Loading...
13-518-001. - -- A ANCHOR HORIZ HORIZONTAL A/C AIR CONDITIONING N.B. HOSE BIBB ACOUST ACOUSTICAL I.D. INTERIOR DIMENSION ACP ACOUSTICAL CEILING PANEL INSUL. INSULATION AH H. ABOVE FINISH FLOOR INTERM INTERMEDIATE AL OR ALUM ALUMINUM JAN. JANITOR ANOD. ANODIZE MANUF. MANUFACTURER BD BOARD MAT MATERIAL BLK'G BLOCKING MAX MAXIMUM BLK BLOCK MIN. MINIMUM CEM CEMENT MTL METAL CER CERAMIC N.I.C. NOT IN CONTRACT C.J. CONTROL JOINT NEOPR NEOPRENE CLG CEILING O.D. OUTSIDE DIMENSION COL COLUMN O.C. ON CENTER CONC. CONCRETE O.S. OVERFLOW SCUPPERS CONT. CONTINUOUS PTN PARTITION COVER'G COVERING Pi PANEL JOINT DBL DOUBLE PL PLATE DIM DIMENSION L.P. LIGHT POLE DET DETAILS PLYWD PLYWOOD E.A. EACH PNL PANEL ELECT /ELEC ELECTRICAL PLAM PLASTIC LAMINATE EL. ELEVATION P.T. PRESSURE TREATED ELEV. ELEVATOR REINF. REINFORCING EXH. EXHAUST REQ'D REQUIRED EXIST EXISTING RM ROOM EXP. EXPANSION R.D. ROOF DRAIN EXT. EXTERIOR SHT SHEET F.D. FLOOR DRAIN SCH SCHEDULE F.E. FIRE EXTINGUISHER S.S. STAINLESS STEEL FIRE EXT. CAB. FIRE EXTINGUISHER CABINET STL STEEL F.O.I.C. FURNISHED BY OWNER, STD. STANDARD INSTALLED BY CONTRACTOR SECT SECTION FLUOR FLUORESCENT SIM SIMILAR FIN. FINISH SPECS SPECIFICATIONS GA GAUGE STRUCT STRUCTURE GWB GYPSUM WALL BOARD SCWD SOLID CORE WOOD GYP. BD. GYPSUM BOARD TEL TELEPHONE GALV. GALVANIZED TEMP TEMPERED GS GALVANIZED STEEL VCT VINYL COMPOSITION TILE GL GLASS VERT VERTICAL HM HOLLOW METAL VEST. VESTIBULE HT HEIGHT SYMBOLS: NORTH ARROW _1� A .� ft COLUMN REFERENCE GRIDS - 1 COLUMN REFERENCE NUMBER A WALL SECTION _.` `4 A1.1;° 1Y*f., I1W6J 1 SHT. ON WHICH DETAIL IS SHOWN OR SHT. ON WHICH DETAIL IS CALLED OUT SECTION NO. A BUILDING SECTION A SHT. ON WHICH SECTION SHOWN OR A1.1 SHT. ON WHICH SECTION IS CALLED OUT (PLAN, ELEVATION) 1 — WALL TYPE MILLWORK ELEVATIONS 4 ELEVATION NO. 3` 1 2 Qom. SHEET ON WHICH ELEVATION IS SHOWN 1 DOOR No. OA WINDOW TYPE ROOM NAME ROOM NAME 101 ROOM No. ELEVATION _ NGVD RELATED KEYED NOTE - NEW WORK /A'°, KEYED NOTE - DEMOLITION GENERAL NOTES: 1. THE CO NTRACT O R SHALL VISIT THE PREMISES AND THOROUGHLY FAMILIARIZE HIMSELF WITH ALL DETAILS OF H T E WORK AND WORKING CONDITIONS, VERIFY ALL DIMENSIONS IN THE FIELD, AND ADVISE THE ARCHITECT / ENGINEER OF ANY DISCREPANCIES BEFORE PERFORMING THE WORK. 2. THE CONTRACTOR SHALL PERFORM ALL WORK REQUIRED UNDER THIS CONTRACT FOR A COMPLETE INSTALLATION AND IN SUCH MANNER THAT SURFACES NOT AFFECTED BY REMOVAL OF EXISTING OR FROM NEW WORK SHALL REMAIN UNDISTURBED AND NORMAL ACTIVITIES AT THE INSTALLATION MAY CONTINUE WITH THE LEAST POSSIBLE INTERFERENCE. ALL DEBRIS SHALL BE REMOVED FROM THE SITE OF THE WORK AT THE END OF EACH WORKING DAY. MATERIALS AND EQUIPMENT SHALL BE STORED ONLY AT LOCATIONS APPROVED BY THE ARCHITECT / ENGINEER AND OWNER'S REPRESENTATIVE. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF THE STRUCTURES AND PERSONNEL DURING THE WORK UNDER THIS CONTRACT. ALL ALTERING, CUTTING, DRILLING OF PAVEMENT, FLOOR AND OTHER MODIFICATIONS SHALL BE NEATLY AND CAREFULLY DONE BY SKILLED MECHANICS. XRAYS OF SLAB MUST BETAKEN PRIOR TO MAKING ANY PENETRATIONS TO ENSURE EXISTING REINFORCEMENT WILL NOT BE DISTURBED. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO EXISTING WORK, MATERIALS AND EQUIPMENT AS A RESULT OF HIS OPERATIONS. ALL DAMAGED WORK SHALL BE REPAIRED OR REPLACED WITH MATERIALS OF LIKE TYPE, QUALITY AND FINISH BY SKILLED MECHANICS OF THE TRADES INVOLVED AT NO ADDITIONAL COST TO THE OWNER AND TO THE FULL SATISFACTION OF THE ARCHITECT / ENGINEER. 5. DISPOSAL OF ALL MATERIAL NOT SPECIFIED OR SHOWN TO BE SALVAGED AND / OR REUSED RESULTING FROM REMOVAL OPERATIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL COSTS IN CONNECTION WITH DISPOSING OF THE MATERIALS WILL BE AT THE CONTRACTOR'S EXPENSE. ALL LIABILITY OF ANY NATURE RESULTING FROM THE DISPOSAL OF THE MATERIALS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 6. CONTRACTOR SHALL PROVIDE AND MAINTAIN ACCESS TO ALL EXISTING FACILITIES AND THOSE UNDER CONSTRUCTION IN THE IMMEDIATE VICINITY, AT ALL TIMES DURING CONSTRUCTION OF PROPOSED PROJECT. 7. CONTRACTOR SHALL INSTALL SECURITY FENCING AND BARRICADES AS REQUIRED BY THE LOCAL AUTHORITIES AND /OR DIRECTED BY THE ARCHITECT / ENGINEER. 8. VERIFICATION OF EXISTING CONDITIONS: EACH CONTRACTOR SHALL DETERMINE AND VERIFY ALL DIMENSIONS AND CONDITIONS AT THE BUILDING SITE AND SHALL BE RESPONSIBLE FOR SAME BEFORE COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT AND /OR ENGINEER AND SHALL BE RESOLVED BEFORE RESUMING THE WORK. DIMENSIONS SHALL BE READ AND NEVER SCALED OR ESTIMATED FROM THE ARCHITECTURAL DRAWINGS. 9. CODE COMPLIANCE: EACH CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE, 2010 EDITION AND WITH ALL OTHER CODES AND GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER HIS PORTION OF THE WORK. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES AND FOR SAFETY PRECAUTION AND PROGRAMS IN CONNECTION WITH HIS PORTION OF THE WORK. 10. EXAMINATION OF THE CONTRACT DOCUMENTS AND SITE: EACH CONTRACTOR FOR THIS PROJECT SHALL STUDY AND FAMILIARIZE HIMSELF WITH THE SITE AND WITH ALL THE DRAWINGS FOR ALL TRADES AND PARTS OF THE WORK. SHOULD ANY CONTRACTOR HAVE THE OPINION THAT THERE EXISTS IN THE ARCHITECTURAL DRAWINGS ANY ERRORS OR DISCREPANCIES, OR THAT CONDITIONS OF THE WORK OF ANY OTHER CONTRACTOR IS SUCH THAT IT WILL PREVENT HIM FROM COMPLETING HIS WORK IN A COMPETENT MANNER, HE SHALL NOTIFY THE ARCHITECT OF SUCH BEFORE PROCEEDING WITH HIS WORK. 11. THE CONTRACTOR SHALL HAVE AT THE BUILDING SITE, FROM START TO FINISH OF CONSTRUCTION, A RESPONSIBLE FOREMAN. IN ADDITION, THE CONTRACTOR SHALL GIVE HIS PERSONAL SUPERVISION TO THE WORK. THE FOREMAN SHALL BE ON DUTY DURING ALL WORKING HOURS. ANY INSTRUCTIONS OR NOTICES GIVEN TO HIM SHALL HAVE THE SAME IMPORTANCE AS IF GIVEN TO THE CONTRACTOR IN PERSON. 