Loading...
11-354-057GENERAL NOTES HVAC EQUIPMENT COMMISSIONING NEW AIR DIFFUSER " "...• ,c °" " i ALL NOTES INCLUDED HEREIN ARE MADE PART OF EACH AND ALL MECHANICAL, ELECTRICAL AND PLUMBING SECTIONS OF WORK. DETAILED HVAC COMMISSIONING INFORMATION IS INCLUDED IN THE ESDAC SITE MANUAL PROVIDED TO THE CONTRACTOR AT THE START OF THE AHU -1 AHU -2 PROJECT. MANUFACTURER 1. REFER TO LANDLORD'S SPECIFICATIONS AND TENANT DESIGN CRITERIA FOR NECESSARY INFORMATION AND COORDINATION WITH OTHER LPCA LPCA TRADES. MANUFACTURER WILL CONTACT THE CONTRACTOR EARLY IN THE PROJECT TO SET PRELIMINARY DATES FOR HVAC INSPECTION, COMMISSIONING MODEL LPCAAIOF AND HVAC CONTROLS COMMISSIONING. CEILING MOUNTED 2. THE ABBREVIATION ESDAC WHEREVER IT APPEARS IN THE DRAWINGS SHALL REFER TO EXPRESS STORE DESIGN AND CONSTRUCTION . " AIR FLOW (CFM) 3,750 ANY REFERENCE TO TENANT, BRAND SPECIFIC (EXPRESS, ETC.) OR FURNISHED NY ANY OF THE ABOVE REFERS TO ESDAC. PRIOR TO HV� nu�l trF - �ySPECTION / COMMISSIONING (TO RE_C D BY,,.•j��A,NICI SUBCONTRACTOR) TMSA 3. ANY DISCREPANCY BETWEEN ESDAC DRAWINGS AND TENANT CRITERIA, ESDAC DRAWINGS SHALL TAKE PRECEDENCE. 1. CONNECT AND BLEED CONDENSATE, DUCTWORK, NATURAL GAS, CHILLED WATER PIPING, AND /OR CONDENSER WATER PIPING. 790 4. THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT ALL INSTALLED ITEMS AND LOCATIONS ARE NOT EXACTLY PLACED 2. CHARGE HVAC SYSTEMS WITH REFRIGERANT FOLLOWING MANUFACTURERS' GUIDELINES AND INSTRUCTIONS. COLD WEATHER CONDITIONS REQUIRE SPECIFIC PROCESSES, CONTACT MANUFACTURER FOR TECHNICAL SUPPORT. EXT. SP. (IN.W.C.) AND ARE NOT TO BE SCALED. 3. CONNECT POWER TO THE HVAC EQUIPMENT FOR A MINIMUM OF 24 HOURS. NOTE: IN COLD WEATHER SITUATIONS, DO NOT OPERATE THE CONTRACTOR SHALL VERIFY SYSTEM PRESSURE, FLOW AND WATER TEMPERATURE BEFORE INSTALLING SYSTEM. PIPING SHALL BE a J THE UNITS PRIOR TO COMMISSIONING! MAX FV FPM 5. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELATED PERMITS AND INSPECTION FEES. 395 JEROMY T. X4321 4j64321 j>I ft CERTIFIC jJTjH{'�I�iN i. BEFORE COMMENCING ANY WORK, CONTRACTORS SHALL REVIEW THE LATEST NATIONAL, STATE AND LOCAL CODE REQUIREMENTS HVAC EQUIPMENT SHOULD BE STARTED UP EARLY IN THE PROJECT. COORDINATE EARLY START UP OF EQUIFMENT WITH MANUFACTURER. 79.9 67.8 INCLUDING LANDLORD CRITERIA AND PERFORM THE WORK IN STRICT ACCORDANCE WITH THESE. IN CASE OF CONFLICT THE STRICTER NOTE: THE GC MAY WE BACK CHARGED FOR ADDITIONAL AC SITE VISITS BEYOND THE FIRST THREE (3) NECESSARY TO DOCUMENT THE APPROVAL THE REPORT SHALL INCLUDE CHILLED WATER TEMPERATURES AND FLOW RATES (AS APPLICABLE) AND ALL AIR FLOW REQUIREMENTS WILL PREVAIL. RESOLUTION OF THE HVAC FUNCHLIST ITEMS. 51.0 57.0 7. NO ADDITIONAL COMPENSATION SHALL BE MADE FOR ANY CHANGE ORDERS DUE TO CONTRACTOR'S FAILURE TO VISIT THE JONSITE HVAC COMMISSIONING PROCESS APD IN.W.C. AND /OR PREDETERMINE ALL EXISTING CONDITIONS BEFORE SUBMITTING HIS MID. 0.135 a = r g E a g € TITUS 127 Y15ff 1:_HVAC EQUIPMENT START UP 45.0 A. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO SUBMITTING A BID. FOR THE <30 PURPOSE OF SURVEYING EXISTING CONDITIONS, WHICH MAY AFFECT THE WORK TO BE DONE UNDER THIS SECTION, ANY 1. CONTRACTOR SHALL HAVE THE MECHANICAL AND ELECTRICAL SUBCONTRACTOR ON SITE DURING THE HVAC INSPECTION AND 60.0 DISCREPANCIES SHALL BE IMMEDIATELY REPORTED TO THE GENERAL CONTRACTOR, ESDAC OR THE LANDLORD'S FIELD REPRESENTATIVE COMMISSIONING. BUDGET 5 HOURS FOR THE HVAC INSPECTION AND COMMISSIONING. (NOTE: THESE HOURS ARE TO BE USED FOR THE FLOW GPM FOR CLARIFICATION. COMPLETION OF THE COMMISSIONING PROCESS &Y. ADDITIONAL HOURS WILL NOT BE APPROVED FOR WORK THAT WAS IN SCOPE HANDLING UNIT SCHEDULE FOR OUTSIDE AIR QUANTITIES. N C7 AND NOT COMPLETED PRIOR TO THE COMMISSIONING PROCESS.) 1.62 1. AFTER BID, ANY QUESTIONS RELATING TO SPECIFIC M, E, OR P ISSUES ARE TO NE DIRECTED AS RFI'S THROUGH THE ESDAC 2. CONTRACTOR TO COMPLETE AND EMAIL, OR FAX, THE HVAC EQUIPMENT START UP SURVEY TO MANUFACTURER PRIOR TO THE HVAC 1,3 PROJECT MANAGER. STARTUP. 