14-776-002a
i
1 a 2 a 3 a 4 a 5
I 1 I ! I 1 P I I
a 6 a 7 a 8 ° 9 a 10
P 1 I I I I [ I I I
16 ° 17 a 18 a 19 a 20 a
1 1 I i I 1 1 I I I
21 a 22 a 23 a 24 a 25 a
1 I I I 1 1 I I I I
I. THE CONTRACT DRAWINGS ARE SCHEMATIC AND ARE INTENDED
DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT
TO CONVEY A FUNCTIONAL HVAC SYSTEM AND TO DEPICT THE
SHALL BE USED AS A MINIMUM FOR THE BASE BID.
V -
GENERAL LOCATION OF THE HVAC SYSTEM COMPONENTS. THEY
MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER IN ALL
I.
MOTOR CONTROLLERS (STARTERS) OR COMBINATION
ARE NOT INTENDED TO BE SCALED FOR ROUGHING -IN
ASPECTS TO THAT SPECIFIED WILL BE SUBJECT TO APPROVAL
EQUIPMENT TOLERANCES_
MEASUREMENTS, OR TO SERVE AS SHOP DRAWINGS OR
IN WRITING THROUGH SHOP DRAWINGS SUBMITTAL PROCESS, FOR
PREVENT CONTACT OF DISSIMILAR METALS_ CHILLED WATER
a -
PORTIONS THEREOF. FURTHERMORE, IT IS THE RESPONSIBILITY"
ACCEPTANCE. THE USE OF ANY UNAUTHORIZED EQUIPMENT
PIPING SHALL BE SUPPORTED WITH NO MORE THAN 8 FT
OF THE CONTRACTOR TO VERIFY ALL THE EXISTING SITE
SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE
INSTALLED BY THE ELECTRICAL CONTRACTOR
CONDITIONS PRIOR TO PLACING THE BID.
CONTRACTOR'S EXPENSE.
u -
2. THE CONTRACTOR SHALL EXAMINE THE CONTRACT DOCUMENTS
21. THE CONTRACTOR SHALL PROVIDE SUBMITTALS TO BE
POINTS OF INTERFACE WHERE PRE -WIRED CIRCUITS CONNECT TO
2.
AND FAMILIARIZE WITH ALL THE REQUIREMENTS OF THE
APPROVED BY THE ENGINEER OF RECORD FOR ALL
CHILLED WATER PIPING MATERIAL:
FIELD WIRED DEVICES.
PROJECT AND NOTIFY THE CONTRACTING OFFICER OF ANY
MECHANICAL COMPONENTS TO BE INSTALLED, INCLUDING BUT
a _
OBSERVED FAULTS AND AMBIGUITY IN THE CONTRACT
NOT LIMITED TO: CHILLER PIPING, PIPING INSULATION, VALVES,
A) FOR 2' AND SMALLER
DOCUMENTS SO THAT THE MATTER WILL BE RESOLVED PRIOR
HYDRONIC ACCESSORIES, ETC)
PENETRATIONS FOR PIPES, CONDUITS, OR OTHER PURPOSES
TO SUBMISSION OF BIDS.
THROUGH FIRE RATED ASSEMBLIES (FLOORS, ROOF, WALLS,
22. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND
T -
3. THE MECHANICAL CONTRACTOR IS REQUIRED TO REVIEW
WOW PROVIDED UNDER THIS CONTRACT AND SHALL MAKE
FITTINGS: BLACK MALLEABLE IRON SCREW FITTINGS, 150 LB.
1. PIPE HANGERS, STRUCTURAL SUPPORT, PIPE AND PIPE FITTINGS,
DRAWINGS FOR ALL TRADES OF WORK AND IS RESPONSIBLE
GOOD, REPAIR OR REPLACE AT HIS OWN EXPENSE, ANY
ANSI /ASME 8163
FOR THE COORDINATION OF HIS WORK AND THE WORK OF HIS
DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE
SEALANTS SHALL BE UL LISTED. APPLY FIRE STOP AS
SUBCONTRACTORS WITH ALL OTHER TRADES OF WORK. IT IS THE
DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE
° -
MECHANICAL CONTRACTOR'S RESPONSIBILITY TO PROVIDE HIS
OF COMMISSIONING OF EQUIPMENT (COMMISSIONING WILL BEGIN
WITH MECHANICAL AND ELECTRICAL EQUIPMENT SHALL BE
SUBCONTRACTORS WITH A COMPLETE SET OF DRAWINGS.
ONCE THE EQUIPMENT IS ACCEPTED AND TURNED OVER TO THE
PAINTED.
OWNER).
B) FOR 2 1/2' T14W 10'
S _
4. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL
PIPE: BLACK STEEL PIPE, ASTM A53, SCHEDULE 40, TYPE E,
OF BID TO DETERMINE CONDITIONS AFFECTING THE WORK.. ANY
23. THE CONTRACTOR SHALL MANTAIN ONE COPY OF DRAWINGS ON
THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO IDENTIFY
ITEMS WHICH ARE NOT COVERED IN THE BID DOCUMENTS OR
THE JOB SITE TO RECORD DEVIATIONS FROM CONTRACT
CEILING CONFLICTS. THE CONTRACTOR IS ALSO RESPONSIBLE
ANY PROPOSED SUBSTITUTIONS SHALL BE LISTED SEPARATELY
DRAWINGS, SUCH AS:
PIPING IN UNPAINTED AREAS IS TO BE GIVEN ONE COAT OF
° -
AND QUALIFIED N THE CONTRACTORS BID. BID SHALL SERVE
JOINTS: WELDED PIPE, ANSI /AWS DLl AND ANSI /ASME SEC. S
ASPHALT VARNISH CONFORMING TO TT -V -51.
AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND
a. REVISIONS, ADDENDA, AND CHANGE ORDERS.
ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT
DAYS OF DISCOVERY. ANY CHANGES RESULTING FROM
4_
OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE
b. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD
R _
SITE DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY
CONDITIONS.
COPPER PIPE, IS TO BE GIVEN A PROTECTIVE COATING PRIOR
IN PERFORMING WORK.
MEAN. INSULATION THICKNESS SHALL BE AS FOLLOWS:
TO INSTALLING THE INSULATION.
c. APPROVED EQUIPMENT SUBSTITUTIONS AND CONTRACTOR'S
a -
5. BY SUBMISSION OF BID, THE CONTRACTOR SHALL
COORDINATION
PROJECT MANAGER
ACKNOWLEDGE ACCEPTANCE OF THE CONTRACT DOCUMENTS
AS AN ADEQUATE DEFINITION OF THE SCOPE OF WORK AND
24. AT COMPLETION OF THE PROJECT AND BEFORE FINAL
4 STEEL AND WROUGHT -IRON PIPE WITH WITH FACTORY APPLIED
5.
