Loading...
13-1329R-020U ^ | /13 no 101 11:7 | ' | ' | 7| ' ) � � � \ D FRAMING NOTES CONT: | |^ |i �—''---- ---- --- ! � ------------------ |j | 16\ POST—TENSIONED SLAB DELEGATED ENGINEER NOTE THAT ALL P.T. SLAB WITH IN AREA 1 SHALL BE DESIGNED F�� �A%WUN ^ DIFFERENTIAL SETTLEMENT OF NTH BOTT U |� \�== -o | | RESPECT TO REMAINING P.T. SLAB AREAS | t� 1@3 OUTSIDE OF AREA 1. jummmal PAN m 11:7 | ' | ' | 7| ' ) � � � \ D FRAMING NOTES CONT: | |^ |i �—''---- ---- --- ! � ------------------ |j | 16\ POST—TENSIONED SLAB DELEGATED ENGINEER NOTE THAT ALL P.T. SLAB WITH IN AREA 1 SHALL BE DESIGNED F�� �A%WUN ^ DIFFERENTIAL SETTLEMENT OF NTH BOTT U |� \�== -o | | RESPECT TO REMAINING P.T. SLAB AREAS | t� 1@3 OUTSIDE OF AREA 1. jummmal A MINIMUM OF TWO TENDONS SHALL BE PROVIDED IN EACH DIREC11ON THROUGH SUPPORT COLUMNS (PER ACI 18.12.4) N / /m + | O~ QP|C0NCRE7E STARS | |V�/ #5 @12- C/C E.W. BOT| TYP —ALL SLAB ANCHORS AND PENETRATIONS MUST BE INSTALLED IN THE SLAB PRIOR TO POURING CONCRETE AND TENSIONING CABLES. ENGINEER OF RECORD (E.O.R.) BEARS NO RESPONSIBILITY FOR CABLES DAMAGED AS A RESULT OF THIS OMISSION. —IF DRILLING OR OTHER DESTRUCTIVE SLAB WORK IS REQUIRED, GENERAL CONTRACTOR MUST FIRST OBTAIN WRITTEN APPROVAL FROM E.O.R., THEN COORDINATE WORK WITH POST—TENSION SPECIALTY ENGINEER. (PRIOR TO SLAB POUR, GENERAL CONTRACTOR MAY WISH TO SPRAY PAINT FORM WORK UNDER POST—TENSION CABLES TO AID IN FUTURE CABLE LOCATING). '�777�� Structural Drawing Updated 11-21-13 RE . #60791, Based on Architectural Backgrounds Dated 10-28-131 9. "S - PE MIT SE T Al ARCHITECTURE & INTERIOR DESIGN, INC. 74Sohenta avenue, suite 1121 oltamonte springs, O32701 phone: 407.830.1400 fax: 407.830.4143 /AOUD2731 vmowv.fomumornhitectuna.00m BENEFICIAL COMMUNITIES 2206 Jo-An Drive Sarasota, FL 34231 etro South /\ SHEET REVISIONS: 3 Im a � \ � - ! m—�~� N 7 m LO 7 1 U277'77 77; 77t \C-2 C-2 Cj C-2 6" CIP CONCRETE STAIRS �2 07 EVENTH FLOOR PLAN Uzi SCALE: I/ A MINIMUM OF TWO TENDONS SHALL BE PROVIDED IN EACH DIREC11ON THROUGH SUPPORT COLUMNS (PER ACI 18.12.4) N / /m + | O~ QP|C0NCRE7E STARS | |V�/ #5 @12- C/C E.W. BOT| TYP —ALL SLAB ANCHORS AND PENETRATIONS MUST BE INSTALLED IN THE SLAB PRIOR TO POURING CONCRETE AND TENSIONING CABLES. ENGINEER OF RECORD (E.O.R.) BEARS NO RESPONSIBILITY FOR CABLES DAMAGED AS A RESULT OF THIS OMISSION. —IF DRILLING OR OTHER DESTRUCTIVE SLAB WORK IS REQUIRED, GENERAL CONTRACTOR MUST FIRST OBTAIN WRITTEN APPROVAL FROM E.O.R., THEN COORDINATE WORK WITH POST—TENSION SPECIALTY ENGINEER. (PRIOR TO SLAB POUR, GENERAL CONTRACTOR MAY WISH TO SPRAY PAINT FORM WORK UNDER POST—TENSION CABLES TO AID IN FUTURE CABLE LOCATING). '�777�� Structural Drawing Updated 11-21-13 RE . #60791, Based on Architectural Backgrounds Dated 10-28-131 9. "S - PE MIT SE T Al ARCHITECTURE & INTERIOR DESIGN, INC. 74Sohenta avenue, suite 1121 oltamonte springs, O32701 phone: 407.830.1400 fax: 407.830.4143 /AOUD2731 vmowv.fomumornhitectuna.00m BENEFICIAL COMMUNITIES 2206 Jo-An Drive Sarasota, FL 34231 etro South /\ SHEET REVISIONS: 3 Im a � \ � - ! m—�~� N 7