Loading...
13-994R-001DETAIL NO. o'A 1. l/ �.,.___.._ ----- SHT. ON WHICH DETAIL IS SHOWN OR SHT. ON WHICH DETAIL IS CALLED OUT SECTION NO. BUILDING SECTION t SHT. ON WHICH SECTION SHOWN OR ' SHT. ON WHICH SECTION IS CALLED OUT (PLAN, ELEVATION) =I lardy 4 ;.° r ------ --- ELEVATION NO. 3.. 2 SHEET ON WHICH ELEVATION IS SHOWN fiw.m 1 r A ANCHOR HORIZ HORIZONTAL WINDOW TYPE A/C AIR CONDITIONING N.B. HOSE BIBB i ACOUST ACOUSTICAL I.D. INTERIOR DIMENSION ACP ACOUSTICAL CEILING PANEL INSUL. INSULATION AFF. ABOVE FINISH FLOOR INTERM INTERMEDIATE e AL OR ALUM ALUMINUM JAN. JANITOR x ANOD. ANODIZE MANUF. MANUFACTURER BD BOARD MAT MATERIAL i BLK'G BLOCKING MAX MAXIMUM BLK BLOCK MIN. MINIMUM i CEM CEMENT MTL METAL CER CERAMIC N.I.C. NOT IN CONTRACT G.J. CONTROL JOINT NEOPR NEOPRENE o CLG CEILING O.D. OUTSIDE DIMENSION COL COLUMN O.C. ON CENTER a CONC. CONCRETE O.S. OVERFLOW SCUPPERS CONT. CONTINUOUS PTN PARTITION COVER'G COVERING Pi PANEL JOINT DBL DOUBLE PL PLATE DIM DIMENSION L.P. LIGHT POLE DET DETAILS PLYWD PLYWOOD E.A. EACH PNL PANEL ELECT /ELEC ELECTRICAL PLAM PLASTIC LAMINATE EL. ELEVATION P.T. PRESSURE TREATED ELEV. ELEVATOR REINF. REINFORCING EXH. EXHAUST REQ'D REQUIRED EXIST EXISTING RM ROOM EXP. EXPANSION R.D. ROOF DRAIN a EXT. EXTERIOR SHT SHEET I F.D. FLOOR DRAIN SCH SCHEDULE F.E. FIRE EXTINGUISHER S.S. STAINLESS STEEL ® ». FIRE EXT. CAB. FIRE EXTINGUISHER CABINET STL STEEL ", -re F.O.I.C. FURNISHED BY OWNER, STD. STANDARD INSTALLED BY CONTRACTOR SECT SECTION FLUOR FLUORESCENT SIM SIMILAR FIN. FINISH SPECS SPECIFICATIONS GA GAUGE STRUCT STRUCTURE I GWB GYPSUM WALL BOARD SCWD SOLID CORE WOOD GYP. BD. GYPSUM BOARD TEL TELEPHONE GALV. GALVANIZED TEMP TEMPERED GS GALVANIZED STEEL VCT VINYL COMPOSITION TILE t GL GLASS VERT VERTICAL HM HOLLOW METAL VEST. VESTIBULE E HT HEIGHT INN DE �. DETAIL NO. o'A 1. l/ �.,.___.._ ----- SHT. ON WHICH DETAIL IS SHOWN OR SHT. ON WHICH DETAIL IS CALLED OUT SECTION NO. BUILDING SECTION t SHT. ON WHICH SECTION SHOWN OR ' SHT. ON WHICH SECTION IS CALLED OUT (PLAN, ELEVATION) =I lardy 4 ;.° r ------ --- ELEVATION NO. 3.. 2 SHEET ON WHICH ELEVATION IS SHOWN fiw.m 1 r DOOR No. ti d WINDOW TYPE ROOM NAME ROOM NAME 101 ROOM No. mcloggamEmm I THE CONTRACTOR . THOROUGHLY DETAILS OF !