EXTRA COST CLAIMS BASED ON INADEQUACY OF CONTRACT
APPROVAL, THE CONTRACTOR SHALL MAKE ANY FINAL
$) 2' INSULATION THICKNESS FOR PIPE DIAMETER FROM 2'4 TO
Q -
DOCUMENTS WILL NOT BE CONSIDERED.
CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY OF
12'�
AND PIPE ON WHICH FACTORY - APPLIED PROTECTIVE COATING
EACH PRINT BY SIGNATURE THEREON.
SURPLUS MATERIALS, AND SCRAP_ ALL IDENTIFIED EXISTING
6. ALL WORK SHALL COMPLY WITH APPLICABLE CODES INCLUDING
IS DAMAGED AND THE PIPE SURFACE SHOWS RUSTING SHALL BE
a _
THE LATEST EDITION OF THE FLORIDA BUILDING CODE,
25. ANY DEVIATION FROM THE DRAWINGS, OMISSION OR
GLEANED TO BARE METAL AND THEN PANTED WITH ONE GOAT
ONE
NATIONAL ELECTRIC CODE, STATE ENERGY CODE, NFPA
SUBSTITUTION OF ANY SPECIFIED MECHANICAL EQUIPMENT OR
COVERED WITH ALUMINUM JACKET.
OF FIR -
OF FIRE-TREATMENT COATING AND TWO GOATS
TWO ZING
REQUIREMENTS, AND OTHER LOCAL CODES. IT IS THE INTENTION
ACCESSORY' SHALL BE APPROVED BY THE ENGINEER OF
OF THE CONTRACT DRAWINGS AND SPECIFICATIONS TO GALL
RECORD.
CONTRACTOR IS RESPONSIBLE TO PROVIDE POWER IF
P -
FOR COMPLETE, FINISHED WORK, TESTING AND READY FOR
REQUIRED, TO THE UNITS FOR CONTROLS AND MAINTENANCE
OPERATION
26. DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL
5. ZING - COATED AND COPPER PIPE UNDER INSULATION SHALL NOT
RECEPTACLES.
LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. WHERE
VALVES, ETC SHALL BE INSULATED WITH CAREFULLY FITTED
a _
I. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES,
DRAWINGS, EXISTING SITE CONDITIONS OR OTHER TRADES
INSULATION VAPOR SEALED AT ALL JOINTS AND ENDS.
PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO
CONFLICT OR ARE UNCLEAR, ADVISE THE ENGINEER IN WRITING_
CONTRACTOR SHALL REVIEW AND COORDINATE THE
HIS WORK
SURFACES ON FACTORY - FINISHED EQUIPMENT 'HAT ARE
ARRANGEMENT OF THE CHILLER ACCESS DOORS PRIOR TO
21. THE CONTRACTOR SHALL PROVIDE THE OWNER WITH EXTENDED
DAMAGED DURING INSTALLATION SHALL BE RESTORED TO
o -
S. CONTRACTOR SHALL THOROUGHLY CLEAN HIS WORK AREA
WARRANTY FOR THE EQUIPMENT INSTALLED WHENEVER IT IS
ALL SERVICEABLE ITEMS SHALL NAVE REMOVABLE CAPS OR
THEIR ORIGINAL CONDITION.
DAILY. CONTRACTOR SHALL ALSO REMOVE ALL TRASH AFTER
AVAILABLE FROM THE MANUFACTURER
PLUGS THAT HAVE TIGHT FIT AND CAN BE REMOVED AS
COMPLETION OF WORK.
° -
9. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOCATIONS
CUTTING AND PATCHING
S.
ALL UL RATED EQUIPMENT MUST HAVE THE UL DOCUMENTATION
FOR PROPER EQUIPMENT INSTALLATION PRIOR TO SUBMITTING
INSULATION.
EQUIPMENT SHOP DRAWINGS FOR APPROVAL.
L CONTRACTOR SHALL DRILL OR CUT OPENINGS AS REQUIRED TO
N _
INSTALL NEW WORK. USE GORE DRILLS OR POWER DRIVEN SAWS.
1.
THE CONTRACTOR SHALL PERFORM A FLUSH AND PRESSURE
10. CONTRACTOR SHALL VERIFY ALL VOLTAGE AND POWER
DO NOT CUT ANY MASONRY STRUCTURES IN A WAY WHICH
THE MECHANICAL EQUIPMENT SHALL NOT BE TURNED OVER TO
REQUIREMENTS AND COORDINATE WITH ELECTRICAL
LESSENS ITS STRUCTURAL STRENGTH. OPENINGS CUT N EXISTING
THE OWNER UNTIL THE MECHANICAL SYSTEM IS ACCEPTED BY
CONTRACTOR AS REQUIRED.
WALLS OR STRUCTURE SHALL NOT BE DONE WITHOUT THE
° -
THE LIBRARY AC MECHANICS AND ISD.
PERMISSION OF A STRUCTURAL ENGINEER
DEPARTMENT. ALL STRAINERS SHALL BE FLUSHED AND
11. ALL SYSTEMS SHALL BE CLEAN OF FOREIGN MATERIAL AND
GLEANED. ALL PIPING SHALL BE TESTED AT 100 PSI FOR NOT
ROUGH SPOTS PRIOR TO BEING PLACED N SERVICE AND
2. TOUCH UP AND PANTING OF EXISTING SURFACES OR NEW WORK
LESS THAT 24 HOURS (MINIMUM). THE LIBRARY DEPARTMENT
BEFORE OPERATIONAL TESTS ARE PEFRFOR'1ED.
DAMAGED DURING CONSTRUCTION SHALL BE PRIMED AND
BY CABINET PENETRATIONS SHALL BE REMOVED IMMEDIATELY
M _
REPRESENTATIVE SHALL BE NOTIFIED IN ADVANCE AND MUST
PANTED TO MATCH EXISTING. APPLY DRYWALL COMPOUND TO
TO PREVENT CORROSION_
12. THE CONTRACTOR SHALL LOCATE ALL EQUIPMENT WHICH MUST
PARTITIONS. PATCH AND FINISH PANT TO MATCH EXISTING.
BE SERVICED, OPERATED OR MAINTAINED N FULLY
PERFORM THIS TEST WITHOUT THE LIBRARY DEPARTMENT
° -
ACCESSIBLE POSITION. MINOR DEVIATIONS FROM DRAWINGS
OPENINGS (ROOF OR FLOOR)
REPRESENTATIVE BEING PRESENT).
