08-1048-002BERMELLO AJAMIL & PARTNERS, INC.
- - -Architecture Engineering Planning
I rfierior Design Landscape Architecture
`I
_2601 South Bayshore Drive 10th Floor
Miami, Florida 33133
(305) 859-2050 Fax (305) 860-3700
SOUTH MIAM
HOSPITAL
6200 SW 73 STREET, MIAMI, FLORIDA 331
MEP ENGINEER:
/?Mtn
li % 11
b�)SR
Smith, Seckman, Reid, Inc.
G (D 11*_z :E3 T-T 1- 11, 1 I%q G
EN GIN IE; 1E-, IE-;,:' :S
600 West Hillsboro, Suite 300
Deerfield Beach, Florida 33441
Phone(954)421-1260 Fax(954)421-1466
REVISIONS:
PROJECT NAME:
SOUTH MIAMI HOSPITAL
LINEAR ACCELERATOR
OBI UPGRADE
PROJECT ADDRESS:
6200 SW 73 STREET
Miami, Florida 331434989
COMM. NO. 4W45.100
SCALE- AS SHOWN
DATE: 12-20-2007
DRAWN:
CHECKED:
CADD FILE: H: Institutional
DRAWING TITLE:
INDEX, NOTE
& SYMBOLS
SHEET NO.
11
ABBREVIATIONS
GENERAL NOTES
GENERAL DEMOLITION NOTES
DRAWING INDEX
A
ACOUS.
ACOUSTICAL L
LAV
LAVATORY
01. ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH CODES LISTED ON SHEET LS-1, THE
01. CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION
ADA
AMERICANS WITH
DISABILITIES ACT
LAM
LT
LAMINATED
FLORIDA BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY /COUNTY ZONING CODES,
WORK TO OWNER'S REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE
ARCHITECTURE
ADJ
ADJUSTABLE
LIGHT
NATIONAL ELECTRICAL CODE, N.F.P.. 101, O.S.H.A., A.D.A. & ALL OTHER APPLICABLE CODES, RULES AND
COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS
AFF
ABOVE FINISH FLOOR
LTWT
LF OR LIN FT
LIGHT WEIGHT
LINEAR FEET
REGULATIONS.
FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND
AGG
AGGREGATE
DAYS OF WEEK TO BE WORKED.
----
A.C.
AIR CONDITIONING
02. THE CONTRACTOR SHALL FAMILIARIZE HIM/HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE
COVER SHEET
ALUM
M
ALUMINUM
MAT
MATERIAL
DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY
- PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED
ML
MATCH LINE
AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING
PROGRESS OF OWNER'S ON SITE OPERATIONS.
A001 INDEX / NOTES SYMBOLS
B
BM
BEAM
MAX
MAXIMUM
PRIOR TO SUBMISSION OF BID.
BLK
BLOCK
MECH
MECHANICAL
- COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND
LS101 FIRST FLOOR LIFE SAFETY PLAN
BLKG
BLOCKING
MET OR MI
METAL
03. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL REQUIRED PERMITS TO CARRY OUT
WITH OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA.
BOT
BOTTOM
MIN
MINIMUM
THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO THE
A101 FIRST FLOOR DEMOLITION PLAN & DETAILS
BLDG
BUILDING
MISC
MISCELLANEOUS
COMMENCEMENT OF WORK.
02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE AND BUILDING SURFACES,
BLKHD
BULKHEAD
MACH
MANUF
MACHINE
MANUFACTURER
04. OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE
EQUIPMENT, AND ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL
Al 02 REVISED GROUND FLOOR PLAN R.C. PLAN ELEVATION
C
CAB
CABINET
DRAWINGS, THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE
OPERATIONS. CONTRACTOR SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNER'S REPRESENTATIVE, ENGINEER AND
A103 MILLWORK SECTIONS
CARP
CARPET N
NFPA
NATIONAL FIRE
SHOWN OR NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION.
ARCHITECT FOR VERIFICATION OF THE WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOLITION WORK. FILE
CLG
CEILING
PREVENTION
WITH ARCHITECT PRIOR TO START OF WORK.
