Loading...
08-1048-002BERMELLO AJAMIL & PARTNERS, INC. - - -Architecture Engineering Planning I rfierior Design Landscape Architecture `I _2601 South Bayshore Drive 10th Floor Miami, Florida 33133 (305) 859-2050 Fax (305) 860-3700 SOUTH MIAM HOSPITAL 6200 SW 73 STREET, MIAMI, FLORIDA 331 MEP ENGINEER: /?Mtn li % 11 b�)SR Smith, Seckman, Reid, Inc. G (D 11*_z :E3 T-T 1- 11, 1 I%q G EN GIN IE; 1E-, IE-;,:' :S 600 West Hillsboro, Suite 300 Deerfield Beach, Florida 33441 Phone(954)421-1260 Fax(954)421-1466 REVISIONS: PROJECT NAME: SOUTH MIAMI HOSPITAL LINEAR ACCELERATOR OBI UPGRADE PROJECT ADDRESS: 6200 SW 73 STREET Miami, Florida 331434989 COMM. NO. 4W45.100 SCALE- AS SHOWN DATE: 12-20-2007 DRAWN: CHECKED: CADD FILE: H: Institutional DRAWING TITLE: INDEX, NOTE & SYMBOLS SHEET NO. 11 ABBREVIATIONS GENERAL NOTES GENERAL DEMOLITION NOTES DRAWING INDEX A ACOUS. ACOUSTICAL L LAV LAVATORY 01. ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH CODES LISTED ON SHEET LS-1, THE 01. CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION ADA AMERICANS WITH DISABILITIES ACT LAM LT LAMINATED FLORIDA BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY /COUNTY ZONING CODES, WORK TO OWNER'S REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE ARCHITECTURE ADJ ADJUSTABLE LIGHT NATIONAL ELECTRICAL CODE, N.F.P.. 101, O.S.H.A., A.D.A. & ALL OTHER APPLICABLE CODES, RULES AND COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS AFF ABOVE FINISH FLOOR LTWT LF OR LIN FT LIGHT WEIGHT LINEAR FEET REGULATIONS. FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND AGG AGGREGATE DAYS OF WEEK TO BE WORKED. ---- A.C. AIR CONDITIONING 02. THE CONTRACTOR SHALL FAMILIARIZE HIM/HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE COVER SHEET ALUM M ALUMINUM MAT MATERIAL DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY - PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED ML MATCH LINE AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING PROGRESS OF OWNER'S ON SITE OPERATIONS. A001 INDEX / NOTES SYMBOLS B BM BEAM MAX MAXIMUM PRIOR TO SUBMISSION OF BID. BLK BLOCK MECH MECHANICAL - COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND LS101 FIRST FLOOR LIFE SAFETY PLAN BLKG BLOCKING MET OR MI METAL 03. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL REQUIRED PERMITS TO CARRY OUT WITH OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA. BOT BOTTOM MIN MINIMUM THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO THE A101 FIRST FLOOR DEMOLITION PLAN & DETAILS BLDG BUILDING MISC MISCELLANEOUS COMMENCEMENT OF WORK. 02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE AND BUILDING SURFACES, BLKHD BULKHEAD MACH MANUF MACHINE MANUFACTURER 04. OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE EQUIPMENT, AND ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL Al 02 REVISED GROUND FLOOR PLAN R.C. PLAN ELEVATION C CAB CABINET DRAWINGS, THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE OPERATIONS. CONTRACTOR SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNER'S REPRESENTATIVE, ENGINEER AND A103 MILLWORK SECTIONS CARP CARPET N NFPA NATIONAL FIRE SHOWN OR NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION. ARCHITECT FOR VERIFICATION OF THE WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOLITION WORK. FILE CLG CEILING PREVENTION WITH ARCHITECT PRIOR TO START OF WORK. A201 PENETRATION DETAILS CEM CEMENT NIC ASSOCIATION NOT IN CONTRACT 05. EXISTING ELECTRICAL, MECHANICAL, LIFE SAFETY AND FIRE PROTECTION FIXTURES INCLUDING BUT NOT LIMITED TO SURFACE/RECESSED LIGHT FIXTURES LIGHT/EQUIPMENT SWITCHES HC REGISTERS THERMOSTATS, ACCESS PANELS, 03. OCCUPANCY. OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE A202 UL SPECIFICATIONS CA CENTER LINE NOM NOMINAL , , .V.A. . , DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF CER CERAMIC NTS NOT TO SCALE INTERCOM SPEAKERS, FIRE ALARM HORNS /STROBES /SWITCHES, HEAT/SMOKE DETECTORS, CONCEALED/ EXPOSED FIRE OWNER'S NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVITIES C.T. CERAMIC TILE SPRINKLER HEADS AND ASSOCIATED PIPING, DUCTWORK AND ORNAMENTAL FIXTURES ARE TO REMAIN. CONTRACTOR THAT WILL AFFECT OWNER'S NORMAL OPERATIONS INCLUDING BUT NOT LIMITED TO LOUD LOISES AND PRODUCTS WITH CO CLEAN OUT 0 Oc ON CENTER SHALL BE RESPONSIBLE FOR REMOVAL AS REQUIRED OF EXISTING FIXTURES TO ACCOMPLISH DEMOLITION WORK AND STRONG ODORS. CL OR CLOS CLOSET OH OR OPP.HD. OPPOSITE HAND NEW CONSTRUCTION WORK INDICATED IN THE CONSTRUCTION DOCUMENTS. FURTHER, THE CONTRACTOR SHALL BE MECHANICAL COL COLUMN OD OUTSIDE DIAMETER RESPONSIBLE FOR THE REINSTALLATION OF EXISTING FIXTURES IN GOOD WORKING ORDER (TO MATCH ORIGINAL 04. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES CONC CONCRETE OPNG OFF OFFICE OPENING INSTALLATION) UPON COMPLETION OF REPAIR WORK. TO BE DEMOLISHED. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY CMU CONST CONCRETE MASONRY UNIT CONSTRUCTION OSHA OCCUPATIONAL 06. ALL DIMENSIONS PROVIDED ARE APPROXIMATE, CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD OWNER INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR. MO-O DRAWING INDEX, LEGEND AND SCHEDULES CONT CONTINUOUS SAFETY AND HEALTH CONDITIONS. ANY DISCREPANCIES SHALL BE BROUGHT TO ARCHITECT ATTENTION BEFORE PROCEEDING WITH THE WORK. 05. PARTIAL DEMOLITION AND REMOVAL: STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED. MOA SCHEDULES & DETAILS - HVAC CG CR CORNER GUARD CRASH RAIL ADMINISTRATION 07. CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE 06. PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNER'S MO.2 SHEET SPECIFICATION - HVAC CU CUBIC P PR PAIR OF ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR TO PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. D DEPT DEPARTMENT PASS PASSENGER STARTING WORK. M1.0 PARTIAL FLOOR PLAN - NEGATIVE AIR PRESSURE PLAN HVAC DET./DTL DETAIL PENT PENTHOUSE 08. CONTRACTOR SHALL PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL DIA DIAMETER PC PRECAST THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND AND GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING. M1.1 PARTIAL FLOOR PLAN - DEMOLITION HVAC DIM DIMENSION Pi PLAS PANEL JOINT PLASTER THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS. B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING M2.1 PARTIAL FLOOR PLAN - NEW WORK HVAC DN DS DON DOWN SPOUT POL POLISHED 09. ALL WALL/CEILING SURFACES WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED/REPLACED TO MATCH DEMOLITION OPERATIONS. DWG DRAWING PMLD PREMOULDED EXISTING ADJACENT SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE, C. PROTECT FLOORS/CARPETS WITH SUITABLE COVERINGS MEN NECESSARY. DF DRINKING FOUNTAIN PNL PANEL CRACKED WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED. 0 QT QUARRY 11LE D. CONSTRUCT TEMPORARY INSULATED RUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WERE E E.A. EXPOSED AGGREGATE QTM QUARRY TILE 10. ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED IN ADVANCE OF PAINT FINISH. NOISY OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTMONS WITH DUSTPROOF DOORS AND EA EACH MINIATURES SECURITY LOCKS. ALL TEMP. PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT, EL ELEVA11ON 11. THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT ELECTRICAL I- EE �GRADE) ELEVATION FACADE) R RAD RADIUS AREAS. CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE/FLAME SPREAD RATINGS OR MEANS OF EGRESS E. TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWO-WAY TAPE. SCREWS, NAILS, ETC. WILL NOT BE ELEV ELEVATOR R RISER WITHIN THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES. PERMITTED. (SEE DRAWING #13 ON SHEET A-6.0) EP EQ ELECTRICAL PANEL EQUAL REINF REQ'D REINFORCED REQUIRED 12, THE CONTRACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND F. REMOVE PROTECTIONS AT COMPLETION OF WORK. EO.1 LEGEND, ABBREVIATIONS & DRAWING INDEX EQUIP EXIST EQUIPMENT EXISTING RF ROOF ACCESSIBLE AT ALL TIMES. G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A 100% NEGATIVE