MAY BE MADE TO ALLOW FOR BETTER ACCESSIBILITY, AND
INCLUDED IN THE SCOPE OF THIS PROJECT ARE REQUIRED TO
ANY CHANGES FOR THAT PURPOSE SHALL BE SUBMITTED FOR
1- THE CONTRACTOR IS RESPONSIBLE TO PROVIDE RE- ROOFING
BE SECURED TO THE UNDERLYING BUILDING STRUCTURE.
APPROVAL.
FOR ANY ROOF PENETRATION. THE CONTRACTOR MUST TEST ALL
L -
AREAS WHERE THERE IS A ROOF PENETRATION TO ENSURE THE
THAT THEY ARE ACCESSIBLE. ALL VALVES (EXCEPT CONTROL
13. CONTRACTOR IS PROHIBITED FROM USING LEAD BASED
OPENING IS PROPERLY SEALED. THE LIBRARY DEPARTMENT
VALVES) AND STRAINERS SHOULD BE FULL SIZE OF PIPE
SOLDER U 41CH COMES N CONTACT WITH DOMESTIC WATER
REPRESENTATIVE MUST BE NOTIFIED N ADVANCE AND MUST BE
IS EXPOSED TO THE WIND SHALL BE BUILT AND ANCHORED TO
a -
BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT
PRESENT DURING THE TESTING (THE CONTRACTOR SHALL NOT
SUSTAIN HURRICANE FORCE WINDS AS OUTLINED IN SECTION 6 OF
14. CONTRACTOR SUBCONTRACTORS AND MATERIAL SUPPLIERS
PERFORM THIS TEST WITHOUT A LIBRARY DEPARTMENT
SHALL BE RESPONSIBLE FOR NSPECTION OF JOB CONDITIONS
REPRESENTATIVE BEING PRESENT).
AT EACH PIECE OF EQUIPMENT TO PERMIT ! DISASSEMBLY FOR
AFFECTING THE INSTALLATION OF AN ITEM AND FOR TAKING ALL
K -
FIELD MEASUREMENTS PRIOR TO THE FABRICATION OR
2- ALL FLOOR SLAB OPENINGS SHALL BE PROPERLY SEALED.
TEST AND BALANCE.
S.
PURCHASE OF THE ITEM TO ENSURE THAT THE ITEM CONCERNED
THE
WILL INTEGRATE PROPERLY WITH ALL ADJACENT MATERIALS
NIGH PERFORMANCE -
a _
AND WILL FIT ALL OTHER CONDITIONS AS THEY EXIST OR WILL
DEMOLITION
EXIST N THE FINISHED/EXISTING BUILDING. SLEEVES ANCHORS
INDEPENDENT TEST AND BALANCE COMPANY THAT SPECIALIZES
10. MANOMETERS (PRESSURE GAGE) SHALL BE BOURDON TYPE,
AND OTHER ITEMS THAT MUST BE EMBEDDED IN OR THAT
L ITEMS IDENTIFIED TO BE REMOVED SHALL BE SAFELY
4 1/25a DIAL SIZE, RANGE: 0 -100 PSIG WITH 1% FULL SCALE
OTHERWISE AFFECT OTHER PORTIONS OF THE WORK SHALL BE
DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE AND
DISTRIBUTION SYSTEMS_ THE COMPANY SELECTED SHALL BE
r -
LOCATED AND SET WHILE SUCH PORTIONS OF THE WORK ARE N
LOCAL CODES.
FULLY CERTIFIED BY THE AABC. ALL FINAL REPORTS SHALL BE
PROGRESS.
RING_ MANUFACTURER WEKSLER GLASS THERMOMETER CORP
V
SIGNED AND SEALED BY A CERTIFIED TEST AND BALANCE
2. THE CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK
(OR APPROVED EQUAL) MODEL- EA14 -C. PRESSURE GAUGES
15. UNLESS OTHERWISE SPECIFICALLY MENTIONED, ALL ANCHORS,
WITH THE LIBRARY DEPARTMENT REPRESENTATIVE. PROVISIONS
SHALL BE NSTALLED WITH PET COCK.
BOLTS, SOWS, FITTINGS, FILLER HARDWARE, ACCESSORIES,
SHALL BE MADE BY THE CONTRACTOR TO PREVENT
COPY TO THE PROJECT MANAGER FOR REVIEW AND APPROVAL.
TRIM AND OTHER PARTS REQUIRED FOR OR N CONNECTION
DISRUPTING OF ADJACENT AREAS OF THE AREA N WHICH WORK
WITH, AN ITEM OR MATERIAL TO MAKE A COMPLETE,
IS BEING PEED.
_
SERVICEABLE, FINISHED AND FIRST QUALITY INSTALLATION
SHALL BE LIQUID IN GLASS TYPE, ANGLE ADJUST, 10' LONG,
T
SHALL BE FURNISHED AND INSTALLED AS PART OF THE ITEM OR
3. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
RANGE 0- 100'_. MANUFACTURER- GLASS
MATERIAL, WHETHER GALLED FOR OR NOT.
SECURING THE WORK AREA AGAINST INTRUSION BY
RECORD FOR REVIEW AND APPROVAL.
THERMOMETER CORD (OR APPROVED EQUAL) MODEL:
UNAUTHORIZED PERSONNEL_ PROVIDE ALL TEMPORARY
° -
16. UNLESS OTHERWISE SPECIFICALLY MENTIONED, ALL ITEMS AND
PARTITIONS AND ENCLOSURES REQUIRED TO KEEP THE WORK
3_
3.
PARTS THEREOF THAT ARE MADE OF STEEL, IRON OR OTHER
AREA SECURE.
PET COCK
WI
FERROUS METAL THAT ARE NOT GALVANIZED, PLATED OR
NOTIFIED IN ADVANCE OF THE DATE AND TIME FOR THE TEST 4
OTHERWISE SPECIFIED TO BE FACTORY FINISHED, SHALL BE
4. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SUPPORTS
BALANCE. THE LIBRARY DEPARTMENT REPRESENTATIVE AND
H _
GLEANED AND PANTED WITH ONE COAT OF BEST QUALITY RUST
AND SERVICE REQUIRED TO MNIMIZE INTERRUPTION OF
ISD REPRESENTATIVE MUST BE PRESENT DURING THE TEST AND
INHIBITIVE METALLIC PRIMER AFTER INSTALLATION, ALL
SERVICES TO THE FACILITY. PROVIDE DUST CONTROL
BALANCE. (CONTRACTOR SHOULD NOT PERFORM THIS TEST
EXPOSED METAL CONNECTIONS AND ABRASIONS SHALL BE
BARRIERS TO KEEP CONSTRUCTION DUST AWAY FROM AREAS
° -
TOUGHED -UP WITH THE SAME MATERIAL AS THE SHOP COAT
NOT NCLUDED N THE AREA OF WORK
PLACED. A LEGEND MUST BE PLACED AT A VISIBLE LOCATION
AND LEFT IN GOOD CONDITION FOR FINAL FINISHING, IF
PRESENT).
