09-305-004b
rn
EXISTING
EXISTING GROUND FLOOR PLAN
TO BE LEGALIZED 1/4"=11-0ff
EXISTING
IT C1 EXIT
MANICUR
5HAPOO EXISTING
�z
AREA BATH AREA
NEW
Z 5MAPOO
z , NEW AREA NEW I ❑
7, INSTANT
z , WIH NEW
Z EX15TING WHILPOOL
�z PEDICURE SPA
5TILING AREA
�2 F1
HU
;z RECEPTION
O
yMANICURE AREA
16-01/2-
NEW BEAUTY SALON:
REMAIN)
WORK CLASSIFICATION: INTERIOR LEGALIZATION
W
FEBC2004 Chapter 3,(Section301 & 303)
TYPE
OCCUPANCY CLASSIFICATION: GROUP B / BUSINESS
SCOPE OF WORK
(Chapter 3) FBC 2004
1
GROSS AREA: 1,177.29s.f.
6'-W
OCCUPANCY LOAD: 1,177.29s.fJ100s.f.=12 PERSONS
THE PROPOSED SCOPE OF WORK CONSIST OF:
FBC 2004 Chapter 10, Table (1004.1.1)
GET PERMITS FOR NEW BEAUTY SALON.
2
WORKS TO BE PERFORMED:
LOT 9, LESS THE NORTHWESTERLY 16.00 feet IN BLOCK I
a-) FLOOR PLAN WORKS: PLAN TO REMAIN A
OF; "LARKING PINES" ACCORDING TO THE PLAT THEREOF
b-) ELECTRICAL WORKS: NEW RECEPTACLES,NEW
AS RECORDED IN PLAT BOOK 24 AT PAGE 20 OF THE
CONNECTORS FOR TV.AND
PUBLIC RECORDS OF MIAMI-DADE COUNTY, FLORIDA.
NEW INSTANT WATER HEATER
AND
LOT 9-A OF THE "REVISED PLAT OF LARKIN PINES"
c-) MECHANICAL WORKS: PLAN TO REMAIN (ADD TWO
ACORDING TO THE PLAT THEREOF AS RECORDED
NEW EXHAUST FAN AND FRESH AIR
IN PLAT BOOK 53 AT PAGE 41 OF THE PUBLIC
TO AHU CLOSET
RECORDS OF MIAMI-DADE COUNTY, FLORIDA.
d-) PLUMBING WORKS: NEW FOUR LAVATORIES, NEW
I MAW
TWO WHILPOOL PEDICURE SPA
AND NEW INSTANT WATER HEATER
WALL LEGEND:
/ /, // INDICATES EXISTING RESIDENCE
INDICATES EXISTING 8"x8 "x16"
D MASONRY UNITS.
INDICATES EXISTING PARTITION
THE CONSTRUCTION DOCUMENTS HAVE BEEN
PREPARED IN COMPLIANCE WITH FBC 2004 & 2006
SUPPLEMENT.
DOOR 4 WINDOW WAEPULE (EXISTING TO
REMAIN)
No.
W
H
TYPE
MAT
FRAME
REMARKS
1
V-0'
6'-W
&JJM
RUID.4CLASS
W.
mJ
2
Y-0m
6'-81
S"
k MTL
ALLPL
A
3'-4'
Y-92
FIXED
CLASS
ALUM.
B
. ill
.
FIXED
I MAW
A-Ull
EX15TING
0 1 1 EX C AI TV D1 A ki
1 1/20
MOE
EXISTING EXIT >
LIFE SAFETY PLAN
1/4 71 =1 1-0 11
#TRAVEL D15TANCE LIMIT: 200 FT.
MEASURED TRAVEL DISTANCE : 39 Fl.
-COMMON PATH LIMIT: 15 FT.
MEASURED MAX. COMMON PATH : 71 FT.
