Loading...
14-776-002a i 1 a 2 a 3 a 4 a 5 I 1 I ! I 1 P I I a 6 a 7 a 8 ° 9 a 10 P 1 I I I I [ I I I 16 ° 17 a 18 a 19 a 20 a 1 1 I i I 1 1 I I I 21 a 22 a 23 a 24 a 25 a 1 I I I 1 1 I I I I I. THE CONTRACT DRAWINGS ARE SCHEMATIC AND ARE INTENDED DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT TO CONVEY A FUNCTIONAL HVAC SYSTEM AND TO DEPICT THE SHALL BE USED AS A MINIMUM FOR THE BASE BID. V - GENERAL LOCATION OF THE HVAC SYSTEM COMPONENTS. THEY MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER IN ALL I. MOTOR CONTROLLERS (STARTERS) OR COMBINATION ARE NOT INTENDED TO BE SCALED FOR ROUGHING -IN ASPECTS TO THAT SPECIFIED WILL BE SUBJECT TO APPROVAL EQUIPMENT TOLERANCES_ MEASUREMENTS, OR TO SERVE AS SHOP DRAWINGS OR IN WRITING THROUGH SHOP DRAWINGS SUBMITTAL PROCESS, FOR PREVENT CONTACT OF DISSIMILAR METALS_ CHILLED WATER a - PORTIONS THEREOF. FURTHERMORE, IT IS THE RESPONSIBILITY" ACCEPTANCE. THE USE OF ANY UNAUTHORIZED EQUIPMENT PIPING SHALL BE SUPPORTED WITH NO MORE THAN 8 FT OF THE CONTRACTOR TO VERIFY ALL THE EXISTING SITE SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE INSTALLED BY THE ELECTRICAL CONTRACTOR CONDITIONS PRIOR TO PLACING THE BID. CONTRACTOR'S EXPENSE. u - 2. THE CONTRACTOR SHALL EXAMINE THE CONTRACT DOCUMENTS 21. THE CONTRACTOR SHALL PROVIDE SUBMITTALS TO BE POINTS OF INTERFACE WHERE PRE -WIRED CIRCUITS CONNECT TO 2. AND FAMILIARIZE WITH ALL THE REQUIREMENTS OF THE APPROVED BY THE ENGINEER OF RECORD FOR ALL CHILLED WATER PIPING MATERIAL: FIELD WIRED DEVICES. PROJECT AND NOTIFY THE CONTRACTING OFFICER OF ANY MECHANICAL COMPONENTS TO BE INSTALLED, INCLUDING BUT a _ OBSERVED FAULTS AND AMBIGUITY IN THE CONTRACT NOT LIMITED TO: CHILLER PIPING, PIPING INSULATION, VALVES, A) FOR 2' AND SMALLER DOCUMENTS SO THAT THE MATTER WILL BE RESOLVED PRIOR HYDRONIC ACCESSORIES, ETC) PENETRATIONS FOR PIPES, CONDUITS, OR OTHER PURPOSES TO SUBMISSION OF BIDS. THROUGH FIRE RATED ASSEMBLIES (FLOORS, ROOF, WALLS, 22. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND T - 3. THE MECHANICAL CONTRACTOR IS REQUIRED TO REVIEW WOW PROVIDED UNDER THIS CONTRACT AND SHALL MAKE FITTINGS: BLACK MALLEABLE IRON SCREW FITTINGS, 150 LB. 1. PIPE HANGERS, STRUCTURAL SUPPORT, PIPE AND PIPE FITTINGS, DRAWINGS FOR ALL TRADES OF WORK AND IS RESPONSIBLE GOOD, REPAIR OR REPLACE AT HIS OWN EXPENSE, ANY ANSI /ASME 8163 FOR THE COORDINATION OF HIS WORK AND THE WORK OF HIS DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE SEALANTS SHALL BE UL LISTED. APPLY FIRE STOP AS SUBCONTRACTORS WITH ALL OTHER TRADES OF WORK. IT IS THE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE ° - MECHANICAL CONTRACTOR'S RESPONSIBILITY TO PROVIDE HIS OF COMMISSIONING OF EQUIPMENT (COMMISSIONING WILL BEGIN WITH MECHANICAL AND ELECTRICAL EQUIPMENT SHALL BE SUBCONTRACTORS WITH A COMPLETE SET OF DRAWINGS. ONCE THE EQUIPMENT IS ACCEPTED AND TURNED OVER TO THE PAINTED. OWNER). B) FOR 2 1/2' T14W 10' S _ 4. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL PIPE: BLACK STEEL PIPE, ASTM A53, SCHEDULE 40, TYPE E, OF BID TO DETERMINE CONDITIONS AFFECTING THE WORK.. ANY 23. THE CONTRACTOR SHALL MANTAIN ONE COPY OF DRAWINGS ON THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO IDENTIFY ITEMS WHICH ARE NOT COVERED IN THE BID DOCUMENTS OR THE JOB SITE TO RECORD DEVIATIONS FROM CONTRACT CEILING CONFLICTS. THE CONTRACTOR IS ALSO RESPONSIBLE ANY PROPOSED SUBSTITUTIONS SHALL BE LISTED SEPARATELY DRAWINGS, SUCH AS: PIPING IN UNPAINTED AREAS IS TO BE GIVEN ONE COAT OF ° - AND QUALIFIED N THE CONTRACTORS BID. BID SHALL SERVE JOINTS: WELDED PIPE, ANSI /AWS DLl AND ANSI /ASME SEC. S ASPHALT VARNISH CONFORMING TO TT -V -51. AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND a. REVISIONS, ADDENDA, AND CHANGE ORDERS. ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT DAYS OF DISCOVERY. ANY CHANGES RESULTING FROM 4_ OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE b. