13-1255-003IrAw
� 1
10. ALL GEILIN6 CONSTRUCTION (INCLUDING, BUT NOT
LIMITED TO, DROPS, BULKHEADS, LIGHTING, DIFFUSERS, ETC)
SHALL BE REMOVED UNLESS SPECIFICALLY GALLED OUT TO
REMAIN ON DEMOLITION PLAN.
II. THE ELEGTRIGAL GONTRACTOR SHALL REMOVE AND /OR
RELOCATE ALL EXI5TIN6 ELECTRICAL DEVICES, GONDUIT AND
WIRING WORK AS CALLED OUT ON THE DRANIN65 AND AS
NEGE55ARY WHETHER 5UGH ITEMS ARE INDIGATED ON
DRAWINGS OR NOT, IN ORDER TO AGGOMPLI5H THE
INSTALLATION OF THE 5PEGIFIED NEW WORK - EQUIPMENT
MATERIAL AND DEVICES REMOVED SHALL BECOME THE
PROPERTY OF CONTRACTOR (IF APPROVED BY TENANT). SUCH
ITEMS MAY BE REUSED IF 5PEGIFIGALLY DE516NATED ON THE
DRAHIN65, GONDUIT, WIRE AND OUTLET BOXES REMOVED
SHALL BE 5GRAPPED BY THE ELEGTRIGAL CONTRACTOR WHERE
WALLS AND GEILIN65 ARE TO BE REMOVED A5 5HOHN ON THE
DRAHIN65. THE CONDUIT 15 TO BE GUT OFF BY THE
ELECTRICAL GONTRAGTOR 50 THAT THE ABANDONED GONDUIT IN
THESE WALLS AND GEILIN6 MAY BE REMOVED FROM THE
WALLS AND CEILIN65 BY THE DEMOLITION GONTRAGTOR.. ALL
DEAD END CONDUIT RUNS SHALL BE PLUGGED AT THE
REMAINING LINE OUTLET BOXES OR AT THE PANELS.
12. G.G. TO VERIFY ALL EX15TIN6 6RADE5 GORRE5PONDING TO TENANT
DE516N PAGKA6E IN FIELD PRIOR TO CONSTRUCTION.
MODIFIGATION FROGEDURES
51JB5TITUTION5 t GHANGE5
1. DO NOT SUBSTITUTE MATERIALS, EQUIPMENT OR METHODS
UNLE55 50614 5UB5TITUTION HAS BEEN APPROVED 5PEGIFIGALLY IN
WRITING BY THE TENANT.
2. NOTIFY THE TENANT IMMEDIATELY BY TELEPHONE OF ANY HIDDEN,
UNFORESEEN GONDITION5 AND ANY REQUIREMENTS IMP05ED BY THE
LANDLORD NHIGH IMPACT THE WORK.
CONFIRM ALL NOTIFICATIONS AND AGTION REQUIRED IN WRITING
WITHIN 24 HOURS OF THE EVENT.
3. MILESTONE DATE GHANGE5 MUST BE MADE IN NRITING BY TENANT.
4. THE TENANT HAS CHOSEN MATERIALS FOR USE ON THIS
PROJEGT AS 5PEGIFIED. UPON ANARD OF THE CONTRACT, THE
SPECIFIED MATERIALS SHALL BE ORDERED IMMEDIATELY AND
ALL DELIVERIES CONFIRMED TO MEET THE GOMPLETION DATE.
DELAY IN ORDERING, RESULTING IN MATERIALS NOT BEING
AVAILABLE TO THE CONTRACTOR FOR COMPLETION OF ALL WORK
ON SCHEDULE AND RESULTING IN EXTRAS, HILL BE THE
RE5PON51BILITY OF THE TRADE RE5PON51BLE FOR 5UGH
DELAYS. MATERIALS THAT ARE UNAVAILABLE FOR INCLUSION IN
THE PROJECT THAT, AS A RESULT CAUSE DELAYS, REQUIRE THE TENANT
TO GHOOSE AND APPROVE NEW REPLAGEMENT MATERIALS
SATISFACTORY TO THE PROJECT, MAY RESULT IN BAGK GHAR6E5
TO THE SAID TRADE, UNLESS THE TENANT HAS BEEN ADVISED
WITH 5UFFIGIENT TIME TO MAKE SUCH MATERIAL REVISIONS.
DELIVERY OF TENANT - FURNISHED ITEMS: THE
CONTRACTOR HILL ADVISE THE TENANT IN WRITING, NITHIN
SEVEN (7) DAYS AFTER ANARDIN6, THE EXACT DELIVERY
DATES AND LOCATIONS THEY N15H TO REGEIVE ALL FURNISHED
ITEMS. ITEMS NOT SCHEDULED NITHIN SEVEN (7) DAYS WILL
BE SGHEDULED AND DELIVERED AT THE TENANT'S OPTION.
GOORDINATION 0RSGHEDULE
I. THE TENANT'S GONTRACTOR AND EACH 5UBGONTRAGTOR SHALL BE
THOROUGHLY FAMILIAR WITH THE WORK 5HOHN ON THE DRAWINGS
AND ON OTHER GONTRAGT DOGUMENT5.
2. ALL SAID PARTIES ARE TO NOTIFY TENANT IMMEDIATELY
OF ANY D15GREPANGIE5 GONTAINED WITHIN THE CONTRACT DOCUMENTS
PRIOR TO PROGEEDIN6 KITH ACTION NHIGH MAY RE50LT IN "EXTRA"
OR ADDITIONAL G05T TO THE TENANT.
