10-1110-006w
BD.
25 GA. CHANNEL
IiHAPED METAL STUDS
TYPICAL
PARTION CONSTRUCTION DETAIL
N.T.S.
PREFAB WD. 'MUSS
ATTIC ACCESS DETAIL
16d NAILS EA
D(TYP.)
!X4
SUPPORT FOR
C ACCESS
lX6 T & G CLG. NAILED TO 3X8's
W/ 8d NAILS @ 6- C.C. 0 ALL
CUPPORTS & 10d NAILS @
0 GABLE ENDS (TYPICAL)
3/4- CAVITY
INSULATION (R-4.1)
CONT. FIRESTOP
1" X 4" P.T. CONT. NAILER (TYP.)
3/4- X 6- BASEBOARD
(SEE FINISH SCHEDULE)
CONC. FLOOR SLAB (SEE
STRUCTURAL DRAWINGS)
6 MIL. VISQUEEN—/
ROOF SHINGLES ON HOT
MOPPED •0# SLATE ON TIN
CAPPED 30# FELT ON 5/8-
PLYWOOD SHEAMNG NAILED TO
TRUSSES W/ 8d NAILS 0
0 ALL SUPPORTS (TYPICAL 0
ALL ROOFS)
HD. GALV. 1" 3/8" x
12 3 1/2" x 6 1/2" x 0'-6 1/2"
14
3/4"Ox5 1/2"
HILTI KWIK3
EXP. BOLT
# 5 VERT. IN BLOCK CELLS
FILLED W/ 3000 PSI CONC.
GROUT (BEYOND)
PROVIDE #9 HORIZ. JOINT REINF.
MED. TEXT. STUCCO
FINISH ON 8" CMU WALL
(SEE ELEVATIONS FOR
BANDS, REVEALS, AND
PRECAST TRIM LOCATIONS)
(n
TOP OF FINISH FLOOR
EL. + 0'-0"
7;
< 00
FINISH GRADE (VARIES
RIGID INSULATION
(R -19)
3"x8" EXPOSED
WOOD JOISTS
0 24" O.C.
WOOD COLLAR
0 24" O.C. OVER
BATH & W.I.C. AREAS
BRD.
CILG.
• 1"x3" WD FURRING
CONT. NAILEA
CONC. RB (SEE
BEAM SCHEDULE)
3/4- CAVITY
INSULATION (R-4.1)
CONT. FIRESTOP
1" X 4" P.T. CONT. NAILER (TYP.)
3/4" X 6" BASEBOARD NAILER
(SEE FINISH SCHEDULE)
CONC. FLOOR SLAB (SEE
STRUCTURAL DRAWINGS)
6 MIL. VISQUEEN_/
ROOF SHINGLES ON HOT
MOPPED 90# SLATE ON TIN
(—CAPPED 30# FELT ON 5/8"
PLYWOOD §kEATING NAILED TO
TRUSSES W/ 8d NAILS 0 4- C/C
@ ALL SUPPORTS (TYPICAL @
ALL ROOFS)
HD. GALV. "L" 3/8" x
12 3 1/2" x 6 1/2" x 0'-6 1/2"
14
ill
Z3 0'-0"
10-
V) All FINISH GRADE (VARIE25
C)
CN
00
LL_
0
<
<
In
M
0 N
Z rq
< r"
DO
r--
U) W ry 0 Z
-,1- 0
0-) =
L0 El-
I.
N.T.S.
LL
Cc
CONT. CONC. FTG.
A lllfflivim�
PROVIDE
CLEAN-OUTS AT ALL
CONT. CONC. FTG.
PROVIDE CLEAN-OUTS AT
ALL
I'm 1-1-39. III
+
ME
(SEE STRUCTURAL DRAWINGS)
VERTICAL
REINFORCING LOCATIONS.
(SEE STRUCTURAL
DRAWINGS
11-33
VERTICAL
REINFORCING LOCATIONS.
■
cjj
0
iii
TYPICAL
WALL
SECTION
%@3% GUEST
HOUSE
Z
TYPICAL
WALL
SECTION
(0 BATH
& W.I.C.
a
C)
A
CID
z
SCALE 3/4" l'-O"
A -4
SCALE 3/4" = l'-O"
soul
'aulL04G •
C-Tiol
i
W
Z
0
0
2 X BACKING AT ALL
(0
CABINET TO PARTITION
CONNECTIONS
CABINET LOCATIONS
WINDOW SCHEDULE
0
MARK
MASONRY
OPNG.
MATERIAL
SILL
T.O.
TYPE
REMARKS
0
WIDTH
HEIGHT
FRAME
FINISH
GLASS DETAIL
SILL
\_20 GA. METAL STUDS ®16" C.C.
A
(2)21-691
39-411
ALUM.
PAINTED
TINT
3'-4"
SINGLE HUNG
IMPACT RESIST.
0
•
B
1 21-6"
3'-4"
ALUM.
PAINTED
TINT 1
3'-4"
SINGLE HUNG
CAT 11, SAF. GL.
ROOM FINISH SCHEDULE
*SECOND MEANS OF
EGRESS WINDOW,
3'-4" X 2-6" = 8.3 SQ.—FT. (5.7 REQ.'D)
Q)
cn
CU
Qj
FIRST FLOOR
**SEE ELEVATIONS
o
LOCATION
FLOOR
BASEBOARD
WALL
CEILING
REMARKS
0
<
NEW GUEST HOUSE
STONE
WOOD
GYP. BRD.
GYP. BRD.
*INEW
BATH
STONE
MARBLE
M.R. GYP. BRD.
M.R. GYP. BRD.
TYPICAL SECTION OF STUD SPACING
@ CABINETS & WALL—HUNG ITEMS
I " = l'-0"
DOOR SCHEDULE
m 0:112 [fog
A lllfflivim�
'.T11, 11, SAF. Gll
10 a"Xisi
I'm 1-1-39. III
+
ME
WIT40TIMEffsTaTsm
11-33
NOTE: EVERY CLOSET DOOR LATCH SHALL BE SUCH THAT CHILDREN
CAN OPEN THE DOOR FROM INSIDE THE CLOSET.
NOTE: EVERY BATHROOM DOOR SHALL BE DESIGNED TO ALLOW OPENING
FROM THE OUTSIDE DURING AN EMERGENCY WHEN LOCKED.
late: 10/27/10
Revisions:
Al ol/o3/11
Em
Sheet 4 of 4