Loading...
08-1048-01014 n M A A 40 LLJ 40 0 HVAC GENERAL NOTES 1. HVAC DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND REPRESENT EXISTING CONDITIONS BASED ON DRAWINGS AND SITE OBSERVATIONS. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL ACTUAL CONDITIONS INCLUDING, DUCTWORK AND PIPING LOCATIONS AND SIZES. 2. DUE TO DRAWINGS BEING DIAGRAMMATICAL IN NATURE RISERS AND DROPS ARE NOT SHOWN - CONTRACTOR SHALL INCLUDE THESE IN THE BID - WHERE POSSIBLE ALL RISERS AND DROPS SHALL BE CONSTRUCTED USING 45 DEGREE OR LONG RADIUS ELBOWS. 3. PROVIDE AND INSTALL NECESSARY DUCTWORK TRANSITIONS AND PIPING INCREASERS /REDUCERS AS REQUIRED FOR EQUIPMENT CONNECTIONS. CONSULT MANUFACTURER'S DATA FOR ACTUAL DUCTWORK AND PIPING CONNECTIONS SIZES, INCLUDING, BUT NOT LIMITED TO THOSE SHOWN. 4. PROVIDE MANUAL VOLUME DAMPERS AT ALL LOW PRESSURE BRANCH DUCTS TO INDIVIDUAL DIFFUSERS AND GRILLES. PROVIDE DAMPERS AS CLOSE AS POSSIBLE FOR BRANCH CONNECTION AT MAIN. SEE DIFFUSER AND GRILLE SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. 5. SCHEDULE NEW CONSTRUCTION WORK WITH THE OWNER WELL IN ADVANCE. 6. ALL FINISHES AND SURFACES TO REMAIN WHICH ARE DAMAGED DURING CONSTRUCTION WORK SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. 7. DO NOT BLOCK SERVICE SPACE ON EQUIPMENT WITH PIPING, DUCTWORK, ETC.. 8. NO PIPING OR DUCTWORK SHALL BE INSTALLED UNTIL IT IS COORDINATED WITH ALL OTHER TRADES AFFECTED. PROVIDE ALL OFFSETS REQUIRED TO AVOID INTERFERENCE WITH OTHER TRADES= EXISTING CONDITIONS AND WITH THE STRUCTURE, INCLUDING, BUT NOT LIMITED TO, THOSE SHOWN. 9. IF NO SIZE IS SHOWN FOR DUCT SERVING DIFFUSER OR GRILLES, USE SIZE SHOWN ON DIFFUSER AND GRILLE SCHEDULE. 10. DUCTWORK ROUTED PARALLEL TO A WALL, RATED OR CORRIDOR SHALL BE INSTALLED WITH MINIMUM 6' CLEARANCE TO ALLOW FOR INSPECTION OF WALL PENETRATIONS. CONTRACTOR SHALL PROVIDE 12' CLEARANCE WHERE POSSIBLE. COORDINATE. K 11. REFER TO DETAIL SHEETS AND SPECIFICATIONS FOR ADDITIONAL INSTALLATION REQUIREMENTS. 12. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF EQUIPMENT AND ITEMS TO BE REMOVED TO THE OWNER. ALL ITEMS THAT THE OWNER WISHES TO RETAIN SHALL BE TURNED OVER TO OWNER AND THE REMAINDER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A PROPER MANNER BY CONTRACTOR. 13. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL WORK NECESSARY TO PREPARE THE STRUCTURE FOR THE INSTALLATION AND /OR DEMOLITION WORK OF THE MECHANICAL SYSTEMS. ALL HOLES, OPENINGS AND ANY DAMAGED MATERIALS OR SURFACES SHALL BE REPAIRED AND FINISHED TO MATCH EXISTING. 14. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS OF THE OWNER. 15. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE BASED ON AVAILABLE RECORD DRAWINGS. THIS INFORMATION IS ONLY PARTIALLY VERIFIED. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AND INVESTIGATE ALL CONDITIONS THAT AFFECTS THE WORK PRIOR TO SUBMITTING THE BID. 16. ALL DIFFUSERS IN SAME SPACE SHALL HAVE THE SAME FULL FACE SIZE USING LARGEST SIZE REQUIRED FROM DIFFUSER AND GRILLE SCHEDULE. HVAC LEGEND DUCTWORK �- SUPPLY DUCTWORK RISE IN DUCTWORK RETURN OR EXHAUST D• _ DROP IN DUCTWORK DUCTWORK i 340 �_ SUPPLY DIFFUSER & s - CONICAL TEE CONN. AIR QUANTITY ® 120 R. -- ETURN GRILLE & AIR - BELLMOUTH CONN. QUANTITY ® 160 E. - EXHA ITT GRILLE & AIR 45• THROAT TAP -�- BRANCH CONNECTION T �S- THERMOSTAT (ADJUST.1 W ?;RADIUS ELBOW R /W =1.5 10000 FC7 REHEAT BOX & SYMBOL R ELBOW G VANES IN DIVIDED FLOW FITTINGS M.V.D. MANUAL VOL. DAMPER A.D. ACCESS DOOR ki AIR DEVICE SCHEDULE 1. AIR DEVICE SIZES & SCHEDULED AIRFLOW ARE BY THIS SCHEDULE UNLESS OTHERWISE NOTED ON HVAC FLOOR PLANS. 2. BRANCH & OPTIONAL BRANCH DUCT SIZES ARE BY THIS SCHEDULE UNLESS OTHERWISE NOTED ON HVAC FLOOR PLANS. 3. ALL AIR DEVICES INSTALLED IN INACCESSIBLE AND /OR DRYWALL CEILINGS SHALL BE PROVIDED WITH MANUAL OPPOSED BLADE DAMPERS. 4- ALL AIR DEVICES INSTALLED IN ACCESSIBLE AND /OR LAY -IN CEILINGS SHALL HAVE A MANUAL VOLUME DAMPER INSTALLED IN THE BRANCH TAKE -OFF. 5. MAXIMUM PRESSURE DROP FOR ALL AIR DEVICES SHALL NOT EXCEED 0.10 IN. W.G. BRANCH SQUARE TO 6. ALL AIR DEVICES SHALL BE WHITE UNLESS OTHERWISE NOTED. MAIN MVD RUNOUT ROUND ADAPTER 7. MAXIMUM NC RATING FOR ALL AIR DEVICES SHALL NOT EXCEED 25. B. ALL AIR DEVICES SHALL BE ALUMINUM CONSTRUCTION UNLESS OTHERWISE NOTED. DIFFUSER 9. THROW VALUES ARE GIVEN FOR TERMINAL VELOCITIES OF 150, 100 & 50 FPM RESPECTIVELY. OR GRILLE MARK MFGR & MODEL CFM RANGE FACE SIZE ! MODULE SIZE NECK SIZE BRANCH DUCT SIZE THROW REMARKS A TITUS TMS -AA 0 - 100 12x12 / 12x12 610 8x6 ! 610 2 -3 -6 7000/5800 B TITUS TMS -AA 101 - 200 24x24 / 24x24 810 10x6 / 810 3 -5 -9 - C TITUS TMS -AA 201 - 325 24X24 / 24X24 1010 12X8 / 10'0 4 -6 -13 D TITUS TMS -AA 326 - 525 24x24 / 24x24 1210 14x10 f 12'0 5 -8 -16 E TITUS TMS -AA 526 - 700 24x24 / 24x24 1410 16x10 / 1410 6 -10 -19 F TITUS 300FL 0 - 125 8x6 / 10x8 8x6 8x6 / - 8 -11 -16 G TITUS 300FL 126 - 300 12x8 / 14x10 12x8 12x8 / - 12 -18 -25 H TITUS 300FL 301 - 550 18x10 / 20x12 18x10 18x1O ! - 16 -23 -34 1 TITUS 50F 0 - 180 8x8 / 10x10 8x8 10x6 / 830 - 2 TITUS 50F 181 - 300 10x10 / 24x24 10x1O 12x8 / 1010 - 3 TITUS 50F 301 - 450 12x12 / 24x24 12x12 14x10 / 120 - 4 TITUS 50F 451 - 650 14x14 / 24x24 14x14 16x10 ! 14'0 - 5 TITUS 50F 651 - 850 16x16 / 24x24 16x16 22x10 / 16tD - 6 TITUS 50F 851 - 1000 18x18 / 24x24 18x18 28x10 / 18'0 - 7 TITUS 50F 1001 - 1900 18x18 / 24x24 22x22 8 TITUS 350FL 0 - 125 8x6 / IOx8 8x6 8x6 / - - 9 TITUS 350FL 126 - 285 12x8 / 14x10 10x8 12x8 / - - 10 TITUS 350FL 286 - 440 18x1O / 20x12 18x10 18x10 0 2 0 4 TEST i BALANCE 5 1. PRECONSTRUCTION: PRIOR TO COMMENCEMENT OF ANY HVAC WORK AN INDEPENDENT AABC OR NEBB CERTIFIED T &B CONTRACTOR SHALL MEASURE AND DOCUMENT, IN A TYPED REPORT THE AIRFLOW QUANTITIES PROVIDED OR EXHAUSTED BY ALL EXISTING EQUIPMENT AND DUCTS TO REMAIN THAT SERVE OR ARE SERVED FROM THE RENOVATED