Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
13-994-026
M' L_ K J a IG F E D 1 0 .A FLOOR PLAN KITCHEN AREA — PLUMBING SCALE: 1/41) = 2 3 11 7 8 I 9 10 11 12 13 I 14 15 16 CO oz ■1r r1`� � �_— --. EXISTING 4" SANITARY---? 4--EXISTING 4" SANITARY \ LINE TO SEWER SYSTEM I GREASE LINE TO EXISTING GREASE TRAP NMI I Big )-4 15 }{ BG }{ 1110 1 - 1 \ __ - _ ---------------------------- _ FFD � L L COLUMN BAR 3" B' 3„ FEAR In CO HGD 111 „ �.. -- -- - - - _ - - - - - - - J R)2' (ERL)11�: F I - -- - - - --( \ j - (E) (ER) -� -, II i 7�J.1 (N)FD (N)3" 1 (E)3, (�)FD (E)Fq' V a '1 1 - - (ER) I (ER) (ER) - IF= 71 rrI I I W� \� ! (E)FD - I SMOKERS I �a " ER) I I SOILED I- I I I _ O DISH IN _ Fp EED (E i W t \ � I FFD � _ - - E3' N. --- -. - - -- - 3 °, __ - -- (E)FD FFD I , �<<, fit• * � - .. BAR SEATING 43 LF / 24" 25 8 • • r ••v 11 i I E)FD _ 1 ' (F)FD i j— BE REMOVED #fir I 1 E r> I (N) NEW co.1 �} (E)FD A (E) EXISTING �� (ER) EXISTING TO BE REMOVED ��t (ERL) EXISTING TO BE REMOVED /RELOCATED kl- INTERIOR OCCUPANT LOAD z BAR SEATING 43 LF / 24" 25 8 • • r ••v 2,600 SF / 15 NET 150* J w U KITCHEN 2,190 SF / 200 GROSS 15* U w • •L V � W 4 • BAR 210 SF / 200 GROSS -1 4* N SMALL BAR ESTIMATED 2* V TOTAL INTERIOR OCCUPANT LOAD 190 * ESTIMATED OCCUPANTS No. CODE BUILDING CODE FBC 2010 PROPOSED OCCUPANCY TYPE A2 • EXISTING CONSTRUCTION TYPE III--A (TABLE 601) INITARY AND GREASE WASTE RUNNING UNDER SLAB OTHERWISE NOTED ON PLANS. )LD WATER, HOT WATER, CONDENSATE AND VENTILATION PIPE RUNNING AT CEILING SPAC HERWISE NOTED ON PLANS. 3 PER SECTION 802.2 OF FBC: ALL INDIRECT WASTE PIPING SHALL DISCHARGE THROUGH N AIR GAP OR AIR BREAK INTO A WASTE RECEPTOR OR STANDPIPE. WASTE RECEPTORS ND STANDPIPES SHALL BE TRAPPED AND VENTED AND SHALL CONNECT TO THE BUILDING RAINAGE SYSTEM. ALL INDIRECT WASTE PIPING THAT EXCEEDS 2' (610 MM) IN DEVELOPEI =NGTH MEASURED HORIZONTALLY, OR 4' (1219 MM) IN TOTAL DEVELOPED LENGTH, SHALL AS BUILT CONDITION NOTE fI 11+) I I I OFFICE ' ___ i9E -- 3 „ ! I {a} 3„ 5FU (E)3” - - -- ,1' ..»(E)3� ��� (E)4 "_�, 1" T a (T T r „ i f I -� W LLN OVEN I 1(E)131 ' 3 (3F.U) ,_ I (ERL)3" I } J h „ I\ 3 I I I FFD I I ICE LOCK RS (ERL)TD = W 1 00 I I I MACHINE I ( ) 1848 ; I 2 ( ) TD I� � (E)FD FD PLUMB. ITEM 5 VER DRY IFY EXIST. STORAGE ,� 1 ��„ PREP (E)z I � _-- - - - - -- -- � I � _ I I E )2" 2F.i,l I D�� ' �� ( —�T - -= {E)2" TO EXISTING �, - - �C.01 I I VENTILATION SYSTEM 1848 481 _ -- - - - - -1 n - -__- J - - -�E -------- - - - - -i --------- - - -T -- Q 2 "V 25 I ' THIS JOB INVOLVE RENOVATION WORK IN EXISTING FACILITY. THIS PLAN IS BASED ON EXISTING SET OF PLAN PROVIDE BY MALL MAINTENANCE /ENGINEERING DEPARTMENT AND A SITE JOB VISUAL INVESTIGATION. P.C. SHALL MAKE A DEEP SITE JOB INVESTIGATION TO VERIFIED IN FIELD ACTUAL CONDITION VS PLANS SUBMITTED. SITE JOB VISIT IS MANDATORY TO BID THIS PROJECT. WRITTEN REPORT SHALL BE SUBMIT TO THE ENGINEER NO LATER THAT 5 WORKING DAYS. CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZES, INVERT AND CONDITION OF EXISTING PIPING BEFORE COMMENCING WORK. CONTRACTOR SHALL COORDINATE AND RE -ROUTE PIPING AS REQUIRED BASED IN EXISTING CONDITIONS, ACCURATE AS -BUILT RECORD SHALL BE MAINTAINED DURING CONSTRUCTION. ANY CHANGES /CORRECTION /MODIFICATION DUE TO UNFORESEEN CONDITION /LACK OF INFORMATION OF EQUIPMENT IN PLACE OR ANY OTHER SITUATION THAT IMPLIES ADDITIONAL COST TO THE PROJECT GSPG CONSULTING CORP, DO NOT ACCEPT RESPONSIBILITY. PC SHALL CONDUCT A FIELD INVESTIGATION (SEE ( "FIELD INVESTIGATION NOTE ") AND CONTACT THE ENGINEERS IMMEDIATELY PRIOR TO COMMENCE TO WORK, PC /GC HAVE 5 WORKING DAYS AFTER COMMENCE DEMOLITION WORK TO NOTIFY THE ENGINEER IF ANY DISCREPANCY IS FOUND IN SET OF DWGS, AFTER THAT GSPG CONSULTING WILL CONSIDER THE PLANS ACCURACY ACCEPTABLE AND ADDITIONAL FEES MAY APPLIES TO ANY CORRECTION REQUESTED. ELECTRICAL AND MECHANICAL PLANS SHALL BE ALSO REVISED BY P.C. AS PART OF SET OF PLANS. ALSO SET OF DWGS SUBMITTED AT 50, 75, 90% FOR PRICING PURPOSE SHALL NOT BE TAKEN AS FINAL. P.C. SHALL HAVE IN THE SITE JOB THE LAST REVISED AND APPROVED SET OF PLANS, WITH NO EXEPTION SITE INVESTIGATION NOTE EXAMINATION OF CONTRACT DOCUMENTS AND SITE: THE BIDDER IS REQUIRED BEFORE SUBMITTING HER /HIS PROPOSAL TO VISIT THE SITE AND FAMILIARIZE HER /HIS WITH THE NATURE AND EXTENT OF THE WORK TO BE PERFORM. ANY DEVIATIONS THAT MAY AFFECT THE WORK TO BE PERFORMED SHALL BE SUBMITTED IN WRITING TO THE ARCHITECT /ENGINEER FOR CONSIDERATIONS. VARIATIONS FROM CONTRACT DOCUMENTS: ROUTING AND OR CONSTRUCTIONS VARIATIONS SHOULD QE ANTICIPATED BY THE ELECTRICAL CONTRACTOR TO AVOID CONFLICTS WITH OTHER TRADES WHERE APPLICABLE. THESE VARIATIONS ARE EXPRESSLY INCLUDED AS PART OF THE WORK WHENEVER REQUIRED AT NO ADDITIONAL COST TO THE OWNER (EXCEPT FOR UNFORESEEN SITUATION DUE TO DESIGN CONDITION; REFER TO UNFORESEEN CONDITION NOTES). THE CONTRACTOR WILL IN NO WAY BE RELIEVED OF HIS OR HER OBLIGATIONS AND RESPONSIBILITIES ASSUMED UNDER THIS CONTRACT. SPECIAL CONSIDERATION WILL BE GIVEN TO UNFORESEEN CONDITIONS. 