14-870-002SCOPE OF WOR4 GM CONSULTING ENGINEERS GENERAL NOTES ABBREVIA11ONS SYMBOLS AND'LEGE-ND 1,0 GENERAL AC c ALTERNATING CURRENT, AIR CONDITIONING KW KILOWATTS AW AIR CONDMONING CONTRACTOR OF AMERICA KWH KILOWATT HOUR i'l ALL WORK TO BE PERFORMED UNDER THESE DOCUMENTS SHALL CONFORM WITH THE ACH AIR CHANGES PER HOUR KX KITCHEN HOOD EXHAUST FLORIDA BUILDING CODE, AND ALL 0114ER APPUCABLF STATE AND LOCAL REGULATIONS AFF ABOVE, FINISHED FLOOR GATE VALVE AND ORDINANCES. AHU AJR HANDLING UNIT L LENGHT 1.2 ALL WORK SHALL BE PERFORMED BY A LICENSED AND INSURED MECHANICAL ANSI AMERICAN NATIONAL STANDARDS INSTITUTE LAT� LKrENT CONTRACTOR, IN A F'IRST CLASS WORKMANUKE MANNER. THE COMPLETE SYSTEM SHALA. APPROX. APPROXIMATE LB& POUNDS BE FULLY OPERATIVE AFTER COMPLETION OF WORK, 'niAT ARCH ARCHITECT OR ARCHITECTURAL, LF LINEAR FOOT t3 MECHANICAL CONTRACTOR SHALL FURNISH WRITTEN GUARANTEE THE INSTALLED AS AIR SEPERATOR LVG LEAVING SYSTEM SHALL BE FREE OF MATERIALS AND WORKMANSHIP DEFECTS FOR A PERIOD OF ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATING AND LAT LEAVING AIR TEMPERATURE ONE YEAR FROM FINAL, ACCEPTANCE UY THE OWNER. AJR CONDITIONING ENGINEERS INC. Lwy' LEAVING WATER TEMPERATURE t4 MECHANICAL CONTRACTOR IS RESPONSIBLE FOR 08TAJNING HIS OWN PERMIT AND A.S.M.E. AMERICAN SOCIETY OF MECHANICAL ENGINEERS LRA LOCKED ROTOR AMPS PAYINO ALL PERMrT AND INSPECTION FEES. A.SJ.M. AMERICAN SOCIElY FOR 'TEnNG AND MATERIALS PRESSURE GAUGE WITH GAUGE VALVE 1.5 suBmrr SHOP DRAWINGS F'OR ACCEPTANCE BY THE ARCHITECT AND/OR ENGINEER AUTO. AUTOMATIC m MOTOR BEFORE PROCEEDING WMi PURCHASE OR INSTALLATION OF THE EOUIPMENT AND AVG. AVERAGE MAX MAXIMUM MATERIALS AWS AMERICAN WELDING SOCIETY M8H THOUSAND BRMSH THERMAL UNIT PER HOUR 1.6 THE CONTRACTOR SHALL PROVIDE A SET OF PRINTS CLEARLY MARKED TO SHOW MECH, MECHANICAL A.S-BUILT CONDMONS AT THE COMPLErION OF CONSTRUCTION. BDD BACK DRAFT DAMPER MEZZ. MEZZANINE 13 All BUILDING CONsmuanON AFFECTED BY THE REMOVAL. RELocAnON OR 8HP BOILER HORSE'POWER, BRAKE HORSEPOWER mFG. MANUFACTURING INSTALLATION Of ANY PIECE OF EQUIPMENT SHALL BE REPAJRED AND nNISHED AS BLDG. BUILDING MFRS. MANUFACTURERS REQUIRED TO MATCH EXISnNG CONDMONS. OR AS DIRECTED BY THE B.O.B. BOTTOM OF BEAM misc. MISCELLANEOUS ARCHITECTURAL DRAWINGS AND/ OR SPECIFICATIONS. B.O.C. BOTTOM OF CURB Mft MINIMUM, MINUTE t8 PLANS AND SCHEMATICS ARE DIAGRAMMATIC ONLY AND SHALL NOT BE SCALED. 