129.24 3. MANUFACTURER COORDINATES THE HVAC EQUIPMENT COMMISSIONING. CONTRACTOR IS RESPONSIBLE FOR COMMUNICATING SCHEDULE SENSIBLE MOH C. SHOULD THE SPACE HAVE BEEN INACCESSIBLE FOR INSPECTION CONTRACTOR MUST INDICATE SO ON HIS BID. DATE CHANGES TO MANUFACTURER AND SUBCONTRACTORS. MARK TO BID AND CONSTRUCTION. 4. PROVIDED THERE ARE NO HVAC INSTALLATION ISSUES. SYSTEMS SHALL BE STARTED FOR TEMPORARY OPERATION ON LOCAL CONTROL. INPUT KW 1. THE GENERAL CONTRACTOR'S FIRE SPRINKLER SUBCONTRACTOR SHALL DESIGN AND INSTALL FIRE SPRINKLER SYSTEM CONFORMING TO 5. IF THERE ARE HVAC INSTALLATION FUNCHLIST ITEMS, THE GC MUST CORRECT THEM AND RESCHEDULE COMMISSIONING WITH V f- W z = z - >- m LANDLORD'S CRITERIA, TENANT'S REQUIREMENTS AND PER LOCAL CODES AND NFPA STANDARDS. MANUFACTURER. 40.99 9. THE CONTRACTOR, WITHIN FIFTEEN (15) DAYS OF THE AWARD OF THE CONTRACT, SHALL SUBMIT TO THE OWNER, SIX (6) COPIES OF A VISIT 2: HVAC CONTROLS COMMISSIONING "T$ B COMPLETE LIST OF MATERIALS AND EQUIPMENT PROPOSED FOR THE JON INCLUDING ALL DATA, PART NUMBERS, RATING CAPACITY, SIZE, 2 1 2 DIMENSIONS, ELECTRICAL DATA, GRADE, MANUFACTURER, AND ANY OTHER DESCRIPTIVE DATA FOR ALL EQUIPMENT OR SYSTEMS THAT THE CONTROLS COMMISSIONING IS PERFORMED BY THE MANUFACTURER IN CONJUNCTION WITH THE GENERAL CONTRACTOR AND THE ELECTRICAL DEVIATE FROM SPECIFIED ITEMS. ANY DELAYS OR COSTS DUE TO THESE DEVIATIONS, WILL BE THE RESFpN51NILITY OF THE CONTRACTOR. MECHANICAL AND ELECTRICAL SUBCONTRACTORS. ALLOW FOR 4 HOURS TO COMPLETE THE CONTROLS COMMISSIONING. NOTE: THESE HOURS 460 3 60 10 "x10" ARE TO BE USED FOR THE COMPLETION OF THE COMMISSIONING PROCESS OM. ADDITIONAL HOURS WILL NOT BE APPROVED FOR WORK MOTOR HP 10. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISPOSAL OF ALL UNUSED OR ABANDONED MATERIALS AND EQUIPMENT, AND ITS THAT WAS IN SCOPE AND NOT COMPLETED PRIOR TO THE COMMISSIONING PROCESS.) REMOVAL OFF THE LANDLORD'S PREMISES. MCA (AMPS) 21.56 21.56 FOLLOW THE CONSTRUCTION DRAWINGS AND MANUFACTURER'S DETAILS AND DRAWINGS DURING THE INSTALLATION OF THE HVAC CONTROL 11. OWNER RESERVES THE RIGHT TO HAVE CONSTRUCTION REVIEWED BY AN OUTSIDE CONSULTANT PRIOR TO ACCEPTANCE OF THE PROJECT. EQUIPMENT. 25 12. EACH CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP RELATED TO HIS WORK FOR A MINIMUM PERIOD OF ONE YEAR 1. CONTRACTOR TO COMPLETE AND EMAIL, OR FAX, THE CONTROLS COMMISSIONING SURVEY TO MANUFACTURER PRIOR TO THE CONTROL APPROX. WEIGHT (LIPS) FROM THE DATE WHICH THE OWNER ACCEPTS THE PROJECT. THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER OR TENANT COMMISSIONING. FINISH SHALL CORRECT ANY DEFECTS IN MATERIALS OR WORKMANSHIP DURING THIS GUARANTEE PERIOD. 2. CONNECT THE HVAC CONTROLS TO AN OPERATIONAL ANALOG PHONE LINE OR ETHERNET CONNECTION TO ALLOW COMMUNICATION. IF 1 -3, 5 -11 1 -3, 5 -11 NECESSARY, UTILIZE SITE FAX LINE TO CONNECT TO THE CONTROLS MODEM IN THE IFS PANEL 13. EACH CONTRACTOR SHALL BE RESPONSIBLE AND ENSURE A CLEAN INSTALLATION ESPECIALLY IN EXPOSED CEILING AREAS. THE FINAL 3. CONTACT MANUFACTURER AT THE SCHEDULED TIME FOR THE CONTROLS COMMISSIONING. 1 APPROVAL OF THIS WORK WILL BE ISSUED NY ESDAC PROJECT MANAGER. 4. PROVIDED THERE ARE NO OPEN ISSUES, VISIT 2 IS COMPLETE. IN THE EVENT THERE ARE OPEN ITEMS, THE GC MUST CORRECT THEM ACCESSORIES ( "S" INDICATES STANDARD; "O" INDICATES OPTIONAL); 1. S- COMBINATION FAN CONTACTOR /DISCONNECT SWITCH (IN HEATER CONTROL CABINET WHERE APPLICABLE). 2. S- FACTORY PROVIDED 1" MATT INSULATION. 3. S- FACTORY PROVIDED ELECTRIC HEATER WITH INTEGRAL FAN CONTACTOR (REHEAT POSITION). 4. S- FACTORY FURNISHED MIXING BOX WITH ACTUATOR AND 0 -10 VOLT ADAPTER. 5. S- FACTORY PROVIDED CONDENSATE PAN OVERFLOW SWITCH. 6. S- FACTORY FURNISHED FAN PROVING SWITCH. 7. S- FACTORY FURNISHED CHILLED WATER CONTROL VALVES (SHIPPED SEPARATELY). 9. S- FACTORY FURNISHED FREEZE PROTECTION THERMOSTAT. 9. S- FACTORY FURNISHED VIBRATION ISOLATORS. 10. S- FACTORY FURNISHED CLAMP -ON WATER TEMP. SENSORS. 11. S -6 ROW, 12 FINS PER INCH CHILLED WATER COIL. 12. 