12-729-002C O N S T R U C T I O N
1. CONSTRUCTION NOTES AND GENERAL CONDITIONS
1.1 ALL WORK LISTED ON THE CONSTRUCTION NOTE SHEETS AND
SHOWN OR IMPLIED ON ALL DRAWINGS SHALL BE SUPPLIED AND
INSTALLED BY THE GENERAL CONTRACTOR UNLESS OTHERWISE
NOTED ON DRAWINGS AND /OR IN SPECIFICATION. HOWEVER, IT
IS EXPECTED THAT THE GENERAL CONTRACTOR SHALL CLOSELY
COORDINATE HIS WORK WITH THE WORK OF ALL CONTRACTORS TO
ASSURE THAT ALL SCHEDULES ARE MET.
1.2 ALL WORK SHALL COMPLY WITH THE REGULATIONS OF THE
GOVERNMENTAL AUTHORITIES HAVING JURISDICTION. THE
SPECIFICATIONS SHALL BE SUPPLEMENTAL TO ALL LAWS AND
CODES OF GOVERNMENTAL REGULATING BODIES RELATING TO
BUILDINGS AND ALL APPLICABLE REQUIREMENTS SPECIFIED IN
THESE REGULATIONS SHALL BE FOLLOWED AS SPECIALLY
NOTED IN THE SPECIFICATIONS OR DRAWINGS.
THIS SHALL NOT, HOWEVER, BE CONSTRUED TO MEAN THAT ANY
REQUIREMENTS SET FORTH IN THE SPECIFICATIONS CAN BE
MODIFIED BECAUSE THEY ARE NOT SPECIFICALLY NOTED BY
SUCH CODES OF LAWS.
1.3 ALL DRAWINGS AND CONSTRUCTIONS NOTES ARE COMPLEMENTARY
AND WHAT IS CALLED FOR BY ANY WILL BE BINDING AS IF
CALLED FOR BY ALL.
1.4 THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY
IF IT CANNOT COMPLY WITH ALL NOTES CALLED FOR ON THIS
SHEET AND ON ALL OTHER INCLUDED DRAWINGS.
1.5 BEFORE COMMENCING ANY WORK, THE CONTRACTOR SHALL NOTIFY
THE ARCHITECT AND SHALL REQUEST CLARIFICATION OF ANY
DISCREPANCIES BETWEEN THE DRAWINGS, THE CONSTRUCTION
NOTES AND FIELD CONDITIONS.
1.6 WHERE THE TERM "APPROVED" OR "APPROVED EQUAL" IS USED
IN THESE SPECIFICATIONS, IT SHALL BE UNDERSTOOD THAT
THE REFERENCE IS MADE TO THE RULING AND JUDGMENT OF AND
THE PROPOSED SUBSTITUTE SHALL BE SUBMITTED FOR REVIEW
AND WRITTEN APPROVAL.
1.7 ALL CORRESPONDENCE TO THE ARCHITECT OR TO THE CLIENT
SHALL BE FORWARDED IN COPY TO THE OTHER PARTY.
1.8 THE GENERAL CONTRACTOR SHALL SUBMIT FOR APPROVAL ALL
SHOP DRAWINGS SCHEDULES AND FIXTURE CUTS IN TRIPLICATE,
ONE COPY IN SEPIA FORM. ALL SHOP DRAWINGS AND CUTS
MARKED "APPROVED" SHALL SUPERSEDE THE ORIGINALS.
1.9 ALL ARCHITECT APPROVALS SHALL BE FOR DESIGN APPEARANCE
ONLY. CONTRACTOR(S) AND ENGINEER(S) SHALL BE
RESPONSIBLE TO VERIFY QUANTITIES, DIMENSIONS AND
COMPLIANCE WITH CONTRACT DOCUMENTS AND FOR INFORMATION
PERTAINING TO FABRICATION PROCESSES OR TECHNIQUES OF
FIRST CLASS CONSTRUCTION AND FOR COORDINATION WITH
OTHER TRADES.
1.10 ALL SHOP DRAWINGS SHALL BE FILED BY THE GENERAL
CONTRACTOR. IN ADDITION, ALL ENGINEERING DRAWINGS SHALL
BE FILED BY THE RESPECTIVE ENGINEERS /CONTRACTOR.
1.11 THE CHARACTER AND SCOPE OF THE WORK ARE ILLUSTRATED BY
THE DRAWINGS LISTED. ANY ADDITIONAL DETAIL DRAWINGS
REQUIRED TO INTERPRET AND EXPLAIN THE DRAWINGS AND
OTHER INFORMATION DEEMED NECESSARY BY ARCHITECT SHALL
BE FURNISHED TO THE CONTRACTOR AS REQUIRED BY THE WORK.
