14-403-007EXISTING ----
STOREFRONT
DETAIL
3' -1' -0'
REWARD FLOORING
QUARTER ROUND TO
MATCH (FGI)
DIRECT GLUE FGI
WOOD FLOORING
4 ) "'
3'-1' -0'
:)R .JAMB
EXISTING CERAMIC
TILE
REWARD FLOORING
STAIR NOSING TO
MATCH (POI)
REWARD FLOORING
QUARTER ROUND TO
MATCH (FGI)
EXISTING PLATFORM
FAGS. REMOVE TILE
AND INSTALL NEW
GYP. B.D.
BI
DIRECT GLUE
BASE SHOE WOOD FLOORING
FGI
Ak
EXISTING CERAMIC
TILE
WA W..
- FRP SEQUENTIA
GAP. M.GPI130
MOLDING
FG3
FG3
7 (FG3) BASE DETAIL
WALL PER PLAN
MATCHING WOOD
TRANSITION BY
VENDOR
BI
DIRECT GLUE DIRECT GLUE
BASE SHOE
WOOD FLOORING WOOD FLOORING
FGI FGI
EXISTING CERAMIC
TILE
(B -1) RETAIL AREA
3
1
EXISTING CERAMIC
TILE
DETAIL t
WALL FINISH PER
ELEV. PAINT OR
FRP
11 1111 B -2
EX/FG
VGT FLOORING
no
SNAP DOWN
ALUM T- MOLDING
PROVIDED BY
FLOORING VENDOR
=IN
TENANT RECESSED
MAT
FLOOR TRANSITION
3'-1' -0'
VINYL BASE DETAIL
THRESHOLD
SQUARE
BACK
SNAP DOWN
ALUM T- MOLDING
PROVIDED BY
FLOORING VENDOR
TENANT RECESSED
MAT
FLOOR
,n. -r-no
VGT SHEET VINYL
EX/FG FG3
5 r`
3'-1'
BOTTOM
DOOR FAIL
EXTERIOR
CONCRETE
WALK
• • • • • • • • • •
C Y
FINISH PLAN NOTES: DATE: 3/28/14
JOB NO: 14-. 91 S
SALES FLOOR: 100 t, : ZAAWN" ; s°rAft
Y
I� PROVIDE PAINT FINISH WHERE REQUIRED SALES AREA. SEE FINISH 50HEDULE AND ELEVATIONS. CHECKED: • CM• 4 Y
�2 INSTALL PROVIDED WOOD FLOORING (FCI) IN SALES AREA AS SHOWN, THE G.G. SHALL :**a • • . • • . • • • . • •
PROVIDE AND INSTALL MASONITE THROUGH OUT AS FLOOR PROTECTION DURING THE BALANG5 • • `
OF CONSTRUCTION. SEE NOTE "D" IN THE FLOOR FINISH INSTALLATION NOTES THIS SHEET. =• • •^"" `""' - ""^'
LJ INSTALL PROVIDED WOOD FLOORING (FCI) ON THE RAISED PLATFORM WITH NOSING TRIM. SEE
DETAIL.
INSTALL PROVIDED ENTRY MAT WITH SNAP DOWN ALUMINUM FRAME PROVIDED BY FLOORING
VENDOR.
Q INSTALL TENANT PROVIDED BASE THOUGH OUT THE SALES FLOOR AREA. SEE DETAIL 2 THIS
SHEET.
PROVIDE AND INSTALL WHIYE CORNER GUARDS ALL OUTSIDE CORNERS SEE SPECIFICATION IN
FINISH SCHEDULE
FITTING HALL: 101
FITTING ROOMS 102
PROVIDE PAINT FINISH THROUGH -OUT. SEE FINISH SCHEDULE AND ELEVATIONS.
❑
� INSTALL PROVIDED WOOD FLOORING (FGI) IN SALES AREA AS SHOWN, THE G.G. SHALL
PROVIDE AND INSTALL MA50NITE THROUGH OUT AS FLOOR PROTECTION DURING THE BALANCE
OF CONSTRUCTION. 5EE NOTE "D" IN THE FLOOR FINISH INSTALLATION NOTES THI5 SHEET.
