HVAC GENERAL NOTES
1. HVAC DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND REPRESENT
EXISTING CONDITIONS BASED ON DRAWINGS AND SITE OBSERVATIONS.
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL ACTUAL
CONDITIONS INCLUDING, DUCTWORK AND PIPING LOCATIONS AND SIZES.
2. DUE TO DRAWINGS BEING DIAGRAMMATICAL IN NATURE RISERS AND
DROPS ARE NOT SHOWN - CONTRACTOR SHALL INCLUDE THESE IN THE
BID - WHERE POSSIBLE ALL RISERS AND DROPS SHALL BE CONSTRUCTED
USING 45 DEGREE OR LONG RADIUS ELBOWS.
3. PROVIDE AND INSTALL NECESSARY DUCTWORK TRANSITIONS AND PIPING
INCREASERS /REDUCERS AS REQUIRED FOR EQUIPMENT CONNECTIONS.
CONSULT MANUFACTURER'S DATA FOR ACTUAL DUCTWORK AND PIPING
CONNECTIONS SIZES, INCLUDING, BUT NOT LIMITED TO THOSE SHOWN.
4. PROVIDE MANUAL VOLUME DAMPERS AT ALL LOW PRESSURE BRANCH
DUCTS TO INDIVIDUAL DIFFUSERS AND GRILLES. PROVIDE DAMPERS AS
CLOSE AS POSSIBLE FOR BRANCH CONNECTION AT MAIN. SEE DIFFUSER
AND GRILLE SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
5. SCHEDULE NEW CONSTRUCTION WORK WITH THE OWNER WELL IN
ADVANCE.
6. ALL FINISHES AND SURFACES TO REMAIN WHICH ARE DAMAGED DURING
CONSTRUCTION WORK SHALL BE REPAIRED OR REPLACED TO THE
SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER.
7. DO NOT BLOCK SERVICE SPACE ON EQUIPMENT WITH
PIPING, DUCTWORK, ETC..
8. NO PIPING OR DUCTWORK SHALL BE INSTALLED UNTIL IT IS
COORDINATED WITH ALL OTHER TRADES AFFECTED. PROVIDE ALL
OFFSETS REQUIRED TO AVOID INTERFERENCE WITH OTHER TRADES=
EXISTING CONDITIONS AND WITH THE STRUCTURE, INCLUDING, BUT NOT
LIMITED TO, THOSE SHOWN.
9. IF NO SIZE IS SHOWN FOR DUCT SERVING DIFFUSER OR GRILLES, USE
SIZE SHOWN ON DIFFUSER AND GRILLE SCHEDULE.
10. DUCTWORK ROUTED PARALLEL TO A WALL, RATED OR CORRIDOR SHALL
BE INSTALLED WITH MINIMUM 6' CLEARANCE TO ALLOW FOR INSPECTION
OF WALL PENETRATIONS. CONTRACTOR SHALL PROVIDE 12' CLEARANCE
WHERE POSSIBLE. COORDINATE.
K
11. REFER TO DETAIL SHEETS AND SPECIFICATIONS FOR ADDITIONAL
INSTALLATION REQUIREMENTS.
12. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF EQUIPMENT AND
ITEMS TO BE REMOVED TO THE OWNER. ALL ITEMS THAT THE OWNER
WISHES TO RETAIN SHALL BE TURNED OVER TO OWNER AND THE
REMAINDER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A
PROPER MANNER BY CONTRACTOR.
13. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL WORK
NECESSARY TO PREPARE THE STRUCTURE FOR THE INSTALLATION
AND /OR DEMOLITION WORK OF THE MECHANICAL SYSTEMS. ALL HOLES,
OPENINGS AND ANY DAMAGED MATERIALS OR SURFACES SHALL BE
REPAIRED AND FINISHED TO MATCH EXISTING.
14. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE
REQUIREMENTS OF THE OWNER.
15. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE BASED ON
AVAILABLE RECORD DRAWINGS. THIS INFORMATION IS ONLY PARTIALLY
VERIFIED. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AND
INVESTIGATE ALL CONDITIONS THAT AFFECTS THE WORK PRIOR TO
SUBMITTING THE BID.
16. ALL DIFFUSERS IN SAME SPACE SHALL HAVE THE SAME FULL FACE SIZE
USING LARGEST SIZE REQUIRED FROM DIFFUSER AND GRILLE SCHEDULE.
HVAC LEGEND
DUCTWORK
�- SUPPLY DUCTWORK RISE IN DUCTWORK
RETURN OR EXHAUST D• _ DROP IN DUCTWORK
DUCTWORK
i 340 �_ SUPPLY DIFFUSER & s - CONICAL TEE CONN.
AIR QUANTITY
® 120 R. -- ETURN GRILLE & AIR - BELLMOUTH CONN.
