Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
14-562-002
L System Checksums By SHAMROCK ENGINEERING AHU -1 Single Zone COOLING COIL PEAK Peaked at Time: Mo /Hr: 1/ 15 Outside Air: OADB/WB /HR: 91/78/125 Space Plenum Net Percent Sens. + Lat. Sens. + Lat Total Of Total Btu /h Itu /h Btu /h (' /.) Envelope Loads Skylite Solar 0 0 0 0i Skylite Cond 0 0 0 0 Roof Cond 0 0 0 0 CLG SPACE PEAK Mo /Hr: Sum of OADB: Peaks Space Percent Sensible Of Total Btu /h (' /.) 0 0 0 0 0 0 1 Envelope Leads Skylite Solar Skylite Cond Roof Cond HEATING COIL PEAK Mo /Hr: Heating Design OADB: 47 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Stu /h (' /.) 0 0 0.00 0 0 0.00 0 0 0.00 TEMPERATURES Ceding Heating SADIt 56.4 70.9 Ra Plenum 76.0 65.5 Return 76.0 65.5 ReUOA 75.2 65.1 Fn MtrTD 0.1 0.0 Fn SIdTD 0.1 0.0 Fn Frict 0.4 0.0 Glass Glass Solar 6,561 0 6,561 3 22,755 15 Glass Solar 0 0 0.00 AIRFLOWS 0.0 Int Door Glass /Door Cond 2,644 0 2,644 1I 571 0 Glass /Door Cond -4,457 -4,457 5.51 Wall Cooling Heating Wall Cond 2,020 520 2,535 1 3,255 2: W211 Wall Cond -2,255 -2,515 6.17 Partition /Door 0 0 0 0 0 Partition /Door 0 0 0.00 Diffuser 7,433 7,433 Floor 0 0 01 0 0 Floor 0 0 0.00 Terminal 7,433 7,433 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0 Main Fan 7,433 7,433 Infiltration 0 0 01 0 0 Infiltration 0 0 0.00 Sec Fan 0 0 Sub Total =_> 11,625 520 12,144 4I 26,625 17 Sub Total = => -6,752 -7,411 15.68 Nam Vent 1,555 1,555 AHU Vent 1,555 1,555 Internal Loads Internal Leads Infil 0 0 Lights 30,317 7,575 37,897 14! 30,317 20 Lights 0 0 0.00 MinStop /Rh 0 0 People 57,500 0 57,500 21 i 29,750 15 People 0 0 0.00 Return 6,011 6,011 Misc 67,226 0 67,226 251 67,226 441 Misc 0 0 0.00 Exhaust 132 132 Sub Total = => 155,043 7,575 162,622 60i 126,253 82 1 Sub Total => 0 0 0.00 Rm Exh 1,423 1,423 Auxiliary 0 0 Ceiling Lead 1,242 -1,242 0 0 1,322 1 1 Ceiling Lead -55 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 52,140 34 0 0 Ventilation Lead 0 - 39,877 94.35 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0; 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 01 OvlUndr Sizing 0 0 0.00 Ov /Undr Sizing 0 0 0 0 0 Exhaust Heat 12 -0.02 ENGINEERING CKS Exhaust Heat -151 -151 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 4,405 2 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 20.5 20.5 Duct Heat Pkup 0 0 0 cfm/ft' 1.94 1.94 Underflr Sup Ht Pkup 0 0 Underfir Sup Ht Pkup 0 0.00 cfm/ton 328.11 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft= /ten 165.06 Stu /hr -ft' 70.51 -12.34 Grand Total =_> 167,910 6,706 271,161 100.00 154,241 100.00 Grand Total = => -6,997 - 47,277 100.00 No. People 115 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBNVB /HR ton MBh MBh cfm 'F 'F gr /lb Main Cig 22.7 271.5 178.0 7,433 75.2 66.5 77.4 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0,0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 22.7 271.9 Project Name: Restaurant Dataset Name: Mello Mushroom Restaurant.trc Leave DSIWS /HR 'F 'F gr /Ib 55.5 54.7 62.5 0,0 0.0 0.0 0.0 0.0 0.0 HEATING COIL SELECTION AREAS CapacityCoil Gress Total Glass Lvg MBh ft' ('L) Floor 3,830 -47.3 7,433 Part 0 Aux Htg 0.0 Int Door 0 0.0 Preheat ExFlr 0 0.0 0.0 Roof 0 0 0 Wall 716 208 25 Ext Door 0 0 0 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm 'F 'F Main Htg -47.3 7,433 65.1 70.9 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -47.3 TRACEQ1 700 v6.3 calculated at 03:01 PM on 05/12/2014 Alternative - 1 System Checksums Report Page 1 of 2