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD R _ SITE DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY CONDITIONS. COPPER PIPE, IS TO BE GIVEN A PROTECTIVE COATING PRIOR IN PERFORMING WORK. MEAN. INSULATION THICKNESS SHALL BE AS FOLLOWS: TO INSTALLING THE INSULATION. c. APPROVED EQUIPMENT SUBSTITUTIONS AND CONTRACTOR'S a - 5. BY SUBMISSION OF BID, THE CONTRACTOR SHALL COORDINATION PROJECT MANAGER ACKNOWLEDGE ACCEPTANCE OF THE CONTRACT DOCUMENTS AS AN ADEQUATE DEFINITION OF THE SCOPE OF WORK AND 24. AT COMPLETION OF THE PROJECT AND BEFORE FINAL 4 STEEL AND WROUGHT -IRON PIPE WITH WITH FACTORY APPLIED 5. EXTRA COST CLAIMS BASED ON INADEQUACY OF CONTRACT APPROVAL, THE CONTRACTOR SHALL MAKE ANY FINAL $) 2' INSULATION THICKNESS FOR PIPE DIAMETER FROM 2'4 TO Q - DOCUMENTS WILL NOT BE CONSIDERED. CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY OF 12'� AND PIPE ON WHICH FACTORY - APPLIED PROTECTIVE COATING EACH PRINT BY SIGNATURE THEREON. SURPLUS MATERIALS, AND SCRAP_ ALL IDENTIFIED EXISTING 6. ALL WORK SHALL COMPLY WITH APPLICABLE CODES INCLUDING IS DAMAGED AND THE PIPE SURFACE SHOWS RUSTING SHALL BE a _ THE LATEST EDITION OF THE FLORIDA BUILDING CODE, 25. ANY DEVIATION FROM THE DRAWINGS, OMISSION OR GLEANED TO BARE METAL AND THEN PANTED WITH ONE GOAT ONE NATIONAL ELECTRIC CODE, STATE ENERGY CODE, NFPA SUBSTITUTION OF ANY SPECIFIED MECHANICAL EQUIPMENT OR COVERED WITH ALUMINUM JACKET. OF FIR - OF FIRE-TREATMENT COATING AND TWO GOATS TWO ZING REQUIREMENTS, AND OTHER LOCAL CODES. IT IS THE INTENTION ACCESSORY' SHALL BE APPROVED BY THE ENGINEER OF OF THE CONTRACT DRAWINGS AND SPECIFICATIONS TO GALL RECORD. CONTRACTOR IS RESPONSIBLE TO PROVIDE POWER IF P - FOR COMPLETE, FINISHED WORK, TESTING AND READY FOR REQUIRED, TO THE UNITS FOR CONTROLS AND MAINTENANCE OPERATION 26. DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL 5. ZING - COATED AND COPPER PIPE UNDER INSULATION SHALL NOT RECEPTACLES. LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. WHERE VALVES, ETC SHALL BE INSULATED WITH CAREFULLY FITTED a _ I. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, DRAWINGS, EXISTING SITE CONDITIONS OR OTHER TRADES INSULATION VAPOR SEALED AT ALL JOINTS AND ENDS. PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO CONFLICT OR ARE UNCLEAR, ADVISE THE ENGINEER IN WRITING_ CONTRACTOR SHALL REVIEW AND COORDINATE THE HIS WORK SURFACES ON FACTORY - FINISHED EQUIPMENT 'HAT ARE ARRANGEMENT OF THE CHILLER ACCESS DOORS PRIOR TO 21. THE CONTRACTOR SHALL PROVIDE THE OWNER WITH EXTENDED DAMAGED DURING INSTALLATION SHALL BE RESTORED TO o - S. CONTRACTOR SHALL THOROUGHLY CLEAN HIS WORK AREA WARRANTY FOR THE EQUIPMENT INSTALLED WHENEVER IT IS ALL SERVICEABLE ITEMS SHALL NAVE REMOVABLE CAPS OR THEIR ORIGINAL CONDITION. DAILY. CONTRACTOR SHALL ALSO REMOVE ALL TRASH AFTER AVAILABLE FROM THE MANUFACTURER PLUGS THAT HAVE TIGHT FIT AND CAN BE REMOVED AS COMPLETION OF WORK. ° - 9. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOCATIONS CUTTING AND PATCHING S. ALL UL RATED EQUIPMENT MUST HAVE THE UL DOCUMENTATION FOR PROPER EQUIPMENT INSTALLATION PRIOR TO SUBMITTING INSULATION. EQUIPMENT SHOP DRAWINGS FOR APPROVAL. L CONTRACTOR SHALL DRILL OR CUT OPENINGS AS REQUIRED TO N _ INSTALL NEW WORK. USE GORE DRILLS OR POWER DRIVEN SAWS. 1. THE CONTRACTOR SHALL PERFORM A FLUSH AND PRESSURE 10. CONTRACTOR SHALL VERIFY ALL VOLTAGE AND POWER DO NOT CUT ANY MASONRY STRUCTURES IN A WAY WHICH THE MECHANICAL EQUIPMENT SHALL NOT BE TURNED OVER TO REQUIREMENTS AND COORDINATE WITH ELECTRICAL LESSENS ITS STRUCTURAL STRENGTH. OPENINGS CUT N EXISTING THE OWNER UNTIL THE MECHANICAL SYSTEM IS ACCEPTED BY CONTRACTOR AS REQUIRED. WALLS OR STRUCTURE SHALL NOT BE DONE WITHOUT THE ° - THE LIBRARY AC MECHANICS AND ISD. PERMISSION OF A STRUCTURAL ENGINEER DEPARTMENT. ALL STRAINERS SHALL BE FLUSHED AND 11. ALL SYSTEMS SHALL BE CLEAN OF FOREIGN MATERIAL AND GLEANED. ALL PIPING SHALL BE TESTED AT 100 PSI FOR NOT ROUGH SPOTS PRIOR TO BEING PLACED N SERVICE AND 2. TOUCH UP AND PANTING OF EXISTING SURFACES OR NEW WORK LESS THAT 24 HOURS (MINIMUM). THE LIBRARY DEPARTMENT BEFORE OPERATIONAL TESTS ARE PEFRFOR'1ED. DAMAGED DURING CONSTRUCTION SHALL BE PRIMED