Loading...
13-161-038FE JI� 3 "VTR • 2" SAN 0" 2 "FD WC ( Lr 2 "FDWCZ 3" SAN A J" 3" SAN 0" (14 FU) 2" SAN Q" 2 "FD 3" SAN 0 In e A kIITA nv innn erTnin 1 j "CW N.T.S. J "CW & I" HW 0" SAN TIE -IN TO EXISTING SEPTIC TANK LINE VERIFY EXACT LOCATION & INVERT BEFORE JOB COMMENCEMENT. DRAINLINE SHALL BE AT LEAST THE SAME SIZE AS THE NIPPLE ON THE DRAIN PAN CLEANOUT —0--= 3" SAN S (24 FU) PITCH DOWN 2" MIN \ TOWARD DRAIN 2" DRAIN PAN MIN. EXISTING COND . TRAP, REPLACE AS NECESSARY OR CONTINUATION OF PIPE AND SIZE SEE PLUMG. DWGS. TYPICAL CONDENSATE DRAIN N.T.S. F�-- rz CONDENSATE DRAIN LINE 1 "CW k "HW I LAV DF I `. 1 I "CW & in HW GRADE WC \ —1 11 WC �I 1 I =11 -:� 1 "cw LI�iIII °° III ° / BELOW GROUND TIE TO °� • 1 j "CW & i" HW �� j' EXISTING CW PIPE 12" DIAMETER CONCRETE OR CLAY PIPE WITHOUT o ° (FIELD VERIFY) COVER FILLED WITH • ' 3/4" CRUSHED ROCK a • o x EWH -1 120V/1.50, ' i "CW 20 GALLONS , HB 1 "SO o o � o 1 � "CW 0 C' o Q o 3 1 i "C • 1 J "CW & in HW I �' SOV 1 "CW & in HW so CONDENSATE DRAIN I � N CW & HW ISOMETRIC 'N.-I 1 j CW & in HW N.T.S. 1 l - e » HW DRYWELL DETAIL ' CW k� l,/ SK I WC N.T.S. 1 j "CW LAV i LEGEND— Co CLEANOUT PROVIDE NICKEL BRONZE FLOOR CW DOMESTIC COLD WATER FLOOR INSBALL COMPATIBLE W /TYPE T��C.O. TEE HW DOMESTIC HOT WATER SAN SANITARY F.U. FIXTURE UNIT MAX. FLOW RATE EXISTING SANITARY PIPE COLD NEW SANITARY PIPE WC �---- - - - -,j NEW VENT PIPE --� NEW CW PIPE 3'!14'01/8' SLOPE HOT CW PIPE j--- -j LA CONNECT TO EXISTING 1/2" F EXTENSION TO SOIL 01 WASTE LINE FLOOR WALL TYPICAL CLEANOUT DETAILS N.T.S. CI flf%r] MMAIA1 CHROME PLATED BRONZE WALL PLATE L 0 R WASTE FLOOR DRAIN WITH RESEAL DETAIL N.T.S. 1 PLUMBING NOTES DETAILS & ISOMETRICS 1/4.1 = 1..U" NOTE: PROVIDE TAILPIECE FLOOR DR W /SIDE T� GENERAL PLUMBING NOTES 1.- ALL WORK SHALL CONFORM WITH THE 2010 FLORIDA BUILDING CODE AND FLORIDA PLUMBING CODE, NFPA, NEC, AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS AND ORDINANCES. FURNISH ALL LABOR, MATERIALS AND EQUIPMENT REQUIRED FOR THE COMPLETION OF THE PLUMBING SYSTEMS DESCRIBED HEREIN AND SHOWN ON THE DRAWINGS. 2.- BUILDING DRAINAGE SYSTEM DESIGN BASED ON 1 /8 " /FT. MIN .FAL, ANY DEVIATIONS SHALL BE APPROVED BY ARCHITECT AND ENGINEER. 3.- MATERIALS SHALL BE ALL NEW AND AS FOLLOWS: A) DRAINAGE PIPING: NO HUB CAST IRON, STD. 301 OR PVC -DWV, SCH. 40. B) WATER PIPING: CPVC, SCH. 40 4.- HORIZONTAL BUILDING DRAINAGE PIPING OF 2" DIAMETER AND LESS SHALL BE INSTALLED WITH A FALL OF NOT LESS THAN 1 /4 " /FT. 5.- HORIZONTAL BUILDING DRAINS 3" OR DIAMETER OR LARGER SHALL BE INSTALLED WITH A FALL OF NOT LESS THAN 1 /8 " /FT. 6.- PROVIDE ALL EXCAVATION, BACKFILL AND COMPACTION REQUIRED BY ALL PLUMBING WORK, AND DEMOLITION OF EXISTING SLAB REQ'D.. 7.- PEFORM THE FOLLOWING TESTS: A) WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OR 100 PSIG. FOR A PERIOD OR TIME SUFFICIENT TO EXAMINE ENTIRE SYSTEM BUT NOT LESS THAN 1 HR. B) DRAINAGE PIPING: BEFORE INSTALLATION OF ANY DRAIN, THE ENDS OF SYSTEM SHALL BE CAPPED AND ALL LINES FILLED WITH INSPECTION IS MADE AND WATER LEVEL REMAINS CONSTANT. C) CORRECT ALL DEFECTS DISCLOSED BY ABOVE TESTS. 