Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
11-354-060
AD ACCESS DOOR UV LAVATORY ITEM ESD&C FURNISHED UNDLORD NY INSTALLED LANDLORD SCON R. BY OTHER RE -USE N/A REMARKS EXISTING NEW WASTE OR SAN. SEWER • "' • : : : • • • • • 0 ADA AMERICAN DISABILITY ACT u POUND VENDOR . • • • • • : • • Z • PLUMBING FIXTURES A TRIM GC GC - - -- �--� - ^ -- - - •- - - • • EXISTING WASTE OR SAN. SEWER AFF ABOVE FINISHED FLOOR LF LINEAL FEET All ACCESS PANEL MECH MECHANICAL CD CEILING DIFFUSER OR CONDENSATE DRAIN MFR MANUFACTURER • • • r DRINKING FOUNTAIN AND ASSOCIATED ACCE550RIES. LD GC CD CONDENSATE DRAIN • • • "" "° CFM CUBIC FEET PER MINUTE MTD MOUNTED Cl r r r . ... • " " r G CAST IRON CO CLEANOUT MTR MOTOR SEWER AND VENT PIPING GC GC G GAS • ' " "+ ' "` ' J " CONT CONTINUE NEW CONTR CONTRACTOR N. NORMALLY CLOSED N.C. COTG CLEANOUT TO GRADE N.I.C. TANK WATER HEATER GC GC -" "' - - - -` - - - - - - NEW VENT rrrr ••,rrr •� + � � � ; 4 � NOT IN CONTRACT CW COLD WATER N.O. NORMALLY OPEN J � Z � DOMESTIC HOT AND COLD GC GC - - -- -•- - - - • + N/A NOT APPLICABLE DET DETAIL WATER PIPING �. - - - � EXISTING VENT „ . + • • • • • . + • • Y CONDENSATE DRAIN PIPING GC GC __._ _ _ _ _ _ NEW COLD WATER NTS NOT TO SCALE OF DRINKING FOUNTAIN OL DOOR LOUVER P PUMP z r { SECOND COND. DRAIN PIPING GC GC - - --- - - --•-- - EXISTING COLD WATER DS DREAMSTEAMER PD PRESSURE DROP DTR DOWN THRU ROOF Z Z Z Q PLIG PLUMBING DWG DRAWING POC POINT OF CONNECTION PRV PRESSURE REDUCING VALVE Z GAS PIPING - - - - - - - - NEW HOT WATER (E) EXISTING PSI COND. DRAIN PUMP GC GC - - - - - - - - POUNDS PER SQUARE INCH EWC ELECTRIC WATER COOLER (R) RELOCATE FCO FLOOR CLEANOUT RD ROOF DRAIN EXISTING HOT WATER Q,,, � 0 Z } LIJ Z , DREAMSTEAMER DS GC SHUT -OFF VALVE FCU FAN COIL UNIT RPIP REDUCED PRESSURE BACKFLOW PREVENTER FLOOR DRAINS, CLEAN OUTS, WATER GC GC FD FLOOR DRAIN RPM REVOLUTION PER MINUTE © ". FPS FEET PER SECOND HAMMER ARRESTORS, ETC. --¢- O- FLOOR CLEAN -OUT W FS FLOOR SINK SCH SCHEDULE 0 Q SOV SHUT -OFF VALVE OR SCHEDULE OF VALVE GAL GALLONS DREAMSTEAMER DRAIN PIPING GC GC a-II WALL CLEAN -OUT, GC GENERAL CONTRACTOR UH UNIT HEATER Cl) W GPM GALLONS PER MINUTE UON UNLESS OTHERWISE NOTED AS -BUILT DRAWINGS GC FLOOR DRAIN r UTR UP THRU ROOF W O Hi HOSE 1111 INSTANTANEOUS WATER HEATER 0 O RISE H" { HD HEAD VTR VENT THRU ROOF CL DRAIN PUMP C DROP HP HORSEPOWER HW HOT WATER WC WATER CLOSET x WCO WALL CLEANOUT W \ ,_ DEMO SINK UV AND FAUCET ( POINT OF CONNECTION INV INVERT WG WATER GAUGE WH WATER HEATER WHA WATER HAMMER ARRESTER WT WEIGHT PLUMBING ABBREVIATIONS NTS G LEGEND AND SYMBOLS NTS 00NP011D1LGND DIVISION 22 1. THESE PUNS MAY BE USED FOR CONSTRUCTION ONLY AFTER APPROVAL IS OBTAINED FROM THE BUILDING DEPARTMENT PLUMBING PUN CHECK DIVISION AND