08-1140-003I:Dj a a a A
AAMIL
I ' . I ;Aw •
INSPECTOR
VERIFY THAT THE EXISTING SPRINKLERS AND THE NEW SPRINKLERS' RESPONSE
MATCH.
THE CONTRACTOR SHALL REVISED THE SHOP DRAWING AND INDICATE THE
MANUFACTURER, TEMPERATURE, SIZE, RESPONSE AND SIN NUMBER OF THE
EXISTING SPRINKLER.
THIS WAS REQUESTED ON THE DISAPPROVED COMMENT NUMBER 6
INSPECTOR
VERIFY THAT THE PIPE SIZES INDICATED ON THE SHOP DRAWING MATCH THE PIPE IN
THE FIELD.
SPRINKLER HEAD LEGEND
SYM I QTY. I NAME I FINISH I TEMP K NPT. ORIF. MFG. MODEL# I SIN #
CO 1 3 ICONCEALED I WHITE 1155- 1 5.6 1 1/2- 1 1/2- IVIKING I HORIZON MIRAGEIVK4041
= 3 1 TOTAL SPRINKLERS ON THIS PAGE JIM TOTAL SPRINKLERS ON THIS JOB 1 3 1
I WN &A I I
Hanger Schedule'
Nominal Pipe Size
•
is
1%,
-13r
2'-
2f '-'
Steel pipe exceR
N/A
12-0
12-0
:5-3
-15-0-
-15-0-
threaded lightwall
4.^LL THREAD ROD
5. HANGER RING
CSIZE VARIES, SEE PLAN)
Steel pipe
N/A
12-0
12-0
12-0
12-0
12-0
threaded lightwall
Nominal Pipe Size
3'
3! 'r
4'
5#
6'
8&
Steel pipe except
15-0
15-0
15-0
15-0
15-0
15-0
threaded lightwall
Steel pipe
12-0
N/A
N/A
N/A
N/A
N/A
threaded lightwall
I
I
-1- 3 - - - - - - - - - - - 3 - 6
; ^"OVE" THAN
7
41 W Le"alf" SHAD. ae
supVC07M sy A HANGM
s
SCHEDULE
EXIST BRANCHLINE OR MAIN
NEW TEE
(SIZE VARIES, SEE PLAN>
al ARMOVER.w
(SIZE VARIES, SEE PLAN>
1' 90• ELL OR TEE
DROP CSIZE VARIES, SEE PLAN.
MAY FEED TEE SUPPLYING
MORE THAN ONE SPRINKLER>
a NEW WHITE CONCEALED
PENDENT FIRE SPRINKLER
a. CEILING.
NIPPLE
REDUCING COUPLING
CSIZE VARIES, SEE PLAN>
SPRINKLER(S) DETAIL
WiCEAUD SPMMQM WDWS) NJA
VA
APPRO c%L AS NOTED
OFFICE CO
Py
FORWARD MATERIAL AND TEST CERTIFICATES
TO A.H.J. FIRE RESCUE AT COMPLETION OF PROJECT
I
GENERAL NOTES:
a A-
SCHEDULE
2
1. CONCRETE SLAB
OMDER DRIVEN STUD
2.POWDER DRIVEN STUD
CSIZE VARIES, SEE PLAN>
ALL TM2EAD_ ROD SYZES
3. ROD COUPLING
FOR I' THRU 41 Pipe
(SIZE VARIES; SEE PLAN>
3/01 is TO BE USED
V--,
4.^LL THREAD ROD
5. HANGER RING
CSIZE VARIES, SEE PLAN)
45. PIPE
HANGER DETAIL
-1- 3 - - - - - - - - - - - 3 - 6
; ^"OVE" THAN
7
41 W Le"alf" SHAD. ae
supVC07M sy A HANGM
s
SCHEDULE
EXIST BRANCHLINE OR MAIN
NEW TEE
(SIZE VARIES, SEE PLAN>
al ARMOVER.w
(SIZE VARIES, SEE PLAN>
1' 90• ELL OR TEE
DROP CSIZE VARIES, SEE PLAN.
MAY FEED TEE SUPPLYING
MORE THAN ONE SPRINKLER>
a NEW WHITE CONCEALED
PENDENT FIRE SPRINKLER
a. CEILING.
NIPPLE
REDUCING COUPLING
CSIZE VARIES, SEE PLAN>
SPRINKLER(S) DETAIL
WiCEAUD SPMMQM WDWS) NJA
VA
APPRO c%L AS NOTED
OFFICE CO
Py
FORWARD MATERIAL AND TEST CERTIFICATES
TO A.H.J. FIRE RESCUE AT COMPLETION OF PROJECT
I
GENERAL NOTES:
a A-