3. EACH 5U5GONTRAGTOR SHALL GOORDINATE THEIR HORK WITH THAT OF
OTHERS AND BE ANARE OF ALL RELATED WORK TO BE PERFORMED
BY OTHERS, VIA THE TENANT'S GONTRAGTOR.
4. THE GENERAL GONTRAGTOR SHALL VERIFY THE
RESPONSIBILITIES OF THE PROJEGT LANDLORD IN RE5PEGT TO
THE EXTENT AND TYPE OF WORK REQUIRED FOR THE STORE.
THE 6ENERAL GONTRACTOR SHALL NOTIFY TENANT OF ANY
DISGREPANGIE5 BETWEEN THE PROJEGT LANDLORD'5
RESPON5IBILITIE5 AND TH05E INDIGATED ON THE DRAHIN65.
THE GENERAL GONTRAGTOR SHALL AL50 COORDINATE THE
INSTALLATION OF THE LANDLORD'S NORK HITH THE PROJEGT
AND ALSO PROVIDE REQUIRED COMPLETION DATES FOR ITEMS
IN THE LANDLORD'S 5GOPE OF WORK TO THE LANDLORD'S
CONTRACTOR.
5. THE CONTRACTOR SHALL, AT ALL TIMES, AFFORD ACCESS TO
THE TENANT LANDLORD AND/OR AGENTS AND EMPLOYEES TO
THE NORK NHEREVER IT 15 IN PREPARATION AND PR06RE55.
THE GONTRAGTOR SHALL PROVIDE FAGILITIE5 NEGE55ARY FOR
5UGH AGGE55 FOR THE TENANT OR LANDLORD TO PERFORM THEIR
FUNGTION5 UNDER THE GONTRAGT DOGUMENT5.
6. G.G. TO ACCOUNT FOR AND INSPECT ALL MILLWORK FIXTURES AND
ASSORTED AGGE55ORIE5 NITHIN 24 HOURS OF DELIVERY TO A55URE
THE CONDITION AND QUANTITY. NOTIFY THE TENANT AND THE
APPROPRIATE D15TRIBUTOR5 WITHIN 24 HOURS IF THE GONDITION
OR QUANTITY OF THE AFOREMENTIONED ITEMS ARE NOT IN ACCORDANCE
WITH THE 5GHEDULE5 AND SPEGIFIGATION5 GONTAINED IN THE
GONTRAGT DOCUMENTS.
-f. THE GENERAL GONTRAGTOR SHALL BE RESPONSIBLE FOR
GOORDINATIN(5 WITH THE TENANT DIVISIONAL
MERGHANDI51N6 MANAGER OR REGIONAL SALES DIREGTOR OR
GONSTRUGTION PROJEGT MANAGER AT THEIR MOST AVAILABLE
DATE HHEN GONSTRUGTION 15 COMPLETE, FOR VISITING THE
JOB 51TE AND DOING THE PUNGH LIST.
8. ALL SUB GONTRAGTOR5 SHALL COORDINATE THEIR WORK HITH THE
NORK OF OTHERS OR HITH EXI5TIN6 CONDITIONS OGGURRIN6
ABOVE OR BELOW THE PREM15E5 AND SHALL MAKE GHAN6E5
FROM TIME TO TIME AS REQUIRED TO AGGOMMODATE 5UGH
WORK OR GONDITION5. ALL GHANGE5 THAT SHALL EFFECT THE
FINAL APPEARANCE OF THE PROJEGT SHALL BE APPROVED IN
ADVANCE BY TENANT.
a. THE PROJEGT LANDLORD'S ROOFING CONTRACTORS WILL, AT
SUB TRADES' WRITTEN REQUEST AND COSTS, PROVIDE
OPENIN65, ANCHORING DEVICES, CURBS, FLASHING,
PATCHES, ETG. AS REQUIRED FOR EQUIPMENT. ALL SUB-
TRADES TO INGLUDE THE G05T OF ALL 5UGH WORK IN THEIR
PROPOSALS. (A5 REQUIRED).
10. GONTRAGTOR HILL GONTAGT FIXTURE AND MATERIAL SUPPLIERS
TO SCHEDULE ALL DELIVERIES.
ARGHITEGTURA m
R EOULATORY REOU I REMENTS
1. COMPLY WITH THE 5TATE AND LOCAL CODES - REFER TO SHEET 65--1
FOR BUILDING GODS REQUIREMENTS.
2. ALL TRADES AND SUB SHALL BE RE615TERED WITH
THE CITY, COUNTY, STATE AND AUTHORITIES AS REQUIRED.
3. THE 6ENERAL CONTRACTOR SHALL BE RE5PON51BLE FOR
OBTAINING A CERTIFIGATE OF OCCUPANCY FROM THE
60VERNIN6 AUTHORITY.
4. ALL TRADES SHALL GONFORM WITH ALL APPLICABLE
FEDERAL, STATE, MUNICIPAL, PROJECT MALL DEVELOPER
AND/OR BUILDING, TENANT AND 0.5.H.A. CODES, RULES AND
REGULATION.
