Loading...
14-562-011FIRE PROTECTION LEGEND SYMBOL DESCRIPTION SIZE FIRE PROTECTION PIPE 3/8" ROD COUPLING --- ---� -_ — — — — — — — — — — FIRE PROTECTION PIPE (EXISTING) C DN PIPE DOWN Q UP PIPE UP ROD SIZE CONNECTION POINT (NEW TO EXISTING) UG UNDERGROUND ABV, ABOVE CLG CEILING TYP TYPICAL TYPICAL HANGER DETAIL x.r CONCRETE SLAB '• ,• SIZE - 3 /S" POWDER DRIVEN STUD 3/8" ROD COUPLING --- ---� -_ =_ --- - -3 /8" ALL THREAD ROD NUT ADJUSTABLE HANGER RING + - -----PIPE(SIZE VARIES) (SIZES 1" TO 4 ") PIPE SIZE ROD SIZE TYPE OF FASTENER MIN. 'C' DIM MAX. 'C' DIM 1„ 3 /S" 1 %" x 1 1%2" DROP -IN ANCHOR V 1- /4„ 1 y4" WHTE (TYCO)TY -1 DRY PENDENT 1 y„ 2" 2„ 2 - 3f„ 2 - %" 2 y2" 1 yi 2- %" 3„ 1 - %4" 3- y4" 3Y" 1%" 3 -%- 4" 2" 3 - %s" 6" 1 /2" 1 %" x 3 X ", DRPAN ANC. 3 - 5 /c° 5 - Y211 S„ MAXIMUM DISTANCE BETWEEN HANGE SIZE NOMINAL PIPE 3/4" 1" 1 y" 1 %z" 2" 12,Y2" 3" 3Y" 4" 5" 6" S" (INCHES) STEEL PIPE(EXCEPT) NIA 12' -0" 12' -0" 15' -0" 15' -0" 15' -0" 154" 15' -0" 15-0" 15-0" THREAD LIGHTWALL STEEL PIPE N/A 12' -0" 12' -0" 12' -0" 12' -0" 12' -0" 12' -0" N/A N/A N/A ]/A THREAD LIGHTWALL CPVC PIPE 5' -6" 16'-0" 16'-0" 6' -6" 7' -0" Ii' -0" 9' -40--o. N/A N/A UL System No. W -L -1054 0 F Ratings - 1 and 2 Hr (See Items 1 and 3) J T Rating - 0 Hr L Rating At Ambient - Less Than 1 CFM /Sq Ft L Rating At 400 F - 4 CFM /Sq Ft SECTION A -A 1. Wall Assembly -- The 1 or 2 hr fire -rated gypsum wallboard /stud wall assembly shall be constructed of the materials and in the manner specified in the individual U300 or U400 Series Wall and Partition Designs in the UL Fire Resistance Directory and shall include the following construction features: A, Studs -- Wall framing may consist of either wood studs or steel channel studs. Wood studs to consist of nom 2 by 4 in. lumber spaced 16 in. OC. Steel studs to be min 2 -1/2 in. wide and spaced max 24 In. OC. When steel studs are used and the diam of opening exceeds the width of stud cavity, the opening shall be framed on all sides using lengths of steel stud installed between the vertical studs and screw - attached to the steel studs at each end. The framed opening in the will shall be 4 to 6 in. wider and 4 to 6 in. higher than the diam of the penetrating item such that, when the penetrating item is installed in the opening, a 2 to 3 in, clearance is present between the penetrating item and the framing on all four sides. S. Gypsum Board" - 5/8 in, thick, 4 ft wide with square or tapered edges. The gypsum board type, thickness, number of layers, fastener type and sheet orientation shall be as specified in the individual U300 or U400 Series Design in the UL Fire Resistance Directory. Max diam of opening is 32 -1/4 in. for steel stud walls. Max diam of opening is 14 -1/2 in. for wood stud walls. The F Rating of the firestop system is equal to the fire rating of the wall assembly. 