8.-- STERILIZE ALL WATER LINES WITH A MIXTURE OF (2) POUNDS OF CHLORI- NATED LIME TO EACH 1000 GAL. OF WATER (50PPH OF AVAILABLE CHLO- RINE). RETAIN MIXTURE IN PIPES 24 HRS. AND FLUSH THOROUGHLY W/ POTABLE WATER BEFORE PLACING IN SERVICE. 9.- COMPLETE SERVICE, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN -SER- VICE TEST AFTER COMPLETION OF THE INSTALLATION. 10.- PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL PLBG. WORK SHALL BE FREE FROM DEFECTS OR MATERIALS AND WORKMAN SHIP FOR A PERIOD OF 1 YR. FROM DATE OF FINAL ACCEPTANCE, AND THAT HE WILL, AT THIS EXPENSE REPAIR is REPLACE ALL WORK WHICH BECOMES DEFECTIVE DURING GUARANTEE PERIOD. PLUMBING NOTES 1-PLUMBING PLAN AND CALCULATIONS WERE BASED ON INFORMATION PROVIDED BY OWNER AGENT. IT IS RESPONSIBILITY OF THE CONTRACTOR BECOME FAMILIAR WITH THE EXISTING CONDITIONS OF THE SPACE PRIOR TO BIT. CONTRACTOR SHALL REVIEW THE SCOPE OF WORK TO BE PERFORMED AND SHALL IMMEDIATELY BRING TO THE ARCHITECT'S ATTENTION ANY DISCREPANCIES OR CONDITIONS WHICH IN THE CONTRACTOR'S OPINION MAY AFFECT THE EXECUTION OF THE WORK. 2- CONTRACTOR SHALL VERIFY EXACT LOCATION AND SIZES OF ALL EXISTING LINES AND EXTEND AS REQUIRED. 3 -NO JOINTS ALLOWED UNDER SLAB FOR WATER LINES. 4 -SIZE AND GRADE HORIZONTAL DRAINAGE PIPING 2" AND SMALLER 1/4" AND 3" ABOVE 1 /8" SLOPE PER FEET. 5- THIS IS A SPACE IN AN EXISTING BUILDING. THE BACKFLOW PREVENTER IS ALREADY INSTALLED. THE POINTS OF CONNECTION TO THE EXISTING WET COLUMNS ARE SHOWN ON DRAWING P--1. 6- SEE ARCHITECTURAL DRAWING FOR TYPE OF OCCUPANCY AND OCCUPANCY LOAD. 7- STEEL STUDS SUPPORTING ALL WALL HUNG PLUMBING FIXTURES SHALL BE DOUBLED OR NOT LESS THAN 20 GAUGE, AS PER FBC, SECTION 2517.5.1.1 a- ALL PLUMBING FIXTURES MUST COMPLY WITH THE ORDINANCE OF THE COUNTY (MAXIMUM FLOW RATES AND CONSUMPTION ON PLUMBING FIXTURES). 9- PROVIDE ANTI -SCAD VALVE TO SINKS AND LAVATORIES 10- THE MAXIMUM DISTANCE OF FIXTURE TRAP FROM VENT SHALL BE: SIZE OF TRAP SIZE OF FIXTURE TRAP SLOPE DISTANCE 1 in 2" i" 6' 2" 2" 4" at 3" 3" �" 10' 4" 4" 12' PLUMBING FIXTURE CONNECTION SCHEDULE < SHALL COMPLY WITH ORDINANCE 08 -14, MIAMI DADE COUNTY) No. DESCRIPTION DRAIN WATER SLOPE MAX. FLOW RATE FU COLD HOT WC WATER CLOSET FLUSH VALVE 3' 1' - 3'!14'01/8' SLOPE 1.28 GALLONS /FLUSH 6 LA LAVATORY 1 -1/4' 1/2' 1/2' 1- 1/2'01/4' SLOPE 0,5 GPM AT 60 PSI 1 DF DRINKING FOUNTAIN 1 -1/2' 1/2' - 1- 1/2'01/4' SLOPE - 2 SK SINK 1 -1/4' 1/2' 1/2' 1- 1/2'01/4" SLOPE 1 GPM AT 60 PSI 2 MSK MOPSINK 1 -1/4' 1/2' 1/2' 1- 1/2'01/4' SLOPE 1 GPM AT 60 PSI 2 Q Z Q O r I — MANUF AU I URER AND MUDELS AS PER ARCHITECT AND OWNER CO❑RDINATI ❑N DETAILS AND DIMENSION OF TOILET FACILITIES SHALL COMPLY WITH ADA AS PER CHAPTER 11, FBC (ALL TOILET ROOM, AND SHOWER SHALL COMPLY WITH CHAPTER 11 AND WITH SECTION 