13-518-002b
m
L
K
i
N
G
F
C
B
A
DEMOLITION NOTES
PART I SUMMARY
1.01 DESCRIPTION
A. FURNISH ALL LABOR, MATERIALS, EQUIPMENT, AND SERVICES TO PERFORM DEMOLITION
AND REMOVAL OF DEBRIS FROM DEMOLITION OPERATIONS WHEN INDICATED ON
DRAWINGS AND SPECIFIED IN THIS SECTION.
1.02 QUALITY ASSURANCE
A. QUALIFICATIONS:
1.) PROVIDE STAFF RESPONSIBLE FOR DEMOLITION WORK FULLY EXPERIENCED IN THIS TYPE OF
WORK.
2.) PROVIDE EQUIPMENT OF SUITABLE TYPE, IN GOOD WORKING CONDITION, AND
OPERATED BY SKILLED MECHANICS.
3.) PERFORM WORK IN SAFE AND CAUTIOUS MANNER TO AVOID ACCIDENTS OR PROPERTY DAMAGE.
4.) REMOVAL AND DEMOLITION OF HAZARDOUS MATERIALS SHALL BE PERFORMED BY
COMPANY LICENSED AND QUALIFIED TO DO SO.
B. REFERENCE STANDARDS : COMPLY WITH ALL CODES AND REGULATIONS REGARDING
DEMOLITION WORK.
C. DEMOLITION WORK SHALL BE PEFORMED FOLLOWING ALL CONDOMINIUM ASSOCIATION'S
RULES AND REGULATIONS. BUILDING ADMINISTRATION SHALL BE INFORMED BY GC PRIOR TO
BEGINNING WORK OF FULL SCOPE OF DEMOLITION AND NEW CONSTRUCTION, AS REQUIRED.
PART 11 PRODUCTS
2,01 SALVAGED ITEMS:
A. FIRE ALARM COMPONENTS /EMERGENCY LIGHTING BATTERY PACKS SHALL
BE SAFELY STORED ON SITE AND SHALL REMAIN OWNER'S PROPERTY.
B. OTHER SALVAGED COMPONENTS WILL BE THE PROPERTY OF THE
CONTRACTOR AND SHALL BE REMOVED FROM THE SITE IMMEDIATELY UPON
DISCONNECTION FROM BUILDING.
PART III EXECUTION
3.01 PERFORMANCE:
A. PREVENT DAMAGE TO ADJOINING TENANT AREAS AND OWNER'S SALVAGED PROPERTY DURING
DEMOLITION.
B. SHORE STRUCTURE AS REQUIRED TO PREVENT STRUCTURAL DAMAGE OR COLLAPSE IF THE WORK INCLUDES DEMOLITION OF
STRUCTURAL ELEMENTS. REMOVE FINISHES FIRST IN ORDER TO ASSERTAIN WHICH ITEMS ARE OF A STRUCTURAL NATURE.
CONTRACTOR SHALL PROVIDE AN ADEQUATE SHORING PLAN AFTER REMOVAL OF FINISHES. SAID SHORING PLAN SHALL BE
PREPARED BY A QUALIFIED PROFESSIONAL STRUCTURAL ENGINEER LICENSED TO PRACTICE IN THE STATE OF FLORIDA.
C. IMMEDIATELY UPON REMOVAL OF FINISHES, CONTACT ARCHITECT FOR
INSPECTION OF EXISTING STRUCTURE.
D. REMOVAL, DISPOSAL AND DEMOLITION OF HAZARDOUS
MATERIALS SHALL BE DONE IN ACCORDANCE WITH ALL
APPLICABLE CODES, RULES AND REGULATIONS.
E. DEMO PLAN IS DIAGRAMMATIC IN NATURE. ALL ITEMS IN THE WAY
OF ANY ITEMS WHICH ARE TO BE INSTALLED, ARE TO BE REMOVED.
CONTRACTOR TO COORDINATE DEMOLITION WITH PROPOSED
WORK AND WITH ARCHITECT FOR ANY QUESTIONABLE ITEMS
PRIOR TO BID.
3.02 ADJUST AND CLEAN :
A. REMOVE ALL DEMOLITION MATERIALS, DEBRIS, AND RUBBISH FROM SITE
IMMEDIATELY ON COMPLETION OF DEMOLITION WORK.
B. DO NOT ALLOW ANY ACCUMULATION OF DEBRIS ON SITE.
C. TRANSPORT ALL DEMOLITION MATERIALS WITHOUT SPILLAGE IN
CORRIDORS AND ON STREETS.
