13-1255-004•,
♦ ,•" EralmrMy
MATERIALS
NOMINAL r RETARDANT r
F
1. :O.r r RETARDANT r r
2. r. - 3/4" FIRE RETARDANT TREATED.
OOD AND PLASTIGS
r r _
THERMAL AND
MOISTURE PROTEGT I ON
2 - WINDOWS
A. THE WORK INCLUDED IN TH15 SUBCONTRACT SHALL BE PERFORMED
AGGORDING TO THE GENERAL GONDITION5 AND REQUIREMENTS
WHICH ARE STATED ON THIS SET OF DRAWING5.
8. GLAZING CONTRAGTOR TO INSTALL ALL GLASS, AND GLAZING
IN ACCORDANCE WITH MANUFAGTURER'5 IN5TRUGTION5 AND
RECOMMENDATION. GLAZING CONTRACT TO FIELD VERIFY ALL
MEASUREMENTS FOR 6LA55 AND FITTINGS PRIOR TO ORDERING.
ALL GLAZING WORK SHALL BE PERFORMED IN ACCORDANCE
WITH "GODE OF FEDERAL RE6ULATION5 GOMMERCIAL
PRAGTIGE5 - 16; 5UBCHAPTER "B" OF CONSUMER PRODUCT
SAFETY ACT RE6ULATION5 PART 1201 "5AFETY 5TANDARD5 FOR
ARCHITECTURAL GLAZING MATERIALS" AND LOGAL CODES.
EACH UNIT OF LAMINATED GLA55 SHALL BE
PERMANENTLY IDENTIFIED BY THE MANUFACTURER.
G. ALL MIRRORS AND GLA55 IN 5ALE5 AREAS TO HAVE POLISHED
EDGE5 AS REQUIRED. SECURE MIRRORS WITH MA5TIG OR AS
REQUIRED. GLAZING CONTRACTOR TO ALSO PROVIDE AND INSTALL
"J " CHANNEL TRIM, BREAK METAL, CLIPS, ETG. AS REQUIRED
AND AS DETAILED FOR SAME MIRROR. SEAL EDGE OF SPACE
BETWEEN BACKS AND MIRROR AND WALL5 WITH SILICONE.
FINISHES
6YP5UM DRYWALL 5Y5TEM
I - GENERAL..
A. THE WORK INCLUDED IN TH15 SUBCONTRACT SHALL BE PERFORMED
AGGORDING TO THE GENERAL CONDITIONS AND REQUIREMENTS WHIGH ARE
ARE STATED ON TH15 SET OF ORAWIN65 AND LANDLORD AND TENANT'S
CONSTRUCTION CRITERIA MANUALS AND SPECIFICATIONS.
B. COORDINATE TH15 WORK WITH THE RELATED WORK OF OTHERS WHIGH
INCLUDES BUT 15 NOT NEGE55ARILY LIMITED TO THE FOLLOWING:
A. 05 - METALS
B. 06 - WOOD
G. FURNISH AND INSTALL ALL DRYWALL MATERIALS, AGGE55ORIE5 AND
PRODUCTS REQUIRED TO PROVIDE A COMPLETE INSTALLATION, INGLUDING,
BUT NOT LIMITED TO GYPSUM DRYWALL ON EXISTING DEM151NG WALLS,
INTERIOR PARTITIONS, 50FFIT5, FASCIAS AND GYPSUM WALLBOARD
USED AS SUBSTRATES FOR OTHER MATERIALS.
D. APPLIGATION PROGEDURE5 AND WORKMAN5HIP SHALL BE IN ACCORDANCE
WITH GA -216 AND A5TM G540.
2 - PRODUCTS AND MATERIALS
A. GYPSUM DRYWALL PANELS
1. FIRE RE515TANT - 5/8" THICK WITH A TYPE "X" CORE, EQUAL TO
GOLD BOND FIRE - SHIELD WITH 5TA- 5MOOTH ED6E5.
2. M015TURE RE515TANT - FOR APPLICATION IN NET AREAS AND FOR
USE AS A SUBSTRATE FOR AREAS DESIGNATED TO RECEIVE TILE, NON -
AB5ORBENT FIN15H MATERIALS AND 51MILAR PRODUCTS, USE 5/5" THICK
GYPSUM WALLBOARD EQUAL TO GOLD BOND MR FIRE - SHIELD G WITH
GREEN PAPER FACES AND TAPERED E06E5.
B. JOINT TREATMENT
I. JOINT TAPE -PAPER
2. JOINT COMPOUND - FAST HARDENING TYPE EQUAL TO GOLD BOND
5TA - 5MOOTH.