THAT DIVISION'S STAMPED APPROVAL AND AUTHORIZED SIGNATURE APPEAR ON THE PUNS. Z� 9 SECTION 220000 - PLUMBING '- 2. COORDINATE cr ALL WORK WITH ALL TRADES INCLUDED BUT NOT LIMITED TO ELECTRICAL, FIRE PROTECTION, MECHANICAL AND STRUCTURAL A• SCOPE OF WORK CONTRACTORS. INSTALL ALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. NO ITEM SUCH AS PIPE, ° W DUCT, ETC. IS TO BE IN CONTACT WITH ANY EQUIPMENT. H W g; W k - IE ° 1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES 3. REFER TO ARCHITECTURAL DRAWINGS FOR DEMOLITION WORK. KA �' T -M- Z. g NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL T0, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL WORK FOR THE L: PLUMBING SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, 4. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT FIXTURE LOCATION. g TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: ie r a . COMPLETE SANITARY PIPING SYSTEMS OF WASTE, DRAINS, AND VENTS. 5. CONTRACTOR SHALL PROVIDE CUT SHEETS TO ESDAC FOR ALL EQUIPMENT AND DEVICES FURNISHED NY THE CONTRACTOR THAT DEVIATE FROM SPECIFIED ITEM FOR REVIEW AND APPROVAL PRIOR TO THE PURCHASE OF ANY SUCH EQUIPMENT OR DEVICES. rl- e T. b. COMPLETE COLD AND HOT WATER PIPING SYSTEMS, APPURTENANCES AND INSULATION. FIXTURES U F C. AND EQUIPMENT A5 SCHEDULED. 6. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE TO FIELD VERIFY THE EXACT LOCATIONS, SIZES, INVERTS AND CONDITION OF EXISTING jazz -N�aii d. COMPLETE NATURAL GAS OR PROPANE PIPING SYSTEMS (A5 APPLICABLE, REFER TO PUNS) SANITARY WASTE PIPING BELOW SUB, VENT PIPING ABOVE CEILING AND UP THROUGH ROOF AND DOMESTIC COLD WATER SUPPLY PIPING C e. CONDENSATE PIPING SYSTEMS (AS APPLICABLE, REFER TO PUNS). TO TENANT'S DEMISED PREMISES PRIOR TO SUBMITTING HIS 110, NO ADDITIONAL COMPENSATION WILL BE MADE FOR ANY EXTRAS DUE TO w 8 W Ram iog It f. TESTS AND ADJUSTMENTS. SUBMIT A COMPLETE CONTRACTOR'S FAILURE TO VISIT THE JOB SITE AND /OR FAILURE TO PREDETERMINE ALL EXISTING CONDITIONS BEFORE SUBMITTING HIS BID. _ W o -' S. SET OF REPRODUCIBLE AS- NUILTS. F E • a 99x� p 2. BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL 7. ACCESS TO ALL COMPONENTS AND EQUIPMENT MUST BE PROVIDED TO MEET CODE AND SERVICE /MAINTENANCE EASE. P €i9 PLANS D SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE PLUMBING SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. 8. THE CONTRACTOR SHALL VERIFY WITH LOCAL CODES AS TO THE REQUIREMENT /INSTALLATION OF ANY "WATER SAVING" DEVICES TO THE le F-� l SAS ° « K' ° K • K W O PLUMBING FIXTURES. (EXAMPLE: TOILET, FAUCETS, ETC.). R 6_ 3. RELOCATION OF BI EXISTING WATER, GAS, WASTE, VENT, OR DRAINAGE LINES TO FACILITATE STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL. 9. PLUMBING SYSTEM SHALL BE PRESSURE TESTED AND STERILIZED PER LANDLORD'S CRITERIA AND LOCAL AUTHORITY. -t � }�� � � � � � � � � ° � � it g -. EQUIPMENT AND N A. BTALLATION 10. UPON COMPLETION Or THE WORK, CONTRACTOR SHALL ENSURE THE PROPER WORKING ORDER OF THE SYSTEM(S) AND MAKE ANY o yi � yj R!