80D. BOTTOM OF' DUCT MOD MOTORIZED DAMPER COORDINATE HVAC WORK WITH ALL PLUMBING, FIRE PROTECnON AND ELECTRICAL WORK Bop� BOTTOM OF PIPE MPH MILES PER HOUR AT THE SITE SO AS NOT TO CONFLICT IN LOCATION WITH OT14ER WORK PERFORMED BOT, BOTTOM M.U. MAKE UP WATER UNDER THIS CONSTRUCTION DOCUMENTS. Bp BOILER PUMP BPD BY-PkSS DAMPER (N) NEW 2,0 FIELD VERIFICATION Bu BOILER UNIT N. NORTH NA NOT AVAILABLE, NOT APPLICABLE 2.1 ALL WORK SHALL BE FIELD VERIFIED BEFORE INSTALLA110N AND COORDINATED WITH ALL CD CONDENSATE DRAJN N.C� NORMALLY CLOSED, NOISE CRITERIA OTHER TRADES. CEN'TRIG,CENT. CENTRIFUGAL N.E. NORTHEAST 12 WHERE INTERFFRENCES OCCUR AND DEPARTURES FROM INDICATED DESIGN WILL. BE CFM CUBIC FEET PER MINUTE NEC NATIONAL ELECTRICAL CODE REQUIRED TO DETERMINE CHANGES ON LOCATIONS, SIZES AND ELEVATIONS OF PIPING, CH CHILLER NEMA NATIONAL ELECTRICAL, MANUFACTURER'S ASSOCIATION DUCrWORK, ETC., THE C04rRACTOR SHALL SUBMIT A 'WRITTEN REQUEST FOR THE CHWP CHILLED WATER PUMP NFPA NATIONAL FIRE PROTECTION ASSOCIATION CHANGE ACCOMPANIED SY A DETAILED DRAWING FOR APPROVAL FROM ARCHITECT/ CHWR CHILLED WATER RETURN N.I.C. NOT IN CONTRACT ENGINEER PRIOR TO PROCEEDING WITH ANY CHANGE OR DEPARTURES FROM CONTRACT CHWS CHILLED WATER SUPPLY NK NECK DOCUMENTS. CL CENTERUNE NO., NUMBER 2.3 BEFORE CUTTING OR MAKING OPENINGS IN ANY BUILDING COMPONENT, CONTRACTOR CLG� COUNG N�O� NORMALLY OPEN SHALL VERWY USING ANY REQUIRED MEANS 'THAT ITS LOAD BEARING CAPABiLrty IS NOT CLR" CLEAR NOM. NOMINAL COMPROMISED IN ANY MATTER AND SHALL REQUEST APPROVAL FROM BUILDING C.o� CLEANOUT N�Pj� NATIONAL PIPE THREAD STRUCTURAL ENGINEER, CO2�S. CARBON DIOXIDE SENSOR N.T.S. NOTTO SCALE COL. COLUMN N�W� NORTHWEST 3.0 DEMOLITION CQMPR� COMPRFSSOR CONC. CONCRETE, O/A OUTSIDE AIR 3.1 CONTRACTOR SHALL COORDINATE AND PHASE THIS PROJECT TO MINIMIZE BUILDING CONN. CONNECTION OAD OUTSIDE AIR DAMPER DOWN TIME. ALL BUILDING SHUT DOWNS SHALL BE COORDINATED WrrH BUILDING CONSTR. CONSTRUCTION OBD OPPOSED BLADE DAMPER PERSONNEL AND DONE ON OVERNIGHT HOURS, CONT. CONTINUOUS O.D� OUTSIDE DIAME.7ER OR DIMENSION 3.2 IT SHALL BE 'THE CONTRACTORS RESPONSIBILITY TO REMOVE ALL DEMOUSHED CU CONDENSING UNIT OSHA OCCUPATIONAL SAFETY & HEALTH ACT EQUIPMENT, PIPING, MATERIALS, DEBRIS, ETC, OFF SfTE AND PROPERLY DISPOSE OF� csj CONSTRUCTION spEcinCATION INDEX 3.3 ALL EXIS-nNG DEMCES AND EQUIPMENT NOT SHOWN, OR IN AREAS OUTSIDE OF CT COOLING TOWER PAU PRIMARY AIR UNIT 'THE PROJECT UMITS OF CONSTRUCTION SHALL REMAIN ACTIVE, INSTALL, CU. FT, CUBIC FOOT P�D. PRESSURE DROP NECESSARY ITEMS AS REQUIRED TO MAINTAIN THE CONTINUITY OF EXISTING DEACES cw CONDENSER WATER P.E. PROFFSSIONAL ENGINEER PRESENTLY ATTACHED TO BUILDING ELEMENTS REMOVED OR AFFECTED SY ANY OF cwp CONDENSER WATER PUMP PH� PHASE THE WORK OF TMS PROJECT SHALL BE RELOCATED AS REOUIRED 'TO A13OVE COUNG CWR CONDENSER WATER RETURN PNI... PANEL UNE AND