INSIDE THE MECHANICAL ROOM.
REQUIRED.
5- ALL NECESSARY SHUTDOWNS AND NTERF.UPTIONS OF EXISTING
SERVICES SHALL BE MINIMAL AND SHALL BE FULLY
SLEEVES.
G -
1-1. ALL ITEMS SHALL BE NSTALLED IN A WORKMANLIKE MANNER IN
COORDINATED WITH THE LIBRARY DEPARTMENT
E
STRICT ACCORDANCE WITH THE BEST RECOGNIZED PRACTICE IN
REPRESENTATIVE IN ADVANCE TO SCHEDULE ALL
A
I.
THE FIELD CONCERNED. MANUFACTURED ITEMS/EQUIPMENT
INTERRUPTIONS TO SUITE THE LIBRARY DEPARTMENT WORK
a
° _
SHALL BE INSTALLED N STRICT ACCORDANCE WITH THE
REQUIREMENTS.
ISSUED BY THE AMERICAN NATIONAL STANDARDS INSTITUTE
MANUFACTURER'S PRINTED DIRECTIONS, SPECIFICATIONS
SHALL EXTEND THROUGH IT'S RESPECTIVE FLOOR WALL OR
AND /OR WRITTEN RECOMMENDATION FOR AN INSTALLATION OF
6. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS N T14E FIELD
PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE
HIGHEST QUALITY. ALL WORKING PARTS SHALL BE PROPERLY
AND COORDINATE WITH ALL TRADES-
r.
-
ADJUSTED AFTER INSTALLATION AND LEFT N PERFECT W10RKING
F
ORDER ITEMS IN ALL CASES SHALL BE INSTALLED PLUMB,
EXTEND 2' ABOVE THE FLOOR CONTRACTOR MUST COORDINATE
2.
PROVIDE ELECTRICAL PRODUCTS WHICH HAVE BEEN TESTED,
TRUE AND N PROPER RELATIONSHIP TO SURROUNDNG
ANY CORE DRILLING OR CUTTNG OF OPENINGS IN MASONRY
MATERIALS.
a
a _
COMPLY WITH NEMA STANDARDS.
v
2.
18. THE PLANS ARE GENERALLY DIAGRAMMATIC. THE CONTRACTOR
3_
a
M
SHALL COORDINATE THE WORK OF THE DIFFERENT TRADES N
/OR FLOORS SHALL BE PROPERLY FIRE SEALED TO RETAIN THE
E -
ORDER THAT INTERFERENCE BETWEEN MECHANICAL,
q
ELECTRICAL AND STRUCTURAL WORK CAN BE AVOIDED. ALL
°p
NECESSARY OFFSETS N CONDUIT, PIPING AND FITTINGS, ETC,
B
3.
REQUIRED TO PROPERLY INSTALL THE WORK SHALL BE
4-
A
_
FURNISHED COMPLETE N PLACE. PIPING, DUCTS, ETC, SHALL
PARTITIONS SHALL BE STANDARD WEIGH STEEL PIPE FINISHED
1
PLASTIC TAPE PIPE MARKERS. TAGS MAY BE USED ON SMALL
BE KEPT AS CLOSE AS POSSIBLE TO WALL, COLUMNS, ETC., N
WITH SMOOTH EDGES - FOR OTHER THAN MASONRY PARTITIONS,
ORDER TO TAKE UP THE MINIMUM AMOUNT OF SPACE_
D _
COORDINATE WITH THE STRUCTURAL REQUIREMENTS OF THE
PRESSURE. INSTALL IN CLEAR VIEW AND ALIGN WITH AXIS OF
PROJECT. ALL OFFSETS, FITTINGS, ETC, REQUIRED SHALL BE
a.
cl
FURNISHED AND INSTALLED WITHOUT ADDITIONAL EXPENSE TO
a
STRAIGHT RUNS INCLUDING RISERS AND DROPS, ADJACENT TO
THE OWNER N CASE THAT UNAVOIDABLE INTERFERENCE
° -
DEVELOP, THE ENGINEER WILL DECIDE WHICH EQUIPMENT SHALL
IN
HANGERS
BE RELOCATED REGARDLESS OF WHICH WAS FIRST INSTALLED
AND MODIFICATIONS WILL BE MADE WITHOUT ADDITIONAL
PIPING IN ACCORDANCE WITH ANSI COLOR REQUIREMENTS FOR
1.
EXPENSE TO OWNER
RESPECTIVE SERVICE.
C _
ANGLE IRON, BANDS, C- CLAMPS WITH RETANING CLIPS,
19. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, AND
CHANNELS, HANGER RODS, ETC, NECESSARY FOR THE
EQUIPMENT NECESSARY FROM THE INSTALLATION OF ALL
a
a -
SYSTEMS IN ACCORDANCE WITH THE DRAWINGS, THE
'-
APPLICABLE EDITION OF THE FLORIDA BUILDING CODE AND
I. CONTRACTOR SHALL FURNISH THE MANUFACTURER'S INSTALLATION,
i
2.
ALL OTHER APPLICABLE STATE, COUNTY AND LOCAL
OPERATION AND MAINTENANCE MANUALS ' WHICH SHALL BE
11.
ORDINANCES.
CONCRETE, OR MASONRY ONLY.
0
B
NSULATION.
20. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE
2.
MANUALS SHALL CONTAIN A COMPLETE DESCRIPTION OF THE
m
ALL INSULATION SYSTEMS SHALL HAVE COMPOSITE FIRE AND
SYSTEM OPERATION, ALL MAINTENANCE PROCEDURES REQUIRED
A
SMOKE HAZARD RATINGS AS TESTED BY PROCEDURE ASTM
TO BE PERFORMED AND THE INTERVALS AT WHICH SUCH
GENERAL NOTES
E -84, NFPA 255 AND UL 'i23. FLAME SPREAD OF 25 AND SMOKE
A _
FI
co
N.T.S.
0
cq
PLASTICS AND CEMENTS, SHALL BE UL LISTED, NON - FLAMMABLE
LIFE OF THE EQUIPMENT.
AND SHALL NOT EXCEED THE FIRE AND SMOKE HAZARD
RATINGS AS STIPULATED N THE ABOVE REQUIREMENTS.