SPA
m
NEW
PAC 4,16A
128 M, Uk
INTERIOR FINISHED
(AS PER F.B.C. TABLE 803.5)-UNSPRINKLERED
(AS PER N.F.P.A. TABLE A.10.2.2)
I.- ROOMS AND ENCLOSED SPACES: CLASS "C"
2.- EXIT ACCESS CORRIDORS AND OTHER
EXITWAYS: CLASS "B"
CLASS W: FLAME SPREAD INDEX 0-25
SMOKE-DEVELOPED INDEX 0-450
CLASS "B": FLAME SPREAD INDEX 26-75
SMOKE-DEVELOPED INDEX 0-450
CLASS "C ": FLAME SPREAD INDEX 76-200
SMOKE-DEVELOPED INDEX 0-450
GENERAL NOTES:
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND ANGLES
AND ALL OTHER EXISTING CONDITIONS PRIOR TO COMMENCING ANY WORK
CONTRACTOR TO ALSO VERIFY AND APPROVE ALL INFORMATION ON DRAWINGS,
ACCEPTANCE OF THESE PLANS CONSTITUTES APPROVAL. PLEASE NOTIFY
ENGINEER BY CERTIFIED MAIL OF ANY CONFLICTS OR DISCREPANCIES, IF ANY.
2. CONTRACTOR SHALL FURNISH AND BE SOLELY RESPONSIBLE FOR
ALL TEMPORARY BRACING AND SHORING REQUIRED TO MAINTAIN PLUMBNESS
AND STABILITY OF ALL STRUCTURAL ELEMENTS DURING CONSTRUCTION.
3. THE CONTRACTOR SHALL OBTAIN FROM ALL SUBCONTRACTORS THE
FINAL APPROVED SITE AND LOCATION OF ALL OPENINGS TO BE
PROVIDED FOR RESPECTIVE TRADES. HE SHALL BE RESPONSIBLE FOR
LOCATION AND DETAILS.
4. ALL CONCRETE FOR FOUNDATIONS & SLABS ON GRADE SHALL
REACH 2500 P.S.I. COMPRESSIVE STRENGTH AT 28 DAYS, AND ALL
COLUMNS, GROUTED CELLS, SLABS ABOVE GRADE AND TIE BEAMS SHALL
REACH 3000 P.S.I. COMPRESSIVE STRENGTH MINIMUM AT 28 DAYS
UNLESS OTHERWISE NOTED.
5. CONTRACTOR/O WNER SHALL BE RESPONSIBLE FOR VERIFYING REQUIRED
GRADE & FINISHED FLOOR ELEVATIONS NTH RESPECT TO DADE COUNTY
FLOOD CRITERIA, EXISTING CROWN OF ROAD ELEVATIONS, FEDERAL
FLOOD CRITERIA OR ANY OTHER GOVERNING BODY.
6. OWNER AND CONTRACTOR SHALL NOTIFY ENGINEER IN WRITING, BY
CERTIFIED MAIL UPON COMMENCEMENT PROJECT.
ml r A ^r alA' 1 2^ TJ Mr -^r1/1 \11111911 I'r%,# ^I-' 'VLA O%r%Lrmrr!k A ^'r^rl
F4 tL[=_VATKA4 2
(EXisnNG)
SCALE ILTA
EXISTING 314"-
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — I
1.25! 1.4V
7 50' w/r S 80* 28' 00"W 50.01Y 50,
3'4"- W�_
50.
10.80' D*
H=6* So. fl. O�
7
7.50'
0.
0.& S
5
" 8 EESTNO
L)
WGA TANK U1, i ,
Orkffiol Late Line—z
Slab
G
3 /4 Y3
oo
R
UJ 0
-cw
V-1 30.05!
