12-303-027z
S!
w
m�
o<
7�
�2
gC
�F
oc
a
2 2
12
C
4�
(3 ¢
Z-
tl
�v
AW
N z�z
F
p µU,
e�C
e Q
{� W
W44
z�
ou
: z
80
J�a
i
(1
co
c*�
N
co
N
Q
N
N
t1
6 14 'j
3' 0" _
UP
F-
TYP.
�
2'- 9'
GENERAL NOTES
A. GC TO COORDINATE ASSEMBLY, INSTALLATION, FLOOR PREPARATION AND
,
ALL OTHER TRADES INVOLVED IN THIS P OR fiON OF THE WORK.
B. GC TO VERIFY THAT ALL PIECES THAT ARE ON PARTS LIST HAVE BEEN
DELIVERED
•
o
, ,,,,,,;, (i, :
ARE NOT D AMAGED AND ARE READY FOR A SEMBLY.
—
kfy
C. SYMBOLS.
:
..
�
•�
- - -- INDICATES FULL DUPLEX RECEPTACLE INS TALLED AT THE BACK
U
N
OF THE LOWEST SHELF ON THE INSIDE OF THE MILLWORK
t
4
REFER TO ELECTRICAL DRAWINGS
•
i
COCOO INDICATES L -
LOCATION OF ELECTRICAL/ DATA STUB UP THRU
O
-
FLOOR VERIFY ADDITIONAL ITI NAL REQUIREMENTS WITH
13'- 0 1/2„
5 3
ARCHITECTURAL AND ELECTRICAL DRAWINGS. COORDINATE ALL
TRENCHING AND CORE DRILLING WITH THE LANDLORD
18'- 3 1/2"
(5) EQUAL SECTIONS
KEYNOTES
i A FRONT WRAP -FRONT ELEVATION
' B FRONT WRAP -BACK ELEVATION
PRE- FINISHED SOLID SURFACING MATERIAL, PROTECT DURING
❑ A
CONSTRUCTION
,
C FRONT WRAP SIDE ELEVATION
[21 ADJUSTABLE SHELVES
F ,
RONTWRAh
1 .
1/2"
O �o
GLASS PANEL SUPPORT
❑ PPORT LEG
4 PULL OUT DRAWER
COMPUTER TER AND MONITOR ASSEMBLY BY OWNER, ❑ R, TO
6„ 14..
COORDINATE INSTALLATION
I�
GC O
,.—, n T PROVIDE QUADRAPLFX RF('.FPTAri F I In -runt I Pnrrnnn