G. AGGE55ORIE5
1. CORNER BEADS - I -I/8" x 1 -1/5" GALVANIZED METAL, CRIMPED TO
ALL WALLBOARD CORNERS.
2. CORNER BEADS - 1 -1/4" x 1 -1/4" GALVANIZED METAL FOR DOUBLE
LAYERED WALL5.
3. GA51146 BEADS - GALVANIZED METAL
D. INTERIOR PAINT5
MANUFACTURED BY 5HERWIN WILLIAM5 OR APPROVED ALTERNATE, BY
DESIGN ARCHITECT.
E. PAINT CONTRACTOR TO APPLY ONE (1) GOAT LATEX PRIMER AND
A MINIMUM OF TWO (2) COATS OF SPECIFIED PAINT TO PROVIDE
AN EVEN FINISH GOAT FREE OF RUNS OR 5AG5.
I. WALL/DRYWALL
PRIME: ONE (1) GOAT QUICK DRY PRIME 5EAL
FINISH: TWO (2) GOATS ALKYD PAINT
2. WOOD TRIM
PRIME: ONE (1) GOAT ALKYD ENAMEL UNDER BODY
FINISH: TWO (2) GOATS 5EMI -GLO55
F. PAINT CONTRACTOR SHALL 5TENGIL PAINT ALL ROOF UNITS,
FANS, 5WITGHES, ETC. WITH NAME AND NUMBER OF TENANT
STORE AS 50ON AS IT 15 INSTALLED IN A MANNER AND COLOR
APPROVED BY LANDLORD AND /OR OWNER. AS REQUIRED.
3 - FABRICATION AND INSTALLATION
A. INSTALL 5Y5TEM FREE OF WAVE5, BUCKLES AND UNEVENNESS.
B. EXPO5ED TO VIEW - ALL JOINTS, HOLES AND DEPRESSIONS VISIBLE
BELOW THE GEILING LINE SHALL BE FILLED, FLOATED, SANDED
SMOOTH AND MADE READY TO RECEIVE PAINT PRIMER.
G. CONGEALED LOCATIONS - ALL JOINTS, HOLES AND DEPRESSIONS
CONCEALED ABOVE GEILING LINES AND BEHIND PERMANENT FIXTURES
SHALL BE FILLED AND TAPED.
D. EXTENT ABOVE GEILIN65 - GYPSUM WALLBOARD SHALL EXTEND A
MINIMUM OF 6" ABOVE THE ADJACENT GEILING LINE.
AT DEMISING WALLS, DRAFT STOP PARTITIONS AND FIRE- 5EPARATION WALL5,
THE GYPSUM WALLBOARD SHALL EXTEND FULLY TO THE UNDERSIDE
OF THE STRUCTURAL DECK ABOVE, UL DESIGN #U456.
E. GYPSUM WALLBOARD SHALL BE INSTALLED WITH ALL
CORNER BEADS, TRIM, ACCESSORIES AND MOLDING5, ETC. AS
REQUIRED FOR COMPLETION, TAPED AND SANDED READY FOR
PAINT BY DRYWALL CONTRACTOR. REPAIR AND PATCH
EXISTING WALL5 AS REQUIRED TO ACCEPT NEW FINISHES.
FLOOR F I N 15HE5
I - GENERAL
A. THE WORK INCLUDED IN TH15 505GONTRAGT SHALL BE PERFORMED
AGCORDING TO THE GENERAL 6ONDITION5 AND REQUIREMENTS WHIGH
ARE STATED ON TH15 SET OF DRAWINGS AND LANDLORD AND TENANT'S
CONSTRUCTION CRITERIA MANUALS AND 5PEGIFIGATION5.
B. COORDINATE TH15 WORK WITH THE RELATED WORK OF OTHERS
WHIGH INCLUDES BUT 15 NOT NEGE55ARILY LIMITED TO THE FOLLOWING:
A. CONCRETE
G. EXTENT OF FLOORING WORK 15 INDICATED ON PRANINC75 AND SCHEDULES.
D. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVIGE5 NEGE55ARY TO
THE EXECUTION AND COMPLETION OF FLOOR FIN15H APPLICATIONS AND
IN5TALLATION5 IN ACCORDANCE WITH THE DRANINC75 AS HEREIN SPECIFIED.
E. G.G. TO INSTALL ALL FLOORING IN ACCORDANCE
WITH MANUFACTURES 5PEGIFIGATION5. G.G. TO COVER FIN15H FLOOR
WITH MA50NITE UNTIL ALL CONSTRUCTION 15 COMPLETE. COORDINATE
WITH TENANT REPRESENTATIVE.