QUANTITY
® 160 E. - EXHA ITT GRILLE & AIR 45• THROAT TAP
-�- BRANCH CONNECTION
T �S- THERMOSTAT (ADJUST.1 W ?;RADIUS ELBOW R /W =1.5
10000
FC7 REHEAT BOX & SYMBOL R
ELBOW G VANES IN
DIVIDED FLOW
FITTINGS
M.V.D. MANUAL VOL. DAMPER
A.D. ACCESS DOOR
ki
AIR DEVICE SCHEDULE
1. AIR DEVICE SIZES & SCHEDULED AIRFLOW ARE BY THIS SCHEDULE UNLESS OTHERWISE NOTED ON HVAC FLOOR PLANS.
2. BRANCH & OPTIONAL BRANCH DUCT SIZES ARE BY THIS SCHEDULE UNLESS OTHERWISE NOTED ON HVAC FLOOR PLANS.
3. ALL AIR DEVICES INSTALLED IN INACCESSIBLE AND /OR DRYWALL CEILINGS SHALL BE PROVIDED WITH MANUAL OPPOSED BLADE DAMPERS.
4- ALL AIR DEVICES INSTALLED IN ACCESSIBLE AND /OR LAY -IN CEILINGS SHALL HAVE A
MANUAL VOLUME DAMPER INSTALLED IN THE BRANCH TAKE -OFF.
5. MAXIMUM PRESSURE DROP FOR ALL AIR DEVICES SHALL NOT EXCEED 0.10 IN. W.G. BRANCH SQUARE TO
6. ALL AIR DEVICES SHALL BE WHITE UNLESS OTHERWISE NOTED. MAIN MVD RUNOUT ROUND ADAPTER
7. MAXIMUM NC RATING FOR ALL AIR DEVICES SHALL NOT EXCEED 25.
B. ALL AIR DEVICES SHALL BE ALUMINUM CONSTRUCTION UNLESS OTHERWISE NOTED. DIFFUSER
9. THROW VALUES ARE GIVEN FOR TERMINAL VELOCITIES OF 150, 100 & 50 FPM RESPECTIVELY. OR GRILLE
MARK
MFGR & MODEL
CFM RANGE
FACE SIZE !
MODULE SIZE
NECK SIZE
BRANCH DUCT SIZE
THROW
REMARKS
A
TITUS TMS -AA
0 - 100
12x12 / 12x12
610
8x6 ! 610
2 -3 -6
7000/5800
B
TITUS TMS -AA
101 - 200
24x24 / 24x24
810
10x6 / 810
3 -5 -9
-
C
TITUS TMS -AA
201 - 325
24X24 / 24X24
1010
12X8 / 10'0
4 -6 -13
D
TITUS TMS -AA
326 - 525
24x24 / 24x24
1210
14x10 f 12'0
5 -8 -16
E
TITUS TMS -AA
526 - 700
24x24 / 24x24
1410
16x10 / 1410
6 -10 -19
F
TITUS 300FL
0 - 125
8x6 / 10x8
8x6
8x6 / -
8 -11 -16
G
TITUS 300FL
126 - 300
12x8 / 14x10
12x8
12x8 / -
12 -18 -25
H
TITUS 300FL
301 - 550
18x10 / 20x12
18x10
18x1O ! -
16 -23 -34
1
TITUS 50F
0 - 180
8x8 / 10x10
8x8
10x6 / 830
-
2
TITUS 50F
181 - 300
10x10 / 24x24
10x1O
12x8 / 1010
-
3
TITUS 50F
301 - 450
12x12 / 24x24
12x12
14x10 / 120
-
4
TITUS 50F
451 - 650
14x14 / 24x24
14x14
16x10 ! 14'0
-
5
TITUS 50F
651 - 850
16x16 / 24x24
16x16
22x10 / 16tD
-
6
TITUS 50F
851 - 1000
18x18 / 24x24
18x18
28x10 / 18'0
-
7
TITUS 50F
1001 - 1900
18x18 / 24x24
22x22
8
TITUS 350FL
0 - 125
8x6 / IOx8
8x6
8x6 / -
-
9
TITUS 350FL
126 - 285
12x8 / 14x10
10x8
12x8 / -
-
10
TITUS 350FL
286 - 440
18x1O / 20x12
18x10
18x10
0
2
0
4
TEST i BALANCE
5
1. PRECONSTRUCTION:
PRIOR TO COMMENCEMENT OF ANY HVAC WORK AN INDEPENDENT AABC OR NEBB
CERTIFIED T &B CONTRACTOR SHALL MEASURE AND DOCUMENT, IN A TYPED REPORT
THE AIRFLOW QUANTITIES PROVIDED OR EXHAUSTED BY ALL EXISTING
EQUIPMENT AND DUCTS TO REMAIN THAT SERVE OR ARE SERVED FROM THE
RENOVATED AREA. SUBMIT TYPE WRITTEN DATA TO ENGINEER FOR REVIEW.