1 ° 2 a 3 a 4 a 5
a 6 ° 7 ° 8 a 9 a 10
a
i
11 a 12 a 13 ° 14 a 15 a
I 1 I I i I I I I 1
16 ° 17 a 18 a 19 a 20 a
1 1 I i I 1 1 I I I
21 a 22 a 23 a 24 a 25 a
1 I I I 1 1 I I I I
MECHANICAL
NOTES
MAXIMUM AND MINIMUM OPERATING PARAMETERS, CONDENSER
2.
ALL PIPING SHALL BE SUPPORTED WITH COMMERCIAL
WATER OPERATING PARAMETERS, AND ALL ROTATING
I.
MOTOR CONTROLLERS (STARTERS) OR COMBINATION
MANUFACTURED CLAMPS. PROVIDE ISOLATION SLEEVES TO
EQUIPMENT TOLERANCES_
STARTER /DISCOMaECT SWITCHES FOR MECHANICAL EQUIPMENT
PREVENT CONTACT OF DISSIMILAR METALS_ CHILLED WATER
5_ MANUAL SHALL CONTAIN ELECTRICAL DIAGRAMS OF ALL
ARE FURNISHED BY THE MECHANICAL CONTRACTOR AND
PIPING SHALL BE SUPPORTED WITH NO MORE THAN 8 FT
ELECTRICAL COMPONENTS. SHOW) ALL CIRCUITS PRE -WIRED BY
INSTALLED BY THE ELECTRICAL CONTRACTOR
BETWEEN SUPPORTS.
THE MANUFACTURER AND ALL REQUIRED FIELD WIRING AND
POINTS OF INTERFACE WHERE PRE -WIRED CIRCUITS CONNECT TO
2.
INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH THE
3.
CHILLED WATER PIPING MATERIAL:
FIELD WIRED DEVICES.
MANUFACTURERS INSTRUCTIONS AND RECOMMENDATIONS.
A) FOR 2' AND SMALLER
FIELD PAINTING
3.
PENETRATIONS FOR PIPES, CONDUITS, OR OTHER PURPOSES
PIPE: BLACK STEEL PIPE, ASTM A53, SCHEDULE 40, TYPE E,
THROUGH FIRE RATED ASSEMBLIES (FLOORS, ROOF, WALLS,
GRADE B
PARTITIONS, ETCJ SHALL BE PROVIDED WITH THE REQUIRED
FITTINGS: BLACK MALLEABLE IRON SCREW FITTINGS, 150 LB.
1. PIPE HANGERS, STRUCTURAL SUPPORT, PIPE AND PIPE FITTINGS,
FIRE RESISTANCE RATING FIRE STOP MATERIAL. FIRE STOP
ANSI /ASME 8163
CONDUIT AND CONDUIT FITTINGS, PIPE COVERINGS AND
SEALANTS SHALL BE UL LISTED. APPLY FIRE STOP AS
JOINTS: PIPE THREADS, GENERAL. PURPOSE (AMERICAN)
INSULATION AS WELL AS ALL METAL SURFACES ASSOCIATED
RECOMMENDED BY THE MANUFACTURER AND IN ACCORDANCE
ANSI /ASME 51.20.1
WITH MECHANICAL AND ELECTRICAL EQUIPMENT SHALL BE
WITH ITS LISTING TO MEET OR EXCEED THE FIRE RATING OF THE
PAINTED.
ASSEMBLY IN WHICH IT tS INSTALLED.
B) FOR 2 1/2' T14W 10'
PIPE: BLACK STEEL PIPE, ASTM A53, SCHEDULE 40, TYPE E,
2. FINISH PAINT IN AREAS HAVING PAINTED ADJACENT SURFACES
4.
THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO IDENTIFY
GRADE B
SHALL MATCH THE ADJACENT SURFACES. UNCOATED FERROUS
CEILING CONFLICTS. THE CONTRACTOR IS ALSO RESPONSIBLE
FITTINGS: STEEL BUTT- WELDM -4 ANSI /ASME 8169
PIPING IN UNPAINTED AREAS IS TO BE GIVEN ONE COAT OF
FOR CHECKING FIELD CONDITIONS PRIOR TO BIDDING AND
JOINTS: WELDED PIPE, ANSI /AWS DLl AND ANSI /ASME SEC. S
ASPHALT VARNISH CONFORMING TO TT -V -51.
REPORT ANY PROBLEMS /CONFLICTS TO THE ENGINEER WITHIN 2
DAYS OF DISCOVERY. ANY CHANGES RESULTING FROM
4_
CHILLED WATER PIPING SHALL BE INSULATED WITH CELLULAR
3_ PIPING TO BE INSULATED, EXCEPT GALVANIZED STEEL AND
CONDITIONS ARISING IN THE FIELD WHICH WERE NOT BROUGHT TO
GLASS INSULATION: ASTM C552, 8 1_55 DENSITY, K =033 AT -15'F
COPPER PIPE, IS TO BE GIVEN A PROTECTIVE COATING PRIOR
THE ENGNEER'S ATTENTION ARE TO BE MADE BY THIS
MEAN. INSULATION THICKNESS SHALL BE AS FOLLOWS:
TO INSTALLING THE INSULATION.
CONTRACTOR WITH NO ADDITIONAL COST TO THE COUNTY'S
PROJECT MANAGER
A) Win NSULATION THICKNESS FOR PIPE DIAMETER FROM %§# TO
I X'a.
4 STEEL AND WROUGHT -IRON PIPE WITH WITH FACTORY APPLIED
5.
UPON COMPLETION OF THE WORK UNDER THIS CONTRACT, THE
$) 2' INSULATION THICKNESS FOR PIPE DIAMETER FROM 2'4 TO
COATING SHALL REQUIRE NO FURTHER PROTECTION. BARE PIPE
CONTRACTOR SHALL REMOVE ALL TOOLS, APPLIANCES,
12'�
AND PIPE ON WHICH FACTORY - APPLIED PROTECTIVE COATING
SURPLUS MATERIALS, AND SCRAP_ ALL IDENTIFIED EXISTING
IS DAMAGED AND THE PIPE SURFACE SHOWS RUSTING SHALL BE
EQUIPMENT TO BE REMOVED SHALL BE TURNED OVER TO THE
5.
ALL OUTDOOR EXPOSED CHILLED WATER PIPING SHALL BE
GLEANED TO BARE METAL AND THEN PANTED WITH ONE GOAT
ONE
OWNER, UNLESS OTHERWISE INDICATED ON THE SCOPE OF WORK
COVERED WITH ALUMINUM JACKET.
