Loading...
12-303-005,r 0 K 0 r 0 r m a v 'd J O I c�c�C V� 0. K zz�O O� F� V .. O Q� m� O�W �O K W O� �O V O� �O �2 ❑W WWwry� xttx F ~ Z. R0R� U� w lz z� 00 Z K µN, O Z 1 / -u l UVIVGV OUrr vF\ I J kI.C. I. JNUUI 10 "llU l­ML1I1V VVIf[C0). REQUIRED. E. OPENINGS ON ELEVATED SLABS MUST BE SLEEVED, SEALED, FIRE STOPPED, AND ®REMOVE (E) DRYWALL AND (E) MASONRY AND PROVIDE E. RAISE OR MODIFY ANY FIRE SPRINKLER LINES, AS REQUIRED, TO PERFORM ALL P. MAINTAIN REQUIRED FIRE RATINGS AT ANY EXISTING DEMISING WALLS, AT THE BULKHEAD, WATERPROOFED. SUPPORT FOR WALL ABOVE. WORK. RE- INSTALL PER FIRE SPRINKLER SHOP DRAWINGS WHICH WILL BE PROVIDED BY THE GENERAL CONTRACTOR. AND MALL CORRIDOR WALLS, F. ALL PIPING SLEEVES MUST EXTEND A MINIMUM OF 4 ", OR TO THE HEIGHT OF THE (N) DEMISING WALL BY LANDLORD UNDER SEPERATE PERMIT F. REMOVE EXISTING IRREGULARITIES IN FLOOR (LE. ANCHOR BOLTS AND CONCRETE Q. MALL BULKHEAD, FASCIA AND /OR SOFFIT, AND THE SUPPORT SYSTEM AT THE STOREFRONT ARE TO BE KEPT INTACT DURING CONSTRUCTION PROCESS BASE. I I (N) SUPPORTED OPENING IN MASONRY DEMISING WALL BY POURS; CORE DRILL ONLY). ANY AND ALL UNDER -SLAB LINES (PLUMBING OR . G. COORDINATION OF CONSTRUCTION BARRICADE AND DUMPSTERS IS TO BE TENANT GC. ELECTRICAL) BEING ABANDONED ARE TO BE CLEANED AND CAPPED BENEATH THE R. THIS PLAN WAS PREPARED 8Y INFORMATION GATHERED FROM ONE OR MORE OF THE COORDINATED WITH MALL MANAGEMENT ON SITE. SURFACE OF THE SLAB AND THE CONCRETE SLAB SHALL BE PATCHED. LEVEL FLOOR FOLLOWING SOURCES AND MAY NOT INDICATE "AS- BUILT" CONDITIONS. 2 (E) BLADE SIGN TO BE REMOVED AS REQUIRED. SOURCES: G. PREPARE FLOOR SURFACE FOR ENGINEERED STONE AND VINYL FLOORING. LANDLORD PROVIDED LEASE DRAWING; CRITERIA; LANDLORD'S SHELL CONSTRUCTION PROVIDE LEVELING CONCRETE AND GRINDING /SMOOTHING OF ANY EXISTING DOCUMENTS; SITE VISIT AND DOCUMENTATION BY OWNER'S DESIGNERS, FOR ALL MEP EQUIPMENT REFER TO MEP DEMOLITION PLAN. – — bEMOLITION DONE UNDER PERMIT-11-910 IRREGULARITIES, H. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE TO MALL S. THE GENERAL CONTRACTOR SHALL NOTIFY THE PROJECT COORDINATOR /ARCHITECT OF PROPERTY DUE TO THE TENANT'S WORK, REPAIR ANY DAMAGE DONE TO BULKHEAD ANY AND ALL DISCREPANCIES PRIOR TO BEGINNING THE CONTRUCTION PROCESS OR NEUTRAL PIERS. (FOLLOWING DEMOLITION OF SPACE). OVERALL DIMENSIONS AND HEIGHT CLEARANCES SHALL BE VERIFIED PRIOR TO BEGINNING THE CONTRUCTION PROCESS, J. ALL EQUIPMENT WHICH PASSES THROUGH THE WORK AREA AND SERVES OTHER .TENANTS OR THE MALL SHALL REMAIN ANY DAMAGE TO SUCH ITEMS SHALL BE T. CONTRACTOR SHALL COORDINATE WITH MALL'S ON -SITE FIELD REPRESENTATIVE FOR ALL REPAIRED AT CONTRACTOR'S EXPENSE (I.E. WATER MAINS, FIRE SPRINKLER MAINS, SCHEDULING AND PHASING OF PROJECT, ELECTRICAL CONDUITS, ETC.). U. COORDINATE WITH MALL'S ON SITE REP. FOR ANY MECHANICAL ELECTRICAL AND PLUMBING DEMO THAT MAY BE REQUIRED BY L.L. REFER TO MEP DRAWINGS FOR MECAHNICAL DEMOLITION [ PLANS .. Wzrrz?s!: -,.. ;.,....i^rmmxan.�s,. „�aar- '�r,,.T.�r�+:s�^e- °�::.,. .. aye m+=- 3rs:^ r+-.:- r ,•.narxrwrm^xrn,.�r,^mx-xk�,m,� fiv,_,.. r , * °,sam�a , �.. -,:,�,;T�tnar,re� =msm•n .. ,, .t�^:s.*.zc:, teas � � :- �m.NS�, a, ^�e�,�,Tmr.. .;^�. .4..,- ..�."_. _r.:. .. r,�F;s^'v'Z'• . . ,"PT�i'e... ,T.3'F,T9.!tF ac iv. tin."dY?t�.. - .'s., arlm..roi �T^2 ^Fr ismrtr,,. ..