5. G.G. TO SUBMIT PLANS TO LOCAL HEALTH DEPT. FOR APPROVAL.
SI EG I AL REOU I R EMENTS
I. WORK SHALL BE COMPLETED IN A TIMELY MANNER, GON515TENT WITH
THE TENANT APPROVED CONSTRUCTION SCHEDULE.
2. THE SUPERINTENDENT WILL BE REQUIRED TO MAINTAIN A
DAILY JOURNAL OF EVENTS WHICH SHALL INGLUDE WORK
PERFORMED, NUMBER OF NORKER5, OF EAGH TRADE ON JOB,
CONSTRUCTION GHAN6E5, TELEPHONE GALLS, ETC. JOURNAL TO
BE PROVIDED TO THE TENANT AT END OF GONSTRUGTION.
3. THE GONTRAGTOR SHALL BE RESPONSIBLE TO THE TENANT
FOR ACTS AND OM15510N5 OF HI5 EMPLOYEES, 5UB-
GONTRAGTORS AND THEIR A6ENT5 AND EMPLOYEES, AND OTHER
PERSONS PERFORMIN6 ANY OF THE HORK UNDER A GONTRAGT
KITH THE CONTRACTOR.
4. THE CONTRACTOR A6REE5 THAT IN THE PERFORMANCES OF
THE WORK GALLED FOR BY THE CONTRACT AND GONTRAGT
DRAHIN65, WILL ONLY EMPLOY 5UGH LABOR AS NOT TO DELAY
OR INTERFERE KITH THE SPEEDY AND LAWFUL PR06RES5 OF
THE PROJEGT AND AS HILL BE AGGEPTABLE TO AND WORK IN
HARMONY KITH ALL OTHER NORKER5 EMPLOYED ON THE
GONSTRUGTION SITE OR ON ANY OTHER BUILDIN6, STRUCTURE
OR OTHER IMPROVEMENT NHETHER PUBLIC OR PRIVATE
NHIGH THE 6ENERAL CONTRACTOR MAY THEN BE EREGTING OR
ALTERING.
5. CONTRACTOR'S 516N5 MAY NOT BE D15PLAYED ON BARRICADES.
6. BUILDING DOORS ARE NOT TO BE PROPPED OPEN BY
GONSTRUGTION HOR.KER5 AT ANY TIME.
7. THERE HILL BE NO STORAGE OF MATERIALS OR RUBBISH IN
CORRIDORS OR OTHER TENANT AREAS AT ANY TIME. IF DEBRI5 15
FOUND IN THESE AREAS, IT HILL BE REMOVED AT THE
EXPENSE OF THE GONTRAGTOR RESPONSIBLE.
8. MATERIALS AND EQUIPMENT SHALL BE STORED AND
INSTALLED IN AGGORDANGE HITH MANUFAGTURER'S
INSTRUCTIONS, KITH 5EAL5 AND LABELS INTACT AND LEGIBLE.
SHOULD A CONFLICT OR D15GREPANGY EXI5T BETWEEN
MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS,
AND TH05E ON THE DRANIN65, THE GENERAL CONTRAGTOR
SHALL GONTAGT TENANT PRIOR TO FURTHER WORK IN THE AREA
OF QUESTION.
Q. THE CONTRACTOR A6REE5 TO AGGEPT ALL TENANT
FURNISHED ITEMS AT THE JOB 51TE OR DESIGNATED 5TORA6E
5PAGE AND UNLOAD THESE ITEMS FROM THE DELIVERY
TRANSPORT TO STORE PREMISES. ITEMS DELIVERED TO A
DE516NATED STORAGE 5PAGE SHALL BE DELIVERED BY
6ENERAL CONTRACTOR.
10. THE GENERAL GONTRAGTOR 5HALL BE RE5PON51BLE FOR
5EGURITY OF THE PROJEGT AND MATERIALS, NHETHER STORED
NITHIN THE PREMISES OR ELSEHHERE UNTIL THE POINT OF
GOMPLETION. THI5 SHALL INGLUDE ALL TENANT
AND LANDLORD - FURNISHED ITEMS ACGEPTED BY THE
GONTRAGTOR.
r �
I. THE GENERAL CONTRACTOR SHALL SUBMIT SHOP DRANIN65
(2 GOPIE5) FOR THE FIRE PROTECTION 5PRINKLEP5 (WITH
FIRE MARSHALL'S AND UNDERWRITER'S APPROVAL THEREON. GG
TO THE LANDLORD'S REP.). ELEGTRIGAL PANELS, 5HITGH GEAR AND
TRANSFORMERS, AIR GONDITIONING EQUIPMENT, PLUMBING
FIXTURES, DOORS, HINDOH5, 5TRUCTURAL STEEL AND
MISCELLANEOUS IRON NORK, ETC. (5 GOPIE5) TO LANDLORD REP.
2. NO PORTION OF THE NORK REQUIRING SUBMISSION OF A
SHOP DRAWING, PRODUGT DATA OR 5AMPLE5 SHALL BE
COMMENCED UNTIL THE SUBMITTAL HAS BEEN APPROVED BY
THE TENANT. ALL 5UGH PORTIONS OF THE WORK SHALL BE IN
AGGORDANGE HITH APPROVED SUBMITTALS.
3. THE GONTRACTOR SHALL NOT BE RELIEVED FROM
RESPONSIBILITY FOR ERRORS OR OMISSIONS IN THE SHOP
DRAHIN65, PRODUCT DATA OR 5AMPLE5.