# * R �<r�el - ° =Wn� ADJUSTMENTS AS REQUIRED. N 1, REFER TO PUNS FOR SCHEDULES OF EQUIPMENT AND FIXTURES. AMERICAN STANDARD, KOHLER AND CRANE ARE CONSIDERED ACCEPTABLE AS EQUALS. Y N O 2. SANITARY PIPING CL J a. WASTE, DRAIN AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON SOIL PIPE. VENT PIPING ABOVE FLOOR 2" OR a SMALLER MAY BE GALVANIZED STEEL. ALTERNATE PIPING MATERIALS ARE ACCEPTABLE AS A SUBSTITUTION WHEN THEIR USE IS PERMITTED NY THE LANDLORD, LOCAL CODES AND BUILDING DEPARTMENT OFFICIALS AND DOES NOT AFFECT OTHER TRADES. SUBSTITUTIONS MUST BE LISTED AND QUALIFIED IN BID. NO PLASTIC PIPING ALLOWED. 6. INSULATE ALL HORIZONTAL RUNS OF PIPING LOCATED IN CEILING SPACES, WHEN APPLICABLE. INSULATION TO BE AS SPECIFIED FOR WATER PIPING. PLUMBING RESPONSIBILITY SCHEDULE E PLUMBING GENERAL NOTES NTS c. CONDENSATE PIPING SHALL NE TYPE 'L' DRAWN COPPER TUNE WITH 95 -5 TIN - ANTIMONY SOLDERED JOINTS AND WROUGHT COPPER FITTINGS WITH DIELECTRIC SEPARATION BETWEEN DISSIMILAR METALS. w o0NP01 GOSCHD z 0ONP011CONOTE W O 3. POTABLE WATER PIPING SHALL BE AS FOLLOWS: ROUGH -IN CERVICES o V �. BELOW GRADE: TYPE 'K', ANNEALED TYPE TEMPERED COPPER TUBE FOR PIPE SIZES 2 INCHES AND SMALLER, (RAZE ALL ITEM FIXTURE DESCRIPTION REMARKS COLD HOT WASTE VENT INDIRECT GAS I. UNLESS OTHERWISE SPECIFIED, CONTRACTOR SHALL PROVIDE ALL NECESSARY EQUIPMENT, MATERIAL, LABOR AND SUPERVISION NECESSARY TO COMPLETE THE PLUMBING WORK IN ACCORDANCE WITH THE SPECIFICATIONS AND STANDARDS. ; OG O_ a Y JOINTS. WATER WATER WASTE WASTE 'LOCATION w J U � KOHLER "HIGHLINE PRESSURE LITE* MODEL NO. K -3519, 1.1 GPF, 2. FIELD VERIFY EXACT SIZE AND OF EXISTING WASTE PIPING BELOW SUB, VENT PIPING ABOVE CEILING AND UP THROUGH ROOF w CL �C7S b. ALL OTHER: TYPE `L' DRAWN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND y5 -5 TIN - ANTIMONY SOLDER. PRESSURE ASSISTED WHITE WATER CLOSET WITH ELONGATED VITREOUS CHINA BOWL (OR AMERICAN STANDARD 'FLOWISE" MODEL NO. 2073.014, AND COLD WATER SUPPLY PIPING ABOVE CEILING PRIOR TO COMMENCEMENT OF ANY WORK. AFTER INSTALLATION AND FINAL CONNECTION 4. PIPING OF DISSIMILAR METALS MUST NE DIELECTRICALLY SEPARATED. WC 0 WATER CLOSET 1/20 _ 4„ 2- _ 1.21 GPF, ELONGATED TOILET), 1711j" HIGH, WHITE OPEN FRONT SEAT AND HANDICAP TYPE OF NEW WASTE PIPING BELOW SLAB, BACK FILL AND PATCH IN ACCORDANCE WITH THE LANDLORDS , SUCH WORK. CRITERIA REGARDING CO m 5. GENERALLY, TANK TYPE COVER JK- 4710 -T. FURNISH WITH BOLT CAPS AND CHROME SUPPLY STOP, (FOR PUBLIC AND