AREA. SUBMIT TYPE WRITTEN DATA TO ENGINEER FOR REVIEW. THE FOLLOWING INFORMATION IS REQUIRED: - AIR FLOW OF ALL AIR DEVICES IN RENOVATED AREA(S). - AIR FLOW (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE RENOVATED AREA(S). - AIR FLOW AT UNITS (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE RENOVATED AREA(S). - SUCTION AND DISCHARGE STATIC AT UNITS SERVING THE RENOVATED AREA(S). - MEASURED FAN RPM,MOTOR AMPERAGE FOR ALL UNITS SERVING THE RENOVATED AREA(S). - PROVIDE EXISTING UNIT AND MOTOR NAME PLATE DATE. - WATERFLOW TO COILS AS APPLICABLE. 2. FINAL CONSTRUCTION: UPON COMPLETION OF THE HVAC RENOVATION WORK, THE SAME CONTRACTOR SHALL REBALANCE THE NEW AND EXISTING EQUIPMENT AND DUCTS TO PROVIDE INDICATED AIR QUANTITIES TO THE RENOVATED SPACE. ANY ADDITION OF DAMPERS, ADJUSTMENTS, (FAN SPEED, CHANGE OUT OF PULLEYS, ETC.) REQUIRED FOR THIS SHALL BE INCLUDED IN THIS CONTRACTORS PROPOSAL. 3. FINAL REPORT: IS FINAL TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND ACCEPTANCE ONE WEEK PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE. HVAC DESIGN REQUIRES UNIT YES NO DUCT SMOKE DETECTORS) X EXISTING FIRE DAMPER(S) - X SMOKE DAMPER(S) EF -2 X FIRE RATED ENCLOSURE - X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY 7000/5800 X FIRE STOPPING (SEE ARCH.) - X SMOKE CONTROL 0/0 X 4 AIR BALANCE SCHEDULE UNIT SUPPLY OLD /NEW (CFM) RETURN OLD /NEW (CFM) OUTSIDE OLD /NEW (CFM) EXHAUST OLD /NEW (CFM) EXISTING - - - 2920/2920 EF -2 - - - 3625/4325 EXISTING RTU -RAD 7000/5800 4630/4530 2370/1270 - RTU -LA 1800/3600 0/0 1800/3600 - RTU -2 2375/2375 0/0 2375/2375 - TOTALS 11,175/11,77514630/45301 6545/7245 6545/7245 NOTE: AHU -RAD AND AHU -LA HAS MERV -14 FINAL FILTERS AND SMOKE DETECTORS IN THE SUPPLY AND RETURN DUCTS. GAUGES FOR FILTERS AND EF- 1.2,3.4,5 & 6 SERVE ADJACENT AREA. MECHANICAL DEMOLITION NOTES 1. FOR EQUIPMENT AND SYSTEMS TO REMAIN IT SHALL BE-TAE CONTRACTOR'S - n RESPONSIBILITY TO VERIFY THE CONDITION OF, EXACT SIZES AND LOCATION OF EXISTING DUCT AND PIPING ETC. BEFORE DEMOLITION WORK IS BEGUN. REPORT ANY DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD .CONDMONS TO THE - - OWNER AND ENGINEER PRIOR TO THE COMMENCEMENT :QF - CEMOLITION WGRK. m 2. REMOVE THE INDICATED HVAC ITEMS AS SHOWN ON PL -ANS,- THIS - INCLUDES ALL, HANGERS, STRAPS AND RELATED MATERIAL. AS DIRECTED_THfS NAa'wtRiAL SHALL BE REMOVED FROM THE SITE OR TURNED OVER TO THE OWNER (AS DIRECTED BY THE OWNER). 3. CAP AND SEAL AIR TIGHT ALL POINTS AT WHICH DUCTWORK IS REMOVED FROM DUCTWORK THAT WILL REMAIN. 4. PATCH AND MATCH OPENINGS IN WALLS TO MAINTAIN THE INTEGRITY OF THE WALL WHERE AIR DEVICES, DUCTS, PIPING, ETC. HAVE BEEN REMOVED. (MAINTAIN THE EXISTING RATINGS). 5. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE ROUTING OF NEW DUCTWORK BEFORE FABRICION BEGINS AS RISES AND DROPS MAY BE NECESSARY DUE TO EXISTING FIELD CONDITIONS. SEQUENCE OF OPERATION UPON ACTIVATION OF ANY FIRE ALARM DEVICE IN THE AREA SERVED BY ANY AIR HANDLING UNIT OR EXHAUST FAN, ALL EQUIPMENT AND ASSOCIATED FSD'S SHALL DE- ENERGIZE. FANS IDENTIFIED AS EXHAUSTING HAZARDOUS MATERIAL SHALL RUN CONTINUOUSLY. HAZARDOUS MATERIAL • 1. PORTIONS OF THE EXISTING SYSTEM MAY CONTAIN HAZARDOUS MATERIAL (ASBESTOS). COORDINATE WITH THE OWNER TO DETERMINE THE LOCATION AND TYPES OF HAZARDOUS MATERIALS. 2. THE OWNER IS RESPONSIBLE FOR THE IDENTIFICATION, REMOVAL AND DISPOSAL OF HAZARDOUS MATERIAL AND IS NOT TO BE INCLUDED AS PART OF THE WORK OF THIS CONTRACT UNLESS SPECIFICALLY IDENTIFIED AS SUCH. 3.I17 ANY MATERIAL APPEARS TO CONTAIN HAZARDOUS MATERIAL AND WAS NOT PREVIOUSLY IDENTIFIED. THE CONTRACTOR IS TO INFORM THE OWNER TO RECEIVE INSTRUCTIONS ON HOW TO PROCEED. AHU OPERATION DURING THE USE OF NEW OR EXISTING AIR HANDLING UNITS DURING CONSTRUCTION IS PROHIBITED UNLESS APPROVED BY THE OWNER AND THE PROCEDURES OUTLINED IN THIS PARAGRAPH ARE FOLLOWED RIGIDLY. 1. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK AND AIR HANDLING UNITS FROM THE ACCUMULATION OF DIRT AND DUST USUALLY ASSOCIATED WITH THE FINISHING STAGES OF THE CONSTRUCTION WORK. 2. DUCTWORK STORED ON SITE AWAITING INSTALLATION SHALL BE CAREFULLY EXAMINED AND THOROUGHLY CLEANED BEFORE PLACEMENT IN ITS FINAL LOCATION. THE ENDS OF DUCTWORK SHALL BE CLOSED DURING CONSTRUCTION. 3. THE AIR HANDLING UNITS WILL BE ALLOWED TO OPERATE DURING THE FINISHING STAGES OF THE GENERAL WORK PROVIDED THE PRE - FILTERS ARE IN PLACE AND THE ENDS OF ALL RETURN AIR INLETS ARE COVERED WITH ROLL -UP FILTER MATERIAL. 4. WHEN THE SPACE IS TURNED OVER TO THE OWNER, THE CONTRACTOR SHALL REMOVE ALL FILTERS USED DURING CONSTRUCTION AND REPLACE THEM WITH NEW FILTERS. 5. USE OF NEW AHU'S DURING CONSTRUCTION IS NOT ALLOWED. HVAC DRAWING INDEX SHEET NO. SHEET TITLE MO.O DRAWING INDEX, LEGENDS, AND SCHEDULES MO.1 SCHEDULES AND DEi'AILS - HVAC MO.2 SHEET SPECIFICATION - HVAC M1.0 PARTIAL FLOOR PLAN - NEGATIVE AIR PRESSURE PLAN - HVAC M1.1 PARTIAL FLOOR PLAN - DEMOLITION - HVAC M2.1 PARTIAL FLOOR PLAN - NEW WORK - HVAC 5 0 BERMELLO AJAMIL & PARTNERS, INC. Architecture •i • Planning Interior Design Landscape Architecture 2601 South Bayshore Drive 10th Floor Florida # 859-2050 1 860-3700 Y SOUTH HOSPITAL a���`• 6200 SW 73 STREET, MIAMI, FLORIDA a Smith SS11 Seckman Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX: (954) 421 -1466 . www.ssr- inc.com Firm Certification - EB- 0000857 Alfred Esquivel PE - 45863 Bruce W. Peek PE - 35901 Donald Netinho PE - 48454 Erik S. Walter PE - 63929 John E. Moulder PE - 33200 Michael A. Steward PE - 65701 Unman A.Tariq PE - 66485 SSR JOB # 0732091.0 C' N :1►1 .4 [*1&*] PROJECT SOUTH G. MI HOSPI LINEAR O. OBI UPGRADE PROJECT ADDRESS: 6200 SW 73 STREET Miami, Florida ..;. KEY PLAN #1 COMM. NO. SCALE: AS SHOWN DATE: 12 -20 -2007 DRAWN: CHECKED: A CADD FILE: DRAWING TITLE: DRAINING INDEX, LEGENDS AND SCHEDULES SHEET NO. �ili7