ALL SERVICE INTERRUPTIONS AND ALL REMOVAL AND DISPOSAL WORK SHALL BE SCHEDULED AND COORDINATED WITH THE AUTHORIZED REPRESENTATIVE OF THE OWNER. 34. CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, FEES, TAXES, INSPECTIONS, TESTS AND OTHER ITEMS AS REQUIRED FOR THE WORK AS OUTLINED IN THE PLANS. PROVIDE ALL THE REQUIRED INSURANCE FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK. 35. CONTRACTOR SHALL MAINTAIN A COMPLETE SET OF PRINTS FOR INDICATING ALL CHANGES AS THE CONTRACTOR PROGRESSES. AT THE COMPLETION OF THE WORK, THE CONTRACTOR SHALL DELIVER A SET OF AS -BUILT DRAWINGS TO THE OWNER IN REPRODUCIBLE MATERIAL CONTRACTOR SHALL STAMP AS -BUILT ON THE PLANS, (EACH SHEET), AND PRINT, DATE AND SIGN WITH INK. 36. CONTRACTOR IS RESPONSIBLE FOR REPLACING ALL PARTITION, FLOOR CEILING, CONDUIT PENETRATION, AND ANY OTHER EXISTING CONDITION AFFECTED BY THIS PROJECT. UPON COMPLETION, RE- PAINT ALL AFFECTED SURFACES MATCHING SURROUNDING COLOR. 37. TELECOM RACEWAYS, EMPTY BOXES AND PULL STRINGS TO BE INSTALLED BY ELECTRICAL CONTRACTOR, WIRING AND WIRING DEVICES AND FINAL CONNECTION BY OWNER. DEMOLITION NOTES: 1. ALL WORK HEREIN DESCRIBED AND SHOWN ON DRAWINGS AND REQUIRED TO MAKE PROJECT COMPLETE IN EVERY ASPECT, PLUS ANY AND ALL PATCHING NECESSARY SHALL BE DONE TO THE COMPLETE SATISFACTION OF THE ARCHITECT / ENGINEER AND / OR OWNER AND SHALL BE ACCOMPLISHED IN STRICT ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS. ALL MATERIALS SHALL MATCH EXISTING WHERE APPLICABLE AND ALL CONSTRUCTION AND ALTERATION LEFT IN NEW CONDITION. 2. ALL ITEMS TO BE REMOVED SHALL BE REMOVED WITH UTMOST CARE AND WITHOUT DAMAGE, AND THOSE ITEMS NOT DESIGNATED TO BE REUSED SHALL BE DELIVERED TO THE OWNER OR DISPOSED OF AS PER HIS WRITTEN INSTRUCTIONS. 3. ALL ALTERATIONS, DEMOLITION AND REMOVAL, CUTTING AND PATCHING AND.OTHER WORK NECESSARY FOR CONSTRUCTION OF THIS CONTRACT SHALL BE PERFORMED WITHOUT ADDITIONAL COST TO THE OWNER. THIS SHALL INCLUDE REMOVAL, REROUTING, ETC. OF ALL ELECTRICAL ITEMS REQUIRED TO COMPLETE INSTALLATION INTENDED. 4. PATCH OR REPLACE ALL DAMAGED FLOOR, WALL, CEILING, ETC. SURFACES ALTERED TO ACCOMMODATE THE NEW CONSTRUCTION. PATCHED SURFACES SHALL MATCH EXISTING ADJACENT SPACES. 5. ALL CUTTING, PATCHING, DEMOLITION, REPAIRING, REPLACING, ECT. NECESSARY UNDER THIS CONTRACT WILL BE COORDINATED BY THE GENERAL CONTRACTOR. WHERE APPLICABLE COORDINATE WORK WITH UTILITY COMPANIES. LOCAL AND STATE AUTHORITIES HAVING JURISDICTION, OWNERS REPRESENTATIVE AND ALL APPLICABLE CODES. 