GUAL I TY GONTROL
1. THE CONTRACTOR SHALL 5UPERV15E AND DIRECT THE WORK,
1551JING THEIR BEST 5KILL5 AND ATTENTION. THE CONTRACTOR
SHALL BE SOLELY RESPONSIBLE FOR ALL FABRICATION,
SHIPMENT, DELIVERY AND INSTALLATION MEANS, METHODS
TECHNIQUES AND PROCEDURES AND FOR GOORDINATIN6 ALL
PORTIONS OF THE WORK UNDER THE CONTRACT.
2. WHEN THE TENANT'S MATERIAL IS RECEIVED AT THE JOB
SITE, THE SUPERINTENDENT 15 TO INVENTORY A6AIN5T THE
TENANT'S VENDORS L15T AND SHALL NOTIFY THE TENANT'S
PROJEGT MANAGER IMMEDIATELY. IF NOTIFICATION
15 NOT FORTHGOMIN6, REPLAGEMENT OF 5HORTA6E5 OR
DAMA6ED MATERIALS SHALL BE BACK GHAR6ED TO THE
GENERAL CONTRACTOR.
3. THE CONTRACTOR SHALL EMPLOY A COMPETENT
SUPERINTENDENT AND NECESSARY A5515TANT5 HHO SHALL BE
IN ATTENDANGE OF THE PROJEGT PREM15E5 DURING THE
PRO6RE55 OF THE WORK. THE 5UPERINTENDENT SHALL
REPRESENT THE GONTRAGTOR AND ALL GOMMUNIGATION5
61 VEN TO THE SUPERINTENDENT SHALL BE AS BINDING AS IF
GIVEN TO THE GONTRAGTOR.
4. THE GONTRAGTOR SHALL, AT ALL TIMES, ENFORCE 5TRIGT
P15GIPLINE AND GOOD ORDER AMONG HIS EMPLOYEES AND
SHALL NOT EMPLOY ON THE WORK ANY UNFIT PERSON OR ANY
PER50N NOT SKILLED IN THE TASK A5516NED.
5. ALL TRADES SHALL CONFINE CONSTRUCTION WORK WITHIN
THE PREM15E5 AS MUCH AS POSSIBLE AND SHALL WORK IN AN
ORDERLY MANNER REMOVING TRASH AND DEBRIS FROM THE.
PROJEGT ON A DAILY BASIS. AT NO TIME SHALL PIPES, HIRE5,
BOARDS OR OTHER CONSTRUCTION MATERIALS GROSS PUBLIC
AREAS WHERE HARM COULD BE CAUSED TO THE PUBLIC.
6. ALL MATERIALS USED IN CONSTRUCTION SHALL BE NEW AND
OF FIRST CLA55 QUALITY UNLESS OTHERN15E INDICATED. ALL
MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR A
PERIOD OF ONE (1) YEAR AFTER DATE OF THE OPENING OF THE STORE.
7. PRODUCT SAMPLES, MANUFACTURER'S DATA AND 5HOP DRANIN65
SHALL BE SUBMITTED TO TENANT FOR REVIEW PRIOR TO
FABRICATION OR START OF WORK.
THE TERMS EQUAL OR APPROVED EQUAL SHALL REQUIRE
REQUESTS FOR SUBSTITUTIONS FOR PRODUCTS OR
MANUFACTURERS NOT 5PEGIFIED. REQUESTS FOR
SUBSTITUTIONS SHALL BE SUBMITTED WITHIN THREE (3)
CALENDAR DAYS PRIOR TO DATE OF BID SUBMI5510N.
APPROVED SUBSTITUTIONS SHALL BE LISTED IN THE
BID 5U13MI5510N.
TEMPORARY SERV I GES
I. THE 6ENERAL CONTRACTOR SHALL PROVIDE SUCH
EXTENSIONS, DEVICES, HOOKUPS AND METERING AS
REQUIRED FOR TEMPORARY WATER, POWER, 1_16HTIN6, HEAT OR
AS REQUIRED TO CARRY OUT THE WORK. ALL TEMPORARY
UTILITIES AT GENERAL CONTRAGTOR'5 EXPENSES.
A. TEMPORARY TELEPHONE - THE TENANT'S 6ENERAL
GONTRACTOR SHALL INSTALL A JOB 51TE TELEPHONE AND FAX
NUMBER AND NOTIFY TENANT BY FAX OF THE TELEPHONE
NUMBER AND THE NAME OF THE SUPERINTENDENT.
B. TEMPORARY WATER - HATER.. REQUIRED IN THE
PERFORMANGE OF THE GONTRAGT SHALL BE PROVIDED AND
PAID FOR BY THE CONTRACTOR. WATER USED FOR HUMAN
CONSUMPTION SHALL CONFORM TO THE REQUIREMENTS OF
STATE AND LOGAL AUTHORITIES FOR PORTABLE WATER.
G. TEMPORARY ELECTRIGAL - TEMPORARY El EGTRICAL
SERVICE SHALL BE THE RESPONSIBILITY OF THE
GENERAL CONTRACTOR. SUPPLIED BY TENANT/LANDLORD.
D. TEMPORARY HEAT - WHEN REQUIRED FOR
PROPER INSTALLATION OR PROTECTION OF ANY PORTION OF THE
WORK. THE CONTRACTOR SHALL FURNISH AND INSTALL
TEMPORARY HEATING UNITS AS APPROVED BY THE LANDLORD OR
LOGAL AUTHORITY.