WE co UJ w
1.24! Bldg. qr. w
Enc.. 0.08"- w
(L
Bldg. :5
LL Z
0 Cn
ExunNG w rl*%
ONE STORY CM 15.03' > a
— 0.0 w
AC
RES. # bM6 Bldg. -2 00
C;
Tie w
Foot Print
1177.30' !2 CV) ccen) CIO)
Go FL INTERIOR I )ALIZZATION 1100
C:)
C) — 0 CO
NEW BEAUTY SALON C) c,
3&1 OP 0.99' Z LL 00
rRd Bldg . J co
g. (1,V729 aqft.) E5 Tie Tie W
Ion y N U)
45.08*
Z3 LCq w
Conc. Sob
0 .......
Cq
BXWrM HANDICAP
FANKPO SPACE
11AFWAft SPACE •4 5,--(r 1.23' Bldg. ar.
Enc. D21' Bldg. 41.50.
A
Ln
N WKISTM F) tV
Ln PAISOM &RACIN 4 M LO
Aspholt
Z
NMTNS
PA190ft SPACE 02 Irk
0;
L16
0
exletm
rAMM SPACE q UA 4
0.80, -
L50075qz
Dim Sq. Ft Found 0
1P. -Nal
00. RIP.
0_150f
S 80.2s' nnmw rn nrV
FUE-0 EXIT 51GN AND If
S' SdwIk
EMERGENCY LIG
COMBO UNIT
cq
1111 BATTERY BACK -UP
(TYP. AT ALL EXIT
EXTERIOR DOORS)
WAITING AREA WAITING ARFA
LIFE SAFETY PLAN
1/4 71 =1 1-0 11
#TRAVEL D15TANCE LIMIT: 200 FT.
MEASURED TRAVEL DISTANCE : 39 Fl.
-COMMON PATH LIMIT: 15 FT.
MEASURED MAX. COMMON PATH : 71 FT.
SPA
m
NEW
PAC 4,16A
128 M, Uk
INTERIOR FINISHED
(AS PER F.B.C. TABLE 803.5)-UNSPRINKLERED
(AS PER N.F.P.A. TABLE A.10.2.2)
I.- ROOMS AND ENCLOSED SPACES: CLASS "C"
2.- EXIT ACCESS CORRIDORS AND OTHER
EXITWAYS: CLASS "B"
CLASS W: FLAME SPREAD INDEX 0-25
SMOKE-DEVELOPED INDEX 0-450
CLASS "B": FLAME SPREAD INDEX 26-75
SMOKE-DEVELOPED INDEX 0-450
CLASS "C ": FLAME SPREAD INDEX 76-200
SMOKE-DEVELOPED INDEX 0-450
GENERAL NOTES:
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND ANGLES
AND ALL OTHER EXISTING CONDITIONS PRIOR TO COMMENCING ANY WORK
CONTRACTOR TO ALSO VERIFY AND APPROVE ALL INFORMATION ON DRAWINGS,
ACCEPTANCE OF THESE PLANS CONSTITUTES APPROVAL. PLEASE NOTIFY
ENGINEER BY CERTIFIED MAIL OF ANY CONFLICTS OR DISCREPANCIES, IF ANY.
2. CONTRACTOR SHALL FURNISH AND BE SOLELY RESPONSIBLE FOR
ALL TEMPORARY BRACING AND SHORING REQUIRED TO MAINTAIN PLUMBNESS
AND STABILITY OF ALL STRUCTURAL ELEMENTS DURING CONSTRUCTION.
3. THE CONTRACTOR SHALL OBTAIN FROM ALL SUBCONTRACTORS THE
FINAL APPROVED SITE AND LOCATION OF ALL OPENINGS TO BE
PROVIDED FOR RESPECTIVE TRADES. HE SHALL BE RESPONSIBLE FOR
LOCATION AND DETAILS.