0 -1 ROW, 12 FINS PER INCH CHILLED WATER COIL 13. CONTRACTOR FURNISHED RECIRCULATION PUMPS. NOTES: 1. REFER TO CONTROL WIRING SCHEMATICS FOR ANY FIELD INSTALLED CONTROL DEVICES NOT FACTORY INSTALLED. AND RESCHEDULE THE CONTROLS COMMISSIONING 2,6 AIR HANDLING UNIT SCHEDULE (ELECTRIC HEAT) MARK AHU -1 AHU -2 DUCT SMOKE DETECTOR MANUFACTURER TRANE PACKAGE NUMSER LPCA LPCA MODEL GEMINI 122 MODEL LPCAAIOF LFCAA10F CEILING MOUNTED X AIR FLOW (CFM) 3,750 3,750 FIRE STOPPING TMSA OA FLOW (CFM) 795 790 X IN BID IF REQUIRED. CONTRACTOR SHALL COORDINATE /CONFIRM DRAIN DOWN /HOT TAPS. IN THE FIRST TWO WEEKS OF THE PROJECT, EXT. SP. (IN.W.C.) 0.9 0.9 THE CONTRACTOR SHALL VERIFY SYSTEM PRESSURE, FLOW AND WATER TEMPERATURE BEFORE INSTALLING SYSTEM. PIPING SHALL BE a J CHILLED WATER COOLING COIL MAX FV FPM 385 395 JEROMY T. X4321 4j64321 j>I ft CERTIFIC jJTjH{'�I�iN 112"02" EAT 'FD1 1 79.9 67.8 79.9 67.1 LAY -IN APPROVAL THE REPORT SHALL INCLUDE CHILLED WATER TEMPERATURES AND FLOW RATES (AS APPLICABLE) AND ALL AIR FLOW UT 'FDI 1 59.0 57.0 51.0 57.0 BALANCE DATA. uj Wow APD IN.W.C. 0.135 0.135 a = r g E a g € TITUS 127 EWT ' F 45.0 45.0 <30 LWT 'FDO WI 60.0 60.0 CD CEILING DIFFUSER OR CONDENSATE DRAIN MFR MANUFACTURER 2,6 FLOW GPM 17.18 17.19 HANDLING UNIT SCHEDULE FOR OUTSIDE AIR QUANTITIES. N C7 WFD FT 1.62 1.62 0 tD � `r N 0 1,3 TOTAL MOH 129.24 129.24 SENSIBLE MOH 93.9 93.8 MARK TO BID AND CONSTRUCTION. ELECTRIC HEAT INPUT KW 12 12 V f- W z = z - >- m MANUFACTURER OUTPUT (MIN ) 40.99 40.98 CODED NOTES "T$ B STAGES 2 1 2 355 -RL 5OF ELECTRICAL VOLTS G HZ 46y3/60 60 460 3 60 10 "x10" 22 x10 MOTOR HP 2 2 FRAME SIZE ( "LxW") MCA (AMPS) 21.56 21.56 MOCP AMPS 25 25 LAY -IN WALL MOUNTED APPROX. WEIGHT (LIPS) 603.3 603.3 FINISH TITUS #27 ACCESSORIES 1 -3, 5 -11 1 -3, 5 -11 NOTES 1 1 <30 ACCESSORIES ( "S" INDICATES STANDARD; "O" INDICATES OPTIONAL); 1. S- COMBINATION FAN CONTACTOR /DISCONNECT SWITCH (IN HEATER CONTROL CABINET WHERE APPLICABLE). 2. S- FACTORY PROVIDED 1" MATT INSULATION. 3. S- FACTORY PROVIDED ELECTRIC HEATER WITH INTEGRAL FAN CONTACTOR (REHEAT POSITION). 4. S- FACTORY FURNISHED MIXING BOX WITH ACTUATOR AND 0 -10 VOLT ADAPTER. 5. S- FACTORY PROVIDED CONDENSATE PAN OVERFLOW SWITCH. 6. S- FACTORY FURNISHED FAN PROVING SWITCH. 7. S- FACTORY FURNISHED CHILLED WATER CONTROL VALVES (SHIPPED SEPARATELY). 9. S- FACTORY FURNISHED FREEZE PROTECTION THERMOSTAT. 9. S- FACTORY FURNISHED VIBRATION ISOLATORS. 10. S- FACTORY FURNISHED CLAMP -ON WATER TEMP. SENSORS. 11. S -6 ROW, 12 FINS PER INCH CHILLED WATER COIL. 12. 0 -1 ROW, 12 FINS PER INCH CHILLED WATER COIL 13. CONTRACTOR FURNISHED RECIRCULATION PUMPS. NOTES: 1. REFER TO CONTROL WIRING SCHEMATICS FOR ANY FIELD INSTALLED CONTROL DEVICES NOT FACTORY INSTALLED. NEW DUCIA�K NEW RETURN AIR GRILLE NEW DUCTWORK • • „ .: • F�w EXISTING EXISTING DUCTI!O0 TO i Y ; • • ; i i s " -- SUPPLY AIR DIFFUSER -------- - - - - -� REMAIN EXISTING ������ ' EXISTING DUS7CRK TO .... ; • • • �"" 'K _� RETURN AIR GRILLE�, BE REMOVED;,, ACCESS PANEL : i Y Y " i . W • .. • " • • J • .v w r FLEXIBLE AIR DUCT ® EXHAUST AIR REGISTER 4' -0" MAX. Z : LD(1) 3/4" 6' LINEAR DIFFUSER NOTATION - MANUAL VOLUME DAMPER Z O ys APPROX. LENGTH, 6 FT COMBINATION FIRE /SMOKE D : SLOT WIDTH, 3/4 IN. AFTER a NO. OF SLOTS, 1 FIRE DAMPER Z s ' LINEAR DIFFUSER O W AUTOMATIC IACKDRAFT t DAMPER 0 U) SHEET METAL PLENUM W t WITH 1/2" LINING UNDERCUT DOOR CD Q CARBON DIOXIDE SENSOR OND OPPOSED BLADE DAMPER U J { {v' �H HUMIDISTAT (n M QS TEMPERATURE SENSOR (R) RELOCATED UJI 0 4. 0 THERMOSTAT (E) EXISTING a U) " 5D DUCT SMOKE DETECTOR w If•ry r POINT OF CONNECTION ` 10 LEGEND AND SYMBOLS "TS 000102300SYMm C O TEMPERATURE SENSOR FURNISHED NY MANUFACTURER, INSTALLED AND WIRED BY MECHANICAL CONTRACTOR 48' A.F.F. SEE SHEET M04.1 FOR RESPONSIBILITY SCHEDULE. AHU -1 AND AHU -2: MECHANICAL CONTRACTOR TO REMOVE AND DISPOSE OF EXISTING AHUS, ALL ASSOCIATED DUCT WORK AND K ACCESSORIES. ESDAC SHALL PROVIDE AND MECHANICAL CONTRACTOR INSTALL A CHILLED WATER AIR HANDLING UNIT WITH ELECTRIC _ __50_ HEAT, HORIZONTALLY. INSTALL WITH PROPER SERVICE CLEARANCE AREA AS RECOMMENDED BY MANUFACTURER AND AS SHOWN ON : W PLANS. MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL STRUCTURAL STEEL, VIBRATION ISOLATION, SECONDARY DRAIN FAN p S. AND 3 SETS OF FILTERS. CHANGE FILTER AFTER FINAL CLEANING AND AGAIN PRIOR TO AIR BALANCE. SEE AIR HANDLING UNITr ° ° y SCHEDULE FOR FURTHER INFORMATION. COORDINATE WITH EXISTING STRUCTURE. FIELD VERIFY EXISTING CONDITIONS. 