11-555R-001v' xiSr e4a , C A ' {yLa ti *r 1 Y L A R K I N 1:2 V I r LARKIN COMMUNIT ":::C TIO IE7) i S7 j A R K I 1�" H 01 8129 S.W. 70th STREET SOUTH MIAMI, FLORIDA 33143 TEL: (305) 284 -7500 FAX: (305) 284 -7545 JUNE 6, 2011 GENERAL NOTES I. CONTRACTOR IS BEING PROVIDED WITH COMPLETE SETS OF DOCUMENTS, CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUBCONTRACTORS WITP COMPLETE SETS OF DRAWINGS, INTENT IS FOR ALL SYSTEMS AND EQUIPMENTS TO BE PROVIDED WITH UTILITY CONNECTIONS AS REQUIRED FOR OPERATION. EXAMPLE: IF A SINK IS SHOWN IN THE ARCHITECTURAL PLANS, AND THE PLUMBING PLANS DO NOT SHOW A WATER OR DRAWING CONNECTION, THE ENGINEER WILL PROVIDE THE DESIGN DETAILS IN ACCORDANCE WITH THE DESIGN CRITERIA FOR THE REST OF THE INSTALLATION, CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE CONNECTION AT NO ADDITIONAL COST TO THE OWNER. 2.� CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE DURING THE BIDDING PERIOD, AND VERIFY THAT CONDITIONS ARE AS DESCRIBED IN THE DOCUMENTS. DISCREPANCIES ARE TO BE NOTED IN WRITING, AND ARCHITECT /ENGINEERS, NOTIFIED, CONTRACTOR ACCEPTS CONDITIONS AS THEY ARE ON THE SITE, AND MUST PROVIDE SYSTEMS AND WORK, AS DESCRIBED IN THE CONTRACT DOCUMENTS AT NO ADDITIONAL COST TO THE OWNER. 3.1 DIMENSIONS PROVIDED ARE NOMINAL NOT ACTUAL, THEY TAKE AS A BASIS EXISTING WALLS. IF DISCREPANCIES ARE FOUND, NOTIFY ARCHITECT IMMEDIATELY FOR COORDINATION. IF CONTRACTOR PROCEEDS, HE DOES SO AT HIS OWN RISK, AND IS RESPONSIBLE FOR ALL EXPENSES INCURRED, IF AT THE DISCRETION OF THE OWNER OR THE ARCHITECT THE WORK HAS TO BE RE -DONE. 4. SHUTDOWN OF UTILITIES: IF A SHUTDOWN OR ANY TYPE OF INTERFERENCE WITH EXISTING SYSTEMS IS ANTICIPATED, THE CONTRACTOR MUST NOTIFY THE OWNER 72 HOURS IN ADVANCE, AND OBTAIN APPROVAL IN WRITING PRIOR TO PROCEEDING. 5. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS, AND USE ALL APPROPRIATE CONSTRUCTION METHODS /TECHNIQUES TO PROTECT EXISTING UTILITIES AND OTHER PROPERTY NOT NOTED FOR REMOVAL. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES INCURRED DURING CONSTRUCTION, AND SHALL REPAIR ANY DAMAGES AT NO EXPENSE TO THE OWNER. 6. IF THERE IS A DISCREPANCY BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, THE CONTRACTOR SHALL OBTAIN CLARIFICATIONS DURING THE BIDDING PERIOD, IF THE DISCREPANCY COMES UP DURING THE CONSTRUCTION, IT IS ASSUMED THE CONTRACTOR BID THE MOST EXPENSIVE WAY, AND WILL DO THE WORK AS PER THE DIRECTIONS OF THE OWNER / ARCHITECT AT NO ADDITIONAL COST TO THE OWNER, 7. ABBREVIATIONS THROUGHOUT THE PLANS ARE THOSE IN COMMON USE. ARCHITECT WILL DEFINE INTENT OF ANY IN QUESTION. 8. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY TEMPORARY BARRIERS, LIGHTING, COVERINGS, FIRE PREVENTION AND OTHER EQUIPMENTS TO PROTECT THE SAFETY OF ALL PERSONS AND THE PROPERTY THROUGHOUT THE ENTIRE PERIOD OF THE CONSTRUCTION CONTRACT. 9.1 THE CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS OF ALL OPENINGS FOR MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENTS WITH SUBCONTRACTORS, AS WELL AS SHOP DRAWINGS AS APPROVED BY ARCHITECT, BEFORE PROCEEDING WITH THE WORK. 10. ALL ITEMS USED IN CONSTRUCTION, BUT NOT SPECIFICALLY MENTIONED HEREIN, SHALL CONFORM TO ALL LOCAL CODES AND STATE ORDINANCES AS TO APPLICATION AND USE. II. PROVIDE ELECTRIC INSULATION BETWEEN ALL DISSIMILAR METALS AND ALSO BETWEEN CEMENT AND METAL, 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL. PERMITS TO COMPLETE THE PROJECT. 13 CONTRACTOR TO REVIEW ALL EXISTING BUILDING SYSTEMS, AS TO THEIR COMPLIANCE WITH ALL LOCAL AGENCY REQUIREMENTS, AND BRING ANY NON - CONFORMING ITEMS TO ARCHITECT'S AND ENGINEER'S ATTENTION. 14' GENERAL CONTRACTOR IS TO PROTECT EXISTING ADJACENT AREAS WHERE WORK IS TO BE PERFORMED. ANY EXISTING MILLWORK OR EQUIPMENT DAMAGED DUE TO WORK PERFORMED, SHALL BE REPAIRED /REPLACED TO MATCH EXISTING (TYPICAL UNLESS OTHERWISE NOTED), 15� DRAWINGS ARE SCHEMATIC, SHOWING RELATIVE LOCATIONS AND CONNECTIONS, AND SHALL NOT BE SCALED AT ANY TIME. 161; ALL WOOD BLOCKING WITHIN BUILDING STRUCTURE, SHALL BE FIRE - RETARDANT TREATED AS PER SPECIFICATIONS. 17.11 GENERAL CONTRACTOR SHALL INSPECT ALL EXISTING RATED WALLS /PARTITIONS WITHIN SCOPE OF WORK AREA. CONTRACTOR SHALL UPGRADE EXISTING PARTITIONS AS REQUIRED TO MAINTAIN THE INTEGRITY OF THE DESIGNATED RATING. 18.1 ELEVATIONS AND LEVELS A. ALL NUMERICAL ELEVATIONS ARE TO TOP OF CONCRETE SLAB. UNLESS NOTED OTHERWISE, 19,1 ALL INTERIOR GYPSUM WALL BOARDS ARE 5/8" TYPE "X" G.W.B. ON METAL STUDS OR FURRING CHANNELS, UNLESS NOTED OTHERWISE. SIZES AS DIMENSIONED ON FLOOR PLANS. SEE NOTE NUMBER "9" FOR LOCATION OF WATER RESISTANT G.W,B. 20. PROVIDE WATER RESISTANT TYPE "X" G.W.B. IN ALL TOILETS AND JANITOR'S CLOSETS. 21.1 BEFORE PATCHING ANY FIRE -RATED C.M.U. PARTITION, FILL ANY EXPOSED CELLS SOLID WITH GROUT. 22t PROVIDE FINISH WALL UNDER AND BEHIND ALL EQUIPMENTS AND CASE WORK. 23 LOCATION AND SIZE OF CEILING AND WALL ACCESS PANELS SHALL BE DETERMINED BY THE 1 POSITION OF VALVES AND OTHER MECHANICAL AND ELECTRICAL ITEMS WHICH REQUIRE ACCESS, THE CONTRACTOR SHALL COORDINATE WITH ALL TRADES. THE ARCHITECT SHALL REVIEW AND APPROVE ALL FINAL LOCATIONS OF ACCESS PANELS PRIOR TO INSTALLATION. 