F. VINYL TILE: DURING DRYING TIME OF ADHESIVE THERE
SHOULD BE NO FURNITURE OR HEAVY TRAFFIG ON THE FLOOR.
AL50 DO NOT WASH TILE DURING TH15 PERIOD. AFTER 45
HOUR5 FLOOR TO BE WASHED WITH A NEUTRAL FLOOR GLEANER,
PROPERLY DILUTED. RINSE FLOOR WITH GLEAN WATER AND
ALLOW TO DRY. THEN APPLY AT LEAST THREE (3) GOATS OF
APPROVED FLOOR FINISH. GLEAN 5URFAGE WITH A NEW MOP
FOLLOWING APPLICATION INSTRUCTIONS.
ARGH I TEGTURAL SPEG I F I GAT IONS
G. TH15 CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION FOR
ALL FINISHED FLOORS DURING CONSTRUCTION. IN PARTICULAR ALL
FLOORS SHALL BE PROTECTED AS FOLLOWS PRIOR TO THE
ARRIVAL OF STORE FIXTURES. WOOD FLOORS SHALL BE COVERED
COMPLETELY WITH 70 LB. KRAFT PAPER. CARPET SHALL BE
GOVERED WITH 4 MIL V15QUEEN. GERAMIG TILE SHALL BE
COVERED WITH 1/4" PLYWOOD.
2 - INSTALLATION
A. SURFACE PREPARATION:
1. INSTALLATION FOR ALL ITEMS ARE TO BE IN AGGORDANGE WITH EACH
MANUFAGTURER'5 5TANDARD5, 5PEGIFIGATION5 AND INSTRUCTIONS.
2. GENERAL CONTRACTOR REQUIRED TO PERFORM A MOISTURE TEST ON
SUBFLOOR PRIOR TO INSTALLATION OF FINISHED FLOOR MATERIAL.
IF M015TURE CONTENT MEASURES 5% OR GREATER ON THE M015TURE
TEST, FLOOR MUST HAVE VAPOR BARRIER.
3. IMMEDIATELY PRIOR TO INSTALLATION OF THE WORK, GLEAN
SUBSTRATE AND REMOVE OIL, GREASE, PAINT, VARNISH,
HARDENERS, AND OTHER ITEM5 WHIGH COULD ADVERSELY
AFFECT THE BOND OF ADHESIVE.
4. MAKE SUBSTRATE LEVEL AND FREE FROM IRREGULARITIE5.
AGOU5TI GAL PANEL GEILING
A. SUSPENSION SYSTEM SHALL BE ADEQUATE TO RECEIVE, BUT NOT
SUPPORT, LIGHT FIXTURES, GEILING, 6RILLE5, DIFFUSERS, AND OTHER
NORMAL ACCESSORIES, COMPLY WITH A5TM G635.
B MINERAL COMPOSITE PANEL - NET FORMED MINERAL FIBER WITH
STANDARD WASHABLE PAINTED FINISH: PROVIDE TYPE 111, FORM 2
UNITS, PER A5TM E1264.
G FURNISH AND INSTALL GEILING SYSTEM COMPLETE WITH SUSPENSION
SYSTEM AND RELATED ACCESSORIES, AS 5HOWN ON DRAWIN65.
INSTALL CEILING AND SUSPENSION SYSTEMS IN STRICT ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS. FIN15H GEILING SHALL BE
.LEVEL WIT ALL JOINTS SNUG AND5QUARE.
SPEG I ALTI ES
AGGE55ORIE5
I - GENERAL
A. THE WORK INGLUDED IN TH15 SUBCONTRACT SHALL BE PERFORMED
ACCORDING TO THE GENERAL CONDITIONS AND REQUIREMENTS WHIGH
ARE STATED ON THI5 5ET OF DRAWIN(55.
B. COORDINATE TH15 WORK WITH THE RELATED WORK OF OTHERS WHIGH
INGLUDE5 BUT 15 NOT NEGE-55ARILY LIMITED TO THE FOLLOWING:
A. 06 - ROUGH CARPENTRY
G. FURNISH AND INSTALL SPECIALTIES WHIGH INGLUDE BUT ARE NOT
NEGE55ARILY LIMITED TO TOILET ROOM ACCE55ORIE5 AND
MISCELLANEOUS ITEMS.
D. SUBMITTALS - PRODUCT DATA SHEETS FOR PROP05ED 5055TITUTION
SHALL BE SUBMITTED FOR APPROVAL.