SUPPORTED FROM 7HE STRUCTURE ABOVE. cws CONDENSER 'WATER SUPPLY PREFAB. PREFABRICATED 14 OBSERVE All OF THE ACCEPTED WORK WITH THE OWNER BEFORE COMMENCING P�S.l. POUNDS PER SQUARE INCH DISMANTLING PROCEDURES AND NaTE THEIR CONDMON. AW DAMAGE SUSTAINED BY DB DRYBULB PSIG. POUNDS PER SQUARE INCH GAUGE 7+4E ACCEPTED WORK FROM THE COMMENCEMENT OF THE DISMANTLING PROCEDURE DEG. F., *F DEGREES FAHRENHEIT Pvc POLYVINYL. CHLORINE TO ITS PLACEMENT IN STORAGE SHALL BE THE RESPONSIBIUTY OF THtS DEPT. DEPARTMENT PWR. POWER CONTRACTOR. ErrHER REPAJR THE DAMAGE 'TO THE OBSERVED CONDMON PRIOR DIA., DIAM. DIAMETER TO ITS DISMANTLING TO THE SATISFACTION OF' THE OWNER OR REPLACE THE DIFF. DIFFUSER ACCEPTED WORK WITH NEW AS DIRECTED ErY THE OWNER. DIM. DIMENSION QUANTITY 3.5 ISOLATE THE REMAINING ACTIVE, POR'nON OF ALL EXISTING WORK INDICATED FOR DIR. DIRECTION, DIRECT PARnAL REMOVAL SO THAT THE ACTIVE SERVICE CAN REMAIN IN OPERATION. THIS DIS; DISCH DISCHARGE RELOCATED INCLUDES, BUT IS NOT LlMrrED TO, EXISTING PIPING, EXIS'nNG EOUIPMENT AND OTHER DIST'RIB� DISTRIBUTION RISER EXISTING WORK INDICATED FOR REMOVAL WHICH CONNECTS TO AN ACTIVE SERVICE 'TO DOM� DOMESTIC WATER R/� RETURN AIR REMAIN IN OPERATION, FINISH THE OPEN, ACTIVE END OF THE REMAINING WORK WITH DN DOWN RAD RETURN AIR DAMPER MATERiALS AND METHODS MokrCHING THE EXI"ENG WORK, DR CLOTH DRYER RECEP. RECEPTACLE 16 RESTORE All EXISTING AREAS DAMAGED DUE TO THE PROGRESS OF CONSTRUCTION TO DAfG. DRAWING REF. REFRIGERATION ITS INRAL CONDMON AT NO ADDITIONAL COST TO THE OWNER, THIS INCLUDES, BUT IS DX DRYER EXHAUST REQ'D REQUIRED NOT UMMED TO, WALLS, COUNGS, PAJNTING, LANDSCAPING, SIDEWALXSI ROOFING, E EAST RM ROOM DUCTWORK, PIPING, INSULATION, SUPPORTS, EOUIPMENT AND CONTROLS. Ek EACH RND. ROUND 3.7 ANY EOUIPMENT OR DEVICES TO REMAIN THAT MIGHT HAVE TO BE DISCONNECTED 'TIED E/A EXHAUST AIR RPM REVOLUTIONS PER MINUTE BECAUSE OF THE REMOVAL OF ANY OTHER DEVICE MUST BE RECONNECTED AND EAT ENTERING AIR TEMPERATURE 13ACK TO THE EXISTING BUILDING SYSTEMS AND TESTED FOR CORRECT OPERATION. EDH ELECTRIC DUCT HEATER S/A SUPPLY AIR 4,0 EOUtPMENT EDP EER ELECTRONIC DATA PROCESSING ENERGY' EFFICIENCY RATING SAN SCH, SCHED. SANfTARY SCHEDULE 4.1 ALL MECHANICAL EQUIPMENT LOCATED ON THE EXTERIOR OF THE BUILDING SHALL BE EF EL., ELEV. EXHAUST FAN ELEVATION SD S(CDT. SMOKE DETECTOR SMOKE DAMPER CONSTRUCTED AND INSTALLED TO WITHSTAND HURRICANE FORCE WINDS FROM AW ELEC. ELECTRICAL s SECTION 41 DIRECTION AS PER F.B.C. MECHANICAL EQUIPMENT SHALL BE SUPPORTED PER MANUFACTURER RECOMMENDATIONS EMER. ENCL. EMERGENCY ENCLOSURE SEF SEER SMOKE EVAC FAN SEASONAL, ENERGY EFFICIENCY RATING AND AS