24. THERE SHALL BE NO BACK -TO -BACK ELECTRICAL TELEPHONE OR OTHER OUTLETS, 25. ALL VERTICAL PIPING AND COLUMNS EXPOSED IN ROOMS, SHALL BE FURRED WITH METAL STUDS AND DRY WALL, AND FINISHED TO MATCH ADJACENT WALLS, U.N.O. EXCEPTIONS; A. ELECTRIC CLOSETS C. MECHANICAL ROOMS B. TELEPHONE CLOSETS D. STAIRS 26 WHERE HVAC OR OTHER MECHANICAL, ELECTRICAL AND PLUMBING ITEMS PENETRATE PARTITIONS, STUDS SHALL BE BRACED AND FRAMED TO STRUCTURE, AS REQUIRED TO PROVIDE ADEQUATE SUPPORTS. 1 ALL PENETRATIONS THROUGH RATED WALLS SHALL BE SEALED TO PROVIDE FIRE, SMOKE ND /OR ACOUSTICAL ISOLATION OF SPACES WITH APPROPRIATE FIRE S.T.C. MATERIAL. 27! SEE INTERIOR ELEVATIONS FOR FINISHES AND FINISH DETAILS FOR INTERIOR SPACES. SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR ACOUSTICAL TILE FINISH. 28. SEE ARCHITECTURAL REFLECTED CEILING PLANS FOR LOCATION OF CEILING - MOUNTED MECHANICAL /ELECTRICAL FIXTURES. 29: STAGGER JOINTS VERTICALLY AND HORIZONTALLY IN ALL G.W.B. PARTITIONS, EACH SIDE, JOINTS STAGGERED MINIMUM 2I -O" U.O.N, 30. CONTRACTOR SHALL CONFIRM THAT ALL EXISTING EXPOSED STEEL COMPLIES WITH N.F.P,A. FIRE PROTECTION REQUIREMENTS. CONTRACTOR SHALL PROVIDE ALL NECESSARY INSULATION /FIRE PROTECTIVE COATINGS. 31. CONTRACTOR TO SUBMIT ALL SHOP DRAWINGS TO ARCHITECT AND THE BUILDING DEPARTMENT FOR APPROVAL. (ELEVATOR, TRUSSES, WINDOWS, ETC.) 3211 CONTRACTOR REQUIRED TO PULL SEPARATE DEMOLITION PERMIT, 0 2121 Ponce de Leon Blvd., Suite 350 PISTORINO & ALAM CONSULTING ENGINEERS, INC. 7171 SW 62nd Avenue, 4th Floor. Miami, Florida 33143 Phone: 305 - 669 -2700 Fax: 305 -669 -2165 e -mail: tigbal@pistorinoalam.com DESIGNING BEAUTIFUL PLACES LAURA � LLERENA & A&%)CIAAM LANDSCAPE ARCHITECTURE 13170 S.W. 128th Street, Suite 207, Miami, Fl 33186 Tel: 305 - 256 -1199 / Fax: 305 - 256 -1155 wrwwr.Illerena- associates.com 2,k. °�� ° v T714 S P I T A L 0 JA : A 0 s a r C h I t e C t s FLORIDA LICENSE I #AA0002689 2100 Ponce de Leon Blvd, Suite 1170, Coral Gables, Florida 33134 Tel: (305)265 -7177 Fax: (305)262 -8435 LUIS E. NAYA, A.I.A Fl. AR0008063 PROJECT NUMBER.* 20]1]5 AHCA LOG X23/]0018] -1]8 -001 BUILDING INFORMATION COVER SHEET, REVISIONS ORIGINAL BUILDING DESCRIPTION A06 -7 -11 COORDINATION. BUILDING JURISDICTION: MIAMI -DARE COUNTY A06-9-11 BUILDING DEPT. COMMENTS. FRIMARY USE CLASS: BUSINESS OCCUPANCY(PROFESSIONAL SERVICES) FIRST FLOOR LIFE SAFETY PLAN. } ID-1 FIRST IMOOR CONSTRUCTION TYPE (NFPA): TYPE I (221) A06-9-11 BUILDING DEPT. COMMENTS. 