IT SHALL BE UNDERSTOOD THAT THIS ADDITIONAL DATA SHALL
BE CONSIDERED AS FORMING A PART OF THESE NOTES AS THEY
RELATE.
1.12 THE USE OF THE WORDS "SUPPLIED BY" OR "PROVIDED ", IN
CONNECTION WITH ANY ITEM SPECIFIED, IS INTENDED TO MEAN
THAT SUCH ITEM SHALL BE FURNISHED, INSTALLED AND
CONNECTED WHERE SO REQUIRED (UNLESS OTHERWISE NOTED).
1.13 EACH CONTRACTOR SHALL MAKE ALL REQUIRED ARRANGEMENTS
FOR DELIVERY OF EQUIPMENT AND /OR MATERIALS. IT SHALL
BE THE RESPONSIBILITY OF EACH CONTRACTOR TO CHECK THE
RULES AND REGULATIONS GOVERNING WORK ON THE PREMISES.
2. PARTITIONS
2.1 ALL GYPSUM WALLBOARD PARTITIONS SHALL BE ERECTED AS
SHOWN ON THE PLANS, DETAILS OR AS CALLED FOR IN
SPECIFICATIONS (NOTES). ALL GYPSUM WALLBOARD PARTITION
JOINTS SHALL BE LOCATED SO THAT PANEL EDGES FALL ON
ALTERNATE STUDS. ALL GYPSUM WALLBOARD TO BE ATTACHED
TO FRAMING WITH FASTENERS WITHIN THE PROPER SPACING.
ALL JOINTS SHALL BE TAPED, SPACKLED, AND FINISHED WITH
WON COTE WALL TREATMENT. ARCHITECT TO APPROVE CHALK
LINES.
2.2 ALL DOORS IN DRYWALL OR MASONRY PARTITIONS SHALL BE SET
4" FROM CLEAR OPENING OF BUCK TO IMMEDIATE ADJACENT
WALL UNLESS OTHERWISE NOTED (SEE 4.5)
2.3 THE GENERAL CONTRACTOR, IN COORDINATION WITH THE
CABINET CONTRACTOR, SHALL PROVIDE ALL LINE AND GRADE
MARKINGS ON THE FINISHED FLOOR FOR ALL PARTITIONS AND
APPROVAL.
2.4 WALLS SHOWN ALIGNED WITH BASE BUILDING STRUCTURE SHALL
BE FLUSH AND SMOOTH WITH BASE BUILDING STRUCTURE UNLESS
OTHERWISE NOTED. ALL EXISTING BEADS SHALL BE REMOVED
AND JOINTS TAPED AND SPACKLED PROPERLY.
2.5 CORNER BEADS SHALL BE USED AT ALL EXPOSED GYPSUM
BOARD CORNERS, ENDS AND /OR AS OTHERWISE SHOWN ON DRAWINGS.
2.6 ALL PARTITIONS SHALL BE ANCHORED FIRMLY AS PER
MANUFACTURER'S SPECIFICATIONS AND BUILDING CODE
REQUIREMENTS.
2.7 THE GENERAL CONTRACTOR SHALL SUPPLY ALL W.O. (WALL
OPENINGS) IN PARTITIONS ABOVE HUNG CEILINGS AS SHOWN ON
ENGINEER'S HVAC DRAWINGS.
2.8 THERE SHALL BE NO HORIZONTAL JOINTS ON EXPOSED SURFACES
OF GYPSUM BOARD WALLS.
2.9 THE GENERAL CONTRACTOR SHALL PROVIDE SUFFICIENT FRAMING
FOR ALL OPENINGS FOR DUCTWORK, RETURN AIR OPENINGS AND
GRILLE OPENINGS ABOVE AND BELOW HUNG CEILINGS. THESE
ARE TO BE COORDINATED WITH HVAC DRAWINGS, ALL OPENINGS
SHALL BE PROPERLY SEALED FOR SOUNDPROOFING AND
VIBRATION.
2.10 UNLESS OTHERWISE NOTED, ALL PARTITIONS SHALL BE FURNISHED
WITH A BASE IN FINISH AS SPECIFIED ON FINISH SCHEDULES
(SEE 9.3).
2.11 THE CONTRACTOR SHALL PROVIDE CENTRALLY LOCATED
BENCHMARKS FOR USE BY ALL TRADES.
2.12 ALL LAYERS, IF GYPSUM BOARD IN MULTI-LAYER APPLICATION,
SHALL BE APPLIED WITH SCREWS.