IE
, INSTALL TENANT PROVIDED BASE THROUGHOUT. SEE DETAIL Z THI5 SHEET
Irra
LET ROOM: 103
PROVIDE PAINT IN TOILET ROOM AREA. SEE FINISH SCHEDULE AND ELEVATIONS.
II FRP 15 EXISTING ON WALL5 TO 4' GLEAN AND FIELD VERIFY ALL 15 SECURED TO WALL. REPAIR
OR REPLACE AS REQUIRED.
12 PROVIDE AND INSTALL SHEET VINYL FLOORING WITH INTEGRATED COVE BASE WELD ALL
SEAMS.
STOCKROOM: 104
13 PROVIDE PAINT FINISH THROUGH OUT STOCK ROOM. SEE FINISH SCHEDULE AND ELEVATIONS.
14 EXISTING STOCKROOM VINYL TILE FLOORING TO REMAIN. G.C. TO CELAN, WAX, AND BUFF.
15 PROVIDE AND INSTALL NEW VINYL COVE BASE THROUGHOUT THE STOCKROOM.
16 PROVIDE AND INSTALL BRUSHED ALUM. CORNER GUARDS ALL OUTSIDE CORNERS. SEE
SPECIFICATION IN FINISH 50HEDULE
FLOOR FINISH PREP AND INSTALLATION:
GENERAL:
A. ALL FLOOR COVERINGS SHALL BE INSTALLED PER
MANUFACTURERS STANDARD DETAILS AND SPECIFICATIONS.
B. THE G.G. 15 RESPONSIBLE TO PREPARE THE EXISTING FLOOR FOR
THE PROPER INSTALLATION OF THE FLOOR COVERING MATERIALS
INDICATED ON THE PLAN. CONSULT MANUFACTURES
SPECIFICATIONS FOR SURFACE PREPARATION REQUIREMENTS
FOR EACH FINISH LISTED IN THE FINISH SCHEDULE.
G. PROVIDE ALL NEcZSS 4RY FLOOR PREP AS REWIRED FOR A
SMOOTH AND LEVEL INSTALLATION OF TENANT FINISH FLOOR.
G1= f9 %A=1=: a CJ 1R rs'AJn1 r1t1M Feld 1 FVF4 IFf'A AND PR[7%ADF IN
FLOOR FINISH PLAN PLAN
SCALE: 1 4' -1'- ' NORTH (I
INTERIOR MODIFICATIONS ONLY
(ANY EXTERIOR MODIFICATION MAY REQUIRE
A WARD APPEARANCE)
ARLINGTON, TX 76012
�H: (817) 635 -5696
FAX: (817) 635 -5699
LICENSE No. AR- 0015586
0
(ADDTC(H
715 OIY kv 100, an w TEL irs") 113 -5i1G
iOUIb#UPk) M Ct ftM4 FAX. (ftV M-%W
Ill
W
O
,
x 0)
cn
li
%ci
�4 ; {
ti i, r � � ♦� .
LLI
Cl)
J
Z
W
> cn
�..�
cn
C'7
In
cn
<
� N
cn
uj
<(n
cn <(* (* Q
CL
z Lu
o
0
=) =
J
=
C/) _ .. d
O
to
H- W
CL
OM 0 i
Lu
00 <
cl)
=
r*% 0 r.L C)
m
Iff-
Lo W cn iff-
STORE NUMBER
tmbmdm
ISSUE
'A' -ISSUE LL, BID, PERMIT
DATE 3/28/14.
'S' -ISSUE
DATE
'C' -ISSUE
DATE
'D' -ISSUE
DATE
'E' -ISSUE
DATE
SHEET TITLE
FLOOR FINISH PLAN
/ BASE AND FLOOR
TRANSITION
DETAILS
SCALE
SHEET NUMBER
A1.2