4. ALL CONCRETE FOR FOUNDATIONS & SLABS ON GRADE SHALL
REACH 2500 P.S.I. COMPRESSIVE STRENGTH AT 28 DAYS, AND ALL
COLUMNS, GROUTED CELLS, SLABS ABOVE GRADE AND TIE BEAMS SHALL
REACH 3000 P.S.I. COMPRESSIVE STRENGTH MINIMUM AT 28 DAYS
UNLESS OTHERWISE NOTED.
5. CONTRACTOR/O WNER SHALL BE RESPONSIBLE FOR VERIFYING REQUIRED
GRADE & FINISHED FLOOR ELEVATIONS NTH RESPECT TO DADE COUNTY
FLOOD CRITERIA, EXISTING CROWN OF ROAD ELEVATIONS, FEDERAL
FLOOD CRITERIA OR ANY OTHER GOVERNING BODY.
6. OWNER AND CONTRACTOR SHALL NOTIFY ENGINEER IN WRITING, BY
CERTIFIED MAIL UPON COMMENCEMENT PROJECT.
ml r A ^r alA' 1 2^ TJ Mr -^r1/1 \11111911 I'r%,# ^I-' 'VLA O%r%Lrmrr!k A ^'r^rl
F4 tL[=_VATKA4 2
(EXisnNG)
SCALE ILTA
EXISTING 314"-
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — I
1.25! 1.4V
7 50' w/r S 80* 28' 00"W 50.01Y 50,
3'4"- W�_
50.
10.80' D*
H=6* So. fl. O�
7
7.50'
0.
0.& S
5
" 8 EESTNO
L)
WGA TANK U1, i ,
Orkffiol Late Line—z
Slab
G
3 /4 Y3
oo
R
UJ 0
-cw
V-1 30.05!
WE co UJ w
1.24! Bldg. qr. w
Enc.. 0.08"- w
(L
Bldg. :5
LL Z
0 Cn
ExunNG w rl*%
ONE STORY CM 15.03' > a
— 0.0 w
AC
RES. # bM6 Bldg. -2 00
C;
Tie w
Foot Print
1177.30' !2 CV) ccen) CIO)
Go FL INTERIOR I )ALIZZATION 1100
C:)
C) — 0 CO
NEW BEAUTY SALON C) c,
3&1 OP 0.99' Z LL 00
rRd Bldg . J co
g. (1,V729 aqft.) E5 Tie Tie W
Ion y N U)
45.08*
Z3 LCq w
Conc. Sob
0 .......
Cq
BXWrM HANDICAP
FANKPO SPACE
11AFWAft SPACE •4 5,--(r 1.23' Bldg. ar.
Enc. D21' Bldg. 41.50.
A
Ln
N WKISTM F) tV
Ln PAISOM &RACIN 4 M LO
Aspholt
Z
NMTNS
PA190ft SPACE 02 Irk
0;
L16
0
exletm
rAMM SPACE q UA 4
0.80, -
L50075qz
Dim Sq. Ft Found 0
1P. -Nal
00. RIP.
0_150f
S 80.2s' nnmw rn nrV
1.4! Cmr- Curb & Gutter
................................ .................... ....... ........
.................................................................................................................
........................................................... ............................ .............. ........
................................................... ....................................
..................................................... ...................... .......... ........
............ ..................................... .............. .........................
........... ............ .................................... ........ R e v i s i o n
................ ................................................. ............ ............
............
....... ............................................................................ .......... , ........
By
.. ....................... .....................................
.......................... ........
AREV-04/28/09
......... ....................... ............................................... .............. ........ ......
........................ .................... ...... . ........
MIAM-901 COU0 F11' 9Ep~ .. " FIRE COMENTS
.................................. ...................
.... ......
....... . ........ .
BLDG. Pr:RW.
......... .............. ...........................................
............. . ....... .................................... ............ ........
1VAT8R ....................
fIE
...............
................ .. .................... ...........................................
............................... ...................... ....... ............... ........
............................................... ....
.................... .................... ........ � � _
................................... .................................... ........... ......... ........
............ I ............... ................ ........ ............. ........................... ................