3. PATCHING AND CUTTING
3.1 THE GENERAL CONTRACTOR SHALL DO ALL CUTTING, FITTING AND
PATCHING OF WORK THAT MAY BE REQUIRED TO MAKE ALL WORK
COME TOGETHER PROPERLY AND FIT PROPERLY TO RECEIVE OR
BE RECEIVED BY WORK BY OTHER CONTRACTORS SHOWN UPON OR
REASONABLY IMPLIED BY THE DRAWINGS AND /OR NOTES.
3.2 THE GENERAL CONTRACTOR SHALL PROVIDE ALL FLOOR CUT -OUTS
AND PATCHING REQUIRED FOR THE INSTALLATION OF ALL WORK.
THE GENERAL CONTRACTOR SHALL SURVEY ALL EXISTING
FINISHED SURFACES TO INCLUDE CORNER BEADS, STOPS, ETC.
FOR CHIPS, CRACKS, HOLES, DAMAGED SURFACES AND ANY
OTHER DEFECTS CAUSING AN APPEARANCE DIFFERENT FROM A
NEW FIRST CLASS FINISHED INSTALLATION. THESE DEFECTIVE
SURFACES SHALL BE REPAIRED, OR IF BEYOND REPAIRING,
THEN THE GENERAL CONTRACTOR SHALL REMOVE EXISTING AND
INSTALL NEW SURFACES TO THE SATISFACTION OF THE ARCHITECT
3.3 ALL OTHER DAMAGED SURFACES (FINISHED FLOOR SLAB, WINDOW
ENCLOSURES, ETC.) SHALL BE REPAIRED TO THE SATISFACTION
OF THE ARCHITECT.
3.4 THE GENERAL CONTRACTOR SHALL INSPECT ALL SURFACES
WHERE, AS A RESULT OF DEMOLITION, THE FINISHED SURFACES
DO NOT ALIGN. THE EXISTING SURFACE SHALL BE REMOVED
AND REINSTALLED TO ACHIEVE A SMOOTH, FLUSH AND ALIGNED
SURFACE.
4. WINDOWS, DOORS, BUCKS AND HARDWARE
4.1 THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL ALL
DOORS AND WINDOWS, BUCK ASSEMBLIES AND HARDWARE 1N
ACCORDANCE WITH DOORS AND WINDOWS SCHEDULES.
4.2 THE CABINET CONTRACTOR SHALL INSTALL HARDWARE IN HIS
WORK SUPPLIED TO HIM BY THE GENERAL CONTRACTOR. THE
CABINET CONTRACTOR SHALL ALSO PROVIDE AND INSTALL ALL
NON-STANDARD CABINET HARDWARE IN HIS WORK.
4.3 ALL NEW LOCK SETS SHALL BE KEYED IN ACCORDANCE WITH THE
BUILDING OWNER REQUIREMENTS. KEYS ARE TO BE DELIVERED
TO THE CLIENT PROPERLY LAGGED AND TESTED. PROVIDE
THREE (3) MASTER KEYS AND THREE (3) PASS KEYS FOR EACH
LOCK.
4.4 PROVIDE THREE (3) DOOR SILENCERS FOR EACH SINGLE HINGED
DOOR AND EIGHT (8) FOR EACH PAR OF SLIDING DOORS.
4.5 ALL INTERIOR DOORS SHALL HAVE A 1" UNDERCUT UNLESS
OTHERWISE NOTED.
4,6 UNLESS OTHERWISE DIMENSIONED, ALL DOORS SHALL BE SET 4"
FROM CLEAR OPENING OF BUCK TO IMMEDIATELY ADJACENT
PARTITION (SEE 2.2).
4.7 ALL EXTERIOR DOORS AND WINDOWS SHALL BE PROVIDED WITH
SHUTTERS OR BE IMPACT RESISTANT IN ORDER TO MEET SOUTH
FLORIDA BUILDING CODE'S PRODUCT APPROVAL.
5. CEILINGS
5.1 THE GENERAL CONTRACTOR SHALL SUPPLY AND INSTALL ALL NEW
CEILING AND SUSPENSION SYSTEMS WHERE INDICATED
IN PLANS.
N O T E S A N D G E N
5.2 SUSPENDED CEILING HEIGHTS SHALL BE SHOWN ON REFLECTED
CEILING PLANS AND ANY DEVIATION FROM HEIGHTS SHOWN WILL
BE SUBMITTED TO THE ARCHITECT FOR APPROVAL.
5.3 THE GENERAL CONTRACTOR SHALL PROVIDE CUTOUTS AND OTHER
SPECIAL PROVISIONS IN CEILINGS REQUIRED FOR LIGHTING
FIXTURES, REGISTERS, DIFFUSERS AND OTHER INSERTED
ITEMS.