A201 PENETRATION DETAILS
CEM
CEMENT
NIC
ASSOCIATION
NOT IN CONTRACT
05. EXISTING ELECTRICAL, MECHANICAL, LIFE SAFETY AND FIRE PROTECTION FIXTURES INCLUDING BUT NOT LIMITED TO
SURFACE/RECESSED LIGHT FIXTURES LIGHT/EQUIPMENT SWITCHES HC REGISTERS THERMOSTATS, ACCESS PANELS,
03. OCCUPANCY. OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE
A202 UL SPECIFICATIONS
CA
CENTER LINE
NOM
NOMINAL
, , .V.A. . ,
DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF
CER
CERAMIC
NTS
NOT TO SCALE
INTERCOM SPEAKERS, FIRE ALARM HORNS /STROBES /SWITCHES, HEAT/SMOKE DETECTORS, CONCEALED/ EXPOSED FIRE
OWNER'S NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVITIES
C.T.
CERAMIC TILE
SPRINKLER HEADS AND ASSOCIATED PIPING, DUCTWORK AND ORNAMENTAL FIXTURES ARE TO REMAIN. CONTRACTOR
THAT WILL AFFECT OWNER'S NORMAL OPERATIONS INCLUDING BUT NOT LIMITED TO LOUD LOISES AND PRODUCTS WITH
CO
CLEAN OUT 0
Oc
ON CENTER
SHALL BE RESPONSIBLE FOR REMOVAL AS REQUIRED OF EXISTING FIXTURES TO ACCOMPLISH DEMOLITION WORK AND
STRONG ODORS.
CL OR CLOS
CLOSET
OH OR OPP.HD. OPPOSITE HAND
NEW CONSTRUCTION WORK INDICATED IN THE CONSTRUCTION DOCUMENTS. FURTHER, THE CONTRACTOR SHALL BE
MECHANICAL
COL
COLUMN
OD
OUTSIDE DIAMETER
RESPONSIBLE FOR THE REINSTALLATION OF EXISTING FIXTURES IN GOOD WORKING ORDER (TO MATCH ORIGINAL
04. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES
CONC
CONCRETE
OPNG OFF
OFFICE
OPENING
INSTALLATION) UPON COMPLETION OF REPAIR WORK.
TO BE DEMOLISHED. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY
CMU
CONST
CONCRETE MASONRY UNIT
CONSTRUCTION
OSHA
OCCUPATIONAL
06. ALL DIMENSIONS PROVIDED ARE APPROXIMATE, CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD
OWNER INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR.
MO-O DRAWING INDEX, LEGEND AND SCHEDULES
CONT
CONTINUOUS
SAFETY
AND HEALTH
CONDITIONS. ANY DISCREPANCIES SHALL BE BROUGHT TO ARCHITECT ATTENTION BEFORE PROCEEDING WITH THE WORK.
05. PARTIAL DEMOLITION AND REMOVAL: STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED.
MOA SCHEDULES & DETAILS - HVAC
CG
CR
CORNER GUARD
CRASH RAIL
ADMINISTRATION
07. CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE
06. PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNER'S
MO.2 SHEET SPECIFICATION - HVAC
CU
CUBIC P
PR
PAIR
OF ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR TO
PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK.
D
DEPT
DEPARTMENT
PASS
PASSENGER
STARTING WORK.
M1.0 PARTIAL FLOOR PLAN - NEGATIVE AIR PRESSURE PLAN HVAC
DET./DTL
DETAIL
PENT
PENTHOUSE
08. CONTRACTOR SHALL PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF
A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL
DIA
DIAMETER
PC
PRECAST
THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND
AND GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING.
M1.1 PARTIAL FLOOR PLAN - DEMOLITION HVAC
DIM
DIMENSION
Pi
PLAS
PANEL JOINT
PLASTER
THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS.
B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING
M2.1 PARTIAL FLOOR PLAN - NEW WORK HVAC
DN
DS
DON
DOWN SPOUT
POL
POLISHED
09. ALL WALL/CEILING SURFACES WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED/REPLACED TO MATCH
DEMOLITION OPERATIONS.