REQUIRED FOR APPUCABLE CODES AND STANDARDS, USING SOUND INDUSTRY ENGR� ENGINEER SF SQUARE FOOT, SUPPLY FAN STANDARD PRAC"TICES. STRUCTURAL ENGINEER DESIGN AND RECOMMENDATIONS SHALL ENT. ENTRANCE, ENTER SIJT� SHEEr BE AS FOLLOWS, SUBMIT SHOP DRAWINGS OF ALL SUPPORTING STRUCTURES THAT EQ. EQUAL SIM. SIMIIAR CLEARLY INDICATE SIZES, MATERIAL. DESIGN AND PRODUCT APPROVAL NUMBERS. EOUIP� EQUIPMENT SKZ SMOKE ZONE 4,3 VIBRATION ISOLATORS SHALL, BE PROVIDED FOR ALL MECHANICAL EQUIPMENT WlTH EQUIV. EQUrVALENT SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS MOVING AND/OR ROTARY PARTS. SUBM[T SHOP DRAWINGS SHOWING, BUT NOT UMMED. E.S.P� EXTERNAL STATIC PRESSURE NATIONAL ASSOCIATION INC. ISOLATION PERFORMANCE AND ALLOWABLE SUPPORnNG L,OADS. ET EXPANSION TANK S.P. STATIC PRESSURE 4.4 FOR ALL OUTDOOR MOUNTED EOUIPMENT, PR0ADE SURFACE AND COIL PROTECnON EXCAV. EXCAVATION SPECS. SPECIFICATIONS AGAINST CORROSION DUE TO PROXIMITY TO MARINE AND/OR CORROSIVF EWIRONMENT. EXH� EXHAUST SPF STAJR PRESSURIZATION FAN 4.5 CONTROL WIRING SRALL BE THE RESPONSIBlUTY OF THE MECHANICAL. CONTRACTOR. EXIST (E) EXISTING SO. SQUARE THE CONTRACTOR SHALL FURNISH ALL MOTORS, STARTERS AND RELAYS, ETC., TO " EXP� EXPANSION, EXPOSURE &s. STAINLESS STEEL CONFORM A FULLY OPERATING SYSTEM, COORDINATE WITH THE ELECTRICAL DIVISION EXPO. EXPOSED STA. STATION ALL WORK RELATED TO THE MECHANICAL SYSTEMS. EXT,, EXTERIOR STD� STANDARD 4.6 PROVIDE EQUIPMENT MAINTENANCE AND INSTRUCTION MANUALS, THE MANUAL SHALL EWT ENTFRING WATER TEMPERATURE STL. STEEL ESTASUSH ALL REQUIRED SCHEDULED MAINTENANCE THAT SHALL BE PERFORMED STRL. STRUCTURAL DURING THE UFE OF THE BUILDING TO GUARANTEE THE WORKING CONDITION OF THE F.A, FIRE ALARM STRUC STRUCTURES INSTALLED SYSTEM, MANUALS SHALL BE SUBMITTED TO THE ENGINEER FOR FC FORWARD CURVE SURF. SURFACE ACCEPTANCE. FCO FLOOR CLEANOUT sym� SYMMETRICAL 43 EQUIPMENT DATA SHOWN IN 'THE EQUIPMENT SCHEDULES IS BASED ON MANUFACTURER FD FIRE DAMPER ACTUAL CATALOG. VERIFY 'THIS INFORMATION W" MANUFACTURERS PRIOR TO FF. nNISH FLOOR T TON, THERMOSTAT PURCHASING OR INSTALUNG ANY EQUIPMENT. MANUFACTUREWS NAMES SHAU- BE FG� FINISH GRADE Tclp. TEMPERATURE CONTROL PANEL INTERPREJED AS ESTABLISHMENT OF REQUIRED TYPE CLASS AND QUALfTY. ALL FIG. FIGURE tD. TEMPERATURE DIFFERENCE SUBSTITUTIONS SHALL BE APPROVED BY THE PROJECT ENGINEER, FIN. F'INISH TEMP. TEMPERATURE 4.8 PROVIDE ALL NECESSARY INSTRUCTIONS TO THE OWNER IN THE OPERATION OF 'THE FIXT� Fll)(rURE T�0.8� 'TOP OF BEAM MECHANICAL SYSTEM,, Fl. FLOW UNE T.O.C. TOP OF CURB, TOP OF CONCRETE 4�9 SEE EQUIPMENT SCHEDULES ON DRAWINGS FOR INFORMATION ON ALL SPECIFIED FL.,FLR. FLOOR 1O.D. TOP OF