14. PROVIDE THREE SETS OF "AS- BUILT" DRAWINGS AND TWO BOUND SETS OF ALL OPERATIONS MANUALS, DIAGRAMS, SERVICE CONTRACTS O SUPPLY AND RETURN AIR DUCT CONNECTIONS TO AHU SHALL BE MADE FULL SIZE OF EQUIPMENT OPENING WITH FLEXIBLE DUCT AND GUARANTEES TO ESDAC PRECEDENT TO FINAL PAYMENT. A REPORT PREPARED NY AN INDEPENDENT AIR BALANCE CONTRACTOR, VISIT 3: FINAL HVAC INSPECTION CONNECTIONS AT UNIT. TRANSITION AS REQUIRED. W y W # sv F HIRED NY GC, MUST BE INCLUDED IN THE CLOSE -OUT PACKAGE. .^ lk ° � � �+ -j . "O : N - THIS VISIT IS TO DO A FINAL INSPECTION OF THE HVAC EQUIPMENT AND CONTROL INSTALLATION. THIS VISIT MUST TAKE PLACE PRIOR TO CONSTRUCTION COMPLETION. HVAC GENERAL NOTE THE FOLLOWING ITEMS MUST BE COMPLETED PRIOR TO THE INSPECTION: 1. HVAC SYSTEM INSTALLATION IS COMPLETE - NO OPEN PUNCHUST ITEMS EXCEPT FOR POSSIBLY THE PERMANENT PHONE LINE. 1. THESE PLANS MAY BE USED FOR CONSTRUCTION ONLY AFTER APPROVAL IS OBTAINED FROM THE BUILDING DEPARTMENT MECHANICAL 2. AIR BALANCE IS COMPLETE. NOTE: AIR BALANCE IS IN THE CONTRACTOR'S SCOPE OF WORK. PLAN CHECK DIVISION AND THAT DIVISION'S STAMPED APPROVAL AND AUTHORIZED SIGNATURE APPEAR ON THE PLANS. , THE GC MUST COMPLETE TRANE 'S SITE VISIT E3 SURVEY PRIOR TO THE VISIT BEING SCHEDULED. 2. COORDINATE ALL WORK WITH ALL TRADES INCLUDED BUT NOT LIMITED TO ELECTRICAL, PLUMBING, FIRE PROTECTION AND STRUCTURAL CONTRACTORS. INSTALL ALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. NO ITEM SUCH AS PIPE, THE CONTRACTOR IS RESPONSIBLE FOR HAVING THE MECHANICAL SUBCONTRACTOR AND THE ELECTRICAL SUBCONTRACTOR ON SITE DURING THE DUCT, ETC. IS TO COME IN CONTACT WITH ANY EQUIPMENT. FINAL INSPECTION. BUDGET 4 HOURS FOR THE FINAL INSPECTION. 3. REFER TO ARCHITECTURAL DRAWINGS FOR DEMOLITION WORK. 1. THE CONTRACTOR IS RESPONSIBLE FOR COMMUNICATING SCHEDULE DATE CHANGES FOR THE FINAL INSPECTION 2. FILTERS ARE TO BE REPLACED DURING THIS VISIT. FILTERS ARE TO BE PROVIDED NY THE CONTRACTOR AND SHALL NE ON SITE WHEN 4. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT FIXTURE LOCATION. THE TRANE TECHNICIAN ARRIVES. 3. WHEN COMPLETE AND ALL OPEN CONTRACTOR HVAC ISSUES ARE RESOLVED A CONTROL NUMBER IS ISSUED BY THE MANUFACTURER. 5. CONTRACTOR SHALL PROVIDE CUT SHEETS TO ESDAC FOR ALL EQUIPMENT AND DEVICES FURNISHED BY THE CONTRACTOR THAT DEVIATE IT IS RECORDED INSIDE THE CONTROL PANEL DOOR IN THE IFS ELECTRICAL PANEL AND ON THE FINAL VISIT CHECK LIST. FROM SPECIFIED ITEM FOR REVIEW AND APPROVAL PRIOR TO THE PURCHASE OF ANY SUCH EQUIPMENT OR DEVICES. 4. IN THE EVENT THERE ARE OPEN ITEMS, THE CONTRACTOR MUST CORRECT THEM AND RESCHEDULE THE FINAL INSPECTION WITH MANUFACTURER. GC IS RESPONSIBLE FOR REPLACEMENT OF SHEAVES, PULLEYS, AND BELTS, IF NEEDED. 6. HVAC CONTRACTOR IS RESPONSIBLE TO INQUIRE WITH THE LANDLORD'S REPRESENTATIVE ON ANY SMOKE EVACUATION SYSTEM IN USE 5. THE HVAC CONTROL NUMBER WILL BE ISSUED AT THE END OF THE VISIT PROVIDED THERE ARE NO UNRESOLVED HVAC FUNCHLIST AT THE MALL AT THE TIME OF THE BID. IF THE SAID SYSTEM IS NOT ADEQUATELY DESCRIBED ON THE DRAWINGS, THE MECHANICAL ITEMS. CONTRACTOR IS RESPONSIBLE TO INFORM THE GENERAL CONTRACTOR AND INCLUDE THE COST AS A SEPARATE LINE ITEM IN THE DID. NO ADDITIONAL MONEYS SHALL NE AWARDED FOR TIE -IN REQUIREMENTS TO A LANDLORD'S SMOKE EVACUATION SYSTEM THAT IS IN THE TRANS TECHNICIAN WILL WRITE THE HVAC CONTROL NUMBER ON THE STICKER INSIDE THE WR CONTROLS PANEL (IFS PANEL) AND ON THE EXISTENCE AT THE TIME OF THE BID, WITHOUT HAVING IDENTIFIED A SEPARATE LINE ITEM FOR THE SMOKE EVACUATION SYSTEM AT THE FINAL VISIT CHECK LIST. TIME OF THE MID. EXHAUST AND VENTILATION FAN SCHEDULE MARK EF -1 NO DUCT SMOKE DETECTOR MANUFACTURER LOREN COOK FIRE DAMPER(5) SD -4 MODEL GEMINI 122 TITUS X TYPE CEILING MOUNTED X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY DRIVE TYPE DIRECT FIRE STOPPING TMSA PERFORMANCE AIR FLOW CFM 75 X IN BID IF REQUIRED. CONTRACTOR SHALL COORDINATE /CONFIRM DRAIN DOWN /HOT TAPS. IN THE FIRST TWO WEEKS OF THE PROJECT, 21 M _ v Fr-W EXT. STATIC IN W.C. 0.375 THE CONTRACTOR