• AND WORKING CONDITIONS DIMENSIONS r AND ADVISE 2. THE CONTRACTOR SHALL PERFORM ALL WORK REQUIRED UNDER THIS CONTRACT FOR A COMPLETE INSTALLATION AND IN SUCH MANNER THAT SURFACES NOT AFFECTED BY REMOVAL OF EXISTING OR FROM NEW WORK SHALL REMAIN UNDISTURBED AND NORMAL ACTIVITIES AT THE INSTALLATION MAY CONTINUE WITH THE LEAST POSSIBLE INTERFERENCE. ALL DEBRIS SHALL BE REMOVED FROM THE SITE OF THE WORK AT THE END OF EACH WORKING DAY. MATERIALS AND EQUIPMENT SHALL BE STORED ONLY AT LOCATIONS APPROVED BY THE ARCHITECT / ENGINEER AND OWNER'S REPRESENTATIVE. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF THE STRUCTURES AND PERSONNEL DURING WORK UNDER CONTRACT. DRILLING OF PAVEMENT, i•. • 'r OTHER MODIFICATIONS AND CAREFULLY DONE BY SKILLED MECHANICS. XRAYSOF SLAB MUST BE TAKEN PRIOR TO MAKING ANY PENETRATIONS TO ENSURE EXISTING REINFORCEMENT WILL NOT BE DISTURBED. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO EXISTING WORK, D EQUIPMENT OF OPERATIONS. DAMAGED WORK SHALL BE REPAIRED OR REPLACED WITH MATERIALS • • SKILLED MECHANICS OF THE TRADES INVOLVED AT 5. DISPOSAL OF ALL MATERIAL NOT SPECIFIED OR SHOWN TO BE SALVAGED AND / OR REUSED RESULTING FROM REMOVAL OPERATIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL COSTS IN CONNECTION WITH DISPOSING OF THE MATERIALS WILL BE AT THE CONTRACTOR'S EXPENSE. ALL LIABILITY OF ANY NATURE RESULTING FROM THE DISPOSAL OF THE MATERIALS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 6. CONTRACTOR SHALL PROVIDE AND MAINTAIN ACCESS TO ALL EXISTING FACILITIES AND THOSE UNDER CONSTRUCTION IN THE IMMEDIATE VICINITY, AT ALL TIMES DURING CONSTRUCTION OF PROPOSED PROJECT. AUTHORITIES 7. CONTRACTOR SHALL INSTALL SECURITY FENCING AND BARRICADES AS REQUIRED BY THE LOCAL AND/OR DIRECTED BY THE ARCHITECT / ENGINEER. 8. VERIFICATION OF EXISTING CONDITIONS: EACH CONTRACTOR DETERMINE AND VERIFY ALL DIMENSIONS fCONDITIONS AT THE BUIi r SHALL BE RESPONSIBLE FOR SAME BEFORE COMMENCING WORK. DISCREPANCIES .• r TO AND/OR AND SHALL BE RESOLVED BEFORE RESUMING THE WORK. DIMENSIONS . READ AND NEVER SCALEI i .. . W- DRAWINGS. IN CONNECTION WITH HIS PORTION OF THE WORK. 1 EXAMINATION OF • DOCUMENTS AND CONTRACTOR FOR THIS PROJECT SHALL STUDY • r FAMILIARIZE HIMSELF WITH THE SITE AND WITH ALL THE DRAWINGS FOR ALL TRADES AND PARTS OF O RK. SHOULD ANY CONTRACTOR HAVE THE OPINION ARCHITECTURAL DRAWINGS ANY ERRORS OR DISCREPANCIES, OR THAT CONDITIONS OF THE WORK OF ANY OTHER CONTRACTOR IS SUCH THAT IT WILL PREVENT HIM FROM • WORK IN A IWGL 11. THE CONTRACTOR SHALL HAVE AT THE BUILDING FROM • FINISH OF CONSTRUCTION, •• FOREMAN. ri # CONTRACTOR SHALL GIVE HIS PERSONAL SUPERVISION • THE WORK. FOREMAN ON DUTY DURING ALL WORKING HOURS. INSTRUCTIONS OR NOTICES GIVEN TO HIM SHALL