2. Through - Penetrants -- One metallic pipe, conduit or tubing to be installed either concentrically or eccentrically within the firestop system. The annular space shall be min 0 in. to max 2 -1/4 in. Pipe may be installed with continuous point contact. Pipe, conduit or tubing may be installed at an angle not greater than 45 degrees from perpendicular. Pipe, conduit or tubing to be rigidly supported on both sides of wall assembly. The following types and sizes of metallic pipes, conduits or tubing may be used: A. Steel Pipe -- Nom 30 in diam (or smaller) Schedule 10 (or heavier) steel pipe. 1, Iron Pipe -- Nom 30 in. diam (or smaller) cast or ductile iron pipe. C. Conduit - Nom 4 in diam (or smaller) steel electrical metallic tubing or 6 in. diam steel conduit. D. Copper Tubing - Nom 6 in. diam (or smaller) Type L (or heavier) copper tubing. E, Copper Pipe -- Nom 6 in. diam (or smaller) regular (or heavier) copper pipe. 3. Fill, Void or Cavity Material* - Sealant - Min 5/8 in. thickness of fill material applied within the annulus, flush with both surfaces of wall. At the point or continuous contact locations between pipe and wall, a min 1/2 in. diam bead of fill material shall be applied at the pipe wall interface on both surfaces of wall. HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC -- FS -One Sealant or approved equal *clearing the UL Classification Mark Reproduced by HILTI, Inc. Courtesy of Underwriters Laboratories, Inc. 711111114 fli IQ September 14, 2004 H i Iti Fi restopSystems TYPICAL DETAIL WALL ASSEMBLY METALLIC PIPING CROSSING INTERIOR PARTITIONS. SPECIFICATIONS: 1. EXISTING FIRE PROTECTION SYSTEM SHALL BE PARTIALLY MODIFIED AS INDICATED ON PLANS. 2. MODIFICATION TO SPRINKLER SHALL BE DESIGNED IN ACCORDANCE W /N.F.P.A. # 13, 2007 EDITION. 3. FIRE SPRINKLER SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA13, FLORIDA BUILDING CODE & UNDERWRITERS INSURANCE COMPANY. 4. ALL SPRINKLER SYSTEM EQUIPMENT AND DEVICES SHALL BE LISTED BY FM & UL FOR SERVICE INTENDED. FOR SPRINKLER HEADS CHARACTERISTICS REFER TO FIRE SPRINKLER SCHEDULE THIS SHEET. 5. ARRANGEMENT AND LOCATION OF SPRINKLER HEAD & EQUIPMENT SHALL BE AS INDICATED ON DRAWINGS AND SUBJECT TO CONTRACTOR SUBMITTALS. 6. DETAILED DRAWINGS OF PROPOSED DEPARTURES DUE TO ACTUAL FIELD CONDITIONS OR OTHER CAUSES SHALL BE SUBMITTED TO THE ARCHITECT /ENGINEER FOR APPROVAL, 7. PIPING: INTERIOR ABOVE GROUND SHALL BE ASTM A 53 -73 OR A -106 STANDARD WEIGHT, SCHEDULE 10 BLACK STEEL PIPE WITH ROLLED MECHANICAL COUPLINGS OR XL BLACK STEEL PIPE AS PER NFPA 13 AND UL APPROVED FOR FIRE SPRINKLER SERVICE. S. MAXIMUM DISTANCE BETWEEN HANGERS SHALL BE AS PER NFPA -13 TABLE 6 -2.2.. 9. FIRE SPRINKLER SYSTEM TO BE HYDROSTATIC ALLY TESTED AT 200 PSI FOR 2 HRS MINIMUM. 10. BEFORE COMMENCING ANY WORK CONTRACTOR SHALL COORDINATE EXACT LOCATION OF EXISTING SYSTEM AND POINT OF CONNECTIONS. 11. ALL MATERIALS MUST BE NEW. 12. ALL FITTINGS TO BE BLACK CAST IRON. 13. ALL PIPE ELEVATIONS AND HEAD LOCATIONS ARE TO BE COORDINATED WITH ALL OTHER TRADES. 14. HANGERS SHALL BE IN ACCORDANCE WITH N.F.P.A. 13, 2007 EDITION SECTION 6 -1. 15. CONFIRM SPARE SPRINKLER HEADS W BOX LOCATION AS PER NFPA -13 PARAGRAPH (3 -2.9) IN ACCESSIBLE LOCATION IN MAINTENANCE OFFICE. 168. CONTRACTOR TO SUBMIT SHOP DRAWINGS TO A/E OFFICES FOR APPROVAL. 17. CONTRACTOR IS RESPONSIBLE TO SUBMIT AT TIME OF PERMIT APPLICATION SIGN & SEALED SHOP DRAWINGS OF THE FIRE SPRINKLER SYSTEM, HYDRAULIC CALCULATIONS AND MANUFACTURER CATALOG CUT SHEETS OF ALL COMPONENTS. 