o _ j lO 5 s4.o I s4.0 I T.O. SLAB I I I G.C. NOTE
s4.oa raj ; s4.o3
I I I I INSTALL B -2 AFTER
LO
.- umi cn I
I
I I i � I POST- TENSIONED
C -2 G -3
C -9 0 j C -1 sR -1 C -1 c 1 `"` C -1 SR -3 I I c_8 II I I CABLES HAVE BEEN
I BELOW c ..� S -1 I I I 4' ® I RESHORING REMOVED. SHORING/
I 0 �a I I `° I I I TYPICAL ON THIS LINE.
I VVMLL r a.u. rNRnrGe nn� it BOTT. TYP. SCALE: 118 " =V -0" Irr :r Hsu 14 v.cl e.rr.
Y I B TT. TYP. I
C14 U_ � I
I I
GENERAL CONTRACTOR
DO NOT SCALE #
COORDINATE DIMENSIONS BETWEEN STRUCTURAL AND
ARCHITECTURAL #` NOTIFY
ENGINEER # ARCHITECT OF DISCREPANCIES
BEFORE -• ► WORK.
-ALL SLAB ANCHORS AND PENETRATIONS MUST BE INSTALLED IN THE SLAB NOTE "
PRIOR TO POURING CONCRETE AND TENSIONING CABLES. ENGINEER OF CONCRETE WALLS CW -1 ARE NOT TO BE
RECORD (E.O.R.) BEARS NO RESPONSIBILITY FOR CABLES DAMAGED AS A COMPLETED UNTIL THE FLOOR ABOVE HAS
RESULT OF THIS OMISSION. BEEN POURED, CABLES TENSIONED AND
ALL SHORES AND RESHORES REMOVED.
-IF DRILLING OR OTHER DESTRUCTIVE SLAB WORK IS REQUIRED, GENERAL
CONTRACTOR MUST FIRST OBTAIN WRITTEN APPROVAL FROM E.O.R., THEN
COORDINATE WORK WITH POST - TENSION SPECIALTY ENGINEER. (PRIOR TO
SLAB POUR, GENERAL CONTRACTOR MAY WISH TO SPRAY PAINT FORM
WORK UNDER POST- TENSION CABLES TO AID IN FUTURE CABLE LOCATING).
� C�+s 9 M •n
. eb
FREDERIG CARRIE,
P.E. FLORIDA
Structural Drawing Updated 12 -20 -13 �:
REG.#60791 e
Based on Architectural Backgrounds Dated 10 -28 -13 _
I An
Y`
. 4. . -
N- ARCHITECTURE &
v INTERIOR DESIGN, INC.
c
RAW" I AIM4MCTtM I INTIMM DEEM
0 745 orienta avenue, suite 1121
m altamonte springs, fl 32701
c phone: 407.830.1400
fax: 407.830.4143
AA0002731
m www.forumarchitecture.com
t
#•
PERMIT SE T
r
4
2
LL o®® Q®®
0 000 00®
c
° D
T i o
A
South Miami, FL
0
c
0
s
o.
A
Q
m
m
w
v
c
w
v
c
c
w
A
m
Q
0
z
m
c
SET DISTRIBUTIONS:
rq
007/14 15 Misc. Coordinatim _
06118/14 16 S R 'neennt _
07131114 17 Crane Tower Foundation Rev.
10
C
0
c
0
E
EDITED BY: YP
• i
iai
;, •
OF
•
• '
'� i
i.EDGE O
n i
r i
i �� a
'n n
irl �
�eD
aim �
-
IM
a •
• '
' NNATION .
.
--
BEAM
L-01
�.
c
f
G
a7
R ) (R
WOMB
�® I
o _ j lO 5 s4.o I s4.0 I T.O. SLAB I I I G.C. NOTE
s4.oa raj ; s4.o3
I I I I INSTALL B -2 AFTER
LO
.- umi cn I
I
I I i � I POST- TENSIONED
C -2 G -3
C -9 0 j C -1 sR -1 C -1 c 1 `"` C -1 SR -3 I I c_8 II I I CABLES HAVE BEEN
I BELOW c ..� S -1 I I I 4' ® I RESHORING REMOVED. SHORING/
I 0 �a I I `° I I I TYPICAL ON THIS LINE.
I VVMLL r a.u. rNRnrGe nn� it BOTT. TYP. SCALE: 118 " =V -0" Irr :r Hsu 14 v.cl e.rr.
Y I B TT. TYP. I
C14 U_ � I
I I
GENERAL CONTRACTOR
DO NOT SCALE #
COORDINATE DIMENSIONS BETWEEN STRUCTURAL AND
ARCHITECTURAL #` NOTIFY
ENGINEER # ARCHITECT OF DISCREPANCIES
BEFORE -• ► WORK.
-ALL SLAB ANCHORS AND PENETRATIONS MUST BE INSTALLED IN THE SLAB NOTE "
PRIOR TO POURING CONCRETE AND TENSIONING CABLES. ENGINEER OF CONCRETE WALLS CW -1 ARE NOT TO BE
RECORD (E.O.R.) BEARS NO RESPONSIBILITY FOR CABLES DAMAGED AS A COMPLETED UNTIL THE FLOOR ABOVE HAS
RESULT OF THIS OMISSION. BEEN POURED, CABLES TENSIONED AND
ALL SHORES AND RESHORES REMOVED.
-IF DRILLING OR OTHER DESTRUCTIVE SLAB WORK IS REQUIRED, GENERAL
CONTRACTOR MUST FIRST OBTAIN WRITTEN APPROVAL FROM E.O.R., THEN
COORDINATE WORK WITH POST - TENSION SPECIALTY ENGINEER. (PRIOR TO
SLAB POUR, GENERAL CONTRACTOR MAY WISH TO SPRAY PAINT FORM
WORK UNDER POST- TENSION CABLES TO AID IN FUTURE CABLE LOCATING).
� C�+s 9 M •n
. eb
FREDERIG CARRIE,
P.E. FLORIDA
Structural Drawing Updated 12 -20 -13 �:
REG.#60791 e
Based on Architectural Backgrounds Dated 10 -28 -13 _
I An
Y`
. 4. . -
N- ARCHITECTURE &
v INTERIOR DESIGN, INC.
c
RAW" I AIM4MCTtM I INTIMM DEEM
0 745 orienta avenue, suite 1121
m altamonte springs, fl 32701
c phone: 407.830.1400
fax: 407.830.4143
AA0002731
m www.forumarchitecture.com
t
#•
PERMIT SE T
r
4
2
LL o®® Q®®
0 000 00®
c
° D
T i o
A
South Miami, FL
0
c
0
s
o.
A
Q
m
m
w
v
c
w
v
c
c
w
A
m
Q
0
z
m
c
SET DISTRIBUTIONS:
rq
007/14 15 Misc. Coordinatim _
06118/14 16 S R 'neennt _
07131114 17 Crane Tower Foundation Rev.