.............................. .............................................. .................. ........ ........
............................ ....... .......................... ................. .... ..:•.•.::.•.•.:•:.•.- ::..::::..
...........................
..............................
........ US.
SOUTH DIXIE HK*frWAY #1; :::: .........
............................................
.............. ...... ..........
.............. ........
.................. .. ...... ........
............................................ .......
................ Mate Road. .
.............. .................... ............................... . ........... .........
............................. ......................................................... ...................
.................................. ................ .................. ............. .
............................ ..................... ............. .........
.. . ...... .......
...................... ........... ................ ....... . 0
:::.SOUL' ............. ...................... ...........
IkSi ilwkD LANES*.-.*.*.*.*.*.'.*-'.'.'.'.'.'.'.'.*.'.*.'.*.*.*.*.*.*.'.*.*.*.'.'.'.'.'.'.'.'.'.'�'.'�'-'-
............... .............
................................... ............. .......................... ....................... ... ... orEwn sp R. G.
.................................... ............. __ .......... ................. ..........
............................. .............. ............
.................................... .................................... ..........
.............. .......................... .......... ........... ......................... .............. ....
.................................................................................. ..............................
.............. ................ __ ......... ......... ................. ................ .......
....................................... ..................... ........ ................ ...........
........................ ................. ...................... ............
................ Mw Asphalt .......... ........................
............. ....................................................... ...... ........ ................ . ......
........... ......... .................. ....... .......................... ............... ............. M. LOPEZ
......................... .................. . ...................... . .........................*.*.'
. '
'*'**
**.*.*.*.'.'.'.'.'.'.'.'.'.'.'.*.*
.'.".*.'
. ...
...
..
............................ ....... ................. ........ ....... ....... ....... .........
........................................................................ ................................ ........
.......................... ............... ................. ............ ......
................... __ ......................................... ....... ..................... ......
..................................... .................... ........ ........ .............. ..........
.......... ..................................... ....... .. .. . .............. ..... ...
......................... .......
om 04/01/09
................................ ........................ I ........ .:....................................
..
20! Cone. Curb & Gutter
.................
Project # 09-40
------------------------ ----
----RORIDA EAST COAST ROAD ----------
49� Sheet
eSITE PLAN
,-q=be SCALE 1"- 20' A- 1
S' SdwIk
cq
9.14
6-5 P m
mJ
0)
Z
LJ 20.4T 30.15
LP. 0
0
(6
14.0' 35.70!
Cq
.............
.............
.............
.............
............................... ................ ......... ........
...
0
X�
.. .
......
............... ............ ..................... ...................
.........................
............
..
UIY Cont
..... Curb & Gutter
=J
0
mi
L16
...... .................................... Original Late Line
...
.. .... ..
09
W
.........
............
.........
................................................. ...... ........
......................... .................... ...................... .......
...............................................
........................................... ....... ..... ...........
....... In:
......
......
.......
0
1U6
................................
.........
................
... ...... ...... .............
... .................... 0-.- ..
........... NORTHEAST BOUND LME�. _0 .................
.......................... ................... ................ ......... ........
........... ..............
........
R
Z
.........
....................................................
.........
.............................................
......................... ...................................
....................... .............. ................. ..............
... ........... ....... ....................... ...............
.......... ...................... ..... .........
30.17'Asphdt Pavement.'.'..*.'.*.*.'.'.'.*.'.*.*.*..'.*.*.*.'-.*.'.*.
........
....
.....
0
.........
...................... ............... .. .... ...... ..........
................................................... ........ ......... .....
...
.. ......
...
.........
I ..............
. _ ............... .......................... ........................ ...........
........ .............. ......................... ............
.......
.....
........
0
......... . ............................................................................. ........... ..
........ ....... ................................. ............ .............. ........ .........
..................... ......... ..............
................ ...... .......
........................ ...................... .............