PRESSURE BY USE OF SUITABLE FANS E1.1 PARTIAL FLOOR PLAN - LOCATION REFERENCE PLAN EXP.JT. OR EJ EXPANSION JOINT RD ROOF DRAIN 13. THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES. EQUIPED WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING.. EXP EXPOSED RM RD ROOM ROUGH OPENING 14. CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW CONSTRUCTION. H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT E2.1 PARTIAL FLOOR PLAN - NEW WORK ELECTRICAL EXT EXTERIOR REFL OR REF REFLECTED CONTAMINATION OF DUCT SYSTEM. E3.1 ELECTRICAL RISER DIAGRAM ELEC ELECTRICAL RWL RAIN WATER 15. CONTRACTOR SHALL PROVIDE ALLOWANCES IN SPECIFICATIONS WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK EWC ELECTRIC WATER COILER LEADER WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND WHICH MUST BE ACCOMPLISHED AT THE TIMES OTHER 07. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK. E4.1 ELECTRICAL STUDIES THAN NORMAL WEEKDAY WORKING HOURS F FT FEET 8 SECT SECTION 08. MAINTAIN EXISTING BUILDING SYSTEMS /UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST E5.1 ELECTRICAL SPECIFICATIONS FIN FINISH SHT SHEET 16. CONTRACTOR SHALL PROVIDE ALLOWANCES IN BID WITH STIPULATED DOLLAR AMOUNTS FOR ALL WORK STOPPAGES DAMAGE DURING DEMOLITION OPERATIONS OR PROVIDE FIREWATCH. FE FIRE EXTINGUISHER SHT MET OR SM SHEET METAL ORDERED BY THE OWNER DUE TO WORK IMPACTING THE DAILY OPERATIONS OF THE FACILITY. FEC FIRE EXTINGUISHER CABINET SI M SIMILAR - DO NOT INTERRUPT BUILDING SYSTEMS/UTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT MEN AUTHORIZED FC FIRE CABINET so SQUARE 17. CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6:00 IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING FL FLOOR STD STANDARD AM AND SATURDAY & SUNDAY 24 HOURS. BUILDING SYSTEMS/UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES. FD FLUOR FLOOR DRAIN FLUORESCENT Ss STL STAINLESS STEEL STEEL 18. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS. - MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS. F.R. FS FIRE RATING FULL SIZE STOR STRUCT STORAGE STRUCTURAL 19. CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE 09. OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL FV FIELD VERIFY SUSP SUSPENDED RESPONSIBLE FOR THEIR PRESERVATION. ANY DAMAGE TO EXISTING SHALL BE REPAIRED AND/OR REPLACED AT NO OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE FVC FIRE VALVE CABINET SPECS SPECIFICATIONS ADDTIONAL COST TO OWNER. PHASE UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER. 0 GALV GALVANIZED T TEL TELEPHONE 10. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT DUST GA GAUGE TEMP TEMPERED 20. CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS. AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. GC GENERAL CONTRACTOR TLT. OR TOT. TOILET GL GLASS T TREADS 21. PROVIDE WALK-OFF MATS AT ALL ENTRY/EXITS OF THE CONSTRUCTION SITE WALK-OF MATS MUST BE CLEANED OR - DO NOT USE WATER WHEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, GB GRAB BAR TYP TYPICAL CHANGED DAILY TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA. POLLUTION AND DAMAGE TO EXISTING FINISHES. GR GYP GRADE GYPSUM TR TELEPHONE 22, 22. CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF 11. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR GYP BD GYPSUM WALLBOARD THK THICK MECHANICAL, ELECTRICAL AND PLUMBING WITH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WALL DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN SHEETS A-6.2, A-10.0 AND A-10.1 FOR SEALING TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL PENDING RECEIPT OF DIRECTIVE FROM OWNER'S H HC HANDICAPPED Ul UL UNDERWRITER FIRE PENETRATIONS. ALL DUCTS CROSSING FIRE RATED ASSEMBLIES SHALL HAVE FIRE DAMPERS TO MATCH THE REPRESENTATIVE, REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS HRDW HARDWARE LABORATORIES RATING OF THE WALL ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED. WITHOUT UNDUE DELAY. HT HEIGHT HM HORIZ HOLLOW METAL V HORIZONTAL VERT VERTICAL 23, IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER (CM). GENERAL CONTRACTOR (GC), AND THE 12. REMOVE FROM BUILDING SITE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM VT VINYL TILE SUB-CONTRACTORS (SCI TO STUDY ALL THE DRAWINGS AND DETAILS SO THAT THE INSTALLATION OF ALL NEW WORK DEMOLITION OPERATIONS. TRANSPORT AND LEGALLY DISPOSE OF OFF SITE. DEBRIS REMOVAL TO BE DONE AFTER I IN INCH VB VAPOR BARRIER CAN BE FULLY COORDINATED. THE CM, GC, AND SC SHALL VISIT THE SITE, INCLUDING DOING AN ABOVE CEILING REGULAR WORKING HOURS. INCAND INCANDESCENT VWC VINYL WALL COVERING INSPECTION, DURING BIDDING TO SATISFY HIMSELF THAT ALL PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS OF THIS ID INSIDE DIAMETER PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS AND/OR SITE CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE -OWNER TO SURVEY AND REMOVE AND PROVIDE CERTIFICATION TO GENERAL CONTRACTOR. IF HAZARDOUS INSUL INSULATION W VWC-GYP WALL COVERING - GENERAL CONTRACTOR IN WRITING PRIOR TO BID DUE DATE, FAILURE TO DO SO WILL NOT BE ALLOWED ON A BASIS MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS COMPLY WITH APPLICABLE REGULATIONS, LAWS, AND INT INTERIOR GYPSUM BOARD FOR ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OF DIFFERENCE FROM CONDITIONS INFERRED OR INDICATED ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION. INV INVERT VWC-PLAS WAVERING - ON THE DRAWINGS. - BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE PTER J JT JOINT WC WET COLUMN 13. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM STE. REMOVE JST JOIST WP WATERPROOFING PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS/VIDEO. ic JANITOR'S CLOSET WD WOOD W/ WITH - REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND W/o WITHOUT SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION WC WATER CLOSET OR SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK. Y YD YARD ARCHITECTURAL SYMBOLS REFERENCE SYMBOLS VICINITY MAP PROJECT LOCATION DOOR SYMBOL WALL WALL HOSPITAL - - -------- r .: - -------- -------- CONSTRUCTION TYPE 10 -DOOR NUMBER 1- ELEVATION LOCATION .. .. .. .... L NUMBER INSULATION Blanket CONCRETE GRAVEL or PRECAST CRUSHED CEMENT MORTAR CONCRETE EXTERIOR & ROOM NAME OFFICE-ROOM NAME INTERIOR 4 X- 0 2 STONE PLASTER ELEVATION SYMBOL FINISH SCHEDULE XX I­ROOM NUMBER SHEET F 77i iii �� 3 NUMBER i. j PROJECT / EARTH TILE SOLID CONIC. Ceramic or MAS. UNIT CONCRETE MASONRY MARBLE DETAIL CONSTRUCTION DETAIL BUILDING, PARTIAL UMBER DETAIL NUMBER !�. aLnl / yy: :I: ate:.... .. .: .: i. :..:. -:: .g. :. ::.. . LOCATION j J. , Structural UNIT & DETAIL SECTION SYMBOL HEET A HEET NUMBER. iiiii SYMBOL NUMBER _ k. C, -Ty 0 sot ) .TVA wa"M, SHEET �� WOOD WOOD WOOD BRICK WINDOW TYPES 01 WINDOW COLUMN NUMBER A BUILIDINGDF SEC 'T" METAL Finished Blocking Blocking Large TYPE REFERENCE OR LETTER STRUCTURA L Continuous Intermittent Scale GENERAL NOTES ABCDEFG NOTE TOP OF CONCRETE ELEVATION 0.0 :< B'y IT GLASS GLASS INSULATION SLAB ELEVATION DETAIL A WE, Small Large Rigid NUMBER DRAWING TITLES Scale Scale 7 F 7­-­---1 1 ABCDEF DRAWING REVISION -1 SCALE: NUMBER REVISIONS STEEL Small Scale STEEL PLYWOOD Large Scale SHEET NUMBER NOTE NOTE THIS N N DEMOLITION NOTE DRAWING . . .... ... BERMELLO AJAMIL & PARTNERS, INC. - - -Architecture Engineering Planning I rfierior Design Landscape Architecture `I _2601 South Bayshore Drive 10th Floor Miami, Florida 33133 (305) 859-2050 Fax (305) 860-3700 SOUTH MIAM HOSPITAL 6200 SW 73 STREET, MIAMI, FLORIDA 331 MEP ENGINEER: /?Mtn li % 11 b�)SR Smith, Seckman, Reid, Inc. G (D 11*_z :E3 T-T 1- 11, 1 I%q G EN GIN IE; 1E-, IE-;,:' :S 600 West Hillsboro, Suite 300 Deerfield Beach, Florida 33441 Phone(954)421-1260 Fax(954)421-1466 REVISIONS: PROJECT NAME: SOUTH MIAMI HOSPITAL LINEAR ACCELERATOR OBI UPGRADE PROJECT ADDRESS: 6200 SW 73 STREET Miami, Florida 331434989 COMM. NO. 4W45.100 SCALE- AS SHOWN DATE: 12-20-2007 DRAWN: CHECKED: CADD FILE: H: Institutional DRAWING TITLE: INDEX, NOTE & SYMBOLS SHEET NO. 11