DWG
DRAWING
PMLD
PREMOULDED
EXISTING ADJACENT SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE,
C. PROTECT FLOORS/CARPETS WITH SUITABLE COVERINGS MEN NECESSARY.
DF
DRINKING FOUNTAIN
PNL
PANEL
CRACKED WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED.
0
QT
QUARRY 11LE
D. CONSTRUCT TEMPORARY INSULATED RUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WERE
E
E.A.
EXPOSED AGGREGATE
QTM
QUARRY TILE
10. ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED IN ADVANCE OF PAINT FINISH.
NOISY OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTMONS WITH DUSTPROOF DOORS AND
EA
EACH
MINIATURES
SECURITY LOCKS. ALL TEMP. PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT,
EL
ELEVA11ON
11. THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT
ELECTRICAL
I-
EE
�GRADE)
ELEVATION FACADE) R
RAD
RADIUS
AREAS. CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE/FLAME SPREAD RATINGS OR MEANS OF EGRESS
E. TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWO-WAY TAPE. SCREWS, NAILS, ETC. WILL NOT BE
ELEV
ELEVATOR
R
RISER
WITHIN THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES.
PERMITTED. (SEE DRAWING #13 ON SHEET A-6.0)
EP
EQ
ELECTRICAL PANEL
EQUAL
REINF
REQ'D
REINFORCED
REQUIRED
12, THE CONTRACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND
F. REMOVE PROTECTIONS AT COMPLETION OF WORK.
EO.1 LEGEND, ABBREVIATIONS & DRAWING INDEX
EQUIP
EXIST
EQUIPMENT
EXISTING
RF
ROOF
ACCESSIBLE AT ALL TIMES.
G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A 100% NEGATIVE PRESSURE BY USE OF SUITABLE FANS
E1.1 PARTIAL FLOOR PLAN - LOCATION REFERENCE PLAN
EXP.JT. OR EJ
EXPANSION JOINT
RD
ROOF DRAIN
13. THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES.
EQUIPED WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING..
EXP
EXPOSED
RM
RD
ROOM
ROUGH OPENING
14. CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW CONSTRUCTION.
H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
E2.1 PARTIAL FLOOR PLAN - NEW WORK ELECTRICAL
EXT
EXTERIOR
REFL OR REF
REFLECTED
CONTAMINATION OF DUCT SYSTEM.
E3.1 ELECTRICAL RISER DIAGRAM
ELEC
ELECTRICAL
RWL
RAIN WATER
15. CONTRACTOR SHALL PROVIDE ALLOWANCES IN SPECIFICATIONS WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK
EWC
ELECTRIC WATER COILER
LEADER
WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND WHICH MUST BE ACCOMPLISHED AT THE TIMES OTHER
07. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK.
E4.1 ELECTRICAL STUDIES
THAN NORMAL WEEKDAY WORKING HOURS
F
FT
FEET 8
SECT
SECTION
08. MAINTAIN EXISTING BUILDING SYSTEMS /UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST
E5.1 ELECTRICAL SPECIFICATIONS
FIN
FINISH
SHT
SHEET
16. CONTRACTOR SHALL PROVIDE ALLOWANCES IN BID WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK STOPPAGES
DAMAGE DURING DEMOLITION OPERATIONS OR PROVIDE FIREWATCH.
FE
FIRE EXTINGUISHER
SHT MET OR SM SHEET METAL
ORDERED BY THE OWNER DUE TO WORK IMPACTING THE DAILY OPERATIONS OF THE FACILITY.
FEC
FIRE EXTINGUISHER CABINET
SI M
SIMILAR
- DO NOT INTERRUPT BUILDING SYSTEMS/UTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT MEN AUTHORIZED
FC
FIRE CABINET
so
SQUARE
17. CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6:00
IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING
FL
FLOOR
STD
STANDARD
AM AND SATURDAY & SUNDAY 24 HOURS.
BUILDING SYSTEMS/UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES.