THE FOLLOWING INFORMATION IS REQUIRED:
- AIR FLOW OF ALL AIR DEVICES IN RENOVATED AREA(S).
- AIR FLOW (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE RENOVATED
AREA(S).
- AIR FLOW AT UNITS (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE
RENOVATED AREA(S).
- SUCTION AND DISCHARGE STATIC AT UNITS SERVING THE RENOVATED AREA(S).
- MEASURED FAN RPM,MOTOR AMPERAGE FOR ALL UNITS SERVING THE RENOVATED
AREA(S).
- PROVIDE EXISTING UNIT AND MOTOR NAME PLATE DATE.
- WATERFLOW TO COILS AS APPLICABLE.
2. FINAL CONSTRUCTION:
UPON COMPLETION OF THE HVAC RENOVATION WORK, THE SAME CONTRACTOR SHALL
REBALANCE THE NEW AND EXISTING EQUIPMENT AND DUCTS TO PROVIDE INDICATED
AIR QUANTITIES TO THE RENOVATED SPACE. ANY ADDITION OF DAMPERS,
ADJUSTMENTS, (FAN SPEED, CHANGE OUT OF PULLEYS, ETC.) REQUIRED FOR THIS SHALL
BE INCLUDED IN THIS CONTRACTORS PROPOSAL.
3. FINAL REPORT:
IS FINAL TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND ACCEPTANCE
ONE WEEK PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE.
HVAC DESIGN REQUIRES
UNIT
YES
NO
DUCT SMOKE DETECTORS)
X
EXISTING
FIRE DAMPER(S)
-
X
SMOKE DAMPER(S)
EF -2
X
FIRE RATED ENCLOSURE
-
X
FIRE RATED ROOF /FLOOR CEILING ASSEMBLY
7000/5800
X
FIRE STOPPING (SEE ARCH.)
-
X
SMOKE CONTROL
0/0
X
4
AIR BALANCE SCHEDULE
UNIT
SUPPLY
OLD /NEW
(CFM)
RETURN
OLD /NEW
(CFM)
OUTSIDE
OLD /NEW
(CFM)
EXHAUST
OLD /NEW
(CFM)
EXISTING
-
-
-
2920/2920
EF -2
-
-
-
3625/4325
EXISTING
RTU -RAD
7000/5800
4630/4530
2370/1270
-
RTU -LA
1800/3600
0/0
1800/3600
-
RTU -2
2375/2375
0/0
2375/2375
-
TOTALS
11,175/11,77514630/45301
6545/7245
6545/7245
NOTE: AHU -RAD AND AHU -LA HAS MERV -14 FINAL FILTERS AND SMOKE
DETECTORS IN THE SUPPLY AND RETURN DUCTS. GAUGES FOR FILTERS
AND EF- 1.2,3.4,5 & 6 SERVE ADJACENT AREA.
MECHANICAL DEMOLITION NOTES
1. FOR EQUIPMENT AND SYSTEMS TO REMAIN IT SHALL BE-TAE CONTRACTOR'S - n
RESPONSIBILITY TO VERIFY THE CONDITION OF, EXACT SIZES AND LOCATION OF
EXISTING DUCT AND PIPING ETC. BEFORE DEMOLITION WORK IS BEGUN. REPORT
ANY DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD .CONDMONS TO THE - -
OWNER AND ENGINEER PRIOR TO THE COMMENCEMENT :QF - CEMOLITION WGRK. m
2. REMOVE THE INDICATED HVAC ITEMS AS SHOWN ON PL -ANS,- THIS - INCLUDES ALL,
HANGERS, STRAPS AND RELATED MATERIAL. AS DIRECTED_THfS NAa'wtRiAL
SHALL BE REMOVED FROM THE SITE OR TURNED OVER TO THE OWNER (AS
DIRECTED BY THE OWNER).
3. CAP AND SEAL AIR TIGHT ALL POINTS AT WHICH DUCTWORK IS REMOVED FROM
DUCTWORK THAT WILL REMAIN.
4. PATCH AND MATCH OPENINGS IN WALLS TO MAINTAIN THE INTEGRITY OF THE
WALL WHERE AIR DEVICES, DUCTS, PIPING, ETC. HAVE BEEN REMOVED.
(MAINTAIN THE EXISTING RATINGS).
5. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE
ROUTING OF NEW DUCTWORK BEFORE FABRICION BEGINS AS RISES AND
DROPS MAY BE NECESSARY DUE TO EXISTING FIELD CONDITIONS.