D. LEAVE SITE NEAT AND ORDERLY ON COMPLETION OF DEMOLITION WORK.
ADDITIONAL NOTES:
1. EXISTING SYSTEMS WHICH ARE TO REMAIN, SHALL BE PROTECTED DURING
DEMOLITION PROCESS AND MUST REMAIN IN WORKING CONDITION THROUGHOUT DEMOLITION
PROCESS (IE, FIRE ALARM, FIRE SPRINKLERS, AND OTHER SYSTEMS NOT BEING REMOVED)
2. LIFE SAFETY SYSTEMS, GENERAL BUILDING SYSTEMS, STRUCTURAL MEMBERS,
EXTERIOR WINDOWS OR DOORS ARE NOT TO BE REMOVED OR DAMAGED.
REFER TO MEP DEMO PLANS FOR ADDITIONAL INFORMATION
\I
REMOVE EXISTING BAR. REMOVE ALL
EQUIPMENT AND PROPERLY
CAP /SEAL/TERMINATE ALL UTILITY
CONNECTIONS AS REQUIRED.
a
P
REMOVE FINISHES —"
l REMOVE ALL COLUMN
I DECORATIVE FINISHES AND LEAVE
1 THE COLUMN STRUCTURE EXPOSED
REMOVE ALL COLUMN
DECORATIVE FINISHES
AND LEAVE THE COLUMN
/&
STRUCTURE EXPOSED
REMOVE EXISTING PARTITION AND FIXED SEATING.���
ti
ti
ALL FLOOR FINISHES TO BE REMOVED THROUGHOUT � o
LJ CREATE NEW 5` 6" W X 7" 0°
HIGH OPENING IN EXISTING
REMOVE EXISTING PARTITION AND DOOR GYPSUM WALL BOARD METAL
FRAMED WALL
p
I
i
f
FF�
ff g
f
1 2
3
4
5
6
7
8
9
10 11
12
13
14
15
DEMOLITION NOTES
PART I SUMMARY
1.01 DESCRIPTION
A. FURNISH ALL LABOR, MATERIALS, EQUIPMENT, AND SERVICES TO PERFORM DEMOLITION
AND REMOVAL OF DEBRIS FROM DEMOLITION OPERATIONS WHEN INDICATED ON
DRAWINGS AND SPECIFIED IN THIS SECTION.
1.02 QUALITY ASSURANCE
A. QUALIFICATIONS:
1.) PROVIDE STAFF RESPONSIBLE FOR DEMOLITION WORK FULLY EXPERIENCED IN THIS TYPE OF
WORK.
2.) PROVIDE EQUIPMENT OF SUITABLE TYPE, IN GOOD WORKING CONDITION, AND
OPERATED BY SKILLED MECHANICS.
3.) PERFORM WORK IN SAFE AND CAUTIOUS MANNER TO AVOID ACCIDENTS OR PROPERTY DAMAGE.
4.) REMOVAL AND DEMOLITION OF HAZARDOUS MATERIALS SHALL BE PERFORMED BY
COMPANY LICENSED AND QUALIFIED TO DO SO.
B. REFERENCE STANDARDS : COMPLY WITH ALL CODES AND REGULATIONS REGARDING
DEMOLITION WORK.
C. DEMOLITION WORK SHALL BE PEFORMED FOLLOWING ALL CONDOMINIUM ASSOCIATION'S
RULES AND REGULATIONS. BUILDING ADMINISTRATION SHALL BE INFORMED BY GC PRIOR TO
BEGINNING WORK OF FULL SCOPE OF DEMOLITION AND NEW CONSTRUCTION, AS REQUIRED.
PART 11 PRODUCTS
2,01 SALVAGED ITEMS:
A. FIRE ALARM COMPONENTS /EMERGENCY LIGHTING BATTERY PACKS SHALL
BE SAFELY STORED ON SITE AND SHALL REMAIN OWNER'S PROPERTY.
B. OTHER SALVAGED COMPONENTS WILL BE THE PROPERTY OF THE
CONTRACTOR AND SHALL BE REMOVED FROM THE SITE IMMEDIATELY UPON
DISCONNECTION FROM BUILDING.
PART III EXECUTION
3.01 PERFORMANCE:
A. PREVENT DAMAGE TO ADJOINING TENANT AREAS AND OWNER'S SALVAGED PROPERTY DURING
DEMOLITION.
B. SHORE STRUCTURE AS REQUIRED TO PREVENT STRUCTURAL DAMAGE OR COLLAPSE IF THE WORK INCLUDES DEMOLITION OF
STRUCTURAL ELEMENTS. REMOVE FINISHES FIRST IN ORDER TO ASSERTAIN WHICH ITEMS ARE OF A STRUCTURAL NATURE.
CONTRACTOR SHALL PROVIDE AN ADEQUATE SHORING PLAN AFTER REMOVAL OF FINISHES. SAID SHORING PLAN SHALL BE
PREPARED BY A QUALIFIED PROFESSIONAL STRUCTURAL ENGINEER LICENSED TO PRACTICE IN THE STATE OF FLORIDA.