NON - PUBLIC RESTROOMS). FLUSH LEVER SHALL BE 3. CONTRACTOR SHALL FURNISH AND INSTALL ALL OF THE NECESSARY PLUMBING FIXTURES SEE PLUMBING RESPONSIBILITY SCHEDULE ON W Z Ld C) O) SANITARY AND POTABLE WATER TAPS WILL BE PROVIDED BY THE LANDLORD. FIELD VERIFY EXACT CONNECTION POINTS PRIOR TO SUBMITTING BID. NOTIFY THE ESDAC PROJECT MANAGER, IF CONDITIONS ARE NOT AS SHOWN ON THE PUNS OR AS LOCATED ON THE WIDE SIDE OF THE TOILET. PROVIDE K- 351a -RA FOR THIS SHEET) TO SERVE THE TENANT'S DEMISED PREMISES AND MAKE NECESSARY INSTALLATION OF DOMESTIC WATER AND SEWER PIPING Z ii STATED IN THE SPECIFICATIONS. CONTRACTOR MUST VERIFY THE OPERABILITY OF ENTIRE SYSTEM PRIOR TO TIE -IN AS FOLLOWS: RIGHT SIDE FLUSHING HANDLE. FROM TENANTS DEMISED PREMISE TO CONNECTION PROVIDED BY LANDLORD. = Q "KATHRYN" �. SNAKE SANITARY TO MALL MAIN AND REPORT ANY BLOCKAGE. KOHLER CONSOLE TABLE TOP MODEL N0. K -30 UNDER- COUNTER LAVATORY MODEL N - ARE LEGS MODEL 4. SANITARY VENTS SHALL BE ROUTED TO THE EXISTING LANDLORD'S POINT OF CONNECTION WITHIN THE TENANT'S DEMISED PREMISES OR TO D p LAVATORY 1/2' - 2' 1 1/2" _ _ " 4"-6861. AUCET MODEL NO. K- 8215 -4 WITH POP -UP HANDICAP A POINT APPROVED BY LOCAL AUTHORITY. THE CONTRACTOR SHALL PROVIDE A CAPPED TEE FOR POSSIBLE FUTURE CONNECTION IF REQUIRED M b. TEST WATER PRESSURE TO INSURE MINIMUM PSI MATCHES MOST DEMANDED BY EQUIPMENT SUPPLIED. UNDERCOUNTER E SUPPLY STOPS AND P -TRAP. INSULATE TYPE BY THE LANDLORD). CONTRACTOR SHALL COORDINATE ALL ROOF PENETRATIONS WITH THE LANDLORD'S ROOFING CONTRACTOR, AS Z .- P -TRAP AND SUPPLY LINES WITH 'ARMAFLEX" PIPING REQUIRED. VENT THRU ROOF SHALL NE AT LEAST 15 FEET AWAY FROM A/C UNIT FRESH AIR INTAKE. O Lw M _ v / Q 6. INSULATE ALL HOT WATER, COLD WATER AND CONDENSATE PIPING WITH 1" THICK (K =0.23 • 75'F) PIPE INSULATION WITH AN INSULATION OR EQUIVALENT. (FOR PUBLIC RESTROOMS) F' ; M qh Cn ALL SERVICE JACKET TO MEET LOCAL CODES AND UL FUME SPREAD AND SMOKE DEVELOPED RATINGS. S. SEAL AROUND ALL PIPES PENETRATING FIRE SEPARATIONS WITH LASTED AND APPROVED FIRE SEAL MATERIAL ONLY LISTED AND APPROVED SEALANTS AND METHODS � 0 Fr � KOHLER "CHESAPEAKE" 20" X 18" LAVATORY, MODEL NO. K -1729 (OR 7. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH 1/2" ARMSTRONG "ARMAFLEX" PIPING INSULATION OR AMERICAN STANDARD "COMRADE' WALL -MOUNT SINK, MODEL NO. FOR THE SPECIFIC USE WILL BE PERMITTED. � LL V O �' U 4RJ TRUEIRO MODEL 102W "HANOI UV GUARD" INSULATION KIT. LAVATORY 0124.024). FURNISH WITH CONCEALED ARM WALL HANGER," CHROME SUPPLY 6. THE CONTRACTOR SHALL INSTALL ALL TOILET FIXTURES IN ACCORDANCE WITH ALL CODES AND AS REQUIRED IY LANDLORD'S CRITERIA. Z _ Ld .. � LAV -2 WALL 1/2" - 2" 1 1/2" _ _ STOPS AND P -TRAP, KOHLER LEVER - OPERATED CORAUIS FAUCET MODEL HANDICAP CONTROLS FOR FLUSH VALVES SHALL BE MOUNTED ON THE WIDE SIDE OF THE WATER CLOSET AND NO MORE THAN 44 A.F.F. - Z O - >' 8. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT ALL PIPING AND FIXTURES. HANGERS MOUNTED NO. K- 15182 -F WITH POP -UP DRAIN. INSULATE P -TRAP AND SUPPLY TYPE /� (� O Z F- d SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPAN OF 5 FEET. PROVIDE SWAY AND SEISMIC BRACING LINES WITH 1/2- ARMSTRONG "ARMAFLEX" PIPING INSULATION OR 7. THE CONTRACTOR SHALL ENSURE THAT ALL SUB PENETRATIONS WITHIN THE TENANT'S DEMISED PREMISES ARE PROPERLY SEALED AND `i• V) w Z U WHERE REQUIRED BY CODES. EQUIVALENT. MOUNT AT HEIGHT DIRECTED BY THE ARCHITECT. (FOR REMAIN WATERTIGHT TO PREVENT ANY POSSIBLE DAMAGE TO OTHER TENANTS AND /OR TO THE BUILDING. FAILURE TO DO SO SHALL BE AT W 2 IAJ X W .- U l- o_ Z .� NON - PUBLIC RESTROOMS) THE RISK AND SOLE EXPENSE OF THE CONTRACTOR. O = O +[ O y o URIN KOHLER "DEXTER" URINAL MODEL - 1.0 GPF a. STERILIZE WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES. 0- U N N N N a La W 10. CLEANOUTS AND FLOOR DRAINS SHALL BE INSTALLED PER LOCAL CODES. WALL COVERS ARE TO BE STAINLESS STEEL AND FLOOR UR WALL 1/2" - 2" 1 i/2 - - K" WHITE VITREOUS CHINA) FURNISH WITH HANDICAP 8. ALL MATERIAL SHALL BE NEW AND OF COMMERCIAL GRADE, AND NEAR UNDERWRITER'S LABORATORIES AND UNION LABELS WHERE SUCH LABELING APPLIES. COVERS ARE TO BE BRASS, UNLESS OTHERWISE SPECIFIED. PROVIDE FLOOR COVERS WITH INSET AREA FOR CARPETED LOCATIONS. MOUN SLOAN ROYAL Iii -1 FLUSH VALVE. TYPE REVISIONS: ALL CLEANOUT LOCATIONS SHALL BE APPROVED BY THE ESDAC PROJECT MANAGER. ELKAY SELF - CONTAINED, BARRIER -FREE, ELECTRIC, REFRIGERATED, B. PLUMBING CONTRACTOR TO FIELD VERIFY PROPER SLOPE OF EXISTING SEWER TO MAIN SEWER PRIOR TO ANY NEW PLUMIING INSTALLATION. REWIRED BY: DATE WALL- MOUNTED, 11 -LEVEL WATER COOLER, MODEL IEZSTLBC, FURNISHED 1 94/01111 11. ESCUTCHEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED, AND PLACED AT ALL PIPE PENETRATIONS AT WALLS, FLOORS AND DRINKING WITH PLUG -IN, 3 -WIRE GROUNDING TYPE SERVICE CORD. STANDARD 120V, 10. PLUMBING CONTRACTOR MUST VISIT THE JOBSITE TO BECOME FAMILIAR WITH MAJOR ITEMS SUCH AS STRUCTURAL ELEMENTS AND OTHER CEILINGS IN FINISHED AREAS. DF FOUNTAIN 1/2" - 2" 1 1/2• - - 60 HZ, 1PH. 120V RECEPTACLE REQUIRED, RATED AT 15 AMP MINIMUM, TO EXISTING JOB CONDITIONS THAT MAY AFFECT THE WORK. ADDITIONALLY, PLUMBING CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND RECEIVE 3 -WIRE PARALLEL BLADE GROUNDING TYPE MALE PLUG. PROVIDE DIMENSIONS OF SUCH ITEMS AS WASTE, VENTS, WATER LINES, ETC. 12. LEAKAGE TESTS SHALL BE PER LOCAL CODES MINIMUM AS FOLLOWS: CHROME SUPPLY STOP AND P -TRAP, SEE MANUFACTURER'S INSTRUCTIONS FOR PROPER INSTALLATION PER ADA. 11. PLUMBING