AND BY CABINET PENETRATIONS SHALL BE REMOVED IMMEDIATELY M _ REPRESENTATIVE SHALL BE NOTIFIED IN ADVANCE AND MUST PANTED TO MATCH EXISTING. APPLY DRYWALL COMPOUND TO TO PREVENT CORROSION_ 12. THE CONTRACTOR SHALL LOCATE ALL EQUIPMENT WHICH MUST PARTITIONS. PATCH AND FINISH PANT TO MATCH EXISTING. BE SERVICED, OPERATED OR MAINTAINED N FULLY PERFORM THIS TEST WITHOUT THE LIBRARY DEPARTMENT ° - ACCESSIBLE POSITION. MINOR DEVIATIONS FROM DRAWINGS OPENINGS (ROOF OR FLOOR) REPRESENTATIVE BEING PRESENT). MAY BE MADE TO ALLOW FOR BETTER ACCESSIBILITY, AND INCLUDED IN THE SCOPE OF THIS PROJECT ARE REQUIRED TO ANY CHANGES FOR THAT PURPOSE SHALL BE SUBMITTED FOR 1- THE CONTRACTOR IS RESPONSIBLE TO PROVIDE RE- ROOFING BE SECURED TO THE UNDERLYING BUILDING STRUCTURE. APPROVAL. FOR ANY ROOF PENETRATION. THE CONTRACTOR MUST TEST ALL L - AREAS WHERE THERE IS A ROOF PENETRATION TO ENSURE THE THAT THEY ARE ACCESSIBLE. ALL VALVES (EXCEPT CONTROL 13. CONTRACTOR IS PROHIBITED FROM USING LEAD BASED OPENING IS PROPERLY SEALED. THE LIBRARY DEPARTMENT VALVES) AND STRAINERS SHOULD BE FULL SIZE OF PIPE SOLDER U 41CH COMES N CONTACT WITH DOMESTIC WATER REPRESENTATIVE MUST BE NOTIFIED N ADVANCE AND MUST BE IS EXPOSED TO THE WIND SHALL BE BUILT AND ANCHORED TO a - BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT PRESENT DURING THE TESTING (THE CONTRACTOR SHALL NOT SUSTAIN HURRICANE FORCE WINDS AS OUTLINED IN SECTION 6 OF 14. CONTRACTOR SUBCONTRACTORS AND MATERIAL SUPPLIERS PERFORM THIS TEST WITHOUT A LIBRARY DEPARTMENT SHALL BE RESPONSIBLE FOR NSPECTION OF JOB CONDITIONS REPRESENTATIVE BEING PRESENT). AT EACH PIECE OF EQUIPMENT TO PERMIT ! DISASSEMBLY FOR AFFECTING THE INSTALLATION OF AN ITEM AND FOR TAKING ALL K - FIELD MEASUREMENTS PRIOR TO THE FABRICATION OR 2- ALL FLOOR SLAB OPENINGS SHALL BE PROPERLY SEALED. TEST AND BALANCE. S. PURCHASE OF THE ITEM TO ENSURE THAT THE ITEM CONCERNED THE WILL INTEGRATE PROPERLY WITH ALL ADJACENT MATERIALS NIGH PERFORMANCE - a _ AND WILL FIT ALL OTHER CONDITIONS AS THEY EXIST OR WILL DEMOLITION EXIST N THE FINISHED/EXISTING BUILDING. SLEEVES ANCHORS INDEPENDENT TEST AND BALANCE COMPANY THAT SPECIALIZES 10. MANOMETERS (PRESSURE GAGE) SHALL BE BOURDON TYPE, AND OTHER ITEMS THAT MUST BE EMBEDDED IN OR THAT L ITEMS IDENTIFIED TO BE REMOVED SHALL BE SAFELY 4 1/25a DIAL SIZE, RANGE: 0 -100 PSIG WITH 1% FULL SCALE OTHERWISE AFFECT OTHER PORTIONS OF THE WORK SHALL BE DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE AND DISTRIBUTION SYSTEMS_ THE COMPANY SELECTED SHALL BE r - LOCATED AND SET WHILE SUCH PORTIONS OF THE WORK ARE N LOCAL CODES. FULLY CERTIFIED BY THE AABC. ALL FINAL REPORTS SHALL BE PROGRESS. RING_ MANUFACTURER WEKSLER GLASS THERMOMETER CORP V SIGNED AND SEALED BY A CERTIFIED TEST AND BALANCE 2. THE CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK (OR APPROVED EQUAL) MODEL- EA14 -C. PRESSURE GAUGES 15. UNLESS OTHERWISE SPECIFICALLY MENTIONED, ALL ANCHORS, WITH THE LIBRARY DEPARTMENT REPRESENTATIVE. PROVISIONS SHALL BE NSTALLED WITH PET COCK. BOLTS, SOWS, FITTINGS, FILLER HARDWARE, ACCESSORIES, SHALL BE MADE BY THE CONTRACTOR TO PREVENT COPY TO THE PROJECT MANAGER FOR REVIEW AND APPROVAL. TRIM AND OTHER PARTS REQUIRED FOR OR N CONNECTION DISRUPTING OF ADJACENT AREAS OF THE AREA N WHICH WORK WITH, AN ITEM OR MATERIAL TO MAKE A COMPLETE, IS BEING PEED. _ SERVICEABLE, FINISHED AND FIRST QUALITY INSTALLATION SHALL BE LIQUID IN GLASS TYPE, ANGLE ADJUST, 10' LONG, T SHALL BE FURNISHED AND INSTALLED AS PART OF THE ITEM OR 3. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR RANGE 0- 100'_. MANUFACTURER- GLASS MATERIAL, WHETHER GALLED FOR OR NOT. SECURING THE WORK AREA AGAINST INTRUSION BY RECORD FOR REVIEW AND APPROVAL. THERMOMETER CORD (OR APPROVED EQUAL) MODEL: UNAUTHORIZED PERSONNEL_ PROVIDE ALL TEMPORARY ° - 16. UNLESS OTHERWISE SPECIFICALLY MENTIONED, ALL ITEMS AND PARTITIONS AND ENCLOSURES REQUIRED TO KEEP THE WORK 3_ 3. PARTS THEREOF THAT ARE MADE OF STEEL, IRON OR OTHER AREA SECURE. PET COCK WI FERROUS METAL THAT ARE NOT GALVANIZED, PLATED OR NOTIFIED IN ADVANCE OF THE DATE AND TIME FOR THE TEST 4 OTHERWISE SPECIFIED TO BE FACTORY FINISHED, SHALL BE 4. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SUPPORTS BALANCE. THE LIBRARY DEPARTMENT REPRESENTATIVE AND H _ GLEANED AND PANTED WITH ONE COAT OF BEST QUALITY RUST AND SERVICE REQUIRED TO MNIMIZE INTERRUPTION OF ISD REPRESENTATIVE MUST BE PRESENT DURING THE TEST AND INHIBITIVE METALLIC PRIMER AFTER INSTALLATION, ALL SERVICES TO THE FACILITY. PROVIDE DUST CONTROL BALANCE. (CONTRACTOR SHOULD NOT PERFORM THIS TEST EXPOSED METAL CONNECTIONS AND ABRASIONS SHALL BE BARRIERS TO KEEP CONSTRUCTION DUST AWAY FROM AREAS ° - TOUGHED -UP WITH THE SAME MATERIAL AS THE SHOP COAT NOT NCLUDED N THE AREA OF WORK PLACED. A LEGEND MUST BE PLACED AT A VISIBLE LOCATION AND LEFT IN GOOD CONDITION FOR FINAL FINISHING, IF PRESENT). INSIDE THE MECHANICAL ROOM. REQUIRED. 5- ALL NECESSARY SHUTDOWNS AND NTERF.UPTIONS OF EXISTING SERVICES SHALL BE MINIMAL AND SHALL BE FULLY SLEEVES. G - 1-1. ALL ITEMS SHALL BE NSTALLED IN A WORKMANLIKE MANNER IN COORDINATED WITH THE LIBRARY DEPARTMENT E STRICT ACCORDANCE WITH THE BEST RECOGNIZED PRACTICE IN REPRESENTATIVE IN ADVANCE TO SCHEDULE ALL A I. THE FIELD CONCERNED. MANUFACTURED ITEMS/EQUIPMENT INTERRUPTIONS TO SUITE THE LIBRARY DEPARTMENT WORK a ° _ SHALL BE INSTALLED N STRICT ACCORDANCE WITH THE REQUIREMENTS. ISSUED BY THE AMERICAN NATIONAL STANDARDS INSTITUTE MANUFACTURER'S PRINTED DIRECTIONS, SPECIFICATIONS SHALL EXTEND THROUGH IT'S RESPECTIVE FLOOR WALL OR AND /OR WRITTEN RECOMMENDATION FOR AN INSTALLATION OF 6. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS N T14E FIELD PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE HIGHEST QUALITY. ALL WORKING PARTS SHALL BE PROPERLY AND COORDINATE WITH ALL TRADES- r. - ADJUSTED AFTER INSTALLATION AND LEFT N PERFECT W10RKING F ORDER ITEMS IN ALL CASES SHALL BE INSTALLED PLUMB, EXTEND 2' ABOVE THE FLOOR CONTRACTOR MUST COORDINATE 2. PROVIDE ELECTRICAL PRODUCTS WHICH HAVE BEEN TESTED, TRUE AND N PROPER RELATIONSHIP TO SURROUNDNG ANY CORE DRILLING OR CUTTNG OF OPENINGS IN MASONRY MATERIALS. a a _ COMPLY WITH NEMA STANDARDS. v 2. 18. THE PLANS ARE GENERALLY DIAGRAMMATIC. THE CONTRACTOR 3_ a M SHALL COORDINATE THE WORK OF THE DIFFERENT TRADES N /OR FLOORS SHALL BE PROPERLY FIRE SEALED TO RETAIN THE E - ORDER THAT INTERFERENCE BETWEEN MECHANICAL, q ELECTRICAL AND STRUCTURAL WORK CAN BE AVOIDED. ALL °p NECESSARY OFFSETS N CONDUIT, PIPING AND FITTINGS, ETC, B 3. REQUIRED TO PROPERLY INSTALL THE WORK SHALL BE 4- A _ FURNISHED COMPLETE N PLACE. PIPING, DUCTS, ETC, SHALL PARTITIONS SHALL BE STANDARD WEIGH STEEL PIPE FINISHED 1 PLASTIC TAPE PIPE MARKERS. TAGS MAY BE USED ON SMALL BE KEPT AS CLOSE AS POSSIBLE TO WALL, COLUMNS, ETC., N WITH SMOOTH EDGES - FOR OTHER THAN MASONRY PARTITIONS, ORDER TO TAKE UP THE MINIMUM AMOUNT OF SPACE_ D _ COORDINATE WITH THE STRUCTURAL REQUIREMENTS OF THE PRESSURE. INSTALL IN CLEAR VIEW AND ALIGN WITH AXIS OF PROJECT. ALL OFFSETS, FITTINGS, ETC, REQUIRED SHALL BE a. cl FURNISHED AND INSTALLED WITHOUT ADDITIONAL EXPENSE TO a STRAIGHT RUNS INCLUDING RISERS AND DROPS, ADJACENT TO THE OWNER N CASE THAT UNAVOIDABLE INTERFERENCE ° - DEVELOP, THE ENGINEER WILL DECIDE WHICH EQUIPMENT SHALL IN HANGERS BE RELOCATED REGARDLESS OF WHICH WAS FIRST INSTALLED AND MODIFICATIONS WILL BE MADE WITHOUT ADDITIONAL PIPING IN ACCORDANCE WITH ANSI COLOR REQUIREMENTS FOR 1. EXPENSE TO OWNER RESPECTIVE SERVICE. C _ ANGLE IRON, BANDS, C- CLAMPS WITH RETANING CLIPS, 19. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, AND CHANNELS, HANGER RODS, ETC, NECESSARY FOR THE EQUIPMENT NECESSARY FROM THE INSTALLATION OF ALL a a - SYSTEMS IN ACCORDANCE WITH THE DRAWINGS, THE '- APPLICABLE EDITION OF THE FLORIDA BUILDING CODE AND I. CONTRACTOR SHALL FURNISH THE MANUFACTURER'S INSTALLATION, i 2. ALL OTHER APPLICABLE STATE, COUNTY AND LOCAL OPERATION AND MAINTENANCE MANUALS ' WHICH SHALL BE 11. ORDINANCES. CONCRETE, OR MASONRY ONLY. 0 B NSULATION. 20. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE 2. MANUALS SHALL CONTAIN A COMPLETE DESCRIPTION OF THE m ALL INSULATION SYSTEMS SHALL HAVE COMPOSITE FIRE AND SYSTEM OPERATION, ALL MAINTENANCE PROCEDURES REQUIRED A SMOKE HAZARD RATINGS AS TESTED BY PROCEDURE ASTM TO BE PERFORMED AND THE INTERVALS AT WHICH SUCH GENERAL NOTES E -84, NFPA 255 AND UL 'i23. FLAME SPREAD OF 25 AND SMOKE A _ FI co N.T.S. 0 cq PLASTICS AND CEMENTS, SHALL BE UL LISTED, NON - FLAMMABLE LIFE OF THE EQUIPMENT. AND SHALL NOT EXCEED THE FIRE AND SMOKE HAZARD RATINGS AS STIPULATED N THE ABOVE REQUIREMENTS. 1 ° 2 a 3 a 4 a 5 a 6 ° 7 ° 8 a 9 a 10 a i 11 a 12 a 13 ° 14 a 15 a I 1 I I i I I I I 1 16 ° 17 a 18 a 19 a 20 a 1 1 I i I 1 1 I I I 21 a 22 a 23 a 24 a 25 a 1 I I I 1 1 I I I I MECHANICAL NOTES MAXIMUM AND MINIMUM OPERATING PARAMETERS, CONDENSER 2. ALL PIPING SHALL BE SUPPORTED WITH COMMERCIAL WATER OPERATING PARAMETERS, AND ALL ROTATING I. MOTOR CONTROLLERS (STARTERS) OR COMBINATION MANUFACTURED CLAMPS. PROVIDE ISOLATION SLEEVES TO EQUIPMENT TOLERANCES_ STARTER /DISCOMaECT SWITCHES FOR MECHANICAL EQUIPMENT PREVENT CONTACT OF DISSIMILAR METALS_ CHILLED WATER 5_ MANUAL SHALL CONTAIN ELECTRICAL DIAGRAMS OF ALL ARE FURNISHED BY THE MECHANICAL CONTRACTOR AND PIPING SHALL BE SUPPORTED WITH NO MORE THAN 8 FT ELECTRICAL COMPONENTS. SHOW) ALL CIRCUITS PRE -WIRED BY INSTALLED BY THE ELECTRICAL CONTRACTOR BETWEEN SUPPORTS. THE MANUFACTURER AND ALL REQUIRED FIELD WIRING AND POINTS OF INTERFACE WHERE PRE -WIRED CIRCUITS CONNECT TO 2. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH THE 3. CHILLED WATER PIPING MATERIAL: FIELD WIRED DEVICES. MANUFACTURERS INSTRUCTIONS AND RECOMMENDATIONS. A) FOR 2' AND SMALLER FIELD PAINTING 3. PENETRATIONS FOR PIPES, CONDUITS, OR OTHER PURPOSES PIPE: BLACK STEEL PIPE, ASTM A53, SCHEDULE 40, TYPE E, THROUGH FIRE RATED ASSEMBLIES (FLOORS, ROOF, WALLS, GRADE B PARTITIONS, ETCJ SHALL BE PROVIDED WITH THE REQUIRED FITTINGS: BLACK MALLEABLE IRON SCREW FITTINGS, 150 LB. 1. PIPE HANGERS, STRUCTURAL SUPPORT, PIPE AND PIPE FITTINGS, FIRE RESISTANCE RATING FIRE STOP MATERIAL. FIRE STOP ANSI /ASME 8163 CONDUIT AND CONDUIT FITTINGS, PIPE COVERINGS AND SEALANTS SHALL BE UL LISTED. APPLY FIRE STOP AS JOINTS: PIPE THREADS, GENERAL. PURPOSE (AMERICAN) INSULATION AS WELL AS ALL METAL SURFACES ASSOCIATED RECOMMENDED BY THE MANUFACTURER AND IN ACCORDANCE ANSI /ASME 51.20.1 WITH MECHANICAL AND ELECTRICAL EQUIPMENT SHALL BE WITH ITS LISTING TO MEET OR EXCEED THE FIRE RATING OF THE PAINTED. ASSEMBLY IN WHICH IT tS INSTALLED. B) FOR 2 1/2' T14W 10' PIPE: BLACK STEEL PIPE, ASTM A53, SCHEDULE 40, TYPE E, 2. FINISH PAINT IN AREAS HAVING PAINTED ADJACENT SURFACES 4. THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO IDENTIFY GRADE B SHALL MATCH THE ADJACENT SURFACES. UNCOATED FERROUS CEILING CONFLICTS. THE CONTRACTOR IS ALSO RESPONSIBLE FITTINGS: STEEL BUTT- WELDM -4 ANSI /ASME 8169 PIPING IN UNPAINTED AREAS IS TO BE GIVEN ONE COAT OF FOR CHECKING FIELD CONDITIONS PRIOR TO BIDDING AND JOINTS: WELDED PIPE, ANSI /AWS DLl AND ANSI /ASME SEC. S ASPHALT VARNISH CONFORMING TO TT -V -51. REPORT ANY PROBLEMS /CONFLICTS TO THE ENGINEER WITHIN 2 DAYS OF DISCOVERY. ANY CHANGES RESULTING FROM 4_ CHILLED WATER PIPING SHALL BE INSULATED WITH CELLULAR 3_ PIPING TO BE INSULATED, EXCEPT GALVANIZED STEEL AND CONDITIONS ARISING IN THE FIELD WHICH WERE NOT BROUGHT TO GLASS INSULATION: ASTM C552, 8 1_55 DENSITY, K =033 AT -15'F COPPER PIPE, IS TO BE GIVEN A PROTECTIVE COATING PRIOR THE ENGNEER'S ATTENTION ARE TO BE MADE BY THIS MEAN. INSULATION THICKNESS SHALL BE AS FOLLOWS: TO INSTALLING THE INSULATION. CONTRACTOR WITH NO ADDITIONAL COST TO THE COUNTY'S PROJECT MANAGER A) Win NSULATION THICKNESS FOR PIPE DIAMETER FROM %§# TO I X'a. 4 STEEL AND WROUGHT -IRON PIPE WITH WITH FACTORY APPLIED 5. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT, THE $) 2' INSULATION THICKNESS FOR PIPE DIAMETER FROM 2'4 TO COATING SHALL REQUIRE NO FURTHER PROTECTION. BARE PIPE CONTRACTOR SHALL REMOVE ALL TOOLS, APPLIANCES, 12'� AND PIPE ON WHICH FACTORY - APPLIED PROTECTIVE COATING SURPLUS MATERIALS, AND SCRAP_ ALL IDENTIFIED EXISTING IS DAMAGED AND THE PIPE SURFACE SHOWS RUSTING SHALL BE EQUIPMENT TO BE REMOVED SHALL BE TURNED OVER TO THE 5. ALL OUTDOOR EXPOSED CHILLED WATER PIPING SHALL BE GLEANED TO BARE METAL AND THEN PANTED WITH ONE GOAT ONE OWNER, UNLESS OTHERWISE INDICATED ON THE SCOPE OF WORK COVERED WITH ALUMINUM JACKET. OF FIR - OF FIRE-TREATMENT COATING AND TWO GOATS TWO ZING PRIMER CONFORMING TO TT- 6_ CONTRACTOR IS RESPONSIBLE TO PROVIDE POWER IF 6. GAUGE COOKS, TEMPERATURE SENSING WELLS, BUTTERFLY REQUIRED, TO THE UNITS FOR CONTROLS AND MAINTENANCE VALVES STEMS AND HANDLES, STRAINER CAPS, SLOWDOWN 5. ZING - COATED AND COPPER PIPE UNDER INSULATION SHALL NOT RECEPTACLES. VALVES, ETC SHALL BE INSULATED WITH CAREFULLY FITTED BE PANTED. EQUIPMENT SHALL BE FINISHED IN ACCORDANCE INSULATION VAPOR SEALED AT ALL JOINTS AND ENDS. WITH THE SPECIFICATION FOR THE PARTICULAR END ITEMS. 1. CONTRACTOR SHALL REVIEW AND COORDINATE THE WHENEVER A MANUFACTURE OFFERS CUSTOMIZED INSULATION SURFACES ON FACTORY - FINISHED EQUIPMENT 'HAT ARE ARRANGEMENT OF THE CHILLER ACCESS DOORS PRIOR TO FOR THEIR EQUIPMENT, THE CONTRACTOR MUST USE THIS OPTION. DAMAGED DURING INSTALLATION SHALL BE RESTORED TO PURCHASING THE EQUIPMENT. COMPONENT OF THE UNITS SHALL ALL SERVICEABLE ITEMS SHALL NAVE REMOVABLE CAPS OR THEIR ORIGINAL CONDITION. BE ACCESSIBLE FOR REPAIR AND SERVICING. PLUGS THAT HAVE TIGHT FIT AND CAN BE REMOVED AS REQUIRED WITHOUT DISTURBING PERMANENT ADJACENT S. ALL UL RATED EQUIPMENT MUST HAVE THE UL DOCUMENTATION INSULATION. OR LABEL VISIBLE FOR INSPECTION. 1. THE CONTRACTOR SHALL PERFORM A FLUSH AND PRESSURE 9. THE MECHANICAL EQUIPMENT SHALL NOT BE TURNED OVER TO TEST FOR ALL CHILLED WATER AND CONDENSER WATER PIPING THE OWNER UNTIL THE MECHANICAL SYSTEM IS ACCEPTED BY PRIOR TO TURNING THE SYSTEM OVER TO THE LIBRARY THE LIBRARY AC MECHANICS AND ISD. DEPARTMENT. ALL STRAINERS SHALL BE FLUSHED AND GLEANED. ALL PIPING SHALL BE TESTED AT 100 PSI FOR NOT 10. ALL METAL SHAVINGS INSIDE MECHANICAL EQUIPMENT CAUSED LESS THAT 24 HOURS (MINIMUM). THE LIBRARY DEPARTMENT BY CABINET PENETRATIONS SHALL BE REMOVED IMMEDIATELY REPRESENTATIVE SHALL BE NOTIFIED IN ADVANCE AND MUST TO PREVENT CORROSION_ BE PRESENT DURING THE TEST (THE CONTRACTOR SHALL NOT PERFORM THIS TEST WITHOUT THE LIBRARY DEPARTMENT 11. ALL ROOF ATTACHED EQUIPMENT AND APPURTENANCES REPRESENTATIVE BEING PRESENT). INCLUDED IN THE SCOPE OF THIS PROJECT ARE REQUIRED TO BE SECURED TO THE UNDERLYING BUILDING STRUCTURE. 8_ LOCATE ALL VALVES, STRAINERS, UNIONS, AND FLANGES SO THAT THEY ARE ACCESSIBLE. ALL VALVES (EXCEPT CONTROL 12. ALL MECHANICAL EQUIPMENT INSTALLED OUTDOORS AND THAT VALVES) AND STRAINERS SHOULD BE FULL SIZE OF PIPE IS EXPOSED TO THE WIND SHALL BE BUILT AND ANCHORED TO BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT SUSTAIN HURRICANE FORCE WINDS AS OUTLINED IN SECTION 6 OF AND CONTROLS. UNION AND /OR FLANGES SHOULD BE NSTALLED ASCE STANDARD 'I. AT EACH PIECE OF EQUIPMENT TO PERMIT ! DISASSEMBLY FOR ALTERATION AND REPAIRS. HYDRONIC TEST AND BALANCE. S. ALL VALVES 2%5 AND LARGER SHALL BE BUTTERFLY TYPE 'HP' THE NIGH PERFORMANCE - 1. THE CONTRACTOR SHALL OBTAIN THE SERVICES OF AN INDEPENDENT TEST AND BALANCE COMPANY THAT SPECIALIZES 10. MANOMETERS (PRESSURE GAGE) SHALL BE BOURDON TYPE, IN THE TESTING AND BALANCING OF THE HVAC AND AIR 4 1/25a DIAL SIZE, RANGE: 0 -100 PSIG WITH 1% FULL SCALE 1. DISTRIBUTION SYSTEMS_ THE COMPANY SELECTED SHALL BE ACCURACY, CORROSION RESISTANT STAINLESS STEEL CASE AND FULLY CERTIFIED BY THE AABC. ALL FINAL REPORTS SHALL BE RING_ MANUFACTURER WEKSLER GLASS THERMOMETER CORP V SIGNED AND SEALED BY A CERTIFIED TEST AND BALANCE (OR APPROVED EQUAL) MODEL- EA14 -C. PRESSURE GAUGES ENGINEER CONTRACTOR TO SUBMIT A SIGNED AND SEALED SHALL BE NSTALLED WITH PET COCK. COPY TO THE PROJECT MANAGER FOR REVIEW AND APPROVAL. 