Loading...
12-729-0184" concrete slab w /6x6 - W 2.1 x W 2.1 w.w.f. e middepth over compacted d soil see Section E /S.2 for concrete wall reinforcement n V N 1 I.{.. Q 1 N r- Q - 211-:.-:.i_ 11 2 31 www�ww wr itir�iiwirww ��`iirM 81 -011 F -4 x 8 W -611 iv +01 -011 fin. conc. slab existing footing exist. slab remove portions of exist footings I I 1 existing concretb column & footing - existing concrete footing drill Y14" dia, x " deep hole ach bar & set *5 or in epoxy exist. 24" concrete Structural Foundation Plan - Level 1 1/4" = 1 ' -0" existing concrete walkway repair any damage to existing concrete slab /Denotes Existing Areas Not Part of this Project Scope i No Habitable Space on this Floor provide control joint in tile or any other finish along this line see Section D /S.2 for reinforcing new landing slab 8" x 16" concrete beam w/4 *5 & *3 a 6" between new CMU wall & elevator wall (at elevator . wall drill (4)Y4" x 6" holes & set 4 *5 bars in epoxy) Section A - Stair Landing (Level 2) 3/4" = F -0" drill (4) %" x 6" holes & set 4 *5 2' -6" long in epoxy exist. 2nd floor slab over precast joists Structural Stairway Plan - Level 2 1/4" = V-0" +10' -011 exist. conc. slab Section B - Entry Landing (Level 3) 3/4" = 1' -0" Denotes Existing Areas Not Part of this Project Scope No Habitable Space on this Floor (X *4 a 6" top 4 *4 bott. *4 0 8" bott. 2 *5 top & 2 *5 bott. drill & set in epoxy from bottom sides (elevator wall & opposite corner) & lapped full length edge of elevator wall existing concrete slab (verify in field) 10 x 16 concrete beam (see sections) r +221 -011 fin. conc. landing N cn I I I .ID I PI Al I�TI I d L �_r T � p •, -`p •`° D 1 W -711 ^ A o \72 *5 top & 2 *5 bottom 0 4" c/c 0 edge of stairway iii D A A A ° 31 °1¢11' p 101 '31.i0,11 D A . `A A A Ate'• A I81 -64' fV 4 +16' -6" fin. conc. landing Z Structural Stairway Plan - Level 3 1/4" = F-0" drill %" dia. x 6" holes 0 8" c/c & set *4 bars 0 8" in epoxy Section C - Entry Landing (Level 3) 3/4" = 11 -0" 17" *3 0 8" ties & hairpins .,; *5 vert. Column Detail - C 1 N.T.S. Denotes Existing Areas Not Part of this Project Scope / No Habitable Space on this Floor +22'_0" fin. conc. landing bottom of existing beam drill Y8" diameter holes x 6" deep and fill w /epoxy paste typical each bar 1-+6 dowels x 3' -0" long drill %8" diameter holes x 6" deep and fill w /epoxy paste typical each bar 1- *6 dowels at centerline of existing beam x 3" -0" long block wall `—top of existing 1'1'r " F � $ „1 concrete footing 111 I'�/11A iii (10I L f,) Nl G 1� E� , � -r. S7'lt.lr': r Ilr: +a<i.d;(;`i`1RA3 Note: 1 *6 in block cell filled w /3000 PSI ff" o pump mix leave one face of block open j Typical Filled Cell 3/4 =1 -0' 113ROCKH(DUSE BROCKHOUSE ASSOCIA'T`ES PA 4973 S. W. 75th AVENUE M IANTI, FI -OP-MA 33155 305 666 2333 ■ FAX 666 2332 AR 1-0682 AA 0002456 BRUCE BROCKHOUSE ARCIIITECTURE ■ INTERIOR DESIGN PROJECT An Interior Renovation to the Medical Offices of: DR. SANDING GONZALEZ 6150 Sunset Drive South Miami, Florida 33143 0 N. OSCAR GONZALEZ, P.E. CONSULTING STRUCTURAL ENGINEER P.E. # 31964 STRUCTURAL 11462 S.W. 75 TERR. MIAMI, FLORIDA 33173 30"96-4874 +Y:f��ITlIy1L =1I STRUCTURAL SHEET TITLE REFERENCE ALL CONCEPTS, DESIGNS, ARRANGEMENTS, DRAWINGS AND SPECIFICATIONS ARE OWNED BY, AND ARE THE PROPERTY OF THIS OFFICE AND WERE CREATED,EVOLVED AND DEVELOPED FOR USE ON, AND IN CONJUNCTION WITH, THE SPECIFIED PROJECT. NONE OF SUCH IDEAS, DESIGNS, ARRANGEMENTS OR PLANS SHAW BE USED BY OR DISCLOSED TO ANY PERSON, FIRM OR CORPORATION FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN PERMISSION OF: BROCKHOUSE ASSOCIATES, PA- REVISION DESIGNED BY B.A. DRAWN BY B.A. APPROVED BY S.G. DATE 7 -13 -12 SCALE 1/4#1= 1 1 -011 PROJECT NO. 12018 SHEET NO. ¢f ' new. Asia l A), i-' -i� i .ir� I A•' 'A■ % -� .. 