CONTRACTOR TO FAMILIARIZE AND FOLLOW SPECIFICATIONS AND DETAILS CONTAINED IN DESIGN CRITERIA OF TENANT HANDBOOK. ■. TEST WATER PIPING AT 100 PSIG FOR SIX HOURS. FIAT MOP MOLDED STONE SERVICE BASIN MODEL NO. MSB -2424 WITH MS MOP SINK 1/2" 1/2" 3" 1 1/20 _ VINYL BUMPERGUARD. FURNISH WITH AMERICAN STANDARD FAUCET MODEL 12. PLUMBING CONTRACTOR TO CLEAR ALL EXISTING AND NEW DRAIN LINES AND FIXTURES, PRIOR TO TURNING OVER SPACE TO TENANT. 6. TEST DRAIN, WASTE, VENT PIPING NY A 10' WATER COLUMN FOR TWO HOURS. _ NO. 8344.112 WITH INTEGRAL VACUUM BREAKER AND STOPS. PROVIDE 42" RUNNER HOSE WITH FAUCET. 13. PLUMBING CONTRACTOR SHALL PROVIDE ACCESS TO VALVES, TRAP PRIMERS, ETC. INSTALLED BEHIND WALLS, FLOORS OR CEILINGS. 13. PUSHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO THE LANDLORD'S CRITERIA. USE A LANDLORD APPROVED ROOFING CONTRACTOR, WHERE APPLICABLE. 14. NO PLASTIC PIPING ALLOWED. WH -1 1/2 - _ _ _ RONOMITE IN STAN .2 KW, INSTANT AMPS. AND - - 14. PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR LOCAL UTILITIES REQUIREMENTS, IF APPLICABLE. WH -2 WATER HEATER (TANK TYPE) 3/4- 3/4" - - 3/4" _ RHEEM WATER HEATER MODEL NO. EGSP -6, G GALLON, 208V- 10 -60, 3 KW • �mc,m x, RUN" n n,s Samar REFER TO PUNS TO DETERMINE IF WATER METER IS REQUIRED. AND 14.4 AMPS. TP TRAP 1/2" - - - - PRECISION PLUMBING NO. RTYPE � "L"OTO END OF SECTION 220000 0 C H R C M C H O C K PRIMER BODY. ADJUSTABLE WITHO1 /2TSCOP ER FLOOR DRAIN.OPPER ZURN FLOOR DRAIN MODEL NO. Z- 415 -61, CAST IRON BODY, WITH DEEP Shremshock Engineering, Inc. FD FLOOR DRAIN - - 3" 1 1/2" - - COMBINATION INVERTIBLE CLAMP AND ADJUSTABLE COLLAR, 2" BOTTOM SEAL 6130S. Sunbury Md. Westerville, OH 43091 OUTLET WITH 6" ROUND NICKEL BRONZE STRAINER. P -TRAP t: 614 545 4550 f: 614 545 4555 wHA WATER HAMMER - - - - - - SIOUX CHIEF 650 SERIES WATER HAMMER ARRESTER OR EQUAL JEROMY T. 4321 ARRESTER CERTIFICAF�r1�1'I�I WCO WALL - - - - ZURN ZN- 1446 -IR CLEANOUT TEE, DURA- COATED CAST IRON BODY, GAS AND WATER TIGHT BRONZE PLUG AND #27087,N- Q= .• "' ,, /l ��',. "1GEN5F.,�{- CLEANOUT .� STAINLESS STEEL WALL ACCESS COVER WITH SECURING SCREW. = •., .,� * NO" 6432) t FCO FLOOR - - - - - ZURN FLOOR CLEANOUT MODEL NO. ZN -1400 WITH GAS -TIGHT AND WATER CLEANOUT -TIGHT TAPERED THREADED PLUG AND ROUND POLISHED NICKEL 'k BRONZE SCORIATED ADJUSTABLE TOP. I ► STATE OF CO CLEANOUT ZURN CLEANOUT FERRULE WITH PLUG Z1440 WITH DURA - COATED CAST IRON BODY, WITH GAS -TIGHT AND WATER -TIGHT AIS TAPERED THREADED (y, PLUG. PLUMBING SPECIFICATION NTS F PLUMBING FIXTURE SCHEDULE OONP011JOSPEC NTS _.. 00NP011EOSCHD D PLUMBING CONSTRUCTION NOTES f/7// DATE IS D' ` 2 8/ 11 DESIGNED BY: BJD DRAWN BY: BJD CHECKED MY: JTP PLUMBING SPECIFICATIONS DRAWING NUMBER: NTS P 0 1 00NP011AONQTE Q . 1 