SHALL VERIFY SYSTEM PRESSURE, FLOW AND WATER TEMPERATURE BEFORE INSTALLING SYSTEM. PIPING SHALL BE a J FRAME SIZE ( "LxW") FAN SPEED RPM 1500 I wan x �_ D JEROMY T. X4321 4j64321 j>I ft CERTIFIC jJTjH{'�I�iN 112"02" ELECTRICAL VOLTS D HZ 120/11/60 LAY -IN APPROVAL THE REPORT SHALL INCLUDE CHILLED WATER TEMPERATURES AND FLOW RATES (AS APPLICABLE) AND ALL AIR FLOW r<���o: y���Ze ���sWB, FAN MOTOR WATTS 70 BALANCE DATA. uj Wow TITUS 127 APPROX. WEIGHT (LSS) 15 a = r g E a g € TITUS 127 NOISE CRITERIA LEVEL SERVES RESTROOM <30 <30 ACCESSORIES 1 CD CEILING DIFFUSER OR CONDENSATE DRAIN MFR MANUFACTURER 2,6 MECHANICAL CONTRACTOR SHALL PROVIDE OUTSIDE AIR DUCT WITH A GRAVITY IACKDRAFT DAMPER AND BALANCE DAMPER. SEE AIR NOTES 1 HANDLING UNIT SCHEDULE FOR OUTSIDE AIR QUANTITIES. N C7 - ACCESSORIES ( "S" INDICATES STANDARD; "O' INDICATES OPTIONAL): 1. S -11RD SCREEN, S- OACKDRAFT DAMPER, S- DISCONNECT SWITCH. NOTES: 1. INTERLOCK WITH LIGHTS. 7. ACCESS TO ALL COMPONENTS AND EQUIPMENT MUST BE PROVIDED TO MEET CODE AND SERVICE /MAINTENANCE EASE, 11 MOUNT TRANSFER GRILLE AS HIGH AS POSSIBLE. 12 THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL A 1/2"x1/2" ALUMINUM WIRE SCREEN OVER OPEN END OF RETURN AIR 9. PRIOR TO STARTUP OF HVAC EQUIFMENT, MECHANICAL CONTRACTOR WILL CONFIRM WITH ONE OF THE LISTED HVAC MANUFACTURER REPRESENTATIVES THAT CORRECT POWER FOR EQUIPMENT HAS BEEN PROVIDED TO ESDAC PROVIDED HVAC UNITS AND HAS BEEN TURNED ON FOR A MINIMUM OF 24 HOURS. ESDAC RESERVES THE RIGHT TO CHECK CONSTRUCTION COMPLIANCE WITH PLANS AND SPECIFICATIONS. SHOULD THE OWNER FIND CORRECTIVE WORK TO BE NECESSARY, HE WILL NOTIFY CONTRACTOR OF SUCH WORK IN WRITING AND EXPECT COMPLIANCE PERFORMED WITH DUE DILIGENCE. IF ANY CORRECTIVE WORK IS DEEMED TO NE NECESSARY, THE COST OF REINSPECTIONS WILL BE BORNE NY THE CONTRACTOR. THE MECHANICAL CONTRACTOR WILL THEN ENSURE THAT THE EQUIPMENT IS POWERED FOR A MINIMUM OF 24 HRS BEFORE START -UP. 9. IF WORK IS REQUIRED BY ESDAC IN ORDER TO IMPROVE, CHANGE OR CORRECT AIR CONDITIONING OPERATIONAL CONDITIONS DUE TO: PART MALFUNCTION, WARRANTY OR OTHER INABILITY TO PROVIDE THE COMFORT CONDITIONS REQUIRED NY THE STORE, CONTRACTOR SHALL BE DIRECTED BY ESDAC TO ADDRESS THIS WORK IN A TIMELY MANNER. IF IT BECOMES EVIDENT THAT THE CONTRACTOR CANNOT ACCOMPLISH THE TASK, THEN AFTER 72 HOURS OF WRITTEN NOTICE THE OWNER MAY, AT HIS DISCRETION, TAKE OVER SUCH WORK AND BACK CHARGE THE CONTRACTOR FOR ANY CORRECTIVE WORK THAT WAS REQUIRED DUE TO LACK OF PERFORMANCE, WORKMANSHIP AND /OR ADHERENCE TO PLANS AND SPECIFICATIONS. 10. UPON COMPLETION OF THE WORK, CONTRACTOR SHALL VERIFY THE PROPER WORKING ORDER OF THE SYSTEM(S) AND MAKE ANY ADJUSTMENTS AS REQUIRED. 11. PROVIDE FILTER CHANGES THROUGHOUT CONSTRUCTION AS REQUIRED FOR ALL HVAC EQUIPMENT. PROVIDE FILTER CHANGES AT LEAST TWICE MONTHLY ONCE STARTED, PRIOR TO TEST AND BALANCE, AND LASTLY, PRIOR TO MERCHANDISING. ANY EQUIPMENT OR DUCTWORK THAT BECOMES SOILED DUE TO A LACK OF FILTER CHANGES, AS DETERMINED SOLELY NY THE ESDAC PROJECT MANAGER, SHALL BE CORRECTED ON BEHALF OF THE CONTRACTOR AND CHANGES GILLED TO THE CONTRACTOR. 12. NOTES TO EQUIPMENT SCHEDULES USE THE WORDS "FURNISH" AND "PROVIDE ". WHERE THE WORD "FURNISH" IS USED, SOME FIELD INSTALLATION I5 REQUIRED BY THE CONTRACTOR. WHERE THE WORD "PROVIDE" IS USED, NO FIELD INSTALLATION IS REQUIRED AS THE DEVICES OR ACCESSORIES ARE FURNISHED AND INSTALLED BY THE MANUFACTURER AS PART OF THE EQUIPMENT WHEN SHIPPED. 13. UNLESS OTHERWISE SPECIFIED, CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, LABOR AND SUPERVISION NECESSARY TO COMPLETE THE HEATING, VENTILATING AND AIR CONDITIONING WORK IN ACCORDANCE WITH THE SPECIFICATIONS AND STANDARDS AS OUTLINED HEREIN. SEE RESPONSIBILITY SCHEDULE ON SHEET M04.1. 14. MECHANICAL CONTRACTOR SHALL FIELD MEASURE EXISTING ROOF CURI(S) FOR CURB ADAFTER(S), WHERE APPLICABLE, AND SHALL SUPPLY DIMENSIONS TO ESDAC HVAC SUPPLIER PRIOR TO START OF CONSTRUCTION. 15. ALL HEATING VENTILATING AND AIR CONDITIONING EQUIPMENT SHALL BE CLEARLY IDENTIFIED WITH TENANT'S NAME, SPACE NUMBER AND UNIT DESIGNATION AND SHALL NE STENCILED IN 4" HIGH BLACK LETTERS. 