OF FIR -
OF FIRE-TREATMENT COATING AND TWO GOATS
TWO ZING
PRIMER CONFORMING TO TT-
6_
CONTRACTOR IS RESPONSIBLE TO PROVIDE POWER IF
6.
GAUGE COOKS, TEMPERATURE SENSING WELLS, BUTTERFLY
REQUIRED, TO THE UNITS FOR CONTROLS AND MAINTENANCE
VALVES STEMS AND HANDLES, STRAINER CAPS, SLOWDOWN
5. ZING - COATED AND COPPER PIPE UNDER INSULATION SHALL NOT
RECEPTACLES.
VALVES, ETC SHALL BE INSULATED WITH CAREFULLY FITTED
BE PANTED. EQUIPMENT SHALL BE FINISHED IN ACCORDANCE
INSULATION VAPOR SEALED AT ALL JOINTS AND ENDS.
WITH THE SPECIFICATION FOR THE PARTICULAR END ITEMS.
1.
CONTRACTOR SHALL REVIEW AND COORDINATE THE
WHENEVER A MANUFACTURE OFFERS CUSTOMIZED INSULATION
SURFACES ON FACTORY - FINISHED EQUIPMENT 'HAT ARE
ARRANGEMENT OF THE CHILLER ACCESS DOORS PRIOR TO
FOR THEIR EQUIPMENT, THE CONTRACTOR MUST USE THIS OPTION.
DAMAGED DURING INSTALLATION SHALL BE RESTORED TO
PURCHASING THE EQUIPMENT. COMPONENT OF THE UNITS SHALL
ALL SERVICEABLE ITEMS SHALL NAVE REMOVABLE CAPS OR
THEIR ORIGINAL CONDITION.
BE ACCESSIBLE FOR REPAIR AND SERVICING.
PLUGS THAT HAVE TIGHT FIT AND CAN BE REMOVED AS
REQUIRED WITHOUT DISTURBING PERMANENT ADJACENT
S.
ALL UL RATED EQUIPMENT MUST HAVE THE UL DOCUMENTATION
INSULATION.
OR LABEL VISIBLE FOR INSPECTION.
1.
THE CONTRACTOR SHALL PERFORM A FLUSH AND PRESSURE
9.
THE MECHANICAL EQUIPMENT SHALL NOT BE TURNED OVER TO
TEST FOR ALL CHILLED WATER AND CONDENSER WATER PIPING
THE OWNER UNTIL THE MECHANICAL SYSTEM IS ACCEPTED BY
PRIOR TO TURNING THE SYSTEM OVER TO THE LIBRARY
THE LIBRARY AC MECHANICS AND ISD.
DEPARTMENT. ALL STRAINERS SHALL BE FLUSHED AND
GLEANED. ALL PIPING SHALL BE TESTED AT 100 PSI FOR NOT
10. ALL METAL SHAVINGS INSIDE MECHANICAL EQUIPMENT CAUSED
LESS THAT 24 HOURS (MINIMUM). THE LIBRARY DEPARTMENT
BY CABINET PENETRATIONS SHALL BE REMOVED IMMEDIATELY
REPRESENTATIVE SHALL BE NOTIFIED IN ADVANCE AND MUST
TO PREVENT CORROSION_
BE PRESENT DURING THE TEST (THE CONTRACTOR SHALL NOT
PERFORM THIS TEST WITHOUT THE LIBRARY DEPARTMENT
11.
ALL ROOF ATTACHED EQUIPMENT AND APPURTENANCES
REPRESENTATIVE BEING PRESENT).
INCLUDED IN THE SCOPE OF THIS PROJECT ARE REQUIRED TO
BE SECURED TO THE UNDERLYING BUILDING STRUCTURE.
8_
LOCATE ALL VALVES, STRAINERS, UNIONS, AND FLANGES SO
THAT THEY ARE ACCESSIBLE. ALL VALVES (EXCEPT CONTROL
12.
ALL MECHANICAL EQUIPMENT INSTALLED OUTDOORS AND THAT
VALVES) AND STRAINERS SHOULD BE FULL SIZE OF PIPE
IS EXPOSED TO THE WIND SHALL BE BUILT AND ANCHORED TO
BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT
SUSTAIN HURRICANE FORCE WINDS AS OUTLINED IN SECTION 6 OF
AND CONTROLS. UNION AND /OR FLANGES SHOULD BE NSTALLED
ASCE STANDARD 'I.
AT EACH PIECE OF EQUIPMENT TO PERMIT ! DISASSEMBLY FOR
ALTERATION AND REPAIRS.
HYDRONIC
TEST AND BALANCE.
S.
ALL VALVES 2%5 AND LARGER SHALL BE BUTTERFLY TYPE 'HP'
THE
NIGH PERFORMANCE -
1.
THE CONTRACTOR SHALL OBTAIN THE SERVICES OF AN
INDEPENDENT TEST AND BALANCE COMPANY THAT SPECIALIZES
10. MANOMETERS (PRESSURE GAGE) SHALL BE BOURDON TYPE,
IN THE TESTING AND BALANCING OF THE HVAC AND AIR
4 1/25a DIAL SIZE, RANGE: 0 -100 PSIG WITH 1% FULL SCALE
1.
DISTRIBUTION SYSTEMS_ THE COMPANY SELECTED SHALL BE
ACCURACY, CORROSION RESISTANT STAINLESS STEEL CASE AND
FULLY CERTIFIED BY THE AABC. ALL FINAL REPORTS SHALL BE
RING_ MANUFACTURER WEKSLER GLASS THERMOMETER CORP
V
SIGNED AND SEALED BY A CERTIFIED TEST AND BALANCE
(OR APPROVED EQUAL) MODEL- EA14 -C. PRESSURE GAUGES
ENGINEER CONTRACTOR TO SUBMIT A SIGNED AND SEALED
SHALL BE NSTALLED WITH PET COCK.
COPY TO THE PROJECT MANAGER FOR REVIEW AND APPROVAL.
2 M
IL
THERMOMETERS (TEMPERATURE GAUGE) FOR CHILLED WATER
2-
THE TEST AND BALANCE CONTRACTOR INFOR!" TATION AND
SHALL BE LIQUID IN GLASS TYPE, ANGLE ADJUST, 10' LONG,
T
CERTIFICATIONS SHALL BE SUBMITTED TO THE ENGINEER OF
RANGE 0- 100'_. MANUFACTURER- GLASS
S
RECORD FOR REVIEW AND APPROVAL.
THERMOMETER CORD (OR APPROVED EQUAL) MODEL:
AS5L -916. TEMPERATURE GAUGES SHALL BE NSTALLED WITH
3_
3.
