Loading...
08-1145-002ABBREVIATIONS GENERAL NOTES GENERAL DEMOLITION NOTES DRAWING INDEX A ACOUS. ACOUSTICAL L LAV LAVATORY 01. ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH CODES LISTED ON SHEET LS -1, THE A1.0 ADA AMERICANS WITH DISABILITIES ACT AM LAM LAMINATED A1.2 FLORIDA BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY /COUNTY ZONING CODES, '8' ADJ ADJUSTABLE 'C' LT LIGHT NATIONAL ELECTRICAL CODE, N.F.P.A. 101, O.S.H.A., A.D.A. & ALL OTHER APPUCABLE CODES, RULES AND AFF ABOVE FINISH FLOOR LTWT LIGHT WEIGHT REGULATIONS. AGG AGGREGATE LF OR UN FT LINEAR FEET A.C. AIR CONDITIONING 02. THE CONTRACTOR SHALL FAMILIARIZE HIM/HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE ALUM ALUMINUM M MAT MATERIAL DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY B BM BEAM ML MATCH LINE AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING BLK BLOCK MAX MAXIMUM PRIOR TO SUBMISSION OF BID. BLKG BLOCKING MECH MECHANICAL BOT BOTTOM MET OR MTL METAL 03. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL REQUIRED PERMITS TO CARRY OUT BLDG BUILDING MIN MINIMUM THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO THE BLKHD BULKHEAD MISC MISCELLANEOUS COMMENCEMENT OF WORK. MACH MACHINE MANUF MANUFACTURER 04. OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE C CAB CABINET DRAWINGS, THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE CARP CARPET N NFPA NATIONAL FIRE SHOWN OR NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION. CLG CEILING PREVENTION ASSOCIATION CEM CEMENT NIC NOT IN CONTRACT 05. EXISTING ELECTRICAL, MECHANICAL, LIFE SAFETY AND FIRE PROTECTION FIXTURES INCLUDING BUT NOT LIMITED TO, CA CENTER LINE NOM NOMINAL SURFACE /RECESSED LIGHT FIXTURES, LIGHT/EQUIPMENT SWITCHES, H.V.A.C. REGISTERS, THERMOSTATS, ACCESS PANELS, CER CERAMIC NTS NOT TO SCALE INTERCOM SPEAKERS, FIRE ALARM HORNS /STROBES /SWITCHES, HEAT /SMOKE DETECTORS, CONCEALED/ EXPOSED FIRE C.T. CERAMIC TILE O SPRINKLER HEADS AND ASSOCIATED PIPING, DUCTWORK AND ORNAMENTAL FIXTURES ARE TO REMAIN. CONTRACTOR CO CL OR CLOS CLEAN OUT CLOSET OC OH OR OPP.HD. ON CENTER OPPOSITE HAND SHALL BE RESPONSIBLE FOR REMOVAL AS REQUIRED OF EXISTING FIXTURES TO ACCOMPLISH DEMOLITION WORK AND COL COLUMN OD OUTSIDE DIAMETER NEW CONSTRUCTION WORK INDICATED IN THE CONSTRUCTION DOCUMENTS. FURTHER, THE CONTRACTOR SHALL BE CONC CONCRETE OFF OFFICE RESPONSIBLE FOR THE REINSTALLATION OF EXISTING FIXTURES IN GOOD WORKING ORDER TO MATCH ORIGINAL CMU CONCRETE MASONRY UNIT OPNG OPENING INSTALLATION) UPON COMPL.E11ON OF REPAIR WORK. CONST CONSTRUCTION OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRAl10N 06. ALL DIMENSIONS PROVIDED ARE APPROXIMATE, CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD CONT CONTINUOUS CONDITIONS. ANY DISCREPANCIES SHALL BE BROUGHT TO ARCHITECT ATTENTION BEFORE PROCEEDING WITH THE WORK. CG CORNER GUARD P PR PAIR CR CRASH RAIL PASS PASSENGER 07• CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE CU CUBIC PENT PENTHOUSE OF ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR TO D DEPT DEPARTMENT PC PRECAST STARTING WORK. DET. /DTL DETAIL Pi PANEL JOINT DIM DIAMETER P PLASTER O8. CONTRACTOR SHALL PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF DIM DIMENSION POL POLISHED THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND DN DOWN PMLD PREMOULDED THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS. DS DWG DOWN SPOUT DRAWING PNL PANEL 09. ALL WALL CEILING SURFACES WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED EPLACED TO MATCH ADJACENT OR DF DRINKING FOUNTAIN 0 QT QUARRY TILE EXISTING SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND MILDEW DAMAGE, QTM QUARRY TILE MINIATURES CRACKED WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED. E E.A. EXPOSED AGGREGATE EA EACH R RAD RADIUS 10. ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED IN ADVANCE OF PAINT FINISH. EL ELE ELEVATION (GRADE) ELEVATION (FACADE) R REINF RISER REINFORCED 11. THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT ELEV ELEVATOR REQ'D REQUIRED AREAS. CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE/FLAME SPREAD RATINGS OR MEANS OF EGRESS EP ELECTRICAL PANEL RF ROOF WITHIN THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES. EQ EQUAL RD ROOF DRAIN 12, THE CONTRACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND EQUIP EQUIPMENT RM ROOM ACCESSIBLE AT ALL TIMES. EXIST EXISTING RO ROUGH OPENING EXP.JT. OR EJ EXPANSION JOINT REFL OR REF REFLECTED 13. THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES. EXP EXPOSED RWL RAIN WATER LEADER EXT EXTERIOR 14. CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW CONSTRUCTION. ELEC ELECTRICAL EWC ELECTRIC WATER COILER 3 SECT SECTION 15. CONTRACTOR SHALL PROVIDE ALLOWANCES IN SPECIFICATIONS WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK SHT SHEET WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND WHICH MUST BE ACCOMPLISHED AT THE TIMES OTHER F FT FEET SHT MET OR SM SHEET METAL THAN NORMAL WEEKDAY WORKING HOURS FIN FINISH SIM SIMILAR FE FIRE EXTINGUISHER SID SQUARE 16. CONTRACTOR SHALL PROVIDE ALLOWANCES IN BID WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK STOPPAGES FEC FIRE EXTINGUISHER CABINET STD STANDARD ORDERED BY THE OWNER DUE TO WORK IMPACTING THE DAILY OPERATIONS OF THE FACILITY. FC FL FIRE CABINET FLOOR SS STAINLESS STEEL 17, CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6:00 FD FLOOR DRAIN STL STOR STEEL STORAGE AM AND SATURDAY & SUNDAY 24 HOURS. FLUOR FLUORESCENT STRUCT STRUCTURAL 18. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS. F.R. FIRE RATING SUSP SUSPENDED FS FULL SIZE SPECS SPECIFICATIONS 19. CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE FV FVC FIELD VERIFY FIRE VALVE CABINET RESPONSIBLE FOR THEIR PRESERVATION. ANY DAMAGE TO EXISTING SHALL BE REPAIRED AND/OR REPLACED AT NO T TEL TELEPHONE ADDTIONAL COST TO OWNER. O GALV GALVANIZED TEMP TEMPERED GA GC GAUGE GENERAL CONTRACTOR TLT. OR T01. T TOILET TREADS 20. CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS. GL GB GLASS GRAB BAR TYP TR TYPICAL TELEPHONE RECEPTACLE 21. PROVIDE WALK -OFF MATS AT ALL ENTRY / EXITS OF THE CONSTRUCTION SITE. WALK -OFF MATS MUST BE CLEANED OR GR GRADE THK THICK CHANGED DAILY TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA. GYP GYPSUM GYP BD GYPSUM WALLBOARD 22. CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF U UL UNDERWRITER MECHANICAL, ELECTRICAL AND PLUMBING WITH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WALL H HC HANDICAPPED LABORATORIES SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN SHEETS A -6.2, A -10.0 AND A -10.1 FOR SEALING HRDW HARDWARE FIRE PENETRATIONS. ALL DUCTS CROSSING FIRE RATED ASSEMBLIES SHALL HAVE FIRE DAMPERS TO MATCH THE HT HEIGHT RATING OF THE WALL. ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED. HM HOLLOW METAL V VERT VERTICAL HORIZ HORIZONTAL W VINYL TILE BARRIER 23. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER (CM), GENERAL CONTRACTOR (GC), AND THE IN INCH VB VINYL WALL COVERING SUB - CONTRACTORS (SC) TO STUDY ALL THE DRAWINGS AND DETAILS SO THAT THE INSTALLATION OF ALL NEW WORK INCAND INCANDESCENT CAN BE FULLY COORDINATED. THE CM, GC, AND SC SHALL VISIT THE SITE, INCLUDING DOING AN ABOVE CEILING ID INSIDE DIAMETER W VWC -GYP WALL COVERING - GYPSUM BOARD INSPECTION, DURING BIDDING TO SATISFY HIMSELF THAT ALL PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS OF THIS INSUL INSULATION VWC -PLAS WALL COVERING - PLASTER PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS AND/OR SITE CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE INT INTERIOR WC WET COLUMN GENERAL CONTRACTOR IN WRITING PRIOR TO BID DUE DATE. FAILURE TO DO SO WILL NOT BE ALLOWED ON A BASIS INV INVERT WATERPROOFING FOR ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OF DIFFERENCE FROM CONDITIONS INFERRED OR INDICATED WP ON THE DRAWINGS. J JT JOINT W/ WITH JST JOIST W/o WITHOUT JC JANITOR'S CLOSET WC WATER CLOSET Y YD YARD 01. CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION WORK TO OWNER'S REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND DAYS OF WEEK TO BE WORKED. - PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED PROGRESS OF OWNER'S ON SITE OPERATIONS. - COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND WITH OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA. 02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE AND BUILDING SURFACES, EQUIPMENT, AND ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL OPERATIONS. CONTRACTOR SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNER'S REPRESENTATIVE, ENGINEER AND ARCHITECT FOR VERIFICATION OF THE WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOLITION WORK. FILE WITH ARCHITECT PRIOR TO START OF WORK. 03. OCCUPANCY: OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF OWNER'S NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVITIES THAT WILL AFFECT OWNER'S NORMAL OPERATIONS INCLUDING BUT NOT LIMITED TO LOUD LOISES AND PRODUCTS WITH STRONG ODORS. 04. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES TO BE DEMOLISHED. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY OWNER INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR. 05. PARTIAL DEMOLITION AND REMOVAL STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED. 06. PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNER'S PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL AND GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING. B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING DEMOLITION OPERATIONS. C. PROTECT FLOORS /CARPETS WITH SUITABLE COVERINGS WHEN NECESSARY. D. CONSTRUCT TEMPORARY INSULATED DUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WHERE NOISY OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUSTPROOF DOORS AND SECURITY LOCKS. ALL TEMP. PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT. E. TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWO -WAY TAPE. SCREWS, NAILS, ETC. WILL NOT BE PERMITTED. (SEE DRAWING #13 ON SHEET A -6.0) F. REMOVE PROTECTIONS AT COMPLETION OF WORK. G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A 100% NEGATIVE PRESSURE BY USE OF SUITABLE FANS EQUIPED WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING.. H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. 07. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK. 08. MAINTAIN EXISTING BUILDING SYSTEMS/UTIUTIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING DEMOLITION OPERATIONS OR PROVIDE FIREWATCH. - DO NOT INTERRUPT BUILDING SYSTEMSAITTLITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING BUILDING SYSTEMS/UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES. - MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS. 09. OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE PHASE UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER. 10. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT D AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. - DO NOT USE WATER WHEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, POLLUTION AND DAMAGE TO EXISTING FINISHES. 11. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL PENDING RECEIPT OF DIRECTIVE FROM OWNER'S REPRESENTATIVE, REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS WITHOUT UNDUE DELAY. 12. REMOVE FROM BUILDING SITE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM DEMOLITION OPERATIONS. TRANSPORT AND LEGALLY DISPOSE OF OFF SITE. DEBRIS REMOVAL TO BE DONE AFTER REGULAR WORKING HOURS. - OWNER TO SURVEY AND REMOVE AND PROVIDE CERTIFICATION TO GENERAL CONTRACTOR. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS COMPLY WITH APPLICABLE REGULATIONS, LAWS, AND ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION. - BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE. 13. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS /VIDEO. - REPAIR DEMOUTION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION OR SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK. ARCHITECTURAL SYMBOLS REFERENCE SYMBOLS VICINITY MAP & PROJECT LOCATION i DOOR SYMBOL WALL CONSTRUCTION A WALL TYPE HOSPITAL PROJECT 17' 1 o DOOR NUMBER +r• ELEVATION LOCATION LOCATION INSULATION CONCRETE GRAVEL or CEMENT CONCRETE NUMBER Blanket PRECAST CRUSHED MORTAR .. L I STONE PLASTER ROOM NAME OFFICE ROOM NAME EXTERIOR &INTERIOR 4 SX-O 2 �_r__� • • -- -- - - -� -- - " - - -- -- - - -- FINISH SCHEDULE ELEVATION SYMBOL _ 1 - -, ^I . J sr i XX ROOM NUMBER 3 SHEET NUMBER EARTH TILE SOLID CONC. CONCRETE MARBLE I �"' I t r It Ceramic or MAS. UNIT MASONRY CONSTRUCTION DETAIL Structural UNIT BUILDING. PARTIAL DETAIL NUMBER SYMBOL DETAIL NUMBER i 1 _ - - -- -- - - -- & DETAIL SECTION A -1 SHEET NUMBER i -g ; t l '- �4P L - SYMBOL A -1 SHEET NUMBER +� r4_ SHEET WOOD WOOD WOOD BRICK METAL Finished Blocking Blocking Large WINDOW TYPES 1 WINDOW TYPE COLUMN REFERENCE -- NUMBER OR LETTER €�- -1" -' Continuous Intermittent Scale ~-- -�-••} '� -- ir�j O ..F{01r - - -- r--- �1 GENERAL NOTES ABCDEFG -NOTE --- ,r � (t�ej GLASS GLASS INSULATION SLAB ELEVATION TOP OF CONCRETE ELEVATION 0.00 yrr _ � _J DETAIL NUMBER Small Large Rlgld Scale Scale - - - - - - -- - DRAWING TITLES 1 ABCDEF � �--1 I DRAWING REVISIONS REVISION NUMBER A .I O -I SCALE: Al r » _._.. -j 1 STEEL STEEL PLYWOOD SHEET NUMBER ,Adjacent Zoning O Small Scale Large Scale X NOTE DEMOLITION NOTE 0- NOTE THIS DRAWING SO= Qt 'Of soum Miami Zoteng'hfap Last Updated Noy 2001. ARCHITECTURE STRUCTURAL SHEET 1 COVER STRUCTURAL AO.0 INDEX STRUCTURAL A1.0 SEVENTH FLOOR ROOF LEVEL PLAN -NEW WORK AM ROOF PLAN AREA 'A' A1.2 ROOF PLAN AREA '8' A1.3 ROOF PLAN AREA 'C' A2.0 EXTERIOR ELEVATION A3.0 ENELARGED PLAN AND DETAILS STRUCTURAL S -1 STRUCTURAL SHEET 1 S -2 STRUCTURAL SHEET 2 S -3 STRUCTURAL SHEET 3 S -4 STRUCTURAL SHEET 4 S -5 STRUCTURAL SHEET 5 CALCULATIONS CITY OF SOUTH MIAMI BUILDING DEPT. STRUCTURAL SECTION APPROVED BY: DATE ----- ba Bermello Aiamil & Partners, Inc. Architecture Engineering Planning Interior Design Landscape Architecture 2601 South Bayshore Drive 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 STRUCTURAL ENGINNER: STRUCTURAL ENGINEER INFORMATION DONNE16 DU(UESNE d ALBAISA PA CON LTI G E ONE ❑RAMON R. DONNELL PE OOfl6Y0 ❑PEDRO 1 DUQUEBNE P.E ; OOUl1 ❑AIDA M. ALBAISA P.6 0045130 �P�O • N � • H0�40�`. � U- 65 7 4, REVISIONS: PROJECT NAME: SOUTH MIAMI HOSPITAL EAST TOWER SCREENING PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN COMM. NO. 40018.100 SCALE: uBr -1,4r DATE: SEPTEMBER 18, 2008 DRAWN: CHECKED: B.H. CADD FILE: H:PROJECTS DRAWING TITLE: INDEX SHEET NO. AOmO