Loading...
12-303-027z S! w m� o< 7� �2 gC �F oc a 2 2 12 C 4� (3 ¢ Z- tl �v AW N z�z F p µU, e�C e Q {� W W44 z� ou : z 80 J�a i (1 co c*� N co N Q N N t1 6 14 'j 3' 0" _ UP F- TYP. � 2'- 9' GENERAL NOTES A. GC TO COORDINATE ASSEMBLY, INSTALLATION, FLOOR PREPARATION AND , ALL OTHER TRADES INVOLVED IN THIS P OR fiON OF THE WORK. B. GC TO VERIFY THAT ALL PIECES THAT ARE ON PARTS LIST HAVE BEEN DELIVERED • o , ,,,,,,;, (i, : ARE NOT D AMAGED AND ARE READY FOR A SEMBLY. — kfy C. SYMBOLS. : .. � •� - - -- INDICATES FULL DUPLEX RECEPTACLE INS TALLED AT THE BACK U N OF THE LOWEST SHELF ON THE INSIDE OF THE MILLWORK t 4 REFER TO ELECTRICAL DRAWINGS • i COCOO INDICATES L - LOCATION OF ELECTRICAL/ DATA STUB UP THRU O - FLOOR VERIFY ADDITIONAL ITI NAL REQUIREMENTS WITH 13'- 0 1/2„ 5 3 ARCHITECTURAL AND ELECTRICAL DRAWINGS. COORDINATE ALL TRENCHING AND CORE DRILLING WITH THE LANDLORD 18'- 3 1/2" (5) EQUAL SECTIONS KEYNOTES i A FRONT WRAP -FRONT ELEVATION ' B FRONT WRAP -BACK ELEVATION PRE- FINISHED SOLID SURFACING MATERIAL, PROTECT DURING ❑ A CONSTRUCTION , C FRONT WRAP SIDE ELEVATION [21 ADJUSTABLE SHELVES F , RONTWRAh 1 . 1/2" O �o GLASS PANEL SUPPORT ❑ PPORT LEG 4 PULL OUT DRAWER COMPUTER TER AND MONITOR ASSEMBLY BY OWNER, ❑ R, TO 6„ 14.. COORDINATE INSTALLATION I� GC O ,.—, n T PROVIDE QUADRAPLFX RF('.FPTAri F I In -runt I Pnrrnnn