THE LIBRARY DEPARTMENT REPRESENTATIVE SHALL BE
PET COCK
WI
NOTIFIED IN ADVANCE OF THE DATE AND TIME FOR THE TEST 4
BALANCE. THE LIBRARY DEPARTMENT REPRESENTATIVE AND
EQUIPMENT IDENTIFICATION
ISD REPRESENTATIVE MUST BE PRESENT DURING THE TEST AND
"'
4
BALANCE. (CONTRACTOR SHOULD NOT PERFORM THIS TEST
1.
ALL VALVES MUST HAVE A NUMERICAL IDENTIFICATION TAG
WITHOUT THE ABOVE MENTIONED REPRESENTATIVES BEND
PLACED. A LEGEND MUST BE PLACED AT A VISIBLE LOCATION
PRESENT).
INSIDE THE MECHANICAL ROOM.
5.
SLEEVES.
2.
FURNISH AND INSTALL LABELS ON ALL EQUIPMENT AND PIPING.
MARKERS /LABELS SHALL BE MNIMUM I j'X an AND IDENTIFIED IN
I.
THE CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT
ACCORDANCE WITH THE BACKGROUND AND LETTER COLORS
6
EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH SLEEVE
ISSUED BY THE AMERICAN NATIONAL STANDARDS INSTITUTE
SHALL EXTEND THROUGH IT'S RESPECTIVE FLOOR WALL OR
(,ANSI). MARKERS SHALL BE AS MANUFACTURED BY CHAMPION
PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE
AMERICA INC. OR EQUAL_
'T.
EXCEPT SLEEVES THAT PENETRATE THE FLOOR WHICH SHALL
EXTEND 2' ABOVE THE FLOOR CONTRACTOR MUST COORDINATE
2.
PROVIDE ELECTRICAL PRODUCTS WHICH HAVE BEEN TESTED,
N
ANY CORE DRILLING OR CUTTNG OF OPENINGS IN MASONRY
LISTED AND LABELED BY UNDERWRITERS LABORATORIES AND
FLOORS OR WALLS.
COMPLY WITH NEMA STANDARDS.
8.
2.
AL.L. SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND
3_
IDENTIFICATION FOR PIPING SHALL INCLUDE BOTH THE FLUID
M
/OR FLOORS SHALL BE PROPERLY FIRE SEALED TO RETAIN THE
TYPE AND DIRECTION OF FLOW.
WI
WALL / FLOOR FIRE RATING_
B
3.
SLEEVES IN BEARING AND MASONRY- WALLS, FLOORS AND
4-
PIPING: IDENTIFY PIPING, CONCEALED OR EXPOSED, WITH
PARTITIONS SHALL BE STANDARD WEIGH STEEL PIPE FINISHED
PLASTIC TAPE PIPE MARKERS. TAGS MAY BE USED ON SMALL
WITH SMOOTH EDGES - FOR OTHER THAN MASONRY PARTITIONS,
DIAMETER PIPING. IDENTIFY SERVICE, FLOW DIRECTION AND
THROUGH CEILINGS, OR FOR CONCEALED VERTICAL PIPING,
PRESSURE. INSTALL IN CLEAR VIEW AND ALIGN WITH AXIS OF
SLEEVES SHALL BE NO. 22 USG GALVANIZED STEEL MNIMUIM_
PIPING. LOCATE IDENTIFICATION NOT TO EXCEED 20 FEET ON
cl
STRAIGHT RUNS INCLUDING RISERS AND DROPS, ADJACENT TO
EACH VALVE AND TEE, AT EACH SIDE OF PENETRATION OF
IN
HANGERS
STRUCTURE OR ENCLOSURE AND AT EACH OBSTRUCTION. PAINT
PIPING IN ACCORDANCE WITH ANSI COLOR REQUIREMENTS FOR
1.
HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS
RESPECTIVE SERVICE.
ANGLE IRON, BANDS, C- CLAMPS WITH RETANING CLIPS,
10. IN
CHANNELS, HANGER RODS, ETC, NECESSARY FOR THE
ORATION AND MAINTENANCE MANUALS.
INSTALLATION OF WORK
T
I. CONTRACTOR SHALL FURNISH THE MANUFACTURER'S INSTALLATION,
2.
HANGERS SHALL BE FASTENED TO THE BUILDING STEEL,
OPERATION AND MAINTENANCE MANUALS ' WHICH SHALL BE
11.
CONCRETE, OR MASONRY ONLY.
COMPLETE FOR ALL EQUIPMENT AND SYSTEMS FURNISHED,
NSULATION.
2.
MANUALS SHALL CONTAIN A COMPLETE DESCRIPTION OF THE
1.
ALL INSULATION SYSTEMS SHALL HAVE COMPOSITE FIRE AND
SYSTEM OPERATION, ALL MAINTENANCE PROCEDURES REQUIRED
12
SMOKE HAZARD RATINGS AS TESTED BY PROCEDURE ASTM
TO BE PERFORMED AND THE INTERVALS AT WHICH SUCH
E -84, NFPA 255 AND UL 'i23. FLAME SPREAD OF 25 AND SMOKE
PROCEDURES ARE TO BE PERFORMED. LIST ALL PARTS WITH
FI
DEVELOPED OF 50. ACCESSORIES, SUCH AS ADHESIVES,
PART NUMBERS WHICH WILL REQUIRE REPLACEMENT DURING THE
PLASTICS AND CEMENTS, SHALL BE UL LISTED, NON - FLAMMABLE
LIFE OF THE EQUIPMENT.
AND SHALL NOT EXCEED THE FIRE AND SMOKE HAZARD
RATINGS AS STIPULATED N THE ABOVE REQUIREMENTS.
3
ALL NECESSARY WARNINGS AND PRECAUTIONS RELATIVE TO THE
SAFE OPERATION OF THE SYSTEM OR SYSTEMS SHALL BE
IDENTIFIED. THE LITERATURE SHALL CONTAIN ALL REQUIRED
TROUBLESHOOTING INFORMATION AND SHALL DESCRIBE ALL
PIPING,
PIPNG NSULATION 4 HYDRONICS
REQUIRED TEST PROCEDURES TO BE PERFORMED BY
MAINTENANCE PERSONNEL.
1.
ALL PIPING SUBJECT TO THERMAL EXPANSION AND /OR
CONTRACTION THAT PENETRATES A SMOKE, FIR OR FIRE /SMOKE
4.
MANUAL SHALL CONTAIN DESIGN DATA FOR ALL EQUIPMENT AND
WALL, PARTITION, OR FLOOR SLAB SHALL BE SUITABLY
SYSTEMS, SPECIFYING KILOWATTS, VOLTAGE, AMPERAGE,
SLEEVED AND FIRE SAFED_
2 MECHANICAL NOTES
N.T.S.