......................................... ............. .......... .....................................
........
.......
........
...................................
...................... ....... . ............................ ..*..*..* ............................. ........ .......... . . .I.. S .. ..C.o.n..c... . . .C...r.b . ..& . ..G..jt..t.e..r...*......'.-.*..'...'...'..'...'..*.-.*.-.,.-.*...*.-.*.-..-.*..*.-.*..*..,.-.*..-*..-..*.. ,.._*.-*.-_ *.- ,......,. ..*..,..,-.
..........
'-.'-.-.,.,.,-. ..
........................................ .............................. I ...............................
Z
Median n
1.4! Cmr- Curb & Gutter
................................ .................... ....... ........
.................................................................................................................
........................................................... ............................ .............. ........
................................................... ....................................
..................................................... ...................... .......... ........
............ ..................................... .............. .........................
........... ............ .................................... ........ R e v i s i o n
................ ................................................. ............ ............
............
....... ............................................................................ .......... , ........
By
.. ....................... .....................................
.......................... ........
AREV-04/28/09
......... ....................... ............................................... .............. ........ ......
........................ .................... ...... . ........
MIAM-901 COU0 F11' 9Ep~ .. " FIRE COMENTS
.................................. ...................
.... ......
....... . ........ .
BLDG. Pr:RW.
......... .............. ...........................................
............. . ....... .................................... ............ ........
1VAT8R ....................
fIE
...............
................ .. .................... ...........................................
............................... ...................... ....... ............... ........
............................................... ....
.................... .................... ........ � � _
................................... .................................... ........... ......... ........
............ I ............... ................ ........ ............. ........................... ................
.............................. .............................................. .................. ........ ........
............................ ....... .......................... ................. .... ..:•.•.::.•.•.:•:.•.- ::..::::..
...........................
..............................
........ US.
SOUTH DIXIE HK*frWAY #1; :::: .........
............................................
.............. ...... ..........
.............. ........
.................. .. ...... ........
............................................ .......
................ Mate Road. .
.............. .................... ............................... . ........... .........
............................. ......................................................... ...................
.................................. ................ .................. ............. .
............................ ..................... ............. .........
.. . ...... .......
...................... ........... ................ ....... . 0
:::.SOUL' ............. ...................... ...........
IkSi ilwkD LANES*.-.*.*.*.*.*.'.*-'.'.'.'.'.'.'.'.*.'.*.'.*.*.*.*.*.*.'.*.*.*.'.'.'.'.'.'.'.'.'.'�'.'�'-'-
............... .............
................................... ............. .......................... ....................... ... ... orEwn sp R. G.
.................................... ............. __ .......... ................. ..........
............................. .............. ............
.................................... .................................... ..........
.............. .......................... .......... ........... ......................... .............. ....
.................................................................................. ..............................
.............. ................ __ ......... ......... ................. ................ .......
....................................... ..................... ........ ................ ...........
........................ ................. ...................... ............
................ Mw Asphalt .......... ........................
............. ....................................................... ...... ........ ................ . ......
........... ......... .................. ....... .......................... ............... ............. M. LOPEZ
......................... .................. . ...................... . .........................*.*.'
. '
'*'**
**.*.*.*.'.'.'.'.'.'.'.'.'.'.'.*.*
.'.".*.'
. ...
...
..
............................ ....... ................. ........ ....... ....... ....... .........
........................................................................ ................................ ........
.......................... ............... ................. ............ ......
................... __ ......................................... ....... ..................... ......
..................................... .................... ........ ........ .............. ..........
.......... ..................................... ....... .. .. . .............. ..... ...
......................... .......
om 04/01/09
................................ ........................ I ........ .:....................................
..
20! Cone. Curb & Gutter
.................
Project # 09-40
------------------------ ----
----RORIDA EAST COAST ROAD ----------
49� Sheet
eSITE PLAN
,-q=be SCALE 1"- 20' A- 1