6. WHERE ALTERATIONS TAKE PLACE IN OCCUPIED AREAS, CONTRACTOR SHALL CLEAN UP DAILY AND NOISE SHALL BE KEPT TO A MINIMUM. 7. NONE OF THE SERVICES TO EXISTING BUILDINGS SHALL BE DISRUPTED IN ANYWAY EXCEPT WITH THE WRITTEN PERMISSION OF THE OWNER. S. ALL EQUIPMENT PRESENTLY "HOT" AND REQUIRED TO BE MAINTAINED SHALL BE RETURNED TO THIS CONDITION AFTER PERFORMING THE CHANGES TO EXISTING BUILDING. REROUTE CONDUITS AND EXTEND OR REPLACE CIRCUITS AS REQUIRED. PERFORM WORK AT CONVENIENCE OF OWNER. 9. WHERE DEVICES ARE SHOWN TO BE REMOVED ON PLANS, REMOVE ALL ASSOCIATED WIRING AND CONDUIT BACK TO THE SOURCE OR MAINTAIN CONTINUITY OF THE CIRCUIT IF OTHER LOADS ARE SERVED FROM THE SAME CIRCUIT. CONSOLIDATE PARTIALLY LOADED CONVENIENCE RECEPTACLE CIRCUITS TO MAXIMIZE SPACE MADE AVAILABLE AT THE PANEL BOARD. TRACE CONSOLIDATED CIRCUITS TO VERIFY THAT THE TOTAL LOAD DOES NOT EXCEED 1920 VOLT AMPERES. 10. EXECUTE ALL WORK IN SUCH MANNER TO AVOID INTERFERENCE WITH THE USE OF PASSAGE TO AND FROM ADJOINING BUILDING OR AREAS. 11. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY DAMAGE TO EXISTING BUILDING AND TO CONTENTS THEREOF INCLUDING MACHINERY, FURNITURE, EQUIPMENT, ETC. AND DAMAGED TO BUILDINGS OR CONTENTS THEREOF DUE TO CONTRACTOR OPERATIONS, SHALL BE REPAIRED OR REPLACED AT DIRECTION OF ARCHITECT /ENGINEER, AND /OR OWNER, THE CONTRACTOR, AT NO EXTRA COST TO THE OWNER. 12. CONNECTION TO EXISTING STRUCTURES OR SYSTEMS SHALL BE MADE IN SUCH A MANNER THAT AS LITTLE TIME AS ABSOLUTELY POSSIBLE WILL BE TAKEN, AND CONTRACTOR WILL BE REQUIRED TO COORDINATE FULLY WITH OWNER IN CONNECTION WITH CONVENIENCE AND SAFETY OF ALL PERSONS INVOLVED, INCLUDING EMPLOYEES. 13. CONTRACTOR SHALL COORDINATE ALL WORK WITH OWNER TO DETERMINE OWNER'S REQUIREMENTS REGARDING ACCESS, TIME OF WORK, PROTECTION OF EXISTING CONDITIONS, ETC. PR�J- No. 18Q56 - _ - EB000C1924 LOUIS= J.14JUIRRE A .ASSWAIES P.A. - 0,04SUIL ; ING 2NclkEi_:f:S 2600 DOUGLAS RD. SUITE 605 CORAL GABLES, FLORIDA 33134 TEtEPHL'NE: (306) - 444 -1675 - - - - - - Fa: _ (3('5) 448-21405 E -:MAIL ADDRESS: -GP.AIJVNL- 6tJAAPA -CUM - Revisions: t Z aNa � 4 h Z w r V F... � .n 3� ao g C% .P" O 0 to 1 a� w, O ca 0 z wz`� pz� Z oo w :w zw LLA V °1 PERMIT SET DRAWM CIRECKEDs P.A. DATE: 09 -25 -OB SCALE: AS NOTED SEAL 1 e rr ELECTRICAL: CE5AR A%V1E P y tlCFN Qj 1• r� � _ Sheet EO.OI JOB # 20003 I