403.4, FBC) TRAP PRIMER SCHEMATIC N.T.S. 3/4" BALL VALVE (TYP. AS SHOWN) ASME T & P RELIEF VALVE. ROUTE RELIEF LINE FULL SIZE VALVE AND TERMINATE 2" ABOVE FF� II�� J� ELECTRIC WATER HEATER EWH1 1 -1/2" MIN. DEPTH DRAIN PAN WITH DIAMETER TO CLEAR HEATER BY 2" PROVIDE SHELF CAPABLE OF SUPPORTING FULL HEATER. MOUNT AS HIGH AS POSSIBLE WITHIN ROOM AND ALLOWING ACCESS TO VALVES AND FITTINGS. ANCHOR SECURELY TO WALL. REFER TO ADJACENT SHELF DETAIL— WATER HEATER DETAIL SCALE: NONE 3/4" HW ,,,-3/4" CW j VALVE CHECK / E 2 GALLON EXPANSION TANK UNION (TYP. AS SHOWN) 3/4" CW DRAIN VALVE N) •r•• •Y♦ 4 • r•r•• ♦es ace Y • • • V V • • • u U Y V • Y•• ♦Er ' Y�Y Y♦ • v Y V Y • ...COLTRAIN • N•• y • • • N u v rN••• r u • • • u • • r+r I.� FM •••• G •u•Y MIAMI COLTRAIN AND JONES ARCHITECTS, P.A. AA 26000922 TELEPHONE (305) 295 -6723 1 FAX (305) 285 -6722 535 SW I ST. SUITE 100 MIAMI, FL. 33130 DESIGN I CONSTRUCTION ADMINISTRATION BUILDING INSPECTIONS I CAD PRODUCTION CONSULTANT/ NOTES ME APPROVALS /REVISIONS DATE --1" PAN DRAIN. ROUTE AND Ste; TERMINATE 2" ABOVE FF r, �a KEV I,,•.•'i�i4 SECURE BRACKET TO WALL �sl 000 � W/ LAG SCREWS (MIN. 6) * : AR 0015755 m i W w "x 2" GUSSET •% .•• V EXPANDED METAL �'/ %•f .•'�'�� S�. '•.•NN•�• x` CLEAN, PRIME AND FRED ARG PAINT ALL STEEL Mark A Celtrain AR 0013380 1i "x1i "xw" ��..FLQ Richard K. Janes, AIA AR 0015755 ANGLE FRAME �Q- O`'��DO �!O SHEET TITLE: .;cl� o:p -n N 0.61028 i PLUMBINGM NOTES �O _ DETAILS & ISOMETRICS * C, .ti.` Jew No. Drawini No. r ; , ..+? Y b 2000 NW, 119th Fl, Suite III 2D12 -5 y r 11 k C F F # t t4 Doren, Pl. 33172 Drawn {�/ w Tel. (305)471 -3777 3 • P1,2 �' : ♦ " Pax. (305) 994 -1801 MG, RG 5 r s+ tn3a. i �«. _ e« rmF�armlenF.com Date Platted: e ► S 1! 1' C.A. 8 27219 * ur i Engineering Inc. Maria 1r. Guartlo 1'.E. * 60100 05/24/2012 CONSULTING ENGINEERS Rolando Guardo P.E. S 61021 Scale: (VARIES —SEE DRAWING) • ,� • �f ... i SHELF DETAIL L 0 z 0 J m z F_ 0 X W 0 Q Z Q O r I — M Q C/) E 0 W W 0 > Q _j U_ -1�aaaj U) 0 z r%_ Lo 0) 3: < Z;3 Z 0 C/) F— 0 cy.) F_ ❑ 00 U) --1" PAN DRAIN. ROUTE AND Ste; TERMINATE 2" ABOVE FF r, �a KEV I,,•.•'i�i4 SECURE BRACKET TO WALL �sl 000 � W/ LAG SCREWS (MIN. 6) * : AR 0015755 m i W w "x 2" GUSSET •% .•• V EXPANDED METAL �'/ %•f .•'�'�� S�. '•.•NN•�• x` CLEAN, PRIME AND FRED ARG PAINT ALL STEEL Mark A Celtrain AR 0013380 1i "x1i "xw" ��..FLQ Richard K. Janes, AIA AR 0015755 ANGLE FRAME �Q- O`'��DO �!O SHEET TITLE: .;cl� o:p -n N 0.61028 i PLUMBINGM NOTES �O _ DETAILS & ISOMETRICS * C, .ti.` Jew No. Drawini No. r ; , ..+? Y b 2000 NW, 119th Fl, Suite III 2D12 -5 y r 11 k C F F # t t4 Doren, Pl. 33172 Drawn {�/ w Tel. (305)471 -3777 3 • P1,2 �' : ♦ " Pax. (305) 994 -1801 MG, RG 5 r s+ tn3a. i �«. _ e« rmF�armlenF.com Date Platted: e ► S 1! 1' C.A. 8 27219 * ur i Engineering Inc. Maria 1r. Guartlo 1'.E. * 60100 05/24/2012 CONSULTING ENGINEERS Rolando Guardo P.E. S 61021 Scale: (VARIES —SEE DRAWING) • ,� • �f ... i SHELF DETAIL L