5.4 THE GENERAL CONTRACTOR'S CEILING CONTRACTOR SHALL
CLOSELY COORDINATE HIS WORK WITH THAT OF THE DRYWALL,
CABINET, PLUMBING, HVAC AND ELECTRICAL CONTRACTORS,
INCLUDING TELEPHONE & SOUND SYSTEM WHEREVER THEIR
RESPECTIVE WORK IS CONTIGUOUS.
5.5 PRIOR TO CLOSING UP ANY CEILING, ALL PLENUM SYSTEMS
(HVAC, PLUMBING ELECTRICAL) SHALL BE INSPECTED AND,
WHERE REQUIRED, TESTED BY CONTRACTORS, ENGINEERS AND BY
AUTHORITIES HAVING JURISDICTION TO INSURE THEIR PROPER
INSTALLATION AND FUNCTION.
5.6 SOUND SYSTEM CONTRACTOR TO COORDINATE ACCESS PANEL TILES
WITH OTHER TRADES, I.E. CABINET WORK, ETC.
6. ROOFING / MOISTURE PROTECTION
REFER TO ATTACHED SPECIFICATION PACKAGE PROVIDED WITH DRAWING SET.
7. LIGHTING AND ELECTRICAL /TELEPHONE /SOUND SYSTEM
7.1 THE GENERAL CONTRACTOR'S ELECTRICAL CONTRACTOR SHALL
FURNISH AND /OR INSTALL ALL LIGHTING FIXTURES AND
ELECTRICAL WORK AS SHOWN ON ALL DRAWINGS AND NOTES.
7.2 ALL ELECTRICAL /TELEPHONE RECEPTACLES AND LIGHT FIXTURES
SHALL BE AS SHOWN ON ENGINEERING DRAWINGS AND LOCATED
AS INDICATED ON PLANS. ARCHTECT'S DRAWINGS ARE
FOR AESTHETIC PURPOSE, CIRCUITING AND LOAD CALCULATION
SHALL BE SUPPLIED BY ELECTRICAL ENGINEERS.
7.3 THE ELECTRICAL CONTRACTOR SHALL COORDINATE HIS WORK
WITH THE MANUFACTURER'S SPECIFICATIONS
7.4 THE WORK SHALL BE INSTALLED IN STRICT ACCORDANCE WITH
THE REQUIREMENTS OF THE NATIONAL BOARD OF FIRE
UNDERWRITERS, PUBLIC UTILITIES COMPANY, TELEPHONE
COMPANY AND ALL OTHER AUTHORITIES HAVING JURISDICTION.
7.5 ALL MATERIALS SHALL BE NEW AND CONFORM WITH THE
STANDARDS OF THE' UNDERWRITER'S LABORATORIES INC. IN
EVERY CASE WHERE SUCH A STANDARD HAS BEEN ESTABLISHED
FOR THE PARTICULAR TYPE OF MATERIAL IN QUESTION.
7.6 PROPOSALS SHALL BE BASED UPON FURNISHING NEW ADDITIONAL
LIGHTING FIXTURES (INCLUDING ALL LAMPING) OF TYPES AND
MANUFACTURERS AS INDICATED ON REFLECTED CEILING PLANS.
7.7 GENERAL AND ELECTRICAL CONTRACTORS SHALL CHECK ALL
CEILING HEIGHTS AND CEILING PLENUM CONDITIONS FOR
CLEARANCE, DUCTWORK, LIGHTING AND OTHER CEILING
OBSTRUCTIONS TO ASSURE THE FINISHED CEILING HEIGHT
SHOWN ON DRAWINGS. ANY DISCREPANCY WILL BE BROUGHT TO
ATTENTION.
7.8 THE ELECTRICAL CONTRACTOR SHALL SUBMIT CUTS OF ALL
FIXTURES AS DIRECTED.
7.9 THE ELECTRICAL CONTRACTOR SHALL COORDINATE ANY
ELECTRICAL OR LIGHTING INSTALLATION INTO CABINETWORK
WITH CABINET CONTRACTOR.
7.10 THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL TEMPORARY
LIGHTING AND POWER FOR ALL TRADES.
7.11 UNLESS OTHERWISE NOTED, ALL SWITCHES SHALL BE SET 10"
FROM CENTER LINE OF FIRST TOGGLE TO THE CLEAR OPENING
OF DOOR AND 48" ABOVE FINISH FLOOR TO CENTER LINE OF
TOGGLE.
7.12 WHERE MORE THAN ONE SWITCH OCCURS IN THE SAME LOCATION,
THEY SHALL BE INSTALLED IN GANGTYPE BOX UNDER ONE COVER
PLATE.
