Loading...
11-360-0197 ♦ 0 r � i B j 11 A/C AIR CONDITIONING AFF ABOVE !O- -- HOUR Cr CEILING DIFFUSSER CFM CUBIC FEET PER MINUTE TDB DEGREE DRY BULB Tw DEGREE DIG r!!• GRILLE DIFF DIFFUSER DN DOWN ENT ENTERING EXH EXHAUST ER EXHAUST t~ COIL UNIT F.D. FIRE DAMPER FIN FINISHED F.LA. FULL • r AMPERES FLEX FLEXIBLE FL FLOOR t LOUVER DOOR FPM FEET PER MINUTE r- GRILLE •- HORIZONTAL HP HORSEPOWER ISOL. ISOLATOR KILOWATTS LBS POUNDS LRA LOCKED ROTOR AMPERES i • OUTSIDE R.A. RETURN AIR RA/U) RETURN AIR THROUGH • E` aD r • ! ' REG. REGISTER - ! r REQUIRED R.H. RELATIVE HUMIDITY RPM REVOLUTIONS SP.D. SPUTTER DAMPER SP STA11C PRESSURE TEMP. TEMPERATURE THERMOSTAT TYP. TYPICAL U.D. UNDERCUT DOOR V.D. VOLUME DAMPER :I' T. VERTICAL W/ WITH W.P. WATER PROO ONE WAY • WAY THREE 4-W FOUR WAY (DA THERMOSTAT • - ABOVE FINISH FLOOR) DUCT FLEXIBLE CONNECTION 1111 MBRA11ON ISOLATORS IS OR TO CLG. • INDICATES ; r 21141wil • • air PERFOR r r` •' NNEW099*013 GEAERAL RVA.C. NOTES: 1. SCOPE OF WORK WORK SHALL INCLUDE ALL LABOR, EQUIPMENT AND MATERIALS AND PERFORMING ALL OPERATIONS IN CONNEC11ON WITH THE FURNISHING AND INSTALLA71ON OF ALL AIR CONDITIONING, AND VEN11LATION WORK AS SHOWN ON DRAWINGS, HEREIN SPECIFIED AND/011 REQUIRED BY SITE CONDITION. • a PROVIDED AS SCHEDULED ON DRAWINGS OR EQUAL EQUIPMENT SUBMITTED FOR APPROVAL, 2. AIR COND11IONING SYSTEM OF SPLIT SYSTEM TYPE SHALL CONSIST OF « COIL UNIT AND CONDENSING UNIT AS INDICATED ON DRAWINGS. SYSTEM PROVIDED, C• - a. AND ENCLOSURES, PIPING AND WIRING, NECESSARY CONTROLS AND SAFETY DEVICES, REFRIGERANT CHARGE 1 OIL CHARGE. COIL UNIT SHALL BE PROVIDED WITH ACCESSORY STRIP HEATER AND FILTER BOY., REFRIGERANT LINES SHALL BE OF COPPER OF THE PRE—CHARGED, ar TYPE FURNISHED AND SIZED BY SUPPLIER OF EQUIPMENT. PROVIDE SMOKE DETECTORS TO SHUT—OFF UNIT. DUCT a- at METAL FOR INDOORS AIR CONDITIONED SUPPLY AND DUCTWORK / METAL FOR atl AND NON—COND11IONED OUTSIDE a M f - (EXPOSED TO E- - COND171ONED SUPPLY & RETURN DUCTWORK SHALL BE INSULATED METAL, MADE TOTALLY WATER PROOF. b) METAL DUCTS SHALL BE IN ACCORDANCE E. OF • VELOCITY DUCT AMERICAN NATIONAL ASSOCIATION, INe AND THE LATEST PUBUCA71ON OF GUIDE & DATA BOOK OF THE • ♦ OF REFRIGERATION & AI• COND17IONING ENGINEERS. C) DMIOR METAL DUCT INSULATION FOR INDOORS SHALL BE ONE INCH THICK, 25 LB. PER CU. FT. FIBERGLASS FLEXIBLE BLANKET INSULATION WITH U.L APPROVED FIRE RESIS71NG ALUMINUM FOIL VAPOR SEAL FACING AND A MINIMUM mKm OF 0.24 AT 75* F MEAN TEMPERATURE INSTALLATION AS PER MANUFACTURER PUBLISHED RECOMMENTATIONS. DMIOR METAL DUCT INSULATION • ' OUTDOOR 1 • - XPOS a • TO WEATHER SHALL BE TWO (2) INCHES THICK, 6 LBS. PER CLI. FT. FIBERGLASS RIGID BOARD INSLJLA71ON WITH DUPLEX VAPOR ` ` E' AND OF i 22 AT 75' F. INSTALLAIATION SHALL BE MADE 1 WATER PROOF AND IN ACCORDANCE WITH MANUFACTURER PUBLISHED RECOMMENDATAV�L l�:�I:it7ly�ii�I 1 �.► a) ALL AIR OUTLETS AND INLETS SHALL BE TITUS, OR EQUAL. AND OF ALL ALUMINUM CONSTRUCTI OF THE SZE AND TYPES SHOYM ON DRAWINGS. b) FIRE DAMPERS AS APPROVED BY LOCAL GOVERNING AUTHORITIES SHALL BE INSTALLED IN ALL DUCTWORK PASSING THRU A FLOOR. ROOF. , OR FIRE (PROVIDE ACCESS) SHOWN ON DRAWINGS c) CONTRACTOR SHALL PROVIDE POSITIVE MEANS FOR BALANCING EACH INDIVIDUAL AIR CONDITIONI SUPPLY AIR OLITLETI AS PER SCHEDULES DRAWINGS. a BALANCED AGAINST THE ACTUAL INSTALLED STA11C PRESSURE SATE TION VIBRATION ISOLATION PROVIDE SUPPORTS OR MOUNTS FOR ALL EQUIPMENT • ar WITHIN THE BUILDING -5 POWERED BY ONE HORSEPOWER OR LARGER MOTOR. FLEXIBLE PIPING CONNECTIONS SHALL BE PROVIDED FOR ALL PIPING CONNECTED TO EQUIPMENT MOUNTED OF SUPPORTED VIBRATION ,, . O ALL TESTS SHALL BE PERFORMED REQUIRED r - DIFFERENT ta. OF WORK AND A FINAL 24 HOUR DONE AFTER ALL OTHY,,i GUARANTEE CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE COVERING •• 1 S AND MATERIALS FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE. • r (I a • r • 1 r CONCRETE BASE W/ - 6X6- 10 /10WWF SEAL ENTRANCE OF REFRIGERANT LINES INTO P.Y.C. PIPE W/ IMPERMEABLE, RESILIENT MATERIAL. t 1 ANCHOR TO SLAB WITH R.M. ENTERPRISES ANCHOR SCREWS CONTROL POWER & CONNECTIONS r UQUID LINE W/0 INSULATION CONDENSING UNIT MOUNTING DETAIL N.T.S. 6" 0 SCHEDULE 40 P -Y.C. PIPE INCREASE SIZE AS REQUIRED BY LENGTH AND ROUTING SUCTION LINE W/ 1-1/2- ARMAFLEX INSULATION & VAPOR BARRIER = I K M I ► j_NM.� ► <<'1 1;1��■■'� j4 � r A l Lml w.am rm "F"%NRv BRACKET (ADd1STAR E) IL « a �r . t . �. EXHAUST FAN DETAIL mm-,w_ MEETING ROOM Ml lqm �k Iu