2 M IL THERMOMETERS (TEMPERATURE GAUGE) FOR CHILLED WATER 2- THE TEST AND BALANCE CONTRACTOR INFOR!" TATION AND SHALL BE LIQUID IN GLASS TYPE, ANGLE ADJUST, 10' LONG, T CERTIFICATIONS SHALL BE SUBMITTED TO THE ENGINEER OF RANGE 0- 100'_. MANUFACTURER- GLASS S RECORD FOR REVIEW AND APPROVAL. THERMOMETER CORD (OR APPROVED EQUAL) MODEL: AS5L -916. TEMPERATURE GAUGES SHALL BE NSTALLED WITH 3_ 3. THE LIBRARY DEPARTMENT REPRESENTATIVE SHALL BE PET COCK WI NOTIFIED IN ADVANCE OF THE DATE AND TIME FOR THE TEST 4 BALANCE. THE LIBRARY DEPARTMENT REPRESENTATIVE AND EQUIPMENT IDENTIFICATION ISD REPRESENTATIVE MUST BE PRESENT DURING THE TEST AND "' 4 BALANCE. (CONTRACTOR SHOULD NOT PERFORM THIS TEST 1. ALL VALVES MUST HAVE A NUMERICAL IDENTIFICATION TAG WITHOUT THE ABOVE MENTIONED REPRESENTATIVES BEND PLACED. A LEGEND MUST BE PLACED AT A VISIBLE LOCATION PRESENT). INSIDE THE MECHANICAL ROOM. 5. SLEEVES. 2. FURNISH AND INSTALL LABELS ON ALL EQUIPMENT AND PIPING. MARKERS /LABELS SHALL BE MNIMUM I j'X an AND IDENTIFIED IN I. THE CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT ACCORDANCE WITH THE BACKGROUND AND LETTER COLORS 6 EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH SLEEVE ISSUED BY THE AMERICAN NATIONAL STANDARDS INSTITUTE SHALL EXTEND THROUGH IT'S RESPECTIVE FLOOR WALL OR (,ANSI). MARKERS SHALL BE AS MANUFACTURED BY CHAMPION PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE AMERICA INC. OR EQUAL_ 'T. EXCEPT SLEEVES THAT PENETRATE THE FLOOR WHICH SHALL EXTEND 2' ABOVE THE FLOOR CONTRACTOR MUST COORDINATE 2. PROVIDE ELECTRICAL PRODUCTS WHICH HAVE BEEN TESTED, N ANY CORE DRILLING OR CUTTNG OF OPENINGS IN MASONRY LISTED AND LABELED BY UNDERWRITERS LABORATORIES AND FLOORS OR WALLS. COMPLY WITH NEMA STANDARDS. 8. 2. AL.L. SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND 3_ IDENTIFICATION FOR PIPING SHALL INCLUDE BOTH THE FLUID M /OR FLOORS SHALL BE PROPERLY FIRE SEALED TO RETAIN THE TYPE AND DIRECTION OF FLOW. WI WALL / FLOOR FIRE RATING_ B 3. SLEEVES IN BEARING AND MASONRY- WALLS, FLOORS AND 4- PIPING: IDENTIFY PIPING, CONCEALED OR EXPOSED, WITH PARTITIONS SHALL BE STANDARD WEIGH STEEL PIPE FINISHED PLASTIC TAPE PIPE MARKERS. TAGS MAY BE USED ON SMALL WITH SMOOTH EDGES - FOR OTHER THAN MASONRY PARTITIONS, DIAMETER PIPING. IDENTIFY SERVICE, FLOW DIRECTION AND THROUGH CEILINGS, OR FOR CONCEALED VERTICAL PIPING, PRESSURE. INSTALL IN CLEAR VIEW AND ALIGN WITH AXIS OF SLEEVES SHALL BE NO. 22 USG GALVANIZED STEEL MNIMUIM_ PIPING. LOCATE IDENTIFICATION NOT TO EXCEED 20 FEET ON cl STRAIGHT RUNS INCLUDING RISERS AND DROPS, ADJACENT TO EACH VALVE AND TEE, AT EACH SIDE OF PENETRATION OF IN HANGERS STRUCTURE OR ENCLOSURE AND AT EACH OBSTRUCTION. PAINT PIPING IN ACCORDANCE WITH ANSI COLOR REQUIREMENTS FOR 1. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS RESPECTIVE SERVICE. ANGLE IRON, BANDS, C- CLAMPS WITH RETANING CLIPS, 10. IN CHANNELS, HANGER RODS, ETC, NECESSARY FOR THE ORATION AND MAINTENANCE MANUALS. INSTALLATION OF WORK T I. CONTRACTOR SHALL FURNISH THE MANUFACTURER'S INSTALLATION, 2. HANGERS SHALL BE FASTENED TO THE BUILDING STEEL, OPERATION AND MAINTENANCE MANUALS ' WHICH SHALL BE 11. CONCRETE, OR MASONRY ONLY. COMPLETE FOR ALL EQUIPMENT AND SYSTEMS FURNISHED, NSULATION. 2. MANUALS SHALL CONTAIN A COMPLETE DESCRIPTION OF THE 1. ALL INSULATION SYSTEMS SHALL HAVE COMPOSITE FIRE AND SYSTEM OPERATION, ALL MAINTENANCE PROCEDURES REQUIRED 12 SMOKE HAZARD RATINGS AS TESTED BY PROCEDURE ASTM TO BE PERFORMED AND THE INTERVALS AT WHICH SUCH E -84, NFPA 255 AND UL 'i23. FLAME SPREAD OF 25 AND SMOKE PROCEDURES ARE TO BE PERFORMED. LIST ALL PARTS WITH FI DEVELOPED OF 50. ACCESSORIES, SUCH AS ADHESIVES, PART NUMBERS WHICH WILL REQUIRE REPLACEMENT DURING THE PLASTICS AND CEMENTS, SHALL BE UL LISTED, NON - FLAMMABLE LIFE OF THE EQUIPMENT. AND SHALL NOT EXCEED THE FIRE AND SMOKE HAZARD RATINGS AS STIPULATED N THE ABOVE REQUIREMENTS. 3 ALL NECESSARY WARNINGS AND PRECAUTIONS RELATIVE TO THE SAFE OPERATION OF THE SYSTEM OR SYSTEMS SHALL BE IDENTIFIED. THE LITERATURE SHALL CONTAIN ALL REQUIRED TROUBLESHOOTING INFORMATION AND SHALL DESCRIBE ALL PIPING, PIPNG NSULATION 4 HYDRONICS REQUIRED TEST PROCEDURES TO BE PERFORMED BY MAINTENANCE PERSONNEL. 