7.13 ALL ELECTRICAL /TELEPHONE COVER PLATES SHALL BE FLUSH
TYPE WHITE AS MANUFACTURED BY LEVITON OR EQUAL (TO BE
APPROVED BY THE ARCHITECT).
7.14 ALL ELECTRICAL, TELEPHONE RECEPTACLES, AND LIGHT
FIXTURES SHALL BE LOCATED AS INDICATED ON PLANS.
7.15 ALL OUTLETS ON COLUMNS WILL BE CENTERED ON FACE SHOWN
UNLESS OTHERWISE NOTED.
7.16 ALL DUPLEX RECEPTACLES AND OTHER OUTLETS IN WALL WITH
SPECIAL APPLIED FINISHES (WOOD PANELING, PLASTIC
LAMINATE, CORK, ETC.) SHALL HAVE THE FACE OF THE
ROUGHING BOX SET FLUSH WITH THE FACE OF THE APPLIED
FINISH. (SEE ELEVATIONS AND DETAIL DRAWINGS.)
7.17 ALL ELECTRICAL WORK SHALL BE COORDINATED WITH AIR
CONDITIONING WORK, PLUMBING WORK, CABINETWORK,
PARTITION WORK, ETC., WHERE REQUIRED.
7.18 ALL ELECTRICAL AND TELEPHONE WIRING CONDUIT SHALL BE
CONCEALED IN DRYWALL OR MASONRY PARTITIONS.
E R A L C CD N
7.19 ALL TELEPHONE OUTLET PLATES SHALL HAVE A 1 -112" CUT OUT
(OR AS OTHERWISE SHOWN) WITH RUBBER GROMMET.
7.20 THE GENERAL CONTRACTOR SHALL PROVIDE ALL CUTTING AND
PATCHING OF ALL CHASES IN FLOORS, WALLS, AND CEILINGS
AS REQUIRED.
7.21 ALL ELECTRICAL CIRCUITS SHALL BE TAGGED OR MARKED WITH
ITS ROOM OR LOCATION NUMBER OF PANEL BOXES TO
FACILITATE FUTURE WORK.
7.22 VERIFY LOCATION OF SOUND SYSTEM EQUIPMENT AND RELATED
AUDIO-VISUAL SYSTEMS WITH LOCATION OF PROPOSED ELECTRICAL
OUTLETS /FIXTURES AND OTHER TRADES (I.E. HVAC, PLUMBING &
LIFE SAFETY)
8. HEATING, VENTILATION AND AIR CONDITIONING
8.1 THE GENERAL CONTRACTOR'S AIR CONDITIONING CONTRACTOR
SHALL SUPPLY ALL HVAC WORK AS SHOWN ON CONSTRUCTION
DRAWINGS AND AS PER ENGINEERING DRAWINGS.
8.2 HVAC DESIGN IS TO INCLUDE DUCTWORK, CONTROLS,
DIFFUSERS, STRIP HEATERS, REGISTERS, THERMOSTATS, DOOR
LOUVERS AND REQUIRED ACCESS DOORS.
8.3 AIR CONDITIONING, ENGINEERING AND SHOP DRAWINGS SHALL
MAINTAIN CEILING HEIGHTS AS SHOWN ON DRAWINGS. ANY
VARIATIONS SHALL BE REPORTED TO THE ARCHITECT.
8.4 THE AIR CONDITIONING DIFFUSERS AND REGISTERS IN ALL
AREAS SHALL BE SET PER STARTING POINTS ON REFLECTED
CEILING PLANS. SUBMIT CUTS ON ALL GRILLES & LINEAR
DIFFUSERS TO THE ARCHITECT FOR APPROVAL.
8.5 THE AIR CONDITIONING CONTRACTOR'S FABRICATION DRAWINGS
OF ALL DUCTWORK, DIFFUSERS AND REGISTERS (ACCESS IF
REQUIRED) SHALL BE SUBMITTED TO ARCHITECT AND THE
CONSULTING ENGINEER FOR APPROVAL PRIOR TO
PROCEEDING WITH FABRICATION AND /OR INSTALLATION.
8.6 THE HVAC CONTRACTOR'S INSTALLATION SHALL BE COORDINATED
WITH ALL TRADES AS REQUIRED FOR PROPER ASSEMBLY.
8.7 THE HVAC CONTRACTOR SHALL PROVIDE ALL FIRE DAMPERS WHERE
REQUIRED.
9. PLUMBING
9.1 THE GENERAL CONTRACTOR'S PLUMBING CONTRACTOR SHALL
SUPPLY AND INSTALL PLUMBING ROUGHING, FIXTURES AND
ACCESSORIES SHOWN ON CONSTRUCTION PLANS AND DETAIL
DRAWINGS AS PER ENGINEERING DRAWINGS.
