Loading...
10-1110-011MKINI i ►I I. ALL WORK SHALL CONFORM WITH THE FLORIDA BUILDING CODE, 2007 EDITION, AND ALL OTHER APPLICABLE STATE AND LOCAL REGULATIONS AND ORDINANCES. 2. CONTRACTOR SHALL WARRANT ALL WORK TO BE FREE OF DEFECT IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER ACCEPTANCE OF THE PROJECT. 3. PROVIDE ALL NECESSARY INSTRUCTIONS TO THE OWNER IN THE OPERATION OF THE MECHANICAL SYSTEMS. 4. PROVIDE EQUIPMENT MAINTENANCE AND INSTRUCTION MANUALS. THE MANUAL SHALL ESTABLISH ALL REQUIRED SCHEDULED MAINTENANCE THAT SHALL BE PERFORMED DURING THE LIFE OF THE BUILDING TO GUARANTY THE WORKING CONDITION OF THE INSTALLED SYSTEM AND THE MAINTENANCE OF A PROPER I.A.D. IN THE BUILDING. MANUALS SHALL BE SUBMITTED TO THE ENGINEER FOR ACCEPTANCE. 5. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ACCEPTANCE BY THE OWNER BEFORE PROCEEDING WITH PURCHASE OR INSTALLATION OF ALL EQUIPMENT AND MATERIALS SPECIFIED IN THESE DOCUMENTS. 6. PROVIDE ALL NECESSARY ACCESS PANELS TO CONTROL VALVES, DAMPERS, ETC. 7. BALANCE All SYSTEMS TO PROVIDE AIR QUANTITIES AND CAPACITIES AS INDICATED ON DRAWINGS. B. ALL WORK SHALL BE FIELD CHECKED BEFORE INSTALLATION AND COORDINATED WITH All OTHER TRADES. 9. A/C CONTRACTOR IS RESPONSIBLE FOR OBTAINING HIS OWN PERMIT AND PAYING ALL PERMIT FEES. 10. ALL SIZES SHOWN FOR LINED AND UNLINED DUCTS ARE CLEAR INSIDE DUCT DIMENSIONS. 11. CONDITIONED AIR DUCTWORK SHALL BE CLASS "ONE" FIBER GLASS DUCT BOARD IN ACCORDANCE WITH SMACNA'S FIBROUS DUCT STANDARDS, R -G IN CEILING SPACE IZ PROVIDE VOLUME DAMPERS, TURNING VANES, ETC., IN DUCTWORK FOR PROPER AIR FLOW AND BALANCE PROVIDE MULTIPLE VANE EXTRACTORS OR SPLITTERS WITH CONTROL RODS AT ALL OUTLETS CONNECTED CLOSER THAN TWO DUCT DIAMETERS TO MAIN SUPPLY DUCT AND WHERE SHOWN ON DRAWINGS. 13. REFRIGERANT PIPING SHALL BE SEAMLESS COPPER TYPE "L" HARD OR SOFT DRAWN OR ACR COPPER TUBING WITH WROUGHT COPPER SOLDER JOINT FITTINGS. SOLDER SHAH 01 95/5, APPLIED WITH SUITABLE FLUX, 14. INSULATE REFRIGERANT SUCTION PIPING WITH 3/4" FIRE RESISTANT FOAM PLASTIC OR CLOSED CELL POLYETHYLENE PRE MOLDED PIPE INSULATION. 15. PROVIDE AIR CONDITIONING UNITS WITH MATCHING HEAT -COOL PROGRAMMABLE THERMOSTATS WITH ON- OFF -AUTO SUB -BASE SWITCH, FURNISHED BY EQUIPMENT MANUFACTURER. 16. COORDINATE LOCATION OF DUCTWORK WITH OTHER TRADES. PARTICULARLY WHERE DUCTS RUN THROUGH STRUCTURAL ELEMENTS. PROVIDE ALL NECESSARY SLEEVES BEFORE CONCRETE IS POURED. 17. ALL CONTROL WIRING SHALL BE THE RESPONSIBILITY OF THE MECHANICAL SUB - CONTRACTOR. MECHANICAL SUB CONTRACTOR TO FURNISH ALL MOTORS, STARTERS, AND RELAYS, ETC. 18. VENTILATION DUCTWORK SHALL BE SHEET METAL PER SMACNA STANDARDS. FIBER GLASS DUCTS, EXHAUST AND RETURN AIR DUCTWORK NEED NOT BE INSULATED. 19. CONDENSATE DRAIN PIPING SHALL BE INSULATED WITH 3/4" AMCDAFLEX INSULATION 20. ALL MECHANICAL EQUIPMENT LOCATED ON THE EXTERIOR OF THE BUILDING SHALL BE CONSTRUCTED AND INSTALLED TO WITHSTAND A WIND PRESSURE OF 60 PSF (140 MPH WINDS) FROM ANY DIRECTION AS PER F.B.C. 2007. 21. ALL FAN UNITS. MOTORS, COMPRESSORS, ETC, SHALL BE ISOLATED, AS REQUIRED, TO OPERATE QUIETLY SO THAT OBJECTIONABLE SOUND WILL BE HEARD IN THE OCCUPIED SPACES, DUE TO AIR VELOCITY, MOTOR HUM, VIBRATION. OR MECHANICAL MOVEMENT. DUCTLESS MINISPLITA /C UNIT SCHEDULE UNIT TAG MANUFACTURER AND DUCT SMOKE DETECTOR I E.S.P. IN. ELECT. FIRE DAMPER COOLING CAP. S/T BTUH O/A SMOKE WEIGHT FIRE RATED ENCLOSURE SUCTION LIOUID FIRE R09 rR RATED CEILING ASSEMBLY -� MODEL NO. CFM WG. HEAT KW MCA Grp 95F 6 67F CFM PROGRAMMABLE THERMOSTAT LBS. VOLTS/PH/Hz DUCTLESS MINISPLITA /C UNIT SCHEDULE UNIT TAG MANUFACTURER AND NOM. I E.S.P. IN. ELECT. TOTAL COOLING CAP. S/T BTUH O/A DIMENSIONS WEIGHT ELECT. SERVICE SEER SUCTION LIOUID 0 .. MODEL NO. CFM WG. HEAT KW MCA Grp 95F 6 67F CFM WxLxH (IN.) LBS. VOLTS/PH/Hz 0 LINE LINE AHU -I CARRIER A17LKY -Ul --- 0.35 5.9 KW 0.8 15 --- --- 41.3 x 12.5 x 8.9 29 208 - 230/1/60 19.0 1/2" R-410 1/4" R-410 CU -1 CARRIER RAS- 17LAV -UL - -- - -- - -_ 13 20 - -- /16.200 - -- 30.7 x21.7x 11.4 91 208 - 239/1/60 Lim � IN 11 = rirrrre WORK l as +•�•. �: DESK /IR�I\ HVAC FLOOR PLAN O Date: 10/27/10 Revisions; Sheet 1 of 1 K 0 0 .. cf) Q) aD 0 < 0 Date: 10/27/10 Revisions; Sheet 1 of 1 K