1 1 I 1 I i I i I I I I I I I I 1 I P i I i I
a 11 a 12 a 13 a 14 a 15 a 16 ° 17 a 18 a 19 a 20 a 21 a
1 1
22 a
26 ° 27 a 28 a 2g a 30 r 31 a 32 a 33
INTERNAL SERVICES DEPARTMENT
n n - DESIGN AND CONSTRUCTION SERVICES DIVISION - V
111 N.W.1 Street, Suite 2420
WmMade, Florida, 33128
_ q
(305)375-400
- u
MIAMI -DADS
0 •
- T
SEAL:
®� -S
t
a
\� / g f .�� " "A
R
ELDIS R. GOWISOLO, P.E.
FL LICENSE No. 60781
PROJECT NAME AND LOCATION:
E*l��0
MIAMI
BRANCH
LIBRARY
CHILLER
REPLACEMENT
CONTRACTOR SHALL PERFORM THE WORK FOLLOWING THE
PROPOSED WORK PHASING PLAN SHOWN IN SHEET M -4. THE SCOPE OF _ M
WORK INCLUDES THE FOLLOWING: 6000 SW SUNSET DRIVE
MIAMI, FL 33143
REMOVE AND PROPERLY DISPOSE TWO (2) EXISTING 20 TON AIR
COOLED CHILLERS WITH RELATED PIPING, ACCESSORIES AND SPRING
IBRATION ISOLATORS AS PER CONSTRUCTION DOCUMENTS. PROPERTY OF MIAMI DADE COUNTY
- FOR OFFICIAL USE ONLY -
ODIFY THE EXISTING METAL STRUCTURE AS REQUIRED TO -DO NOT REMOVE THIS NOTE - _ L
CCOMMODATE THE NEW CHILLERS AS PER STRUCTURAL DRAWINGS. PROPERLY DESTROY DOCUMENTS WHEN NO
LONGER NEEDED. GENERAL CONTRACTOR TO
HIS INCLUDES BUT IS NOT LIMITED TO: RAISE THE GALVANIZED STEEL VERIFY ALL DIMENSIONS AND CONDITIONS AT
'AND 14' ABOVE CURRENT ELEVATION. JOB SITE PRIOR TO CONSTRUCTION. GENERAL
CONTRACTOR SHALL NOTIFY ISD OF ANY
FURNISH AND INSTALL TWO (2) NEW 20 TON AIR COOLED CHILLERS
DISCREPANCIES PRIOR GCONSTRUCTION
TH RELATED PIPING, ACCESSORIES, SPRING VIBRATION ISOLATORS AND / OR ORDERING MATERIALS.
AS PER CONSTRUCTION DOCUMENTS. - K
KEY PLAN:
REPLACE AND RELOCATE THE EXISTING DISCONINECT SWITCHES FOR
CHILLERS 01 4 2 AS PER ELECTRICAL DRAWINGS.
REPLACE THE EXISTING CHILLED WATER TREATMENT BYPASS
FEEDER AS PER MECHANICAL DRAWINGS. _
REPLACE CHILLED WATER PIPING (INCLUDING SHUT OFF VALVES) WITH
RELATED ACCESSORIES AS INDICATED IN MECHANICAL PLANS.
_ a
REPLACE THE NSULATION FOR ALL EXISTING CHILLED WATER PIPING
AND FURNISH AND NSTALL NEW NSULATION FOR NEW PIPING. NEW
SULATtON SHALL BE INSTALLED WITH ALUMINUM JACKET. _ 1
EXISTING METAL STAND SHALL BE RE- PANTED AFTER ALL
ODIFICATIONS ARE COMPLETE. ALL SURFACES TO BE RE- PANTED
SHALL BE PROPERLY PREPARED (CLEANED AND [LED) SUBMITTALS:
TROUT DAMAGING THE FACTORY APPLIED GALVANIZED COATING NO. DATE DESCRIPTION:
EFORE APPLYING THE NEW PRIMER AND FINAL COAT. NEW PRIMER
SHALL BE FULLY COMPATIBLE WITH ZNC COATINGS. FINAL COAT _ _ - H
SHALL BE FULLY COMPATIBLE WITH THE PRIMER METAL STAND -
SI-IALL BE PRIMED WITH HIGH PERFORMANCE EPDXY PRIMER 2 - -
NEW CHILLER SHALL BE CONNECTED TO THE EXISTING 'TRANE' 3
BUILDING MANAGEMENT SYSTEM (BMS). THE EXISTING PUMP 4
TERLOCK SYSTEM MUST BE INTEGRATED INTO THE NEW CHILLER THE
NEW CHILLER SHALL BE INTEGRATED TO THE EXISTING PROGRAMMED - G
SCHEDULE OF OPERATION.
REVISIONS:
ORDER TO RAISE THE CHILLER STAND, THE EXISTING ENCLOSURE No. DATE DESCRIPTION:
SCREEN SHALL BE REMOVED, STORED AND RE- INSTALLED AFTER °
HE CHILLERS REPLACEMENT 18 COMPLETED. -
ALL WOOD STRIPS ON METAL STAND SHALL BE REMOVED, STORED - _ F
AND RE- INSTALLED AFTER THE CHILLERS REPLACEMENT IS
COMPLETED. -
PEWOR" i A WATER SIDE TEST AND BALANCE FOR THE NEW CHILLERS,
AND TWO (2) EXISTING CHILLED WATER PUMPS LOCATED ON THE -
RST FLOOR MECHANICAL ROOM.
- - E
DRAWING TITLE.
HVAC NOTES
_ Is
MKS]
mmoff-.1
- C
PROJECT PHASE 100% CD'S
ISSUE DATE 06119/2013
_ a
DRAWN BY EG APPROVED BY EG
WORK ORDER NUMBER: W130M
- B
SHEET NUMBER
3 SCOPE OF W_ C3 _ A
N.T.S.
I I I l I I I I t i I 1 t I 1 1 1 1 I I
23 a 24 a 25 ° 26 a 27 a 28 ° 29 a 30 a 31 a 32 a 33
DRAWING TITLE.
HVAC NOTES
_ Is
MKS]
mmoff-.1
- C
PROJECT PHASE 100% CD'S
ISSUE DATE 06119/2013
_ a
DRAWN BY EG APPROVED BY EG
WORK ORDER NUMBER: W130M
- B
SHEET NUMBER
3 SCOPE OF W_ C3 _ A
N.T.S.
I I I l I I I I t i I 1 t I 1 1 1 1 I I
23 a 24 a 25 ° 26 a 27 a 28 ° 29 a 30 a 31 a 32 a 33