18. AREA OF WORK DOES NOT FALL UNDER MOST REMOTE OR DEMANDING AREA DEMOLITION NOTES: 1. EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF WORK; THE BIDDER IS REQUIRED, BEFORE SUBMITTING HIS PROPOSAL TO VISIT THE SITE OF THE PROPOSED WORK AND FAMILIARIZE HIMSELF WITH THE NATURE AND EXTENT OF THE WORK AND ANY LOCAL CONDITIONS THAT MAY IN ANY MANNER EFFECT THE WORK TO BE DONE AND EQUIPMENT, MATERIALS AND LABOR REQUIRED THEREFORE, SINCE THE WORK INVOLVES THE EXISTING SYSTEMS AND FACILITIES, SPECIAL CONSIDERATION SHALL BE GIVEN TO EXAMINATION OF WORKING CONDITIONS, EXISTING FACILITIES AND ALL STRUCTURES TO FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS. SLIGHT VARIATION OF ROUTING AND OR CONSTRUCTIONS SHOULD BE ANTICIPATED BY THIS CONTRACTOR TO AVOID CONFLICTS WITH OTHER TRADES ARE EXPRESSLY INCLUDED AS PART OF THE WORK WHENEVER REQUIRED AT NO ADDITIONAL COST TO THE OWNER. IGNORANCE ON THE PART OF THE CONTRACTOR WILL IN NO WAY RELIEVE HIM OF THE OBLIGATIONS AND RESPONSIBILITIES ASSUMED UNDER PROPOSED CONTRACT. 2. THE NATURE OF THE REMODEL TYPE CONSTRUCTION POSES SPECIAL PROBLEMS FOR THE DESIGNER ENGINEERS AS WELL AS THE CONTRACTOR. EVERY EFFORT HAS BEEN MADE BY THE ENGINEERS TO SHOW AND VERIFY, WHERE POSSIBLE, THE LOCATION OF THE EXISTING FIRE SPRINKLER SYSTEM. THE MAJOR PORTION OF THE SPRINKLER SYSTEMS ARE AS SHOWN ON THE DRAWINGS: HOWEVER MINOR DEVIATIONS MAY BECOME EVIDENT AS THE JOB PROGRESSES. NO ADVANTAGE IS TO BE TAKEN BY THE CONTRACTOR BECAUSE THESE MINOR DIFFERENCES. CONTRACTOR SHALL PERFORM A FIELD OF VERIFICATION BEFORE BIDDING THIS PROJECT. 3. CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATIONG HIS DEMOLITION WORK WITH OTHER TRADES, AND TO PROTECT FROM DAMAGE EXISTING PIPES. 4. CONTRACTOR SHALL VERIFY THE EXACT LOCATION AND DIAMETER OF EXISTING PIPES & HEADS BEFORE COMMENCING TO WORK AND MAKE MODIFICATIONS AS REQUIRED WITHOUT ADDITIONAL COST TO THE OWNER. 5. CONTRACTOR SHALL PAY ALL FEES, AND INSPECTIONS CHARGES REQUIRED. FIRE SPRINKLER HEAD SCHEDULE Fr.-, DESCRIPTION SIZE "K" TEMP FINISH MFG. -MODEL REMARK rfI A/ r I,iJi •i.,. PENDENT SPRINKLER HEAD '/Z' 5.6 155'F CHROME (TYCO)TY -FRB PENDENT NEW SPRINKLER HEADS DRY PENDEN SPRINKLER HEAD ' /z" 5.6 155'F WHTE (TYCO)TY -1 DRY PENDENT NEW SPRINKLER HEAD CONTRACTOR TO OBTAIN WRITTEN APPROVAL FROM OWNER REP CONCERNING SPRINKLER HEAD STYLE, FINISH & COLOR BEFORE COMMENCING ANY WORK K I, ,t AR 92953 ID 5054 AA26001202 SEBASTIAN EILERT, AIA, LEED SEBASTIAN EILERT ARCHITECTURE, SUSTAINABLE ARCHITECTURE AND CONSULTING 9840 S.W. 85 Street Miami, Florida 33173 (786)556 -3118 Sebastian @SebastianEilert.com gorm / /% of fj %.o% iy�ro rfI A/ r I,iJi •i.,. CONSULTANTS: ®L. TRIANA & ASSOCIATES, INC. CONSULTING ENGINEERS CERTIFICATE OF AUTHORIZATION: 26644 9701 SW 56TH STREET MIAMI, FLORIDA 33165 PH: (305) 595 -9765 FAX: (305) 59ti\ ,\MN,11 I I i l/ /, /// WEB: http :/www.Itrigno.com ♦ ♦ NZ O T �j O'��! r � CjYriYYr` �tJ i � ` : 1 OR`d IIIII PROJECT: Mellow Mushroom Tenant Build Restaurant Design Development The Shops at Sunset Place 5701 Sunset Drive South Miami, 33143, Unit A01A DRAWING TITLE: SEAL AR 92953 Project number Project Number Date December 2, 2013 Drawn by DGL Checked by DGL No. Description Date 1 Landlord's Comments 05 -29 -14 SHEET NO. FP-2 rM..,