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TEMPORARY PROVISIONS SUCH AS TOILETS, WATER SUPPLY, LIGHT AND POWER AS WELL AS ANY OTHER DEEMED NECESSARY FOR THE COMPLETION OF THE PROJECT. COORDINATE WITH OWNER THE USE OF EXISTING FACILITIES DURING THE PROJECT. 13. ANY ITEM OF WORK NECESSARY TO THE PROPER COMPLETION OF CONSTRUCTION WHICH IS NOT SPECIFICALLY COVERED IN THESE DOCUMENTS SHALL BE PERFORMED IN A MANNER DEEMED GOOD PRACTICE OF THE TRADE INVOLVED. 14. PERMITS, FEES AND TAXES: THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES LICENSES AND DEPOSITS AND BE LIABLE FOR ALL STATE AND FEDERAL SALES TAXES, AND ALL OBLIGATIONS UNDER THE FEDERAL SECURITY ACT. UPON COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL OBTAIN CERTIFICATES OF COMPLIANCE, APPROVAL OR ACCEPTANCE FROM ALL AUTHORITIES HAVING JURISDICTION OVER THE WORK AND DELIVER THESE CERTIFICATES TO THE OWNER ALONG WITH OFFICIAL RECEIPTS FOR THE SAME. 15. PERFORMANCE OF WORK: NO SUBCONTRACTOR SHALL BEGIN HIS WORK UNLESS THE PREVIOUS TRADES, UPON WHOM HE IS DEPENDENT, HAS PERFORMED THEIR WORK SATISFACTORILY ACCORDING TO THE PLANS AND SPECIFICATIONS. ONCE THE CONTRACTOR HAS STARTED HIS WORK, HE ASSUMES FULL RESPONSIBILITY FOR THAT WORK, BOTH FOR MATERIALS AND LABOR PERFORMED. ALL SUBCONTRACTORS ARE RESPONSIBLE FOR REMOVING DEBRIS RESULTING FROM THEIR WORK FROM THE PREMISES. 16. CLEANUP: IN ADDITION TO THE REMOVAL OF ALL CONSTRUCTION DEBRIS FROM THE PREMISES, IT IS THE FINAL RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ALL SMUDGES, SPOTS OF PLASTER, PUTTY, CAULKING COMPOUND, ADHESIVE, PAINT AND PENCIL MARKINGS, TAGS AND DESTINATION LABELS NOT CALLED FOR AS BEING PERMANENT. THE CONTRACTOR SHALL ALSO CLEAN EACH AREA SEPARATELY, INCLUDING THE WASHING OF ALL WINDOWS AND VACUUMING OR WAXING OF ALL FLOORS, PRIOR TO HANDING THE COMPLETED PROJECT OVER TO THE OWNER. 17. MATERIALS: ALL MATERIALS SHALL BE NEW, AS CALLED FOR IN THE DRAWINGS, AND THE BEST OF THEIR RESPECTIVE KINDS. NO SUBSTITUTIONS SHALL BE MADE BY THE CONTRACTOR WITHOUT PRIOR WRITTEN APPROVAL BY THE OWNER, UNLESS SPECIFIED OTHERWISE ON THE DRAWINGS. FOR PORTIONS OF THE WORK NOT SHOWN IN DETAIL, BUT WHICH ARE SHOWN GENERALLY, OR ARE REASONABLY INFERABLE AS BEING REQUIRED FOR A COMPETENT AND COMPLETE INSTALLATION, THE MATERIAL METHODS AND WORKMANSHIP SHALL CONFORM AS A MINIMUM TO THE TYPICAL OR REPRESENTATIVE. 