16. FURNISH AND INSTALL ALL NEW DUCTWORK INCLUDING INSTALLATION OF OWNER SUPPLIED PLENUM BOOTS, SUPPLY AIR DIFFUSERS, AND RETURN AIR GRILLES. (SEE AIR DEVICE SCHEDULE ON THIS SHEET). A. ALL MATERIAL SHALL BE NEW AND OF COMMERCIAL GRADE AND NEAR UNDERWRITER'S LABORATORY AND UNION LABELS WHERE SUCH LABELING APPLIES. 9. ALL PLENUMS SHALL BE FABRICATED FROM GALVANIZED SHEET METAL OF THE APPROPRIATE GAUGE AND OE INSULATED WITH A NATIONAL ACCOUNTS-HYAC SUPPLIE11 GENERAL HVAC EQUIPMENT NOTED HAS BEEN PREPURCHASED NY EXPRESS STORE DESIGN A CONSTRUCTION. WITHIN THE FIRST WEEK OF CONSTRUCTION, THE GENERAL CONTRACTOR OR THEIR MECHANICAL SUBCONTRACTOR SHALL NOTIFY SUPPLIER VIA EMAIL THE EMAIL SHALL STATE THE PHONE NUMBER, EMAIL ADDRESS AND DELIVERY ADDRESS OF THE CONTACT PERSON RESPONSIBLE FOR SCHEDULING AND RECEIVING THE HVAC EQUIPMENT AND ACCESSORIES. EQUIPMENT AND ACCESSORIES ARE TO BE SHIPPED NY ANY SPECIAL SHIPPING INSTRUCTIONS REQUIRED OR REQUESTED. ALLOW A MINIMUM OF TWO WEEKS AFTER CONSTRUCTION STARTS FOR DELIVERY UNLESS SPECIAL ARRANGEMENTS ARE MADE PRIOR TO THE START OF CONSTRUCTION. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL SHIPPING COST INCURRED IF DELIVERY IS REQUIRED PRIOR TO THE STANDARD TWO WEEKS SCHEDULED. IF THIS INFORMATION IS NOT SENT TO NATIONAL ACCOUNT SUPPLIER, THEN THE EQUIPMENT AND ACCESSORIES WILL BE SHIPPED IN ACCORDANCE WITH THE PURCHASE ORDER DATE AND INSTRUCTIONS ISSUED BY ESDAC AND THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR UNLOADING AND STORAGE OF EQUIPMENT UNTIL SUCH TIME AS REQUIRED FOR INSTALLATION ON PROJECT. IF OWNER'S REPRESENTATIVE IS PERFORMING START UP, THEN GC AND /OR MECHANICAL CONTRACTOR MUST COORDINATE WITH MANUFACTURER REP. 2 WEEKS PRIOR TO CONSTRUCTION END DATE. CONTACT INFORMATION JIM HOOVLER JODY SOWERS VICKI WILSON TRANE NATIONAL ACCOUNTS REPRESENTATIVE TRANE TECHNICAL SUPPORT, PRIMARY HVAC COMMISSIONING EMAIL: jeheevierfIrane.cem EMAIL: jsowers0frane.cem EMAIL: Vield.wilson9trene.cem PHONE NO.: 866.415.2499+ PHONE NO.: 866.415.2499 PHONE NO.: 866.415.2499 FAX NO.: 614.473.3587 FAX NO.: 614.473.3587 FAX NO.: 614.473.3517 SCOTT CRABTREE JOHN D'AGOSTINO TRANE NATIONAL ACCOUNTS REPRESENTATIVE TRANE SHIPPING EMAIL: secra6traesfrane.com (OR TECHNICAL SUPPORT, SECONDARY) PHONE NO: 866.415.2499 EMAIL: Ishn.4'e jestinesfrane.com FAX NO.: 614.473.3597 PHONE NO: 866.415.2499 FAX NO.: 614.473.3597 CODE OF MIAMI -DADE COUNTY, FLORIDA CHAPTER 8 SEC. 8 -10. PERMITS HVAC DESIGN REOUIREMENTS O DASHED LINE AROUND HVAC EQUIPMENT REPRESENTS MANUFACTURER'S RECOMMENDED CLEARANCES FOR EQUIPMENT MAINTENANCE. IT -M jjF�_ NO DUCT SMOKE DETECTOR IS THE MECHANICAL CONTRACTORS RESPONSIBILITY TO MAINTAIN SERVICE CLEARANCES THE FULL HEIGHT OF THE UNIT IN THIS AREA. �= FIRE DAMPER(5) SD -4 5O SUPPLY AIR TEMPERATURE SENSOR FURNISHED BY MANUFACTURER, INSTALLED AND WIRED IN DUCT BY MECHANICAL CONTRACTOR. SEE: SMOKE DAMPER(S) TITUS X SHEET M04.1 FOR RESPONSIBILITY SCHEDULE. _ • B � w X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY O THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL CHILLED WATER PIPING FROM THE EXISTING LANDLORD MAINS TO THE AIR wnU1FtHo"� !3= h FIRE STOPPING TMSA HANDLING EQUIPMENT AS SHOWN ON PLANS. CONTRACTOR MUST VERIFY EXISTING TAP SIZES, PRIOR TO BID AND INCLUDE NEW TAPS SMOKE CONTROL A AIR HANDLING UNIT X IN BID IF REQUIRED. CONTRACTOR SHALL COORDINATE /CONFIRM DRAIN DOWN /HOT TAPS. IN THE FIRST TWO WEEKS OF THE PROJECT, 21 M _ v Fr-W SEE PLAN AP ACCESS PANEL L LONG ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATING LI POUND THE CONTRACTOR SHALL VERIFY SYSTEM PRESSURE, FLOW AND WATER TEMPERATURE BEFORE INSTALLING SYSTEM. PIPING SHALL BE a J FRAME SIZE ( "LxW") 12 x10 INSTALLED IN ACCORDANCE WITH THE LANDLORD'S SYSTEM REQUIREMENTS AND AS DETAILED ON PLANS. UPON COMPLETION OF INSTALLATION, EACH CONTRACTOR MUST SUBMIT I wan x �_ D JEROMY T. X4321 4j64321 j>I ft CERTIFIC jJTjH{'�I�iN 112"02" A CERTIFIED TEST AND BALANCE REPORT TO THE LANDLORD FOR REVIEW AND y W B r i � W� °e = M 1 -_ 94 LAY -IN APPROVAL THE REPORT SHALL INCLUDE CHILLED WATER TEMPERATURES AND FLOW RATES (AS APPLICABLE) AND ALL AIR FLOW