Loading...
08-1400-0111� T 3 S J P s O s t ry aft 1 �13-errnit No. - v 1 A dress: &66) CITY OF SOUTH cr' ^ yt4l E'1?J '1! Dt G DEPART !'�'i i SECTION !! EIPi OVE-D DI 1 PF'R0IIED DATE By A lV Resubmission not required i� PLANNING REVIEWED AS NOTED The purpose of this subxmttat review sltstl be ortly for general confor- mance with the design concept and general compliance with the E.R.P.B. review of quantities dimensions, weights or gauges, fatxtcatton 1� T 3 S J P s O s t ry aft 1 �13-errnit No. - v 1 A dress: &66) CITY OF SOUTH cr' ^ yt4l E'1?J '1! Dt G DEPART !'�'i i SECTION !! EIPi OVE-D DI 1 PF'R0IIED DATE By T ZONING Resubmission not required PLANNING REVIEWED AS NOTED The purpose of this subxmttat review sltstl be ortly for general confor- mance with the design concept and general compliance with the E.R.P.B. review of quantities dimensions, weights or gauges, fatxtcatton processes. construction methods or techniques, coordination with the work of other trades construction safety precautions, or for assuring consistency with the Contract Documents, all of which are the ado responsibility of the Contractor Martdrtgs or comments chili riot be constructed as acceptance of retponaibi8ty for design or intent and does not relieve the Contractor of the responsibility for complying with all the requirements of the Contract Documents. CODE ENF ELECTRICAL MIECHANICAL ENERGY PLUM31NG STRUCTURAL ROOFING BUILDING 4 OWNER BLDR. BLDG.OFFICIAL 1. Sub;ect to eompha:ue with all Federal, :ate and Ceurty Laws, rules and regulat+or.s, the City of South Miami assumes no re!;,-ur.s.bi:,Les for the accuracy ot,'er results from these plans Z. This Copy of the approved plans and the permit card must be available at the buwld.ng site or no inspection will be conducted, 3. REVIEWED FOR CODE COMPLIANCE. G &A CONSULTING ENGINEERS, INC. SHOP DRAWING STAMP APPROVED DISAPPROVED APPROVED AS NOTED REVIEWED Resubmission not required REVISE AND RESUBMIT REVIEWED AS NOTED The purpose of this subxmttat review sltstl be ortly for general confor- mance with the design concept and general compliance with the infommtton given in the Contract Documents 11 does not include review of quantities dimensions, weights or gauges, fatxtcatton processes. construction methods or techniques, coordination with the work of other trades construction safety precautions, or for assuring consistency with the Contract Documents, all of which are the ado responsibility of the Contractor Martdrtgs or comments chili riot be constructed as acceptance of retponaibi8ty for design or intent and does not relieve the Contractor of the responsibility for complying with all the requirements of the Contract Documents. By.