08-1400-0111�
T
3
S
J
P
s
O
s
t
ry
aft 1
�13-errnit No. -
v 1
A dress:
&66)
CITY OF SOUTH cr' ^ yt4l
E'1?J '1! Dt G DEPART !'�'i i
SECTION
!! EIPi OVE-D
DI 1 PF'R0IIED
DATE
By
A
lV
Resubmission not required
i�
PLANNING
REVIEWED AS NOTED
The purpose of this subxmttat review sltstl be ortly for general confor-
mance with the design concept and general compliance with the
E.R.P.B.
review of quantities dimensions, weights or gauges, fatxtcatton
1�
T
3
S
J
P
s
O
s
t
ry
aft 1
�13-errnit No. -
v 1
A dress:
&66)
CITY OF SOUTH cr' ^ yt4l
E'1?J '1! Dt G DEPART !'�'i i
SECTION
!! EIPi OVE-D
DI 1 PF'R0IIED
DATE
By
T
ZONING
Resubmission not required
PLANNING
REVIEWED AS NOTED
The purpose of this subxmttat review sltstl be ortly for general confor-
mance with the design concept and general compliance with the
E.R.P.B.
review of quantities dimensions, weights or gauges, fatxtcatton
processes. construction methods or techniques, coordination with
the work of other trades construction safety precautions, or for
assuring consistency with the Contract Documents, all of which are
the ado responsibility of the Contractor Martdrtgs or comments chili
riot be constructed as acceptance of retponaibi8ty for design or
intent and does not relieve the Contractor of the responsibility for
complying with all the requirements of the Contract Documents.
CODE ENF
ELECTRICAL
MIECHANICAL
ENERGY
PLUM31NG
STRUCTURAL
ROOFING
BUILDING
4
OWNER BLDR.
BLDG.OFFICIAL
1. Sub;ect to eompha:ue with all Federal, :ate and Ceurty Laws, rules and
regulat+or.s, the City of South Miami assumes no re!;,-ur.s.bi:,Les for the
accuracy ot,'er results from these plans
Z. This Copy of the approved plans and the permit card must be available at
the buwld.ng site or no inspection will be conducted,
3. REVIEWED FOR CODE COMPLIANCE.
G &A CONSULTING ENGINEERS, INC.
SHOP DRAWING STAMP
APPROVED
DISAPPROVED
APPROVED AS NOTED
REVIEWED
Resubmission not required
REVISE AND RESUBMIT
REVIEWED AS NOTED
The purpose of this subxmttat review sltstl be ortly for general confor-
mance with the design concept and general compliance with the
infommtton given in the Contract Documents 11 does not include
review of quantities dimensions, weights or gauges, fatxtcatton
processes. construction methods or techniques, coordination with
the work of other trades construction safety precautions, or for
assuring consistency with the Contract Documents, all of which are
the ado responsibility of the Contractor Martdrtgs or comments chili
riot be constructed as acceptance of retponaibi8ty for design or
intent and does not relieve the Contractor of the responsibility for
complying with all the requirements of the Contract Documents.
By.