18. CUTTING AND PATCHING: EACH CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CUTTING, FITTING, PATCHING AND MATCHING OF HIS NEW WORK TO EXISTING WORK WHERE APPLICABLE AND INDICATED IN THE DRAWINGS. NO CONTRACTOR SHALL ENDANGER ANY WORK OF ANY OTHER CONTRACTOR BY EXCAVATING CUTTING OR OTHERWISE ALTERING ANY WORK OF ANY OTHER CONTRACTORS. 19. PRIOR TO BEGINNING WORK, GC IS TO OBTAIN, BECOME FAMILIAR AND FOLLOW ANY AND ALL CONSTRUCTION GUIDELINES, RULES AND REGULATIONS FROM THE OWNER AND /OR CONDOMINIUM OFFICE, SO LONG AS SUCH GUIDELINES ARE NOT IN CONFLICT WITH FBC 2007 OR LOCAL JURISDICTION. IF GC DETECTS DISCREPANCIES BETWEEN CONDO GUIDELINES AND LOCAL CONSTRUCTION REGULATIONS, GC MUST INFORM ARCHITECT, CONDO OFFICE AND OWNER IN WRITING IN ORDER TO REACH A RESOLUTION PRIOR TO PROCEEDING WORK. 20. DEMOLITION: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF DEBRIS REQUIRED TO COMPLETE THE CONSTRUCTION AS SPECIFIED ON THE DRAWINGS. EXISTING UNUSED ELECTRIC AND PLUMBING SHALL BE REMOVED OR ADEQUATELY CAPPED AS ALLOWED BY CODE. 21. DEMOLITION NOTES ARE A GENERAL OUTLINE OF ITEMS TO BE REMOVED. HOWEVER, ANY ITEMS IN THE WAY OF NEW CONSTRUCTION MUST BE REMOVED AND DISCARDED IN ORDER TO INSTALL NEW PRODUCTS. FUTURE SITE OF BROTHER JIMMY'S BBQ (FORMERLY DAN MARINO'S TAVERN) LOCAT N.T.S. ;> r m- ----- - C ST 0 5701 SUNSET DRIVE I MIAMI, FLORIDA 33143 DRAWING LIST ARCHITECTURAL SHEETS: A0.0 COVER PAGE, GENERAL NOTES, LEGENDS D1.0 DEMOLITION FLOOR PLAN, GENERAL NOTES MEP SHEETS: E1.0 ELECTRICAL DEMO SHEET REFERENCE SHEETS: R -1 FOR REFERENCE - EXISTING POWER PLAN R -2 FOR REFERENCE - EXISTING SPRINKLER PLAN R -3 FOR REFERENCE - EXISTING PLUMBING PLAN ION MAP R-4 FOR REFERENCE - FUTURE SEATING LAYOUT LEGAL DESCRIPTION: CARVERS SUB PB 6 -36 ALL BLK 1 LESS E & S35FT OF LOTS 16 & 19 LYG E OF 18 & LOT 18 & PORT LOT 33 PER DB 3860 -556 & ALL BLK 2 LESS LOTS 14 THRU 16 FOLIO # 09- 4025 - 031 -0060 ZONING: SR - SPECIALTY RETAIL OCCUPANCY A2 GENERAL AREAS: INTERIOR: +/- 6,420SF ALTERATION -LEVEL 2 AS PER SECTION 404, EXISTING BUILDINGS CODE 404.1 SCOPE. LEVEL 2 ALTERATIONS INCLUDE THE RECONFIGURATION OF SPACE, THE ADDITION OR ELIMINATION OF ANY DOOR OR WINDOW, THE RECONFIGURATION OR EXTENSION OF ANY SYSTEM, OR THE INSTALLATION OF ANY ADDITIONAL EQUIPMENT. SCOPE OF WORK: 1. PARTIAL DEMOLITION OF VARIOUS DECORATIVE AND NON STRUCTURAL ELEMENTS OF EXISTING BUILD OUT AS EXPLORATORY MEASURES AND IN PREPARATION FOR FUTURE WORK (UNDER SEPARATE PERMIT). PARTIAL DEMOLITION IS IN PREPARATION FOR FUTURE REMODELING OF EXISTING RESTAURANT (UNDER SEPARATE PERMIT) SUBMITTAL: PARTIAL DEMO SET 05/7/2013 PROJECT #P120928 OA PROJECT #P120928