9.2 THE PLUMBING CONTRACTOR SHALL SUBMIT CUTS OF ALL
FIXTURES, FITTINGS AND ACCESSORIES FOR THE ARCHITECT'S
APPROVAL.
9.3 THE PLUMBING CONTRACTOR SHALL COORDINATE HIS WORK WITH
THE MANUFACTURER'S SPECIFICATIONS.
9.5 THE PLUMBING CONTRACTOR SHALL COORDINATE HIS WORK WITH
THAT OF ALL TRADES.
9.6 THE PLUMBING CONTRACTOR SHALL FURNISH ALL VALVES AS
INDICATED ON THE DRAWINGS OR AS MAY BE REQUIRED FOR THE
PROPER CONTROL OF THE VARIOUS APPARATUS AND PIPELINES
INSTALLED UNDER THIS SECTION SO THAT ANY FIXTURES,
LINES OR PIECES OF APPARATUS MAY BE CUT OFF FOR REPAIR
WITHOUT INTERFERENCE OR INTERRUPTION OF SERVICE TO THE
REST OF THE RESIDENCE. BEFORE BEING COVERED UP OR BUILT
IN, ALL PIPING SHALL BE TESTED AS REQUIRED BY THE
AUTHORITIES HAVING JURISDICTION.
10. FLOOR COVERING
10.1 THE GENERAL CONTRACTOR SHALL FLASH PATCH ALL CRACKS,
HOLES OR OTHER IMPERFECTIONS (PROJECTS SHALL BE REMOVED
AND PATCHED) TO PROVIDE A CONTINUOUS SMOOTH FLOOR
SURFACE FOR HIS WORK. THE GENERAL CONTRACTOR SHALL
NOTIFY ARCHITECT AFTER ALL FLOOR PATCHING IS
COMPLETED AND RECEIVE THEIR APPROVAL PRIOR TO
INSTALLATION OF FINISHED FLOORING. ALL NEW FLOOR TILE
IS TO BE INSTALLED BY THE GENERAL CONTRACTOR UNLESS
OTHERWISE INDICATED.
10.2 ALL WORKMANSHIP SHALL BE OF THE BEST QUALITY AND WHEN
THE WORK IS COMPLETED IT SHALL BE FREE FROM BUCKLES,
CRACKS, OPEN JOINTS OR OTHER IMPERFECTIONS. SEAMS
& GROUT LINES SHALL BE KEPT IN ACCURATE ALIGNMENT ALONG
BOTH COORDINATES. TILE HAVING CHIPPED OR ROUNDED CORNERS
WILL BE REJECTED AND, IF LAID SHALL BE REMOVED AND
REPLACED WITH ACCEPTABLE TILE. ALL WORKMANSHIP WHICH
IS NOT JUDGED TO BE FIRST QUALITY BY THE ARCHITECT
OR OWNER'S REPRESENTATIVE SHALL NOT BE ACCEPTED.
10.3 TILE SHALL BE LAID IN A SQUARE PATTERN WITH COURSES
PARALLELED TO WALLS UNLESS OTHERWISE INDICATED ON
DRAWINGS. THE TILE SHALL BE SECURELY CEMENTED AND
SHALL BE LAID WITH TIGHT BUTT JOINTS. THE ADHESIVE
USED FOR CEMENTING TILE SHALL BE APPLIED FAR ENOUGH IN
ADVANCE OF THE TILE SETTING TO PERMIT THE ADHESIVE TO
REACH ITS INITIAL SET, BUT NOT ITS FINAL SET.
10.4 UPON COMPLETION, ALL WORK SHALL BE CLEANED BY THE
CONTRACTOR. ALL SPOTS OF GROVE ADHESIVE AND SURFACE
STAINS, ALL SCRAP, CARTONS AND CONTAINERS SHALL BE
REMOVED FROM THE BUILDING.
11. PAINTING AND WALLCOVERINGS
11.1 UNLESS OTHERWISE SPECIFIED, ALL AREAS ARE TO BE PAINTED
IN ACCORDANCE WITH FINISH PLANS, INCLUDING BUT NOT LIMITED
TO UTILITY CLOSETS AND STORAGE AREAS.
11.2 WALLS SHALL INCLUDE SURFACES FROM FLOOR TO CEILING
INCLUDING PILASTERS, FASCIAS, JAMBS, BUCKS, REVEALS,
RETURNS AND ALL VERTICAL SURFACES NOT INCLUDED IN
CEILING.