DUCT EQUIPMENT FOR THIS JOB. FLA FULL LOAD AMPS, FLORIDA tO.P� TOP OF PIPE FLASH. FL4SHING TP TOTAL PRESSURE 5�O PIPING FLEX. FLEXIBLE Tx TOILET EXHAUST FPM FEET PER MINUTE TXV THERMAL EXPANSION VALVE 5.1 CHILLED WATER PIPING SHALL BE SCHEDUll 40 BLACK IRON PIPE WIT'li WEII)ED FS COOUNG TOWER FILTRXnON SYSTEM Typ. TYPICAL 5.2 FfMNGS OR GROOVED JOINTS AND \4CTAULIC FITTINGS. ALL CHIU.ED WATER PIPING SHALL, BE INSULATED WITH 2* THICK CELLULAR GLASS FSD, F/S FIRE AND SMOKE DAMPER Ul. UNDERWRITERS LABORATORIES INSULATION WITH ASJ JACKETING. PIPING EXPOSED TO THE EXTERIOR SHALL BE FT FEEr U.N.O� UNLESS NOTED OTHERWISE PROVIDED WITH ALUMINUM JACKETING. FURN. FURNISH v VOLT, SHUT-OFF GATE VALVE, VOLUME, VALVE 5,3 PROVIDE ALL SHUT OFF VALVES, HYDRONIC SPECIALPES, 'THERMOMETERS, PRESSURE VEL VELOCrTY GUAGES, CONTROL DEVICES. ETC. REQUIRED FOR A COMPLETE OPERA'nNG SYSTEM. Ck GAUGE VQ VOLUME DAMPER GAL, GALLON VERT, VERTICAL 6.0 TEST AND PALANCING GALV� GALVANIZED VOL. VOLUME GEF GARAGE EXHAUST FAN VGL GLOBE VALVE 6.1 aALANCE ALL SYSTEMS TO PROVIDE FLOW OUANTITIES, TFMPERATURES AND CAPACITIES GPM,GAL./MlN GALLON PER MINVrE VFD VARIABLE FREQUENCY DRIVE 6�2 AS INDICATED ON THE DRAWINGS. PERFORM A COMPLETE OPERATING AND BALANCING TEST OF THE FINISHED SYSTEM. GR. GSF GRILLE GARAGE SUPPLY FAN W. WEST, WIRE, WATT, WIDE PROVIDE WRITTEN REPORT OF THE RESULT OF 'THIS TEST STATING T'HE ACCEPTABILITY 'THE w U WtTH WET BULB OF SYSTEM AND COMPLIANCE WITH THE DESIGN DOCUMENTS. TEST AND BALANCE H� HEIGHT, HUMIDISTAT AGENCY SHALL BE AN INDEPENDENT, AABC OR NE88 CER-nFlED AGENCY. CONIRACTOR HOA HAND-OFF-AUTOMATIC w.F. WIDE FLANGE SHALL COORDINATE WITH OWNER AND TESTING AND COMMISSIONING AGENCY ALL WORK HP HORSEPOWER W�G� WXrER GAUGE FOR nNAL CERTIFICArION OF THE HVAC SYSTEM. HPU HEAT PUMP UNIT WLDG. WELDING HWP HOT WATER PUMP wms WIRE MESH SCREEN WITHOUT HWR HOT WATER RETURN Vo WEIGHT HWS HOT WATER SUPPLY HX HEAT EXCHANGER XFMR TRANSFORMER HZ� HERTZ (CYCLES) LD� IN., INSIDE DIAMETER INCH&S) y YD, YP WYE YARD INCL. INCLIDONG) YR YEAR INSUL. INSULARN tNT� INTERIOR SCOPE OF WOR4 GM CONSULTING ENGINEERS MECHANICAL SYMBOLS AND'LEGE-ND "R EQ"lr"ME* T EXISTING PIPING C �4 TO BE DEMOLISHED NE'A' IPJPIN,� EkSTING Pir-ING TO, RSMA�N UNION FLEX CONNECTOR BUTTERFLY VALVE GATE VALVE BALL VALVE 7q la SUCTION DIFFUSER 'TRIPLE DUTY VALVE CIRCUIT SETTER, BAL.ANCING VALVE TWO-WAY MOTORIZED VALVE THREE-WAY MCrTORIZED VALVE DIRECTION OF WATER FLOW CHECK VALVE STRAINER 'TEE DOWN TEE UP ELBOW U P ELBOW DOWN REDUCER THERMOMETER WITH WELL -------- W---- 'rEST WELL. PRESSURE GAUGE WITH GAUGE VALVE CONNECTION TO EXISTING SCOPE OF WOR4 GM CONSULTING ENGINEERS