5 1 6 1 7 I 8 9 10 I 11 I 12 FLOOR PLAN -- PLUMBING01,1.1 i i %� graphic scale 1/4 " =1' -0" 13 I 14 15 16 M • u 4 V 4 V 4 • u 4 Y c V • 'i : • • r ••v • • r Y 4 r• V•• r • • • Y u • Y•i• • w W •wi Y M G • Y Y W • c♦ • W • 4 4 4 G • Y• � � Y i• 1 � Y M • u 4 V 4 V 4 • u 4 Y c V • 'i : • • r ••v • • r Y 4 r• V•• r • • • Y u • Y•i• • w W •wi Y M G J w U �[ wV z U U w • •L V � W 4 • U y• Y V • • • G� r N G i 0 O � . 0�! � V • 4 Y W� 0 ■ �z' 4• W 4 Iwo O LQ No. Q N O F-fD LLI L U) o • Y r LL <U�� r ©� z Uj 5a a w W L fD WW w cn C)z J w z Y "I"'A REG. N.. DOI FROF'ESSONAL ENGINEER W /1 z zaw M O C 6 J h ¢a_ z z w D O O U zr v o v 0 W VJ 0 o� z on 0 LL M LLJLL J t7 H z 0 a LLI r z z CD � O mof L1...A w u, o oQ Lu z r(n a CD J w U SEAL U z w 0 O � . 0�! � Q° Iwo O LQ No. Q F-fD _S OF L U) o CC z Uj 5a a w W L fD WW w cn C)z DAB P 2013 w z GERARDO, SIXfO PEREZ- GALGERAN "I"'A REG. N.. DOI FROF'ESSONAL ENGINEER W /1 zaw O C J ro ¢a_ z N D O O U zr C)< o v W VJ < o� on 0 LL LLJLL J t7 CC U z CD � O mof L1...A w u, o oQ 17 w= z z� L zLU LU O U w zW_ Architect: w �w a� O �z o� EL= M U a= z � I- ?�:2 00 JORGE EDUARDO GONZALEZ,AIA U F- AR 114751 / ID 55115 / LEED A11 d z O O U Revisions w w 00 j1-- CO/) YC W n� M ao zw _j Le _LLI U) Of n� zt z o L ,. ao ME O �F- � U LL otl P120928 a a> Pro iect I 05/7/2013 s Date: z a Author llj Cr Drawn / ~ Checked o� � Pi W ■ z�3 in �Q 0 U r(n CD J w U U z w LU LQ Q F-fD Cn 2 CC z Uj 5a a w W L fD WW w cn �n J z D � LLJ C)< W VJ < O 7i t7 J t7 17 w= z z� L zLU LU O U w zW_ Architect: w �w a� O �z o� EL= M U a= z � I- ?�:2 00 JORGE EDUARDO GONZALEZ,AIA U F- AR 114751 / ID 55115 / LEED A11 d z O O U Revisions w w 00 j1-- CO/) YC W n� M ao zw _j Le _LLI U) Of n� zt z o L ,. ao ME O �F- � U LL otl P120928 a a> Pro iect I 05/7/2013 s Date: z a Author llj Cr Drawn / ~ Checked o� � Pi W ■ z�3 in �Q 0 U z w LU U)~ Q Cn 2 CC z Uj 5a a w w cn 17 w= z z� L zLU LU O U w zW_ Architect: w �w a� O �z o� EL= M U a= z � I- ?�:2 00 JORGE EDUARDO GONZALEZ,AIA U F- AR 114751 / ID 55115 / LEED A11 d z O O U Revisions w w 00 j1-- CO/) YC W n� M ao zw _j Le _LLI U) Of n� zt z o L ,. ao ME O �F- � U LL otl P120928 a a> Pro iect I 05/7/2013 s Date: z a Author llj Cr Drawn / ~ Checked o� � Pi W ■ z�3 in �Q