11.3 CEILINGS FOR PAINT SHALL INCLUDE THE GENERAL SURFACE OF
THE CEILING (INCLUDING LUMINOUS PLENUM SIDES . AND
SOFFITS), BREAKS, DRAPERY POCKETS, ETC.
11.4 PAINT COLORS SHALL BE AS SPECIFIED ON SCHEDULES AND THE
GENERAL CONTRACTOR SHALL SUBMIT SAMPLES 30'X 30" TO
THE ARCHITECT FOR APPROVAL. SAMPLES SHALL BE
SUBMITTED OR FIELD APPLIED ON THEIR RESPECTIVE
SURFACES.
11.5 ALL WALLS AND CEILING SHALL BE PROPERLY PREPARED,
SPACKLED, SANDED, ETC. TO PROVIDE A PERFECTLY SMOOTH
FINISH AND SURFACE.
11.6 ALL SPACES SHALL BE PAINTED IN COLORS SHOWN ON FINISH
SCHEDULE. THE CONTRACTOR SHALL, UPON COMPLETION,
REMOVE ALL PAINT FROM WHERE IT HAS SPILLED, SPLASHED OR
SPLATTERED ON SURFACES INCLUDING LIGHT FIXTURES,
DIFFUSERS AND REGISTERS ALSO FITTINGS, ETC. HE SHALL
REMOVE ALL ELECTRIC SWITCH AND OUTLET PLATES, SURFACE
HARDWARE, ETC. BEFORE PAINTING, PROTECTING AND
REPLACING SAME WHEN PAINTING HAS BEEN COMPLETED.
11.7 THE CONTRACTOR SHALL USE LATEX OR ALKYD BASE PAINT IN
COLORS SELECTED BY THE ARCHITECT. HE SHALL
PROPERLY PREPARE ALL SURFACES TO RECEIVE ONE (1) PRIME
COAT AND TWO (2) FINISH COATS OF PAINT (UNLESS
OTHERWISE NOTED).
11.8 THE CONTRACTOR SHALL INSTALL WALLCOVERINGS WHERE
DESIGNATED. ALL WALLCOVERINGS SHALL BE SMOOTH WITH NO
WRINKLES, BUBBLES OR LOOSE EDGES. ALL PASTE AND BRUSH
MARKS SHALL BE THOROUGHLY REMOVED. WALLCOVERING AND
ADJOINING WOOD OR METAL TRIM SHALL BE CUT STRAIGHT AND
SQUARE. ALL WORKMANSHIP WHICH IS NOT JUDGED TO BE
FIRST QUALITY BY THE ARCHITECT SHALL NOT BE
ACCEPTED. THERE SHALL BE NO VERTICAL JOINTS AT
SURFACES SMALLER THAN 4' -0" IN WIDTH. WALLS RECEIVING WALL
COVERING SHALL BE PRIMED PRIOR TO INSTALLING THE WALL
COVERING.
11.9 ALL EXISTING LOOSE PAINT SHALL BE REMOVED AND SPACKLED
OR PLASTER PATCHED.
11.10 ALL EXISTING UNEVENNESS IN ALL PARTITIONS SHALL BE
SANDED OR CHIPPED AWAY AND SURFACES PLASTER PATCHED OR
SPACKLED TO ENSURE A PERFECTLY EVEN SURFACE. ARCHITECT
SHALL APPROVE ALL SURFACES PRIOR TO THE APPLICATION
OF FINISH PAINT COAT.
11.11 THE GENERAL CONTRACTOR SHALL EXAMINE ALL AREAS OF
CONSTRUCTION AFTER COMPLETION OF WORK BY ALL TRADES
(INCLUDING TELEPHONE INSTALLATION, FLOORING, ETC.) AND
PROVIDE NECESSARY "TOUCH -UP" PAINTING AND /OR PATCHING.
ED I T I O N
12. CABINETRY
12.1 ALL FINISHED CABINET WOOD AND FINISHES SHALL BE AS
NOTED ON ALL DRAWINGS CONCERNED.
12.2 THE CABINET CONTRACTOR SHALL CHECK AND VERIFY ALL
DIMENSIONS AND CONDITIONS AT THE JOB SITE.
12.3 THE CABINET CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS
TO ARCHITECT THRU THE GENERAL CONTRACTOR FOR APPROVAL
(TWO SETS).
12.4 THE CABINET CONTRACTOR SHALL SUBMIT FINISH SAMPLES FOR
APPROVAL.
12.5 THE CABINET CONTRACTOR SHALL CHECK JOB PROGRESS AND
COORDINATE WITH OTHER TRADES INVOLVED.