2 CONSTRUCTION TYPE: TYPE I, FLORIDA BUILDING CODE A 07 -20 -11 AHCA COMMENTS. NUMBER OF STORIES: 2 FLOOR ID -2 SECOND FLOOR A -11 C -1 A07-21-11 fi` BUILDING DEPT. COMMENTS. NEW PROJECT DESCRIPTION C -1.1 08 -03 -11 08 -05 -11 STRUCTURAL COORDINATION, MEP FIRST FLOOR A -14 C -1.2 COORDINATION PROJECT AREA: TOTAL 10,504 SQ. FT. Q 08 -16 -11 BUILDING DEPT. COMMENTS. SPRINKLED: FULLY SPRINKLERED ID -4 SECOND FLOOR E8,04 L -1 A08-16-11 BUILDING DEPT. COMMENTS. APPLICABLE CODES A08-26-11 LANDSCAPE DETAILS. • FLORIDA BUILDING CODE 2007 EDITION WITH 2009 REVISION. FIRST FLOOR • FLORIDA FIRE PREVENTION CODE 2007 EDITION. SOFFIT /MOLDING & SCONCES • NFPA 101 LIFE SAFETY CODE, 2006 EDITION FOUNDATION AND FIRST FLOOR PLAN. LOCATION PLAN (CHAPTER 18 NEW HEALTHCARE). S -1A 10 -14 -11 COORDINATION. • AIA GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES 2006 EDITION. ® 10 -14 -11 AHCA COMMENTS. SECOND FLOOR PLAN. All-17-11 BUILDING DEPT. COMMENTS. S -3 Al2-09-11 COORDINATION. A 01 -09 -12 AS BUILT. INTERIOR ELEVATIONS NOTESA01-02-12 S -5 AHCA COMMENTS. 1 THROUGH 31 S -6 GENERAL NOTES. ID -8 A01 -25 -12 TCO COMMENTS. ARCHITECTURAL • FIRE SPRINKLER AND FIRE ALARM WILL BE MAINTAINED OPERATIONAL 15 THROUGH 31 SF -1 DURING AND AFTER DEMOLITION. THE BUILDING WILL NOT BE OCCUPIED ID -9 INTERIOR ELEVATIONS DURING DEMOLITION. 32 THROUGH 49 2 SP -2 SITE PLAN PHOTOS. INDEX OF DRAWINGS CS -1 COVER SHEET, w �' E7.02 A -6 LIFE SAFETY , INTERIOR DESI N LS -1 FIRST FLOOR LIFE SAFETY PLAN. } ID-1 FIRST IMOOR SECOND FLOOR EQUIPMENT PLAN. LS -2 SECOND FLOOR LIFE SAFETY PLAN. A -9 .FLOOR i, Ii1ISH LAYOUT. PLAN.' ,k CIVIL ID -2 SECOND FLOOR A -11 C -1 CIVIL SITE PLAN fi` FLOOR FINISH LAYOUT. EXTERIOR ELEVATIONS. C -1.1 CIVIL SITE DETAILS ID -3 FIRST FLOOR A -14 C -1.2 CIVIL SITE DETAILS WALL FINISHES LAYOUT. E8.03 ELECTRICAL SCHEDULES.z:� ID -4 SECOND FLOOR E8,04 L -1 LANDSCAPE PLAN. i WALL FINISHES LAYOUT. L -2 LANDSCAPE DETAILS. ID -5 FIRST FLOOR STRUCTURAL SOFFIT /MOLDING & SCONCES S -1 FOUNDATION AND FIRST FLOOR PLAN. LOCATION PLAN S -1A ENERGY BUILDING FLOOR PLAN AND ID -6 SECOND FLOOR S--2 SECOND FLOOR PLAN. SOFFIT /MOLDING & SCONCES S -3 ROOF PLAN. LOCATION PLAN S -4 SCHEDULE AND TYPICAL DETAILS. ID -7 INTERIOR ELEVATIONS S -5 SECTIONS AND DETAILS. 1 THROUGH 31 S -6 GENERAL NOTES. ID -8 INTERIOR ELEVATIONS ARCHITECTURAL 15 THROUGH 31 SF -1 SITE PLAN. ID -9 INTERIOR ELEVATIONS 32 THROUGH 49 SP -2 SITE PLAN PHOTOS. ID -10 TYPICAL RESTROOM PLAN A -1 FIRST FLOOR DEMOLITION PLAN. AND ELEVATIONS A -2 SECOND FLOOR DEMOLITION PLAN. A -3 ROOF DEMOLITION PLAN. ID -11 SPECIFICATIONS A -4 FIRST FLOOR PLAN. ID -12 FINISH SCHEDULE A -5 SECOND FLOOR PLAN. E7.02 A -6 ROOF PLAN. , <rj�,�' >, A -7 FIRST FLOOR EQUIPMENT PLAN. DETAILS. ° E A -8 SECOND FLOOR EQUIPMENT PLAN. ELECTRICAL W(� A -9 FIRST FLOOR REFLECTED CEILING PLAN.' ,k A -10 SECOND FLOOR REFLECTED CEILING PLAN: {& a? A -11 ENERGY BUILDING FLOOR PLAN & DETAILS fi` A -12 EXTERIOR ELEVATIONS. ELECTRICAL A -18 BUILDING SECTIONS AA & BB. A -14 BUILDING SECTIONS CC & DD. SCHEDULES. E8.03 ELECTRICAL RO U A -16A INTERIOR ELEVATIONS - THROUGH 15 - 31. 