2. 005T OF TEMPORARY UTILITY SERVICES PROVIDED BY LANDLORD.
IF HE ELECTS TO DO 50, THE GONTRACTOR 5HALL MAKE
PROVISIONS OR COORDINATE KITH THE LANDLORD ON GENERAL
GONSTRUCTION OF THE UTILITY SERVIGE5.
GONTAGT GLOSS -OUT
I. COMPLETION 15 THE DATE CERTIFIED BY TENANT
ON NHIGH THE WORK OR DE516NATED PORTION THEREOF
15 5UFFIGIENTLY COMPLETE 50 THE TENANT MAY OCCUPY THE
SAME FOR THE INTENDED PURPOSE.
2. PROVIDE THE FOLLOWING FOR CL05E -OUT:
A. - 6.G.'S FINAL HAIVER5 (NEED TWO ORJ61NAL5, 516NED 4 NOTARIZED)
B. - 6.G.'S ONE YEAR WARRANTY (ON TENANT'S FORM)
G. - 6.G.'S AFFIDAVITS 6706 # 6706A
D. - 9U5GONTRAGTOR'5 FINAL WAIVERS (NEED THO OR161NAL5, 516NED
AND NOTARIZED)
E. - 5UB6ONTRAGTOR'5 ONE YEAR HARRANTY (ON THEIR LETTER-
HEAD 15 AGGEPTABLE)
F. - GERTIFIGATE OF OCCUPANCY
6. -A5 BUILT DRAHING5
H. - PICTURES OF CONSTRUCTED 5PAGE
I. - 516NED OFF PUNGHL15T
THE FOLLOWIN6 DOCUMENTATION IF REQUIRED:
I. -5- YEAR MANUFAGTURER'S GOMPRE55OR WARRANTY
2. -AIR BALANCE REPORT
3. - APPROVED SPRINKLER SHOP DRANIN65
NOTE: ALL PAPERWORK TO BE SUBMITTED 24 DAYS AFTER COMPLETION DATE.
FINAL GLEAN I NCB
I - GENERAL
A. THE HORK INCLUDED IN THI5 51)BGONTRAGT SHALL BE PERFORMED
ACGORDIN6 TO THE GENERAL CONDITIONS AND REQUIREMENTS
NHIGH ARE STATED ON THI5 SET OF DRAHIN65.
B. EAGH SUBCONTRACTOR SHALL GLEAN HIS/HER HORK AND REMOVE
ALL TRASH, DEBRIS, PAGKING, ETG. RE501-TIN6 FROM THAT HORK.
G. THE FINAL GLEANING SHALL BE PERFORMED BY A PROFESSIONAL
GLEANING GOMPANY.
D. ALL SURFACES AND FIN15HED SHALL BE LEFT FREE OF MARKS, BLEM15HE5,
DUST, DIRT, OVER SPRAY, PAINT SPILLS, ETG.
E. ALL SUB CONTRACTORS SHALL REMOVE EXGE55 MATERIALS AFTER
WORK 15 COMPLETED AND FLOOR TO BE BROOM GLEANED.
F. GENERAL CONTRACTOR SHALL PROVIDE A PROFESSIONAL
GLEANING 5ERVIGE FOR ALL AREAS OF THE STORE AT THE
COMPLETION OF THE PROJEGT AND BEFORE TURNING THE
SPACE OVER TO THE TENANT. WORK TO INGLUDE BUT NOT BE
LIMITED TO REMOVAL OF ALL TRACES OF SOIL, HASTE
MATERIALS, 5MUD6E5, AND FOREIGN MATTER. REMOVE ALL
TRAGE5 OF SPLASHED MATERIAL FROM ADJAGENT 5URFAGE5.
GLEAN 6LA55, BOTH SIDES. TO 5URFAGE5 REQUIRING POLISH,
APPLY POLISH RECOMMENDED BY THE MANUFACTURER OF
THE MATERIAL BEING POLISHED. FLOORING REQUIRING
HAXIN6, AFTER ADHESIVE HAS FULLY DRIED SHALL HAVE ANY
DRIED ADHESIVES REMOVED. THE FLOOR 5HALL BE GLEANED
AND WAXED U51N6 MANUFACTURER'S REGOMMENDED
GLEANING AND HAXIND MATERIALS ONLY.
2 - PRODUCTS AND MATERIALS
A. ALL PRODUCTS USED FOR GLEANING SHALL BE APPROPRIATE FOR AND
GOMPATIBLE HITH THE MATERIALS BEING GLEANED.
3 - EXECUTION
A. GLEAN ALL PLA5TIG LAMINATES, COUNTER TOPS AND METAL TRIM WITH
NON- ABRA5IVE GLEAN5ER5.
B. GLEAN ALL 6LA55 AND MIRRORS HITH AMMONIA -TYPE, NON - STREAKING
6LA55 GLEANER.
G. DAMP NIPS ALL FIXTURES, INGLUDING LIGHT FIXTURES.
CAST Q
IN PLAGE GONGRETE
A. THE CONTRACTOR 15 RESPON51 BLE TO DETERMINE IF CONCRETE SLAB WORK
15 REQUIRED IN ALL OR PART OF THE LEASED 5PAGE. SUCH FLOOR SLAB WORK
SHALL BE INSTALLED IN ACCORDANCE WITH ALL REQUIREMENTS, LOCAL CODES,
AND COMMON STANDARDS OF PRAGTIGE FOR THE LOCALITY OF THE PROJEGT
OR WHIGHEVER 15 M05T STRICT.