12.6 ALL BLOCKING REQUIRED SHALL BE SCRIBED TO WALL OR
CEILING. IN ADDITION, ALL WOODWORK ATTACHED TO THE
PREMISES SHALL BE FIREPROOFED AND CONFORM WITH LOCAL
BUILDING CODES.
12.7 GROUNDS, FURRING, STRAPPING AND BLOCKING SHALL CONSIST
OF NO. 1 COMMON SPRUCE, FREE FROM KNOTS WHICH WOULD
AFFECT THE STRENGTH OR RENDER NAILING DIFFICULT. IN
ADDITION, ALL GROUNDS, FURRING AND BLOCKING SHALL BE
FIREPROOFED AND CONFORM WITH LOCAL BUILDING CODES.
12.8 ALL MATERIALS FOR INTERIOR WOODWORK SHALL BE KILN -
DRIED.
12.9 ALL FINISHED WORK SHALL, AS FAR AS PRACTICABLE, BE
ASSEMBLED AND FINISHED IN THE SHOP AND DELIVERED TO
LOCATION READY TO ERECT IN PLACE.
12.10 ALL WORK SHALL BE FABRICATED, ASSEMBLED, FINISHED
AND ERECTED IN THE BEST METHODS KNOWN TO THE CABINET
TRADE. SURFACE AND RISES SHALL BE TRUE, STRAIGHT AND
FREE FROM ALL MACHINE AND TOOL MARKINGS, BRUISES,
INDENTATIONS, CHIPS OR ABRASIONS.
12.11 WHERE MEMBERS ARE MITERED OR BUFFED, THEY SHALL BE
JOINED AND SECURED IN A MANNER TO INSURE AGAINST THE
JOINT OPENING.
12.12 ALL SHELVES SHALL BE Y4" PLYWOOD PAINT GRADE WITH
HARD WOOD EDGES UNLESS OTHERWISE NOTED.
12.13 THE CABINET CONTRACTOR SHALL PROVIDE AND INSTALL
WOOD /GLASS PARTITIONS AS SHOWN ON THE ARCHITECT'S
DETAILS AND DRAWINGS.
13. MISCELLANEOUS
13.1 THE GENERAL CONTRACTOR SHALL CHECK FOR ALL BROKEN OR
CRACKED WINDOW GLAZING PRIOR TO START OF CONSTRUCTION
AND SHALL REPORT SUCH FINDINGS TO INTERIOR DESIGNER.
AFTER THE START OF CONSTRUCTION, THE GENERAL CONTRACTOR
SHALL BE RESPONSIBLE FOR ALL DAMAGED WINDOW GLAZING.
13.2 THE GENERAL CONTRACTOR SHALL CHECK EXISTING WALLS FOR 1
AND 2 HOUR RATINGS ABOVE HUNG CEILING (AS SHOWN ON
DRAWINGS) IN ORDER TO CONFORM WITH LOCAL BUILDING CODES
AS REQUIRED.
soup -i li/il�" -SIFT
8UIL. INN IDL :p
'6y
r
FBROCKHOUSE
B WCKHO:JSE ASSOCJATI�_S PA
4973 S_ V✓_ 75th AVENUL:
MIAMI, hi.0.P,1DA 33155
-O5 666 23333 ■ FAX 666 2332
AR 10682 AA 0002456
13RUCL? BROCKHOUSE
ARCWTECTURE ■ INTERIOR DESIGN
PROJECT
An Interior Renovation to
the Medical Offices of:
DR. SANDINO
GONZALEZ
6150 Sunset Drive
South Miami, Florida 33143
SEAL
t
ri
SHEET TITLE
CONSTRUCTION
NOTES & GENERAL
CONDITIONS
STIEET TITLE REFERENCE
12018- gnotes.dgn
ALL CONCEPTS, DESIGNS, ARRANGEMENTS, DRAWINGS AND
SPECIFICATIONS ARE OWNED BY,AND ARE THE PROPERTY OF
THIS OFFICE AND WERE CREAtED,EVOLVED AND DEVELOPED
FOR USE ON, AND IN CONJUNCTION WITH, THE SPECIFIED
PROJECT. NONE OF SUCH IDEAS, DESIGNS, ARRANGEMENTS
OR PLANS SHALL BE USED BY OR DISCLOSED TO ANY PERSON,
FIRM OR CORPORATION FOR ANY PURPOSE WHATSOEVER
WITHOUT THE WRITTEN PERMISSION OF
BROCKHOUSE ASSOCIATES, PA.
REVISION
DESIGNED BY
B.A.
DRAWN BY
B.A.
APPROVED BY
S.G.
DATE 7 -13 -12
SCALE AS NOTED
PROJECT NO. 12018
SHEET N0.
A.