C. IMMEDIATELY UPON REMOVAL OF FINISHES, CONTACT ARCHITECT FOR
INSPECTION OF EXISTING STRUCTURE.
D. REMOVAL, DISPOSAL AND DEMOLITION OF HAZARDOUS
MATERIALS SHALL BE DONE IN ACCORDANCE WITH ALL
APPLICABLE CODES, RULES AND REGULATIONS.
E. DEMO PLAN IS DIAGRAMMATIC IN NATURE. ALL ITEMS IN THE WAY
OF ANY ITEMS WHICH ARE TO BE INSTALLED, ARE TO BE REMOVED.
CONTRACTOR TO COORDINATE DEMOLITION WITH PROPOSED
WORK AND WITH ARCHITECT FOR ANY QUESTIONABLE ITEMS
PRIOR TO BID.
3.02 ADJUST AND CLEAN :
A. REMOVE ALL DEMOLITION MATERIALS, DEBRIS, AND RUBBISH FROM SITE
IMMEDIATELY ON COMPLETION OF DEMOLITION WORK.
B. DO NOT ALLOW ANY ACCUMULATION OF DEBRIS ON SITE.
C. TRANSPORT ALL DEMOLITION MATERIALS WITHOUT SPILLAGE IN
CORRIDORS AND ON STREETS.
D. LEAVE SITE NEAT AND ORDERLY ON COMPLETION OF DEMOLITION WORK.
ADDITIONAL NOTES:
1. EXISTING SYSTEMS WHICH ARE TO REMAIN, SHALL BE PROTECTED DURING
DEMOLITION PROCESS AND MUST REMAIN IN WORKING CONDITION THROUGHOUT DEMOLITION
PROCESS (IE, FIRE ALARM, FIRE SPRINKLERS, AND OTHER SYSTEMS NOT BEING REMOVED)
2. LIFE SAFETY SYSTEMS, GENERAL BUILDING SYSTEMS, STRUCTURAL MEMBERS,
EXTERIOR WINDOWS OR DOORS ARE NOT TO BE REMOVED OR DAMAGED.
REFER TO MEP DEMO PLANS FOR ADDITIONAL INFORMATION
\I
REMOVE EXISTING BAR. REMOVE ALL
EQUIPMENT AND PROPERLY
CAP /SEAL/TERMINATE ALL UTILITY
CONNECTIONS AS REQUIRED.
a
P
REMOVE FINISHES —"
l REMOVE ALL COLUMN
I DECORATIVE FINISHES AND LEAVE
1 THE COLUMN STRUCTURE EXPOSED
REMOVE ALL COLUMN
DECORATIVE FINISHES
AND LEAVE THE COLUMN
/&
STRUCTURE EXPOSED
REMOVE EXISTING PARTITION AND FIXED SEATING.���
ti
ti
ALL FLOOR FINISHES TO BE REMOVED THROUGHOUT � o
LJ CREATE NEW 5` 6" W X 7" 0°
HIGH OPENING IN EXISTING
REMOVE EXISTING PARTITION AND DOOR GYPSUM WALL BOARD METAL
FRAMED WALL
p
I
i
f
FF�
ff g
f
I I DEMOLITION PLAN
I I SCALE: 1/8" = 1 `-O"
NOTE: NO EXTERIOR WORK UNDER THIS PERMIT
REMOVE FINISHES
DEMOLISH THIS PORTION OF EXISTING PARTITION
REMOVE WALL DECORATIVE FINISHES. REPAIR
BASE WALL TO MAINTAIN I HR FIRE RATING, AS
7 REQUIRED /
/
5 " -6"
it
t '/
1) �— REMOVE DOOR AND FRAME
THE FBlEQW1%E0 UFE SATIETY AT TIME o FOCCUPANCY:
SHALT BE PftQYID
06 z0
W 0
mW"
o�v
LU aJ
I mod
C VLU
4�
.� 7
ILL
Q �p
O
4
C �e
W
z
c
c
0
U
0 Co
CIO
W CY)
W Q
W °
W
cc
O
U—
L..�..
C[: � W
C/)
W o
W
VJ z
0 D
{. r C0
r
o
rl-
U
N
'a
a.
Architect:
j�
° C -LA Q
�vc ; J GE.EbUAF}00 GON7nf F7 4 A`j
Y. AR 51 J IE} 5595.0 LEES AP. `
^ram,.
7 ;Revisions.
1 � 2 � 3 � 4 ( 5 � 6 ( 7 � 8 � 9 � 10 I 11 12 1 13 1 14 1 15 1 16 � 17
Project No.
05/7/2013
Date:
Author
Drawn / Checked
D 1