r<���o: y���Ze ���sWB, BHP BRAKE HORSEPOWER MAX MAXIMUM SURFACE MOUNTED BALANCE DATA. uj Wow TITUS 127 BLDG BUILDING MPH THOUSAND BTU PER HOUR ITUH BRITISH THERMAL UNIT PER HOUR MCA MINIMUM CIRCUIT AMPACITY O7 DUCT MOUNTED SUPPLY AIR SMOKE DETECTOR FURNISHED AND IN STALLED IN DUCT NY MECHANICAL CONTRACTOR. POWER WIRING a = r g E a g € TITUS 127 NOISE CRITERIA LEVEL SHALL BE PROVIDED BY ELECTRICAL CONTRACTOR. INTERLOCK TO SHUT DOWN UNIT ON SIGNAL FROM FIRE ALARM SYSTEM. W w w M? w E w w KL5T�r�hC <30 <30 CD 0 ACCESSORIES CD CEILING DIFFUSER OR CONDENSATE DRAIN MFR MANUFACTURER 2,6 MECHANICAL CONTRACTOR SHALL PROVIDE OUTSIDE AIR DUCT WITH A GRAVITY IACKDRAFT DAMPER AND BALANCE DAMPER. SEE AIR (� i CFM CUBIC FEET PER MINUTE MOCP MAXIMUM OVER CURRENT PROTECTION HANDLING UNIT SCHEDULE FOR OUTSIDE AIR QUANTITIES. N C7 - 1,3 O MECHANICAL CONTRACTOR SHALL REMOVE AND DISPOSE OF EXISTING OUTSIDE AIR DUCT. CAP EXISTING OUTSIDE AT LOCATION SHOWN 0 tD � `r N 0 1,3 - AND RE- INSULATE AS REQUIRED. COORDINATE WITH LANDLORD AND GC. FIELD VERIFY EXACT LOCATION AND REQUIREMENTS. J O10 TENANT CONTRACTOR SHALL LL FIELD VERIFY EXACT LOCATION OF ALL HVAC EQUIPMENT. COORDINATE WITH LANDLORD ENGINEER PRIOR � FAN COIL UNIT S FF S LIAR FEET FLLA FULL LOAD AMPS S S AINLEsS STEEL MARK TO BID AND CONSTRUCTION. � RG -3 7. ACCESS TO ALL COMPONENTS AND EQUIPMENT MUST BE PROVIDED TO MEET CODE AND SERVICE /MAINTENANCE EASE, 11 MOUNT TRANSFER GRILLE AS HIGH AS POSSIBLE. 12 THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL A 1/2"x1/2" ALUMINUM WIRE SCREEN OVER OPEN END OF RETURN AIR 9. PRIOR TO STARTUP OF HVAC EQUIFMENT, MECHANICAL CONTRACTOR WILL CONFIRM WITH ONE OF THE LISTED HVAC MANUFACTURER REPRESENTATIVES THAT CORRECT POWER FOR EQUIPMENT HAS BEEN PROVIDED TO ESDAC PROVIDED HVAC UNITS AND HAS BEEN TURNED ON FOR A MINIMUM OF 24 HOURS. ESDAC RESERVES THE RIGHT TO CHECK CONSTRUCTION COMPLIANCE WITH PLANS AND SPECIFICATIONS. SHOULD THE OWNER FIND CORRECTIVE WORK TO BE NECESSARY, HE WILL NOTIFY CONTRACTOR OF SUCH WORK IN WRITING AND EXPECT COMPLIANCE PERFORMED WITH DUE DILIGENCE. IF ANY CORRECTIVE WORK IS DEEMED TO NE NECESSARY, THE COST OF REINSPECTIONS WILL BE BORNE NY THE CONTRACTOR. THE MECHANICAL CONTRACTOR WILL THEN ENSURE THAT THE EQUIPMENT IS POWERED FOR A MINIMUM OF 24 HRS BEFORE START -UP. 9. IF WORK IS REQUIRED BY ESDAC IN ORDER TO IMPROVE, CHANGE OR CORRECT AIR CONDITIONING OPERATIONAL CONDITIONS DUE TO: PART MALFUNCTION, WARRANTY OR OTHER INABILITY TO PROVIDE THE COMFORT CONDITIONS REQUIRED NY THE STORE, CONTRACTOR SHALL BE DIRECTED BY ESDAC TO ADDRESS THIS WORK IN A TIMELY MANNER. IF IT BECOMES EVIDENT THAT THE CONTRACTOR CANNOT ACCOMPLISH THE TASK, THEN AFTER 72 HOURS OF WRITTEN NOTICE THE OWNER MAY, AT HIS DISCRETION, TAKE OVER SUCH WORK AND BACK CHARGE THE CONTRACTOR FOR ANY CORRECTIVE WORK THAT WAS REQUIRED DUE TO LACK OF PERFORMANCE, WORKMANSHIP AND /OR ADHERENCE TO PLANS AND SPECIFICATIONS. 10. UPON COMPLETION OF THE WORK, CONTRACTOR SHALL VERIFY THE PROPER WORKING ORDER OF THE SYSTEM(S) AND MAKE ANY ADJUSTMENTS AS REQUIRED. 11. PROVIDE FILTER CHANGES THROUGHOUT CONSTRUCTION AS REQUIRED FOR ALL HVAC EQUIPMENT. PROVIDE FILTER CHANGES AT LEAST TWICE MONTHLY ONCE STARTED, PRIOR TO TEST AND BALANCE, AND LASTLY, PRIOR TO MERCHANDISING. ANY EQUIPMENT OR DUCTWORK THAT BECOMES SOILED DUE TO A LACK OF FILTER CHANGES, AS DETERMINED SOLELY NY THE ESDAC PROJECT MANAGER, SHALL BE CORRECTED ON BEHALF OF THE CONTRACTOR AND CHANGES GILLED TO THE CONTRACTOR. 12. NOTES TO EQUIPMENT SCHEDULES USE THE WORDS "FURNISH" AND "PROVIDE ". WHERE THE WORD "FURNISH" IS USED, SOME FIELD INSTALLATION I5 REQUIRED BY THE CONTRACTOR. WHERE THE WORD "PROVIDE" IS USED, NO FIELD INSTALLATION IS REQUIRED AS THE DEVICES OR ACCESSORIES ARE FURNISHED AND INSTALLED BY THE MANUFACTURER AS PART OF THE EQUIPMENT WHEN SHIPPED. 13. UNLESS OTHERWISE SPECIFIED, CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, LABOR AND SUPERVISION NECESSARY TO COMPLETE THE HEATING, VENTILATING AND AIR CONDITIONING WORK IN ACCORDANCE WITH THE SPECIFICATIONS AND STANDARDS AS OUTLINED HEREIN. SEE RESPONSIBILITY SCHEDULE ON SHEET M04.1. 