12-314-0062. PLYWOOD SHEATHING:
SHALL CONFORM TO THE AMERICAN PLYWOOD INSTITUTE, AND MUST BE CONNECTED TO THE WOOD
TR�J55ES WITH 8D RING SHANK NAILS AT ro" C/C AT ALL SUPPORTS. PLYWOOD SWEETS TO BE
STAGGERED THRU-OUT ROOF SYSTEM. USE 5/8" EXTERIOR GRADE STRUCTURAL PLYWOOD AS RAT
BY THE APA, MINIMUM, UNLESS NOTED OTHERWISE IN PLANS. I
2. ROOF UPLIFT :
TRU55ES TO BE DE51GND AS PER A5r—E 1-10 FOR WIND UPLIFT
WITH V=14(o MPH COMPONENTS AND CLADDING.
DAMAGED AREA.
LOWG SCAB W1 lod NAILS a 411
c/c ONE RACE.
I -MATA cow u mkl�� a iii'lli 1 ri -by -011-1 il
I PON N VAR I Im 11 Is i/.111,
0,
RELOCATED
3xI0 S.^ FINE RAFTERS
AT 24" c/c.
PROVIDE ONE (1) NU WE NVRT 30
W1 10-110d NAILS
AND 1-114" DIAM. TAPCONS
W/ 3" EMBEDMENT.
--'OTE, WRAP STRAP OVER BEAM.
Ct 11 ==A CD Moll
PROVIDE 300 FELT PAPER
FOR ISOLATION-
IN ONN o
RAFTER CONNECTION DETAIL
SCALE: 11/2"=V-0"
EXISTING TOP CHORD.
BUILDING DEPT.
STRUCTURAA"IECTION
4
Date: 03-23-2012
S.4
n
I
•
•
•
4
Date: 03-23-2012
S.4
n
I