Loading...
09-305-011AIR CONDITIONING NOTES �1 PROVIDE (FURNISH AND INSTALL) ALL NECESSARY MATERIALS AND LABOR FOR A COMPLETELY OPERATIONAL AIR CONDITIONING, HEATING AND VENTILATING SYSTEM AS SHOWN ON THE DRAWINGS. AND HEREIN SPECIFIED. INSTALL IN ACCORDANCE WITH THE FLORIDA BUILDING CODE, ASHRAE, SMACNA, NFPA, AND LOCAL ORDINANCES. O DRAWINGS ARE DIAGRAMMATIC. DO NOT SCALE DRAWINGS FOR THE EXACT LOCATION OF EQUIPMENT. PIPING, DUCTWORK, ETC. 03 DUCTWORK IN UNCONDITIONED SPACE SHALL BE R =6.0 THESE DRAWINGS ARE NOT INTENDED TO SHOW EVERY MINOR DETAIL, BUT THE CONTRACTOR SHALL FURNISH AND INSTALL ALL ITEMS REQUIRED FOR A COMPLETE ACCEPTABLE WORKING INSTALLATION. ALL WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER. THE COMPLETE SYSTEM SHALL BE FULLY OPERATIVE AND ACCEPTANCE BY THE ARCHITECT AND / OR ENGINEER MUST BE CONDITION OF THE CONTRACT. 6� CONTRACTOR WILL PAY FOR ALL PERMITS, FEES, INSPECTIONS, AND TESTS. THE CONTRACTOR SHALL VISIT THE JOB SITE AND THOROUGHLY FAMILIARIZE WITH EXISTING CONDITIONS. ® PRIOR TO INSTALLING EQUIPMENT AND /OR FABRICATING DUCTWORK, A.C. CONTRACTOR SHALL CHECK THAT THERE IS SUFFICIENT CLEARANCES FOR EQUIPMENT , DUCTWORK, ETC. AND ALSO TO AVOID ANY INTERFERENCE WITH THE PROCESS OF CONSTRUCTION. IF THERE ARE ANY CHANGES IN ENGINEER'S DRAWINGS, IN DESIGN OR IN EQUIPMENT, WITHOUT ENGINEER'S CONSENT, THE A.C. CONTRACTOR SHALL ASSUME ALL RESPONSIBILITIES FOR THE PROJECT. EXISTING S1='LIT SYSTEM SCHEDULE UNIT . UNIT No 1 TONS 5.0 -TONS TOTAL CAPACITY 5TU/HR 55 500 SENS CAPACITY I3TU/4R 38 300 CFM SUPPLY 1 800 HEATER KW 10.0 VOLTAGE 1 -60 -240 DESIGN MANUFACTURER GE A.H.U. MODEL NO. 6535V- 060K -C G.U. MODEL NO. 5KCP39GFV493S SEER 130 RI =FRIG. LIQUID /SUCTION x 3'0 EXHAUST DUCT (METAL PIPE 30GA) STEEL HANGER WIRE • TYPICAL CEILING CABINET EXHAUST FAN WITH BACKDRAFT DAMPER -LOW NOISE LEVEL AND % VIBRATION FRONT FACE GRILLE WITH FASTENING SCREENS EXHAUST FAN HANGING BRACKET (ADJUSTABLE) CEILING MOUNTED GA5INET EXHAUST FAN DETAIL N.T.S. REVISED OUTSIDE AIR CALCULATIONS AS PER FBr-/M 4033 1165 OF / 100 SF. PER PERSON s 12 PERSONS O/A CFM REQUIRED 15 CFM / PERSON 12 x 15 = 180 CFM REQUIRED CFM F'ROVIDED 200 CFM SCOPE OF WORK MECHANICAL WORKS: PLAN TO REMAIN (ADD TWO NEW EXHAUST FAN AND FRESH AIR TO AHU CLOSET. TO BE SECURED (WIK BOLT 3/8'X3 /2' MIN EMBEDMENT AMI -DADE COUNTY 8C -5. GONDENSING UNIT INSTALLATION DETAIL NT5 08” FRESH AIR INTAKE FLEXIBLE DUCT THROUGH SCREENED VENT WITH MANUAL DAMPER SET AT 200 CFM. EXI5TM REFINES TNRUOGs -I R0, 0 r—J FAN SCHEDULE ITEM EXISTING EF -1 NEW EF -2 MANUFAC. NUTONE NUT ❑NE TYPE CEILING CEILING CFM 80 210 SONES 2.5 6.5 REFERENCEM ❑DEL 684NT 8210 REMARKS 4' 9( DUCT 7' 9( DUCT THERM ❑FIN DUCT VENT THRU WALL WALL CAP WITH INSECT SCREEM. CONECT TO INDEPENT SWITCH I EXISTNG 2' P.V.C. CONO. ORAN BELOW THE FLOOR TO THE WAIL, EGOS DOUN TO OUTSIDE, 6' AFa q B 3. 1 RU WALL 1LL CA N Z HVAC DESIGN REQUIRES' YES NO DUCT SMOKE DETECTOR x FIRE DAMPER (S) 4 x SMOKE DAMPER(S) y x FIRE RATED ENCLOSURE x FIRE RATED ROOF/FLOOR CEILING ASSEMBLY x FIRE STOPPING x SMOKE CONTROL x LEGEND '1" EF -2 THRU WALL CAP (�) EXISTNG THERMOSTAT <'I EXIT , , Oa EF-2 NOTE ilt;sHAPOO ATii MANICURE AREA EXISTING AIR CONDITIONING AREA O TO REMAIN WATER 10" X 8" GD BOTTLE 300 CFM 5HAP00 ' AREA 12" X 8" CD' 300 GFM t -' F] EXIStNG �TANT U1/4 -- � '- T' EF -2 all, II 1 TH WALL LL C.A -------------------- __ - 10" �NCO .' PEDICURE AREA �`�' N 8'r-LEXIBLE DUCT(NEW) _ - ' < FE XIT E „ X20 „ R/A -� 10 "X10 "� „ - - -- �� _ -- 108" ll 110 t 300 P. `.f' i .' T _ AIR DISCHARGE EXISTING PLENUM SHALL BE EXIS HANICALLY L NU ATTACHED TO AHU. RECEPTION FBC MEC 603.7 MW w 4 I � MANICURE AREA WALL ` A U oc i REFRIG. LINES `0 A.H.U. 8 °.' 1 112" FLOAT SWITCH 2 75 "x37 "G EXIT 1 SECONDARY DRAIN LINE 10 X 8 CD 300 CFM EXISTNG PRINCIPAL DRAIN LINER WAITING AREA TO OUTSIDE METAL STAND WAITING ARFA WAITING AREA :A •''t` •.� ty" is •.. N A SU INSTALLATION DETAIL EXISTING MECHANICAL PLAN 1 4� =17 -Ow gums • • CA Cq Cq • • • mJ • • • • • Revision D� w R. G. o wdm& M. LOPEZ D= 04/01/09 Project # 08-40 Sheet: M-1 4 y f ..�� 7 • � es ui�dtit +pv,. W 0 UL M Jw W Q,�.o O Z M M tM — a � J C WP% do �... J Cl) >_ LO w (.5 U-) h • • CA Cq Cq • • • mJ • • • • • Revision D� w R. G. o wdm& M. LOPEZ D= 04/01/09 Project # 08-40 Sheet: M-1