12-1142-001HANGER LOCATION DETAIL_ > 100Pai
PIPE SIZE
A
B*
C
1"
1'--0" MAX.
12' -0" MAX.
3" MIN.
1 1/4"
1' -0" MAX.
12' -0" MAX.
3" MIN.
1/2"-8':
1' -0" MAX.
15-0" MAX.
3" MIN.
ALL ARMOVERS
GREATER THAN 12" ARE TO HAVE A HANGER.
A
E3
I_
- — I C
SPRINKLER HEAD
STEEL RIPE
dD
LHANGER RING
* MAXIMUM HANGER SPACING FOR THREADED LIGHTWALL
STEEL PIPE IS 12' -0" FOR ALL PIPE SIZES
C NCRETE K
POWDER DRIVEN STUD
ROD gURLIN✓
ALL THREAD ROD
,RIPE RING
POWDER DRIVEN STUD
HANGER
rrAM /dolsr�
TYPICAL HANGER
NO SCALE
1 -- All rt94
1 -- Swivel cl Pin Ring
1 -- ream Clomp
SCHEDULE
2 1. EXISTING ■RANCHLINE.
2. 1.. ARMOVER.•
3. 1 " DROP K
4. NEW FIRE SPRINKLER HEAD.
Q. 3
ARMOVERS GREATER THAN
12" IN LENGTH SHALL BE -
SUPPORTED BY A HANGER OR STRAP.
z FIRE SPRINKLER DETAIL
N.T.S.
I HANGER LOCATION DETAIL
PP - l NT.0
l+ �,,,�.'a. y�y,. •rte. _p`'v � —,�rt��
iZw 4'
N4 ' r SW. anti AbE (RED ROAD)
ILDG "C" — SECOND FL
KEY PLAN N
N.T.S.
N _
i
DESIGN DATA SPRINKLERS /NOZZLES
SCALE: IeX�/' /I1/iP.��I BE �' r
SYSTEM INFO
SYMBOLS IMPORTANT NOTICE TO USER HYDRAULIC D AS NOTED
RESPONSIBILITY APPROVA
LS � ORIENTATION SPK FINISH TEMP. K -FACT NRT SIN MAN FACT. MODEL �! RESPONSE ESCUTCHEON /SPRINKLER NOTE
I DRAWING THE DESIGN DESIGN DES. AREA INSIDE OUTSIDE �OF TOTAL SYSTEM sYM. Qom'• - Arco In�ernat�onal Company / Y'
SYS., SYS. TYPE VA. DIA. TTL. SPK. SYS. AREA *13' PIPE TO IOTTOM OF DECK NY ACCEPTING OR USING THIS HAZARD CLASSIFICATION DENSITY AREA LENGTH HOSE HOSE SPRINKLERS w DRAWN BY: Tyco
T X IN USER AGREES TO THE FOLLOWING TERMS AND CONDITIONS: THE ELECTRONIC AREA$ GPM /SO.FT. ® 11 Pendent White 155 5.6 1/2 TY -3551 Tyco RF -II Standard White Conceded
SG DESCRIPTION OF WORK ❑ OUT 12-4 PIPE �TOFINISHED FLOOR sca. FT. FACTOR ALLOW. ALLOW. FLOWING GPM PSI AT NODE
T IN INFORMATION IN THE DRAWING MAY BE SUBJECT TO INTENTIONAL OR UNINTENTIONAL �%•O• LOCAL B NAME AND 10550 Commerce Parkway '
❑ OUT MI WATER FLOW SWITCH ALTERATION. ANY USE, REUSE, COPYING MODIFICATION OR ALTERATION OF THE
Adding i� Relocatin Fire Spkr. Hds. CHECKED BY: �o� NAME AND LOCATION:
❑ OUT IN T❑ IAMPERSWITCH INFORMATION CONTAINED HEREIN SHALL BE AT THE SOLE RISK OF THE USER. THIS
❑ ❑ OUT IN S1 HYDRAULIC REFERENCE POINT
INFORMATION MAY NOT BE SOLD OR TRANSFERRED TO ANY THIRD PARTY, USED ON OTHER B.G. ISIS Yr ���' y��� 'v ~���
X11 BRANCHLINE /MAIN LAIEL PROJECTS OR ADDITIONS 70 THE PROJECT FOR WHICH IT WAS PREPARED, OR USED FOR Shops at Sunset Place S �
COMPLETION OF THIS PROJECT BY ANY THIRD PARTY. SIMPLEXGRINNELL DISCLAIMS ALL CONTRACT WITH: h p J
REVISIONS A4 WELDED PIPE LAIEL LIABILITY FOR THE USE OR REUSE OF ALTERED FILES NY THE USER OR ANY THIRD PARTY _________ J%O1 Sunset Dr. /
El NO. DATE BY REVISION DESCRIPTION -u CAr(THR'DORGRVD) AND SUCH USE WILL BE A USER'S SOLE RISK, USER SHALL, TO THE FULLEST EXTENT
® SYSTEM RISER PERMITTED BY LAW, DEFEND, INDEMNIFY, AND HOLD SIMPLEXGRINNELL HARMLESS FROM CONTRACT NO: South Miami, FL 3�
0 10 -11 -12 O. FOR A.H.J. APPROVAL ANY AND ALL CLAIMS FOR LOSS, DAMAGE OR INJURY ARISING DIRECTLY OR INDIRECTLY SHEET DESCRIPTION! /
❑ -a- COUPLING (THR'D OR GRV'D) ��
THEREFROM. 966as13rn FIRE SPRINKLE
❑ --- FLANGED CONNECTION W LOCALITIES SUBJECT TO FREEZING CONDITIONS, THE OWNER MUST MAINTAIN HEAT
1 2•WAYEARTHQUAKEBRACE THROUGHOUT WET PIPE SPRINKLER SYSTEMS AREAS, AND IN ENCLOSURES WHERE DRY DATE: REV. : LATEST REV. DESCRIPTION: DRS
+ 4-WAY EARTHQUAKE IRACE PIPE, DELUGE OR OTHER VALVES CONTROLLING WATER SUPPLIES 70 SPRINKLER SYSTEMS WATER SUPPLY INFO: STATIC PRESSURE PSI - RESIDUAL PRESSURE: PSI WITH GPM FLOWING
11 TOTAL SPRINKLERS /NOZZLES THIS SHEET 10 -11 -12
ARE LOCATED.
PIPE HANGER TEST LOCATION: NY;
TEST DATE:
❑ � 2009 SIMPLEXGRINNELL LP -ALL RIGHTS RESERVED