HAVE THE SAME IMPORTANCE TO THE CONTRACTO [ • 12 THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TEMPORART PROVISIONS TOILETS, r POWER AS WELL AS ANY OTHER DEEMED NECESSARY FOR THE COMPLETION OF THE PROJECT. COORDINATE WITH OWNER THE USE OF EXISTING FACILITIES DURING .O 13 ANY ITEM OF WORK NECESSARY TO THE PROPER COMPLETION OF CONSTRUCTION WHICH IS NOT SPECIFICALLY COVERED IN THESE DOCUMENTS SHALL BE PERFORMED IN A MANNER DEEMED GOOD Plit-WICE OF r E INVOLVED. 14 PERMITS, FEES AND F J Jw0l?' s S. FEES LICENSES AND DEPOSITS AND BE LIABLE La NOW- #• r r r •; • ■ r .# • # i •# • # is i i is : ui � -;. •# ♦• ,! •, fir. IN ADDITION ! THE REMOVAL OF +r • DEBRIS FROM RESPONSIBILITY OF i • TO REMOVE ALL SMUDGES, SPOTS OF COMPOUND, •r • r ■ • • s •• PERMANENT. AS BEING CONTRACTOR i CLEAN EACH AREA SEPARATELY, INCLUDING WASHING OF r• AND VACUUMING OR WAXING OF •! •` TO HANDING COMPLETED PROJECT OVER # THE OWNER. 17. MATERIALS: ALL MATERIALS SHALL BE NEW, AS CALLED FOR IN THE DRAWINGS, AND THE BEST OF THEIR RESPECTIVE KINDS. NO SUBSTITUTIONS SHALL BE MADE BY THE CONTRACTOR WITHOUT PRIOR WRITTEN APPROVAL BY THE OWNER, UNLESS SPECIFIED OTHERWISE ON THE DRAWINGS. FOR PORTIONS OF THE WORK NOT SHOWN IN DETAIL, BUT WHICH ARE SHOWN GENERALLY, OR ARE REASONABLY INFERABLE AS BEING REQUIRED FOR A COMPETENT AND COMPLETE INSTALLATION, THE MATERIAL METHODS AND WORKMANSHIP SHALL CONFORM AS A MINIMUM TO THE TYPICAL OR REPRESENTATIVE. 18. CUTTING • EACH CONTRACTOR RESPONSIBLE i' ANY CUTTING, FITTING, PATCHING AND MATCHING OF HIS NEW WORK TO EXISTING WORK AND INDICATED IN THE DRAWINGS. • CONTRACTOR SHALL ENDANGER ANY WORK OF ANY OTHER CONTRACTOR BY EXCAVATING CUTTING OR OTHERWISE ALTERING ANY WORK OF OTHER CONTRACTORS. 19. PRIOR TO BEGINNING WORK, GC IS TO OBTAIN, BECOME FAMILIAR AND FOLLOW ANY AND ALL CONSTRUCTION r D REGULATIONS FROM OWNER AND/OR • r! OFFICE, SO LONG AS SUCH GUIDELINES ARE NOT IN CONFLICT WITH FBC 2007 OR LOCAL JURISDICTION. IF GC DETECTS DISCREPANCIES BETWEEN CONDO GUIDELINES AND LOCAL CONSTRUCTION REGULATIONS, INFORM ARCHITECT, CONDO i D OWNER IN WRITING IN ORDER i REACH A RESOLUTION PRIOR TO PROCEEDING WORK. 20. DEMOLITION: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ELECTRIC AND PLUMBING SHALL BE REMOVED OR ADEQUATELY CAPPED AS ALLOWED BY CODE. DEMOLITION N# r PLANS ARE A GENERAL OUTLINE OF • BE REMOVED. HOWEVER, ANY ITEMS IN THE WAY OF NEW CONSTRUCTION MUST BE REMOVED AND DISCARDED IN ORDER TO INSTALL NEW ,i,r ate •• r I L��_._J SCALE: N.T.S. LEGAL DESCRIPTION: OF PORT LOT 33 PER D: 3860-556 & ALL BLK 2 LESS LOTS c. 1e ARCHIQUADRA, P.A. I a s 0 00 PONCE DE LEON BLVD. CORAL GABLES, FL 33134 786.430.7765 1 aR DRAWING LIST ARCHITECTURAL SHEETS CSTRUCTURAL SHEET AQ.O COVER, GENERAL NOTES, PROJECT STRUCTURAL PLAN AND DETAILS DATA AND SCOPE OF WORK A0.1 REFERENCE (PREVIOUS TENANT) MEP SHEETS P0.0 PLUMBING - GENERAL AND SPECIFIC NOTES, LEGEND AND SCHEDULES A1.0 PARTIAL DEMOLITION PLAN P1.0 PLUMBING - FLOOR PLAN A2.0 SITE PLAN / EXTERIOR ELEVATIONS PIA PLUMBING - FLOOR PLAN FRONT BAR A2.1 LIFE SAFETY PLAN P2.0 PLUMBING - DOMESTIC WATER FLOOR PLAN A3.0 FLOOR PLAN - FRAMING P2.1 PLUMBING - HVAC CONDENSATE LINE PLAN A3.1 FLOOR PLAN - KITCHEN FRAMING P3.0 PLUMBING - SANITARY RISER DIAGRAM P4.0 PLUMBING - GAS SYSTEM FLOOR PLAN A3.2 FURNITURE PLAN P5.0 PLUMBING - STANDARD ACCESSORIES AND COMPONENT DETAILS A3.3 FINISH PLAN A3.4 REFLECTED CEILING PLAN M0.0 MECHANICAL - GENERAL NOTES A3.5 KITCHEN REFLECTED CEILING PLAN M0.1 MECHANICAL - GENERAL AND SPECIFIC NOTES, LEGEND AND SCHEDULES A3.6 TV LOCATIONS MI.0 MECHANICAL - HVAC FLOOR PLAN DINING AREA A4.0 KITCHEN EQUIPMENT PLAN MI.] MECHANICAL - HVAC FLOOR PLAN KITCHEN AND RESTROOMS (REFERENCE) MI.2 MECHANICAL - HVAC FLOOR PLAN AHU / REFRIGERANT LINES M2.0 MECHANICAL - HVAC GENERAL AND STANDARD EQUIPMENT DETAILS A4.1 KITCHEN SCHEDULE (FOR REFERENCE) M2,1 MECHANICAL - HVAC GENERAL AND STANDARD EQUIPMENT DETAILS A4.2 KITCHEN SCHEDULE (FOR REFERENCE) M3..0 MECHANICAL - HVAC ROOF PLAN A5.0 ELEVATIONS A6.0 DETAILS E0.0 ELECTRICAL - GENERAL AND STANDARD NOTES, LEGEND AND SCHEDULES A6.1 DETAILS E1.0 ELECTRICAL - FLOOR PLAN DINING AREA LIGHTING E1.1 ELECTRICAL - FLOOR PLAN KITCHEN AREA LIGHTING A6.2 DETAILS E2.0 ELECTRICAL - FLOOR PLAN DINING AREA POWER A6.3 DETAILS E2.1 ELECTRICAL - FLOOR P / HVAC POWER AND EXISTING KITCHEN OUTLETS A6.4 TYPICAL FRANCHISE DETAILS E3.0 ELECTRICAL - KITCHEN FLOOR PLAN A7.0 ADDITIONAL DETAILS E3.1 ELECTRICAL - EQUIPMENT SCHEDULE E4.0 ELECTRICAL - ROOF PLAN E5.0 ELECTRICAL - PANEL SCHEDULES ® ». E6.0 ELECTRICAL - RISER DIAGRAMS ►; ", -re E7.0 ELECTRICAL - GENERAL AND STANDARD DETAILS x I � FA1.0 FIRE A - ELECTRICAL FLOOR PLAN FA2.0 FIRE ALA - FLOOR PLAN FA3.0 FIRE ALARM - DETAILS nl, ",•� c�` » •ltf, ®t,tl` FS1.0 FIRE PROTECTION - FLOOR PLAN DINING AREA FS2.0 FIRE PROTECTION - FLOOR PLAN KITCHEN FS3.0 FIRE PROTECTION - DETAILS f NOTES e #'O_m alit �^y dhs Dgg., INN DE �. p^y9 a"2 rp'L%�C7- U'�R,At„ E:CT10t c� 4 DESIGN • 12/05/13 • t" ;