B. REFERENCE STANDARDS. ALL CONCRETE NORK SHALL BE PERFORMED IN
AGGORDANGE KITH AGI 301 -5q, "5PEGIFICATION5 FOR STRUCTURAL CONCRETE
FOR BUILDING5 ", NHIGH 15 INGORPORATED INTO THE CONTRACT DOGUMENT5 BY
REFERENCE HEREIN
G. G.G. TO NET FLOOR BEFORE 6RINDIN6 TO MINIMIZE DUST.
�, =
UNIT MASONRY
A. THE CONTRACTOR IS RE5PON51E3LE TO IDENTIFY ALL REQUIRED UNIT
MASONRY WORK NOT 5PEGIFIGALLY IDENTIFIED AND DETAILED ON THE
DRANIN65. ALL UNIT MASONRY NORK SHALL BE INSTALLED IN AGGORDANGE
WITH ALL REQUIREMENTS LOCAL CODES AND GOMMON STANDARDS OF
PRAGTIGE FOR THE LOGALITY OF THE PROJEGT OR HHIGHEVER 15 MOST
5TRIGT.
B. REFERENCE STANDARDS. ALL UNIT MASONRY WORK SHALL BE PERFORMED IN
ACGORDANGE WITH AGI 503.1 -88, "SPEGIFIGATION5 FOR MASONRY
5TRUGTURE5 ", WHIGH 15 INGORPORATED INTO THE CONTRACT DOGUMENT5 BY
REFERENGE HEREIN.
METALS
rl 4
I - GENERAL
A. THE WORK INCLUDED IN THI5 SUBCONTRACT SHALL BE PERFORMED
AGGORDING TO THE GENERAL GONDITION5 AND REQUIREMENT5
NHIGH ARE STATED ON THI5 SET OF DRAWING5.
B. COORDINATE THI5 WORK WITH THE RELATED HORK OF OTHERS
WHIGH INGLUDE5 BUT 15 NOT NEGE55ARILY LIMITED TO THE FOLLOWING:
A. FINISHES
G. FURNISH AND INSTALL METAL FABRICATIONS NHIGH INGLUDE BUT ARE
NOT NECE55ARILY LIMITED TO BLOGKING /5TRAPPIN6, L16HT 6AU6E METAL
FRAMING, HALL SYSTEM AND M15GELLANEOU5 METALS.
2 - PRODUCTS AND MATERIALS
A. LIGHT GAUGE METAL FRAMING
A. DEM15IN6 HALLS - 6HB ONE SIDE. (IF APPLICABLE).
B. INTERIOR PARTITIONS AND STOREFRONT FRAMING - 1 -1/2 ", 3 -518 ",
AND 6" STUDS AT 16" O.G. AND 6A 20 MINIMUM OR AS DETAILED
ON THE PARTITION SCHEDULE.
G. INTERIOR PARTITIONS TO BE BRACED TO EXI5TIN6 STEEL BEAM
D. PROVIDE WITH MATGHIN6 TRAGK5 IN HIDTH5 AS 5HONN ON
THESE DRAHIN65.
B. HEAVY 6AU6E METAL FRAMING
STOREFRONT AND 50FFIT FRAMING 3 -5/8 ", 6" STUDS ® 16" O.G.
AND IS 6A. MINIMUM OR AS DETAILED ON 5EGTION5. PROVIDE
HITH MATCHING TRAGK5 INHIDTH5 AS 5HOHN ON THESE bf IN65..
el leg P
G. METAL FURRING GHANNEL5 SHALL BE 6ALVANIZED
D. METAL 'G' JO15T5
SHALL BE 14 GAUGE HITH APPROPRIATE GONNEGTION5 � �
WELD CONNECTIONS AS INDIGATED OR REQUIRED F .,'
V400D AND PLAST IGS
ROUGH CARPENTRY
I- GENERAL
A. THE WORK INGLUDED IN TH15 SUBCONTRACT SHALL BE PERFORMED
ACGORDIN6 TO THE GENERAL GONDITION5 AND REQUIREMENTS
NHIGH ARE STATED ON THI5 SET OF DRANING5.
B. COORDINATE THI5 NORK HITH THE RELATED WORK OF OTHERS
WHIGH INCLUDES BUT 15 NOT NEGE55ARILY LIMITED TO THE FOLLOWING:
A. 14 - ELEGTRIGAL
G. FURNISH AND INSTALL ALL ROUGH GARPENTRY WHIGH INGLUDE5 BUT
15 NOT NECESSARILY LIMITED TO ROUGH BLOGKIN6, PANELS
AND BAGKBOARD5.
D. ALL HOOD USED FOR FRAMING AND BLOGKIN6 SHALL BE FIRE- RETARDENT
TREATED, TESTED PER A5TM E84 AND SHALL HAVE A FLAME SPREAD
RATING NOT 6REATER THAN 25. THE MATERIAL SHALL BEAR THE
IDENTIFIGATION OF AN AUTHORITATIVE TE5TIN6 OR IN5PEGTION A6ENGY.
E. ALL LUMBER IN CONTACT HITH CONCRETE, MASONRY AND
EARTH SHALL BE TREATED HITH PRESERVATIVE, THAT 15 ALSO
NON COMBUSTIBLE.