54. A- A -19 TYPICAL RESTROOM PLANS AND DETAILS. 9 7 A -20 FINISH AND WINDOW SCHEDULES, LIST OF EQUIPMENT, NOTES, & DETAILS. A -21 DOOR SCHEDULE, NOTES & DETAILS. A -22 DOOR DETAILS & NOTES. A -23 PARTITION TYPES, NOTES AND DETAILS. A -24 PARTITION TYPES, NOTES AND DETAILS. A -25 CEILING DETAILS. A -26 MISCELLANEOUS DETAILS. A -27 PENETRATION AND FIRE RATING DETAILS. A -28 PENETRATION AND FIRE RATING DETAILS. A -29 PENETRATION AND FIRE RATING DETAILS. MECHANICAL MEP1.01 SITE PLAN -MEP. MO.00 GENERAL INFORMATION- MECHANICAL. MD2.01 FIRST FLOOR DEMOLITION PLAN- MECHANICAL. MD2.02 SECOND FLOOR DEMOLITION PLAN - MECHANICAL. MD2.03 ROOF DEMOLITION PLAN - MECHANICAL. M2.01 FIRST FLOOR NEW WORK PLAN - MECHANICAL. M2.02 SECOND FLOOR NEW WORK PLAN - MECHANICAL. M2.03 ROOF NEW WORK PLAN - MECHANICAL. M3.01 FIRST FLOOR HVAC DEVICES PLAN- MECHANICAL. M3.02 SECOND FLOOR HVAC DEVICES PLAN - MECHANICAL. M7.00 MECHANICAL DETAILS. M7.01 MECHANICAL DETAILS. M7.02 MECHANICAL DETAILS. M8.00 MECHANICAL SCHEDULES. M9.00 MECHANICAL CONTROLS. PLUMBING PO.00 GENERAL INFORMATION- PLUMBING PD2.01 FIRST FLOOR DEMOLITION PLAN - PLUMBING. PD2.02 SECOND FLOOR DEMOLITION PLAN PLUMBING. P2.00 FIRST FLOOR UNDERFLOOR NEW WORK PLAN - PLUMBING. P2.01 FIRST FLOOR NEW WORK PLAN - PLUMBING. P2.02 SECOND FLOOR NEW WORK PLAN - PLUMBING. P2.03 ROOF NEW WORK PLAN - PLUMBING. P3.01 FIRST FLOOR MEDICAL GAS PLAN. P3.02 SECOND FLOOR MEDICAL GAS PLAN. P6.01 PLUMBING RISERS. P6.02 PLUMBING RISERS. P6.03 PLUMBING RISERS. P7.01 PLUMBING DETAILS. P8.01 PLUMBING SCHEDULES. FIRE PROTECTION FO.00 GENERAL INFORMATION -FIRE PROTECTION. F2.01 FIRST FLOOR NEW WORK PLAN -FIRE PROTECTION. F2.02 SECOND FLOOR NEW WORK PLAN- FIRE PROTECTION. F2.03 ROOF NEW WORK PLAN -FIRE PROTECTION. ELECTRICAL EO.00 ELECTRICAL NOTES AND SYMBOLS. EO.01 ELECTRICAL NOTES AND SYMBOLS. ED2.01 FIRST FLOOR DEMOLITION PLAN - ELECTRICAL. ED2.02 SECOND FLOOR DEMOLITION PLAN - ELECTRICAL. ED2.03 ROOF DEMOLITION PLAN - ELECTRICAL. E2.01 FIRST FLOOR NEW WORK PLAN - POWER. E2.02 SECOND FLOOR NEW WORK PLAN - POWER. E2.03 ROOF NEW WORK PLAN - ELECTRICAL. E3.01 FIRST FLOOR NEW WORK PLAN - LIGHTING. E3.02 SECOND FLOOR NEW WORK PLAN - LIGHTING. E5.01 ENLARGED FLOOR PLANS. . 1 C I R G E6.02 ELECTRICAL STUDIES, E6.03 ELECTRICAL STUDIES. E6.04 ELECTRICAL STUDIES. E6.05 GENERATOR DETAILS. 7 E7.01 E CTRIC D TAILS. - E7.02 ELECTRICAL DETAILS. , <rj�,�' >, E7.03 ELECTRICAL DETAILS. ° E '�''0 E7.04 ELECTRICAL DETAILS., E7.05 ELECTRICAL DETAILS. E7.06 ELECTRICAL DETAILS. E8.01 ELECTRICAL SCHEDULES.'i E8.02 ELECTRICAL SCHEDULES. E8.03 ELECTRICAL SCHEDULES.z:� E8,04 ELECTRICAL SCHEDULES.