14. MECHANICAL CONTRACTOR SHALL FIELD MEASURE EXISTING ROOF CURI(S) FOR CURB ADAFTER(S), WHERE APPLICABLE, AND SHALL SUPPLY DIMENSIONS TO ESDAC HVAC SUPPLIER PRIOR TO START OF CONSTRUCTION. 15. ALL HEATING VENTILATING AND AIR CONDITIONING EQUIPMENT SHALL BE CLEARLY IDENTIFIED WITH TENANT'S NAME, SPACE NUMBER AND UNIT DESIGNATION AND SHALL NE STENCILED IN 4" HIGH BLACK LETTERS. 16. FURNISH AND INSTALL ALL NEW DUCTWORK INCLUDING INSTALLATION OF OWNER SUPPLIED PLENUM BOOTS, SUPPLY AIR DIFFUSERS, AND RETURN AIR GRILLES. (SEE AIR DEVICE SCHEDULE ON THIS SHEET). A. ALL MATERIAL SHALL BE NEW AND OF COMMERCIAL GRADE AND NEAR UNDERWRITER'S LABORATORY AND UNION LABELS WHERE SUCH LABELING APPLIES. 9. ALL PLENUMS SHALL BE FABRICATED FROM GALVANIZED SHEET METAL OF THE APPROPRIATE GAUGE AND OE INSULATED WITH A NATIONAL ACCOUNTS-HYAC SUPPLIE11 GENERAL HVAC EQUIPMENT NOTED HAS BEEN PREPURCHASED NY EXPRESS STORE DESIGN A CONSTRUCTION. WITHIN THE FIRST WEEK OF CONSTRUCTION, THE GENERAL CONTRACTOR OR THEIR MECHANICAL SUBCONTRACTOR SHALL NOTIFY SUPPLIER VIA EMAIL THE EMAIL SHALL STATE THE PHONE NUMBER, EMAIL ADDRESS AND DELIVERY ADDRESS OF THE CONTACT PERSON RESPONSIBLE FOR SCHEDULING AND RECEIVING THE HVAC EQUIPMENT AND ACCESSORIES. EQUIPMENT AND ACCESSORIES ARE TO BE SHIPPED NY ANY SPECIAL SHIPPING INSTRUCTIONS REQUIRED OR REQUESTED. ALLOW A MINIMUM OF TWO WEEKS AFTER CONSTRUCTION STARTS FOR DELIVERY UNLESS SPECIAL ARRANGEMENTS ARE MADE PRIOR TO THE START OF CONSTRUCTION. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL SHIPPING COST INCURRED IF DELIVERY IS REQUIRED PRIOR TO THE STANDARD TWO WEEKS SCHEDULED. IF THIS INFORMATION IS NOT SENT TO NATIONAL ACCOUNT SUPPLIER, THEN THE EQUIPMENT AND ACCESSORIES WILL BE SHIPPED IN ACCORDANCE WITH THE PURCHASE ORDER DATE AND INSTRUCTIONS ISSUED BY ESDAC AND THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR UNLOADING AND STORAGE OF EQUIPMENT UNTIL SUCH TIME AS REQUIRED FOR INSTALLATION ON PROJECT. IF OWNER'S REPRESENTATIVE IS PERFORMING START UP, THEN GC AND /OR MECHANICAL CONTRACTOR MUST COORDINATE WITH MANUFACTURER REP. 2 WEEKS PRIOR TO CONSTRUCTION END DATE. CONTACT INFORMATION JIM HOOVLER JODY SOWERS VICKI WILSON TRANE NATIONAL ACCOUNTS REPRESENTATIVE TRANE TECHNICAL SUPPORT, PRIMARY HVAC COMMISSIONING EMAIL: jeheevierfIrane.cem EMAIL: jsowers0frane.cem EMAIL: Vield.wilson9trene.cem PHONE NO.: 866.415.2499+ PHONE NO.: 866.415.2499 PHONE NO.: 866.415.2499 FAX NO.: 614.473.3587 FAX NO.: 614.473.3587 FAX NO.: 614.473.3517 SCOTT CRABTREE JOHN D'AGOSTINO TRANE NATIONAL ACCOUNTS REPRESENTATIVE TRANE SHIPPING EMAIL: secra6traesfrane.com (OR TECHNICAL SUPPORT, SECONDARY) PHONE NO: 866.415.2499 EMAIL: Ishn.4'e jestinesfrane.com FAX NO.: 614.473.3597 PHONE NO: 866.415.2499 FAX NO.: 614.473.3597 CODE OF MIAMI -DADE COUNTY, FLORIDA CHAPTER 8 SEC. 8 -10. PERMITS HVAC DESIGN REOUIREMENTS HVAC DESIGN REQUIRES YES NO DUCT SMOKE DETECTOR X AANC AMERICAN AIR BALANCE COUNCIL ID INSIDE DIAMETER FIRE DAMPER(5) SD -4 X SMOKE DAMPER(S) TITUS X FIRE RATED ENCLOSURE w X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY MODEL X FIRE STOPPING TMSA X SMOKE CONTROL A AIR HANDLING UNIT X MINIMUM OF 1" THICK, 0.75 U /CU.FT. DENSITY FIBERGLASS INSULATION WITH ALUMINUM FOIL BACKED VAPOR BARRIER. C. WHERE DESIGNATED, BRANCHES FROM MAIN LOW VELOCITY TRUNK DUCTWORK SHALL BE FURNISHED WITH SPUTTERS, DAMPERS OR SIMILAR BALANCING DEVICES IN ACCORDANCE WITH THE STANDARDS OF SMACNA. D. ALL DUCTS FOR FINAL CONNECTION TO DIFFUSERS SHALL BE CLASS 1. U.L. LISTED (SL 181) FLEXIBLE AIR DUCT NOT TO DUCT. ODM023COCOD U U) y z m h °- 13 ESDAC SHALL PROVIDE AND MECHANICAL CONTRACTOR SHALL INSTALL NEW CEILING MOUNTED EXHAUST FAN, COMPLETE WITH AANC AMERICAN AIR BALANCE COUNCIL ID INSIDE DIAMETER NTS SD -4 INTEGRAL BACKDRAFT DAMPER. EXHAUST CAPACITY SHALL BE 75 CFM AT 0.5" S.P. INSTALL AND SECURE PER MANUFACTURE'S U TITUS TITUS INSTRUCTIONS. EXTEND TO LANLORD'S EXHAUST MAIN, FIELD VERIFY EXACT LOCATION AND REQUIREMENTS. w TITUS TITUS MODEL W O') n- W I'_ In In V) N o W TMSA 14 EXISTING UTILITIES (DUCTWORK, PIPING, CONDUIT, ETC.) TO REMAIN. TYPE AND ELEVATION ARE AS NOTED. FIELD VERIFY EXACT C� C9 i