F. ALL FIELD LAMINATES SHALL BE DONE IN 5TRIGT AGGORDANGE
HITH MANUFAGTURER'5 SPEGIFIGATION5. SET UP OR BLOGKIN6
APPARATUS AND APPLICATIONS TECHNIQUE SHALL BE HELD
AS NEAR AS POSSIBLE TO CABINET SHOP SITUATIONS.
PARTICLE BOARD SHALL BE FREE OF SHEET DEFECTS AND SHALL
BE GUT HITH A CARBIDE TIPPED 5AH TO AVOID SPLINTERING.
ALL LAMINATES SHALL BE SEGURELY GLAMPED TO THE BAGKIN6 UNTIL
P051TIVE ADHESION 15 ATTAINED.
6. UNLE55 NOTED, ALL INTERIOR PARTITIONS SHALL EXTEND A MINIMUM
OF 6" ABOVE ADJACENT GEILIN6 OR AS 5HOHN ON PLANS.
H. ALL RATED PARTITIONS SHALL BE FITTED T16HT TO THE ROOF DEGK
SHALL BE FIRE TAPED, AND ALL OPENINGS AND PENETRATIONS FIRE
STOPPED WITH SMOKE AND FIREPROOF MATERIALS. ALL DUCTWORK
PA551N6 THROUGH RATED HALLS SHALL HAVE FIRE DAMPERS.
111
:•
•
•
lo
3...
W iii V)
C 1
1
C
� U
i
t
II �
I
I► • - • *`
_J
Mws 110/14/2013
•• Checked 1• -
�i
11'11
frawing No.
AS
O
F =A� r
r..! C
C-4 t
-
Po _ d
d) Z
Z C
C-4
D. R
REMOVE LABELS, EXCEPT FOR TH05E REQUIRED TO DEMONSTRATE
GOMPLIANGE WITH BUILDIN6 GODE5, FIRE- RATIN65 AND-- E5TING- --/tiL50_
REMOVE ALL RESIDUE AND GLUE REMAINING ON THE 5UPF E. Z
Z b
b
E. T
TOILET ROOMS - ALL FIXTURES AND NA5HABLE SURFAGF5 -.IN THF- - ry F
F=4
TOILET ROOMS SHALL BE GLEANED, SANITIZED AND POLISHED.
F. E
ELEGTRIGAL PANELS AND FLOOR MOUNTED MEGHANIGAL EQUIPMENT m
m
SHALL BE DUSTED AND WIPED GLEAN.
6. V
VINYL COMPOSITION TILE - HA5H, SEAL AND WAX. Q
Q f
f r
r--
H. W
WOOD FLOORING - FIN15H PER DIRECTION OF TENANT REPRESENTATIVE. -
-- `
`°Q
rn
1. R
REMOVE PROTEGTIVE GOVERIN65 AND TA65. F
Fes- °
°Q
J. R
REMOVE AND DISPOSE OF ALL TRASH, 5GRAP5, PAGKING, ETC. =
= w
w o
oI
DISPOSAL SHALL BE IN AGGORDANGE V4ITH THE LANDLORD'S REQUIREMENT5. Z
Z -
rn
K. T
TRIM - WIPE GLEAN J
- r
I
L. S
SOFFITS - DUST GLEAN. X
J I
C
X -
--
GONGRETE SLA NORK
C
I �
C=> I
�
IN PLAGE GONGRETE
A. THE CONTRACTOR 15 RESPON51 BLE TO DETERMINE IF CONCRETE SLAB WORK
15 REQUIRED IN ALL OR PART OF THE LEASED 5PAGE. SUCH FLOOR SLAB WORK
SHALL BE INSTALLED IN ACCORDANCE WITH ALL REQUIREMENTS, LOCAL CODES,
AND COMMON STANDARDS OF PRAGTIGE FOR THE LOCALITY OF THE PROJEGT
OR WHIGHEVER 15 M05T STRICT.
B. REFERENCE STANDARDS. ALL CONCRETE NORK SHALL BE PERFORMED IN
AGGORDANGE KITH AGI 301 -5q, "5PEGIFICATION5 FOR STRUCTURAL CONCRETE
FOR BUILDING5 ", NHIGH 15 INGORPORATED INTO THE CONTRACT DOGUMENT5 BY
REFERENCE HEREIN
G. G.G. TO NET FLOOR BEFORE 6RINDIN6 TO MINIMIZE DUST.
�, =
UNIT MASONRY
A. THE CONTRACTOR IS RE5PON51E3LE TO IDENTIFY ALL REQUIRED UNIT
MASONRY WORK NOT 5PEGIFIGALLY IDENTIFIED AND DETAILED ON THE
DRANIN65. ALL UNIT MASONRY NORK SHALL BE INSTALLED IN AGGORDANGE
WITH ALL REQUIREMENTS LOCAL CODES AND GOMMON STANDARDS OF
PRAGTIGE FOR THE LOGALITY OF THE PROJEGT OR HHIGHEVER 15 MOST
5TRIGT.
B. REFERENCE STANDARDS. ALL UNIT MASONRY WORK SHALL BE PERFORMED IN
ACGORDANGE WITH AGI 503.1 -88, "SPEGIFIGATION5 FOR MASONRY
5TRUGTURE5 ", WHIGH 15 INGORPORATED INTO THE CONTRACT DOGUMENT5 BY
REFERENGE HEREIN.