7'1.7 1^ I pl. + p y -317W. 't Y A A � MIV � is -.. � d • A ■ , i ■ - 211-:.-:.i_ 11 2 31 www�ww wr itir�iiwirww ��`iirM 81 -011 F -4 x 8 W -611 iv +01 -011 fin. conc. slab existing footing exist. slab remove portions of exist footings I I 1 existing concretb column & footing - existing concrete footing drill Y14" dia, x " deep hole ach bar & set *5 or in epoxy exist. 24" concrete Structural Foundation Plan - Level 1 1/4" = 1 ' -0" existing concrete walkway repair any damage to existing concrete slab /Denotes Existing Areas Not Part of this Project Scope i No Habitable Space on this Floor provide control joint in tile or any other finish along this line see Section D /S.2 for reinforcing new landing slab 8" x 16" concrete beam w/4 *5 & *3 a 6" between new CMU wall & elevator wall (at elevator . wall drill (4)Y4" x 6" holes & set 4 *5 bars in epoxy) Section A - Stair Landing (Level 2) 3/4" = F -0" drill (4) %" x 6" holes & set 4 *5 2' -6" long in epoxy exist. 2nd floor slab over precast joists Structural Stairway Plan - Level 2 1/4" = V-0" +10' -011 exist. conc. slab Section B - Entry Landing (Level 3) 3/4" = 1' -0" Denotes Existing Areas Not Part of this Project Scope No Habitable Space on this Floor (X *4 a 6" top 4 *4 bott. *4 0 8" bott. 2 *5 top & 2 *5 bott. drill & set in epoxy from bottom sides (elevator wall & opposite corner) & lapped full length edge of elevator wall existing concrete slab (verify in field) 10 x 16 concrete beam (see sections) r +221 -011 fin. conc. landing N cn I I I .ID I PI Al I�TI I d L �_r T � p •, -`p •`° D 1 W -711 ^ A o \72 *5 top & 2 *5 bottom 0 4" c/c 0 edge of stairway iii D A A A ° 31 °1¢11' p 101 '31.i0,11 D A . `A A A Ate'• A I81 -64' fV 4 +16' -6" fin. conc. landing Z Structural Stairway Plan - Level 3 1/4" = F-0" drill %" dia. x 6" holes 0 8" c/c & set *4 bars 0 8" in epoxy Section C - Entry Landing (Level 3) 3/4" = 11 -0" 17" *3 0 8" ties & hairpins .,; *5 vert. Column Detail - C 1 N.T.S. Denotes Existing Areas Not Part of this Project Scope / No Habitable Space on this Floor +22'_0" fin. conc. landing bottom of existing beam drill Y8" diameter holes x 6" deep and fill w /epoxy paste typical each bar 1-+6 dowels x 3' -0" long drill %8" diameter holes x 6" deep and fill w /epoxy paste typical each bar 1- *6 dowels at centerline of existing beam x 3" -0" long block wall `—top of existing 1'1'r " F � $ „1 concrete footing 111 I'�/11A iii (10I L f,) Nl G 1� E� , � -r. S7'lt.lr': r Ilr: +a<i.d;(;`i`1RA3 Note: 1 *6 in block cell filled w /3000 PSI ff" o pump mix leave one face of block open j Typical Filled Cell 3/4 =1 -0' 113ROCKH(DUSE BROCKHOUSE ASSOCIA'T`ES PA 4973 S. W. 75th AVENUE M IANTI, FI -OP-MA 33155 305 666 2333 ■ FAX 666 2332 AR 1-0682 AA 0002456 BRUCE BROCKHOUSE ARCIIITECTURE ■ INTERIOR DESIGN PROJECT An Interior Renovation to the Medical Offices of: DR. SANDING GONZALEZ 6150 Sunset Drive South Miami, Florida 33143 0 N. OSCAR GONZALEZ, P.E. CONSULTING STRUCTURAL ENGINEER P.E. # 31964 STRUCTURAL 11462 S.W. 75 TERR. MIAMI, FLORIDA 33173 30"96-4874 +Y:f��ITlIy1L =1I STRUCTURAL SHEET TITLE REFERENCE ALL CONCEPTS, DESIGNS, ARRANGEMENTS, DRAWINGS AND SPECIFICATIONS ARE OWNED BY, AND ARE THE PROPERTY OF THIS OFFICE AND WERE CREATED,EVOLVED AND DEVELOPED FOR USE ON, AND IN CONJUNCTION WITH, THE SPECIFIED PROJECT. NONE OF SUCH IDEAS, DESIGNS, ARRANGEMENTS OR PLANS SHAW BE USED BY OR DISCLOSED TO ANY PERSON, FIRM OR CORPORATION FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN PERMISSION OF: BROCKHOUSE ASSOCIATES, PA- REVISION DESIGNED BY B.A. DRAWN BY B.A. APPROVED BY S.G. DATE 7 -13 -12 SCALE 1/4#1= 1 1 -011 PROJECT NO. 12018 SHEET NO.