FD
FLUOR
FLOOR DRAIN
FLUORESCENT
Ss
STL
STAINLESS STEEL
STEEL
18. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS.
- MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS.
F.R.
FS
FIRE RATING
FULL SIZE
STOR
STRUCT
STORAGE
STRUCTURAL
19. CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE
09. OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL
FV
FIELD VERIFY
SUSP
SUSPENDED
RESPONSIBLE FOR THEIR PRESERVATION. ANY DAMAGE TO EXISTING SHALL BE REPAIRED AND/OR REPLACED AT NO
OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE
FVC
FIRE VALVE CABINET
SPECS
SPECIFICATIONS
ADDTIONAL COST TO OWNER.
PHASE UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER.
0
GALV
GALVANIZED T
TEL
TELEPHONE
10. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT DUST
GA
GAUGE
TEMP
TEMPERED
20. CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS.
AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION.
GC
GENERAL CONTRACTOR
TLT. OR TOT.
TOILET
GL
GLASS
T
TREADS
21. PROVIDE WALK-OFF MATS AT ALL ENTRY/EXITS OF THE CONSTRUCTION SITE WALK-OF MATS MUST BE CLEANED OR
- DO NOT USE WATER WHEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING,
GB
GRAB BAR
TYP
TYPICAL
CHANGED DAILY TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA.
POLLUTION AND DAMAGE TO EXISTING FINISHES.
GR
GYP
GRADE
GYPSUM
TR
TELEPHONE
22, 22. CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF
11. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR
GYP BD
GYPSUM WALLBOARD
THK
THICK
MECHANICAL, ELECTRICAL AND PLUMBING WITH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WALL
DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT
SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN SHEETS A-6.2, A-10.0 AND A-10.1 FOR SEALING
TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL PENDING RECEIPT OF DIRECTIVE FROM OWNER'S
H
HC
HANDICAPPED Ul
UL
UNDERWRITER
FIRE PENETRATIONS. ALL DUCTS CROSSING FIRE RATED ASSEMBLIES SHALL HAVE FIRE DAMPERS TO MATCH THE
REPRESENTATIVE, REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS
HRDW
HARDWARE
LABORATORIES
RATING OF THE WALL ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED.
WITHOUT UNDUE DELAY.
HT
HEIGHT
HM
HORIZ
HOLLOW METAL V
HORIZONTAL
VERT
VERTICAL
23, IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER (CM). GENERAL CONTRACTOR (GC), AND THE
12. REMOVE FROM BUILDING SITE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM
VT
VINYL TILE
SUB-CONTRACTORS (SCI TO STUDY ALL THE DRAWINGS AND DETAILS SO THAT THE INSTALLATION OF ALL NEW WORK
DEMOLITION OPERATIONS. TRANSPORT AND LEGALLY DISPOSE OF OFF SITE. DEBRIS REMOVAL TO BE DONE AFTER
I
IN
INCH
VB
VAPOR BARRIER
CAN BE FULLY COORDINATED. THE CM, GC, AND SC SHALL VISIT THE SITE, INCLUDING DOING AN ABOVE CEILING
REGULAR WORKING HOURS.
INCAND
INCANDESCENT
VWC
VINYL WALL COVERING
INSPECTION, DURING BIDDING TO SATISFY HIMSELF THAT ALL PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS OF THIS
ID
INSIDE DIAMETER
PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS AND/OR SITE CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE
-OWNER TO SURVEY AND REMOVE AND PROVIDE CERTIFICATION TO GENERAL CONTRACTOR. IF HAZARDOUS
INSUL
INSULATION W
VWC-GYP
WALL COVERING -
GENERAL CONTRACTOR IN WRITING PRIOR TO BID DUE DATE, FAILURE TO DO SO WILL NOT BE ALLOWED ON A BASIS
MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS COMPLY WITH APPLICABLE REGULATIONS, LAWS, AND
INT
INTERIOR
GYPSUM BOARD
FOR ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OF DIFFERENCE FROM CONDITIONS INFERRED OR INDICATED
ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION.
INV
INVERT
VWC-PLAS
WAVERING -
ON THE DRAWINGS.
- BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE
PTER
J
JT
JOINT
WC
WET COLUMN
13. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM STE. REMOVE
JST
JOIST
WP
WATERPROOFING
PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS/VIDEO.
ic
JANITOR'S CLOSET
WD
WOOD
W/
WITH
- REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND
W/o
WITHOUT
SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION
WC
WATER CLOSET
OR SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK.
Y
YD
YARD
ARCHITECTURAL SYMBOLS
REFERENCE SYMBOLS
VICINITY MAP
PROJECT LOCATION
DOOR SYMBOL WALL WALL
HOSPITAL
- - --------
r .:
- -------- --------
CONSTRUCTION TYPE
10 -DOOR NUMBER
1- ELEVATION
LOCATION
.. .. .. ....
L
NUMBER
INSULATION
Blanket
CONCRETE GRAVEL or
PRECAST CRUSHED
CEMENT
MORTAR
CONCRETE
EXTERIOR &
ROOM NAME OFFICE-ROOM NAME INTERIOR 4 X- 0 2
STONE
PLASTER
ELEVATION SYMBOL
FINISH SCHEDULE XX IROOM NUMBER SHEET
F 77i
iii
��
3 NUMBER
i. j
PROJECT
/
EARTH
TILE SOLID CONIC.
Ceramic or MAS. UNIT
CONCRETE
MASONRY
MARBLE
DETAIL CONSTRUCTION DETAIL
BUILDING, PARTIAL UMBER DETAIL NUMBER
!�. aLnl / yy: :I: ate:.... .. .: .: i. :..:. -:: .g. :. ::..
.
LOCATION j J. ,
Structural
UNIT
& DETAIL SECTION SYMBOL HEET
A HEET NUMBER.
iiiii
SYMBOL NUMBER
_ k.
C, -Ty 0 sot ) .TVA wa"M,
SHEET
��
WOOD WOOD
WOOD
BRICK
WINDOW TYPES
01 WINDOW COLUMN NUMBER
A
BUILIDINGDF
SEC 'T"
METAL
Finished Blocking
Blocking
Large
TYPE REFERENCE OR LETTER
STRUCTURA L
Continuous
Intermittent
Scale
GENERAL NOTES ABCDEFG NOTE
TOP OF CONCRETE
ELEVATION 0.0
:<
B'y
IT
GLASS
GLASS INSULATION
SLAB ELEVATION
DETAIL
A
WE,
Small
Large Rigid
NUMBER
DRAWING TITLES
Scale
Scale
7 F 7----1
1 ABCDEF
DRAWING REVISION
-1 SCALE: NUMBER
REVISIONS
STEEL
Small Scale
STEEL PLYWOOD
Large Scale
SHEET
NUMBER NOTE
NOTE THIS
N
N
DEMOLITION NOTE
DRAWING
. . .... ...
BERMELLO AJAMIL & PARTNERS, INC.
- - -Architecture Engineering Planning
I rfierior Design Landscape Architecture
`I
_2601 South Bayshore Drive 10th Floor
Miami, Florida 33133
(305) 859-2050 Fax (305) 860-3700
SOUTH MIAM
HOSPITAL
6200 SW 73 STREET, MIAMI, FLORIDA 331
MEP ENGINEER:
/?Mtn
li % 11
b�)SR
Smith, Seckman, Reid, Inc.
G (D 11*_z :E3 T-T 1- 11, 1 I%q G
EN GIN IE; 1E-, IE-;,:' :S
600 West Hillsboro, Suite 300
Deerfield Beach, Florida 33441
Phone(954)421-1260 Fax(954)421-1466
REVISIONS:
PROJECT NAME:
SOUTH MIAMI HOSPITAL
LINEAR ACCELERATOR
OBI UPGRADE
PROJECT ADDRESS:
6200 SW 73 STREET
Miami, Florida 331434989
COMM. NO. 4W45.100
SCALE- AS SHOWN
DATE: 12-20-2007
DRAWN:
CHECKED:
CADD FILE: H: Institutional
DRAWING TITLE:
INDEX, NOTE
& SYMBOLS
SHEET NO.
11