10-1110-007Imamm
I
BD.
25 GA. CHANNEL
SHAPED METAL STLV.
I' •
lerg giiiiii -gI = NOR 1:4 unwAg I.-kill I Nfl;
Rl I FLI• 4 on?. 1:1111 Fil W-1 MOM
TYPICAL
PARTION CONSTRUCTION DETAIL
N.T.S.
/,, --- -- PREFAB WD. TRUSS
16d NAILS EA
D(TYP.)
N.T.S.
4G AT All
P. PARTITION
NS
lX6 T & G CLG. NAILED TO 3X8 0 s
W/ 8d NAILS 0 6" C.C. 0 ALL
SUPPORTS & 1 Od NAILS 0
0 GABLE ENDS (TYPICAL)
3/4" CAVITY
INSULATION (R-4.1)
• mumaftm
1" X 4" P.T. CONT. NAILER (TYP.)
3/4" X 6" BASEBOARD
(SEE FINISH SCHEDULE)
CONC. FLOOR SLAB (SEE
STRUCTURAL DRAWINGS)
6 MIL. VISQUEEN
-7
CONT. CONC. FTG.
(SEE STRUCTURAL DRAWINGS)
ROOF SHINGLES • HOT
MOPPED 90# SLATE ON TIN
CAPPED 30• FELT ON 5/8"
PLYWOOD SHEATING NAILED TO
TRUSSES W/ 8d NAILS 0
0 ALL SUPPORTS (TYPICAL @
ALL ROOFS)
H D. GALV. "L" 3/8" x
12 3 1/2" x 6 1/2" x 0'-6 1/2"
14.5
# 5 VERT. IN BLOCK CELLS
FILLED W/ 300• PSI CONC.
GROUT (BEYOND)
MED. TEXT. STUCCO
FINISH ON 8" CMU WALL
(SEE ELEVATIONS FOR
BANDS, REVEALS, AND
PRECAST TRIM LOCATIONS)
TOP OF FINISH FLOOR
EL. + 0'-0"
< 0- 00
m V) FINISH GRADE (VARIES)gl[-N
'0
't
MM %,[N \1�yy1 A1t. 97 [iJIY[il�<G+ZeIIJ�fyll�:Nlify�
SCALE : 3/4" = l'—O'
ROOF SHINGLES ON HOT
MOPPED 90# SLATE ON TIN
CAPPED 30# FELT ON 5/8"
PLYWOOD SHEATING NAILED TO
TRUSSES W/ 8d NAILS 0 4" C/C
0 ALL SUPPORTS (TYPICAL @
ALL ROOFS)
H D. GALV. "L" 3/8" x
12 3 1/2" x 6 1/2" x 0'-6 1/2"
2`X6" WOOD COLLAR
0 24 O.C. OVER
BATH AREAS
1/2" GYP. BRD.
CLG.
• 1"x3" WD FURRING
CONT. NAILE,ti
CONC. RB (SEE
BEAM SCHEDULE)
3/4" CAVITY
INSULATION (R-4.1)
1" X 4" P.T. CONT. NAILER (TYP.)
3/4" X 6" BASEBOARD
(SEE FINISH SCHEDULE)
CONC. FLOOR SLAB (SEE
STRUCTURAL DRAWINGS)
17
6 MIL. VISQUEEN_/
14.5
El I
�4-
# 5 VERT. IN BLOCK CELLS
FILLED W/ 3000 PSI CONC.
GROUT (BEYOND)
PROVIDE #9 HORIZ. JOINT REINF.
MED. TEXT. STUCCO
FINISH ON 8" CMU WALL
(SEE ELEVATIONS FOR
BANDS, REVEALS, AND
PRECAST TRIM LOCATIONS)
TOP • FINISH FLOOR
EL. + 0'-0"
j
CL
FINISH GRADE (VARIES1
V)
TYPICAL WALL SECTION (@' BATH & w1w.I.C.
SCALE : 3/4" = l'—O"
o
00
n
_j
4f^+..
0
<
<
In
Q0
Co
0
<
Q0
00
r--
U) Llj
0 Z
< ,;;j- 0
_j 0-) =
I In E
00
•
TYPICAL WALL SECTION (@' BATH & w1w.I.C.
SCALE : 3/4" = l'—O"
o
00
n
_j
4f^+..
0
<
<
In
Q0
Co
0
<
Q0
00
r--
U) Llj
0 Z
< ,;;j- 0
_j 0-) =
I In E
TYPICAL SEC11ON OF STUD SPACING
@ CABINETS & WALL-HUNG ITEM]
[It = it—opt
L
DOOR SCHEDULE
•
1
u—
CABINET LOCATIONS
WINDOW SCHEDULE
N
w
cfj
n
•
MARK MASONRY
•
C)
w
CD
z
0
cfj
0
HEIGHT
W
Z
0
0
EfflTsTmom
CID
TYPICAL SEC11ON OF STUD SPACING
@ CABINETS & WALL-HUNG ITEM]
[It = it—opt
L
DOOR SCHEDULE
CABINET LOCATIONS
WINDOW SCHEDULE
0
CAT 11, SAF. GL.
MARK MASONRY
OPNG.
MATERIAL SILL T.O. TYPE REMARKS
W, , NOSTIM
0 WIDTH
HEIGHT
FRAME FINISH GLASS DETAIL SILL
EfflTsTmom
\-20 GA. METAL STUDS 0 C.C.
A* (2) 2' -6"
A
3' -4"
ALUM. PAINTED TINT 3' -4" SINGLE HUNG IMPACT RESIST.
0
B 20-6ft
3'-4"
ALUM. PAINTED TINT 3'-4" SINGLE HUNG I CAT 11, SAF. GL.
k A
ROOM FINISH
SCHEDULE
(1)
W
*SECOND MEANS OF
EGRESS
WINDOW, 3-4" X 2-6" = 8.3 SQ.—FT. (5.7 REQ.D)
Q)
FIRST FLOOR
**SEE ELEVATIONS
LOCATION FLOOR BASEBOARD
WALL CEILING REMARKS
PAZ
0
<
NEW GUEST HOUSE STONE WOOD
GYP. BRD. GYP. BRD.
NEW BATH STONE MARBLE
M.R. GYP. BRD. M.R. GYP. BRD.
TYPICAL SEC11ON OF STUD SPACING
@ CABINETS & WALL-HUNG ITEM]
[It = it—opt
L
DOOR SCHEDULE
CAT 11, SAF. GL.
W, , NOSTIM
=31hil
EfflTsTmom
NOTE: EVERY CLOSET DOOR LATCH SHALL BE SUCH THAT CHILDREN
CAN OPEN THE DOOR FROM INSIDE THE CLOSET.
NOTE: EVERY BATHROOM DOOR SHALL BE DESIGNED TO ALLOW OPENIN#
FROM THE OUTSIDE DURING AN EMERGENCY WHEN LOCKED.
Date: 10/27/10
Revisions:
011IMMIWIIIIIII IIIII=*I9A