2 - PRODUCTS AND MATERIALS
A. TOILET ROOM AGGE55ORIE5
I. MIRROR: GENERIG ADJUSTABLE ANGLE 36 "L x 15 "W. TEMPERED
WITH STEEL FRAME.
2. TOILET PAPER DISPENSER: RESIDENTIAL GRADE, CHROME WITH
PLASTIC INSERT.
3. PAPER TOWEL DISPENSER: RESIDENTIAL GRADE, CHROME WITH
PLASTIC INSERT.
B. FIRE EXTINGUI5HER
BY J.L. INDUSTRIES, TWO (2) - ONE AT GASH WRAP AND ONE IN STOCKROOM.
COSMIC IOE, TYPE - 4A -60BG, OR APPROVED EQUAL.
ROOM MODEL
G. TENANT TO FURNISH AND G.G. INSTALL PORTABLE FIRE EXTINGUI5HER
IN ACCORDANCE WITH IcN4 NFPA 10- 5TANDARD FOR PORTABLE FIRE
EXTINGUI5HER5.
D. STOREFRONT 51GNA6E
I. STOREFRONT SIGNS TO BE PROVIDED AND INSTALLED BY
TENANT'S SIGN CORPORATION. 516N SHALL MEET MUNICIPAL
ORDINANCE AND PROJECT LANDLORD'S CRITERIA. THE SIGN
CONTRACTOR SHALL SUBMIT SHOP DRAWIN65 FOR APPROVAL
TO GNG, THE PROJECT LANDLORD AND THE LOCAL AUTHORITY
AS REQUIRED PRIOR TO FABRICATION AND INSTALLATION OF
SAID SIGNS.
E. M15CELLANEOU5 HARDWARE
I. TOGGLE BOLT5 FOR WALL MOUNTED ITEMS TO BE HILTI TOGGLER
WITH BOLT #5520520" (OR APPROVED EQUAL). PROVIDED
AND INSTALLED BY G.G.
2. STOCK ROOM SHELVING AND STANDARDS TO BE SUPPLIED BY
TENANT, INSTALLED BY G.G., VERIFY SPECIFICATION ON PRODUCT
WITH DE516N ARCHITECT BEFORE INSTALLATION.
3 - INSTALLATION
A. INSTALLATION FOR ALL ITEMS ARE TO BE IN ACCORDANCE WITH EACH
MANUFACTURERS 5TANDARD5, 5PEGIFIGATION5 AND INSTRUCTIONS.
B. ALL ACCESSORIES TO BE MOUNTED AS PER LOCAL AND STATE
HANDICAPPED GODE5. (5EE ADA NOTES).
G. NOTICE THAT PAINT ON THE WALL5 MUST BE COMPLETED FOUR DAYS
PRIOR TO INSTALLATION OF SUCH 6RAPHIG5.
AGGESS PANELS
AGGE55 PANELS
A. FURNI5H AND INSTALL AGGE55 PANELS WHERE INDICATED ON THE
DRAWIN65, REQUIRED BY THE NATURE OF THE PROJECT OR
REQUIRED TO SERVICE EXISTING DEVIGE5 IN THE SPACE. INSTALL
AGGE55 PANELS IN DRYWALL WALL5 AND GEILING5. THE AGGE55
PANELS SHALL BE OF SUFFICIENT 51ZE 50 THAT ALL EQUIPMENT
WILL BE COMPLETELY SERVICEABLE. PANELS SHALL BE PAINTED
TO MATCH THE WALL OR GEILING IN WHIGH THEY ARE LOCATED.
B.
INSTALL METAL AGGE55 PANELS FURNISHED BY OTHER
CONTRACTORS FOR ACCESS TO MECHANICAL OR ELEGTRIGAL
EQUIPMENT. PAINT TO MATCH ADJACENT FINISHES.
�_) MEGHHA III GAL
I - GENERAL
A. CONGEALED 5PRINKLER HEAD TO BE USED IN ALL
HARD GEILIN65.
B. 5EMI- REGE55ED SPRINKLER HEADS TO BE USED IN ALL
DROP GEILING5.
G. ALL SPRINKLER HEADS TO BE WHITE.
4:
Lam: :a° ;Fyn
pa
-A
F=f
u
z
0
i .
r
rr
•
r
1
••
lab
I
w
a
3.
� 1
i
i
i
Stare No. 3 8 3 9
1 • • Date
MWS 10 I
Checked :I 1•
..
Drawing Name:
03839.DTG
Drawing No.
AS-2