1. ALL PIPING SUBJECT TO THERMAL EXPANSION AND /OR CONTRACTION THAT PENETRATES A SMOKE, FIR OR FIRE /SMOKE 4. MANUAL SHALL CONTAIN DESIGN DATA FOR ALL EQUIPMENT AND WALL, PARTITION, OR FLOOR SLAB SHALL BE SUITABLY SYSTEMS, SPECIFYING KILOWATTS, VOLTAGE, AMPERAGE, SLEEVED AND FIRE SAFED_ 2 MECHANICAL NOTES N.T.S. 1 1 I 1 I i I i I I I I I I I I 1 I P i I i I a 11 a 12 a 13 a 14 a 15 a 16 ° 17 a 18 a 19 a 20 a 21 a 1 1 22 a 26 ° 27 a 28 a 2g a 30 r 31 a 32 a 33 INTERNAL SERVICES DEPARTMENT n n - DESIGN AND CONSTRUCTION SERVICES DIVISION - V 111 N.W.1 Street, Suite 2420 WmMade, Florida, 33128 _ q (305)375-400 - u MIAMI -DADS 0 • - T SEAL: ®� -S t a \� / g f .�� " "A R ELDIS R. GOWISOLO, P.E. FL LICENSE No. 60781 PROJECT NAME AND LOCATION: E*l��0 MIAMI BRANCH LIBRARY CHILLER REPLACEMENT CONTRACTOR SHALL PERFORM THE WORK FOLLOWING THE PROPOSED WORK PHASING PLAN SHOWN IN SHEET M -4. THE SCOPE OF _ M WORK INCLUDES THE FOLLOWING: 6000 SW SUNSET DRIVE MIAMI, FL 33143 REMOVE AND PROPERLY DISPOSE TWO (2) EXISTING 20 TON AIR COOLED CHILLERS WITH RELATED PIPING, ACCESSORIES AND SPRING IBRATION ISOLATORS AS PER CONSTRUCTION DOCUMENTS. PROPERTY OF MIAMI DADE COUNTY - FOR OFFICIAL USE ONLY - ODIFY THE EXISTING METAL STRUCTURE AS REQUIRED TO -DO NOT REMOVE THIS NOTE - _ L CCOMMODATE THE NEW CHILLERS AS PER STRUCTURAL DRAWINGS. PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED. GENERAL CONTRACTOR TO HIS INCLUDES BUT IS NOT LIMITED TO: RAISE THE GALVANIZED STEEL VERIFY ALL DIMENSIONS AND CONDITIONS AT 'AND 14' ABOVE CURRENT ELEVATION. JOB SITE PRIOR TO CONSTRUCTION. GENERAL CONTRACTOR SHALL NOTIFY ISD OF ANY FURNISH AND INSTALL TWO (2) NEW 20 TON AIR COOLED CHILLERS DISCREPANCIES PRIOR GCONSTRUCTION TH RELATED PIPING, ACCESSORIES, SPRING VIBRATION ISOLATORS AND / OR ORDERING MATERIALS. AS PER CONSTRUCTION DOCUMENTS. - K KEY PLAN: REPLACE AND RELOCATE THE EXISTING DISCONINECT SWITCHES FOR CHILLERS 01 4 2 AS PER ELECTRICAL DRAWINGS. REPLACE THE EXISTING CHILLED WATER TREATMENT BYPASS FEEDER AS PER MECHANICAL DRAWINGS. _ REPLACE CHILLED WATER PIPING (INCLUDING SHUT OFF VALVES) WITH RELATED ACCESSORIES AS INDICATED IN MECHANICAL PLANS. _ a REPLACE THE NSULATION FOR ALL EXISTING CHILLED WATER PIPING AND FURNISH AND NSTALL NEW NSULATION FOR NEW PIPING. NEW SULATtON SHALL BE INSTALLED WITH ALUMINUM JACKET. _ 1 EXISTING METAL STAND SHALL BE RE- PANTED AFTER ALL ODIFICATIONS ARE COMPLETE. ALL SURFACES TO BE RE- PANTED SHALL BE PROPERLY PREPARED (CLEANED AND [LED) SUBMITTALS: TROUT DAMAGING THE FACTORY APPLIED GALVANIZED COATING NO. DATE DESCRIPTION: EFORE APPLYING THE NEW PRIMER AND FINAL COAT. NEW PRIMER SHALL BE FULLY COMPATIBLE WITH ZNC COATINGS. FINAL COAT _ _ - H SHALL BE FULLY COMPATIBLE WITH THE PRIMER METAL STAND - SI-IALL BE PRIMED WITH HIGH PERFORMANCE EPDXY PRIMER 2 - - NEW CHILLER SHALL BE CONNECTED TO THE EXISTING 'TRANE' 3 BUILDING MANAGEMENT SYSTEM (BMS). THE EXISTING PUMP 4 TERLOCK SYSTEM MUST BE INTEGRATED INTO THE NEW CHILLER THE NEW CHILLER SHALL BE INTEGRATED TO THE EXISTING PROGRAMMED - G SCHEDULE OF OPERATION. REVISIONS: ORDER TO RAISE THE CHILLER STAND, THE EXISTING ENCLOSURE No. DATE DESCRIPTION: SCREEN SHALL BE REMOVED, STORED AND RE- INSTALLED AFTER ° HE CHILLERS REPLACEMENT 18 COMPLETED. - ALL WOOD STRIPS ON METAL STAND SHALL BE REMOVED, STORED - _ F AND RE- INSTALLED AFTER THE CHILLERS REPLACEMENT IS COMPLETED. - PEWOR" i A WATER SIDE TEST AND BALANCE FOR THE NEW CHILLERS, AND TWO (2) EXISTING CHILLED WATER PUMPS LOCATED ON THE - RST FLOOR MECHANICAL ROOM. - - E DRAWING TITLE. HVAC NOTES _ Is MKS] mmoff-.1 - C PROJECT PHASE 100% CD'S ISSUE DATE 06119/2013 _ a DRAWN BY EG APPROVED BY EG WORK ORDER NUMBER: W130M - B SHEET NUMBER 3 SCOPE OF W_ C3 _ A N.T.S. I I I l I I I I t i I 1 t I 1 1 1 1 I I 23 a 24 a 25 ° 26 a 27 a 28 ° 29 a 30 a 31 a 32 a 33 DRAWING TITLE. HVAC NOTES _ Is MKS] mmoff-.1 - C PROJECT PHASE 100% CD'S ISSUE DATE 06119/2013 _ a DRAWN BY EG APPROVED BY EG WORK ORDER NUMBER: W130M - B SHEET NUMBER 3 SCOPE OF W_ C3 _ A N.T.S. I I I l I I I I t i I 1 t I 1 1 1 1 I I 23 a 24 a 25 ° 26 a 27 a 28 ° 29 a 30 a 31 a 32 a 33