SEQUENCE OF OPERATION
UPON ACTIVATION OF ANY FIRE ALARM DEVICE IN THE AREA SERVED
BY ANY AIR HANDLING UNIT OR EXHAUST FAN, ALL EQUIPMENT AND
ASSOCIATED FSD'S SHALL DE- ENERGIZE. FANS IDENTIFIED AS EXHAUSTING
HAZARDOUS MATERIAL SHALL RUN CONTINUOUSLY.
HAZARDOUS MATERIAL •
1. PORTIONS OF THE EXISTING SYSTEM MAY CONTAIN HAZARDOUS MATERIAL (ASBESTOS).
COORDINATE WITH THE OWNER TO DETERMINE THE LOCATION AND TYPES OF
HAZARDOUS MATERIALS.
2. THE OWNER IS RESPONSIBLE FOR THE IDENTIFICATION, REMOVAL AND DISPOSAL OF
HAZARDOUS MATERIAL AND IS NOT TO BE INCLUDED AS PART OF THE WORK OF THIS
CONTRACT UNLESS SPECIFICALLY IDENTIFIED AS SUCH.
3.I17 ANY MATERIAL APPEARS TO CONTAIN HAZARDOUS MATERIAL AND WAS NOT PREVIOUSLY
IDENTIFIED. THE CONTRACTOR IS TO INFORM THE OWNER TO RECEIVE INSTRUCTIONS ON HOW
TO PROCEED.
AHU OPERATION DURING
THE USE OF NEW OR EXISTING AIR HANDLING UNITS DURING CONSTRUCTION IS PROHIBITED UNLESS
APPROVED BY THE OWNER AND THE PROCEDURES OUTLINED IN THIS PARAGRAPH ARE FOLLOWED RIGIDLY.
1. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK AND AIR HANDLING UNITS FROM THE
ACCUMULATION OF DIRT AND DUST USUALLY ASSOCIATED WITH THE FINISHING STAGES OF THE
CONSTRUCTION WORK.
2. DUCTWORK STORED ON SITE AWAITING INSTALLATION SHALL BE CAREFULLY EXAMINED AND THOROUGHLY
CLEANED BEFORE PLACEMENT IN ITS FINAL LOCATION. THE ENDS OF DUCTWORK SHALL BE CLOSED DURING
CONSTRUCTION.
3. THE AIR HANDLING UNITS WILL BE ALLOWED TO OPERATE DURING THE FINISHING STAGES OF THE GENERAL
WORK PROVIDED THE PRE - FILTERS ARE IN PLACE AND THE ENDS OF ALL RETURN AIR INLETS ARE
COVERED WITH ROLL -UP FILTER MATERIAL.
4. WHEN THE SPACE IS TURNED OVER TO THE OWNER, THE CONTRACTOR SHALL REMOVE ALL FILTERS USED
DURING CONSTRUCTION AND REPLACE THEM WITH NEW FILTERS.
5. USE OF NEW AHU'S DURING CONSTRUCTION IS NOT ALLOWED.
HVAC DRAWING INDEX
SHEET
NO.
SHEET TITLE
MO.O
DRAWING INDEX, LEGENDS, AND SCHEDULES
MO.1
SCHEDULES AND DEi'AILS - HVAC
MO.2
SHEET SPECIFICATION - HVAC
M1.0
PARTIAL FLOOR PLAN - NEGATIVE AIR PRESSURE PLAN - HVAC
M1.1
PARTIAL FLOOR PLAN - DEMOLITION - HVAC
M2.1
PARTIAL FLOOR PLAN - NEW WORK - HVAC
5
0
BERMELLO AJAMIL & PARTNERS, INC.
Architecture •i • Planning
Interior Design Landscape Architecture
2601 South Bayshore Drive 10th Floor
Florida
# 859-2050 1 860-3700
Y SOUTH
HOSPITAL
a���`•
6200 SW 73 STREET, MIAMI, FLORIDA
a
Smith
SS11 Seckman
Reid, Inc.
600 West Hillsboro, Suite 300
Deerfield Beach, FL 33441
(954) 421 -1260
FAX: (954) 421 -1466
. www.ssr- inc.com
Firm Certification - EB- 0000857
Alfred Esquivel PE - 45863
Bruce W. Peek PE - 35901
Donald Netinho PE - 48454
Erik S. Walter PE - 63929
John E. Moulder PE - 33200
Michael A. Steward PE - 65701
Unman A.Tariq PE - 66485
SSR JOB # 0732091.0
C'
N :1►1 .4 [*1&*]
PROJECT
SOUTH G. MI HOSPI
LINEAR O.
OBI UPGRADE
PROJECT ADDRESS:
6200 SW 73 STREET
Miami, Florida ..;.
KEY PLAN
#1
COMM. NO.
SCALE: AS SHOWN
DATE: 12 -20 -2007
DRAWN:
CHECKED:
A CADD FILE:
DRAWING TITLE:
DRAINING INDEX,
LEGENDS AND
SCHEDULES
SHEET NO.
�ili7