METALS
rl 4
I - GENERAL
A. THE WORK INCLUDED IN THI5 SUBCONTRACT SHALL BE PERFORMED
AGGORDING TO THE GENERAL GONDITION5 AND REQUIREMENT5
NHIGH ARE STATED ON THI5 SET OF DRAWING5.
B. COORDINATE THI5 WORK WITH THE RELATED HORK OF OTHERS
WHIGH INGLUDE5 BUT 15 NOT NEGE55ARILY LIMITED TO THE FOLLOWING:
A. FINISHES
G. FURNISH AND INSTALL METAL FABRICATIONS NHIGH INGLUDE BUT ARE
NOT NECE55ARILY LIMITED TO BLOGKING /5TRAPPIN6, L16HT 6AU6E METAL
FRAMING, HALL SYSTEM AND M15GELLANEOU5 METALS.
2 - PRODUCTS AND MATERIALS
A. LIGHT GAUGE METAL FRAMING
A. DEM15IN6 HALLS - 6HB ONE SIDE. (IF APPLICABLE).
B. INTERIOR PARTITIONS AND STOREFRONT FRAMING - 1 -1/2 ", 3 -518 ",
AND 6" STUDS AT 16" O.G. AND 6A 20 MINIMUM OR AS DETAILED
ON THE PARTITION SCHEDULE.
G. INTERIOR PARTITIONS TO BE BRACED TO EXI5TIN6 STEEL BEAM
D. PROVIDE WITH MATGHIN6 TRAGK5 IN HIDTH5 AS 5HONN ON
THESE DRAHIN65.
B. HEAVY 6AU6E METAL FRAMING
STOREFRONT AND 50FFIT FRAMING 3 -5/8 ", 6" STUDS ® 16" O.G.
AND IS 6A. MINIMUM OR AS DETAILED ON 5EGTION5. PROVIDE
HITH MATCHING TRAGK5 INHIDTH5 AS 5HOHN ON THESE bf IN65..
el leg P
G. METAL FURRING GHANNEL5 SHALL BE 6ALVANIZED
D. METAL 'G' JO15T5
SHALL BE 14 GAUGE HITH APPROPRIATE GONNEGTION5 � �
WELD CONNECTIONS AS INDIGATED OR REQUIRED F .,'
V400D AND PLAST IGS
ROUGH CARPENTRY
I- GENERAL
A. THE WORK INGLUDED IN TH15 SUBCONTRACT SHALL BE PERFORMED
ACGORDIN6 TO THE GENERAL GONDITION5 AND REQUIREMENTS
NHIGH ARE STATED ON THI5 SET OF DRANING5.
B. COORDINATE THI5 NORK HITH THE RELATED WORK OF OTHERS
WHIGH INCLUDES BUT 15 NOT NEGE55ARILY LIMITED TO THE FOLLOWING:
A. 14 - ELEGTRIGAL
G. FURNISH AND INSTALL ALL ROUGH GARPENTRY WHIGH INGLUDE5 BUT
15 NOT NECESSARILY LIMITED TO ROUGH BLOGKIN6, PANELS
AND BAGKBOARD5.
D. ALL HOOD USED FOR FRAMING AND BLOGKIN6 SHALL BE FIRE- RETARDENT
TREATED, TESTED PER A5TM E84 AND SHALL HAVE A FLAME SPREAD
RATING NOT 6REATER THAN 25. THE MATERIAL SHALL BEAR THE
IDENTIFIGATION OF AN AUTHORITATIVE TE5TIN6 OR IN5PEGTION A6ENGY.
E. ALL LUMBER IN CONTACT HITH CONCRETE, MASONRY AND
EARTH SHALL BE TREATED HITH PRESERVATIVE, THAT 15 ALSO
NON COMBUSTIBLE.
F. ALL FIELD LAMINATES SHALL BE DONE IN 5TRIGT AGGORDANGE
HITH MANUFAGTURER'5 SPEGIFIGATION5. SET UP OR BLOGKIN6
APPARATUS AND APPLICATIONS TECHNIQUE SHALL BE HELD
AS NEAR AS POSSIBLE TO CABINET SHOP SITUATIONS.
PARTICLE BOARD SHALL BE FREE OF SHEET DEFECTS AND SHALL
BE GUT HITH A CARBIDE TIPPED 5AH TO AVOID SPLINTERING.
ALL LAMINATES SHALL BE SEGURELY GLAMPED TO THE BAGKIN6 UNTIL
P051TIVE ADHESION 15 ATTAINED.
6. UNLE55 NOTED, ALL INTERIOR PARTITIONS SHALL EXTEND A MINIMUM
OF 6" ABOVE ADJACENT GEILIN6 OR AS 5HOHN ON PLANS.
H. ALL RATED PARTITIONS SHALL BE FITTED T16HT TO THE ROOF DEGK
SHALL BE FIRE TAPED, AND ALL OPENINGS AND PENETRATIONS FIRE
STOPPED WITH SMOKE AND FIREPROOF MATERIALS. ALL DUCTWORK
PA551N6 THROUGH RATED HALLS SHALL HAVE FIRE DAMPERS.
111
:•
•
•
lo
3...
W iii V)
C 1
1
C
� U
i
t
II �
I
I► • - • *`
_J
Mws 110/14/2013
•• Checked 1• -
�i
11'11
frawing No.
AS