13-161-001,1.
ADDITION AND RENOVATION TO EXISTING U11 DINC-i,
8530 SW 57 AVE
...... . .... ............ . . ............................ .... . ....................................... .. . .... .. ....................
INDEX OF DRAWINGS
SW 84TH TER.
ARCHITECTURAL STRUCTURE ELECTRICAL PLAN Sw84THTER.
S -1 FOUNDATION PLAN
COVER SHEET S -2 SECOND FLOOR FRAMING PLAN E1.0 RISER DIAGRAM /NOTES /CALCULATIONS
A1.0 SITE PLAN S -3 ROOF FRAMING PLAN E2.1 LIGHTING PLAN - 1ST FLOOR
M (1 hGl.d(111TI(1m PI AEI CR(ll lKifl C . rniiunnrinni nrTnuo __ _. .._.._. O
•
ABOVE
ORR
FOUNDATION DETAILS
E2.2
LIGHTING PLAN
- 2ND FLOOR
D1.1
DEMOLITION ROOF
S -5
SECOND FLOOR DETAILS
E3.1
POWER PLAN -
SW 8,
1 ST FLOOR
LS -1.0
LIFE SAFETY - GROUND FLOOR
S -6
ROOF SECTIONS & DETAILS
E3.2
POWER PLAN -
2ND FLOOR
LS -1.1
LIFE SAFETY - CALCULATION
S -7
SECTIONS & DETAILS
E4.1
FIRE ALARM PLAN
A2.0
FLOOR PLAN - GROUND FLOOR
S--8
WINDOWS AND DOORS WIND PRESSURES
ROOF
WH WALL HUNG
ACC
A2.1
FLOOR PLAN - SECOND FLOOR
DEMOUNTABLE
GI
FIRE SPRINKLER
PLAN
MILLWORK
A2.2
ROOF PLAN AND DETAILS
MECHANICAL
AP
ACCESS PANEL
DER
DEPRESS (ED)
A3.0
REFLECTED CEILING PLAN - GROUND FL &SEC.FL
MIN
MINIMUM
FP -1.0
FIRE SPRINKLER
PLAN
A4.0
ELEVATIONS
M1.0
MECHANICAL PLAN - FIRST FLOOR
FP -2.0
FIRE SPRINKLER
PLAN
A4.1
ELEVATIONS
M1.1
MECHANICAL PLAN - FIRST FLOOR
ACT
ACOUSTICAL TILE
DIAG
A4.2
ELEVATIONS
M2.0
MECHANICAL NOTES /SCHEDULES /DETAILS
MISCELLANEOUS
RUB
SW 86
A5.0
SECTIONS 1 &2
M2.1
MECHANICAL NOTES & DETAILS
DIAMETER
GL
GLASS, GLAZING
A5.1
SECTIONS 3 &4
R■
RUBBER BASE
W/ : WITH
ADH
ADHESIVE
DIM
DIMENSION
GLI
GLASS BLOCK
MILD
MOLDING, MOULDING
A6.0 WINDOW SCHEDULE AND DETAILS PLUMBING
A6.1 DOOR AND FINISH DETAILS
A6.2 WALL SCHEDULE AND DETAILS P1.0 PLUMBING 1 FLOOR
A6.3 BATHROOM DETAILS P1.1 PLUMBING 2ND FLOOR
A7.0 STAIR DETAILS P1.2 NOTES & ISOMETRICS
ABBREVIATIONS
NOTE: ALL ITEMS, PRODUCTS OR SYSTEMS ABREVIATED MAY NOT BE INCLUDED IN THIS CONTRACT
A D G M- CON'T R- CON'T W
ARV
ABOVE
ORR
DAMPER
GA
GAGE, GAUGE
MPR
METAL RIPE - RAILING
RH
RIGHT HAND
WSCT WAINSCOT
A.F.F.
ABOVE FINISHD FLOOR
OIL
DEAD LOAD
GPM
GALLONS PER MINUTES
MTHR
METAL THRESHOLD
R
RISER
WTW WALL TO WALL
ASC
ABOVE SUSPENDED CEILING
DEM
DEMOLISH, DEMOLITION
GALV
GALVANIZE (D)
M
METER (S)
RF
ROOF
WH WALL HUNG
ACC
ACCESS
DMT
DEMOUNTABLE
GI
GALVANIZED IRON
MWK
MILLWORK
RFD
ROOF DRAIN
WC WATER CLOSET
AP
ACCESS PANEL
DER
DEPRESS (ED)
GKT
GASKET (ED)
MIN
MINIMUM
RM
ROOM
WP WATERPROOF (ING)
ACP
ACOUSTICAL PANEL
DET
DETAILS (S)
GEN
GENERAL
MIR
MIRROR
RO
ROUGH OPENING
WT WIDE, WIDTH
ACT
ACOUSTICAL TILE
DIAG
DIAGONAL
GC
GENERAL CONTRACT (OR)
MISC
MISCELLANEOUS
RUB
RUBBER
WIN WINDOW
ADD
ADDENDUM
DA
DIAMETER
GL
GLASS, GLAZING
MOD
MODULAR
R■
RUBBER BASE
W/ : WITH
ADH
ADHESIVE
DIM
DIMENSION
GLI
GLASS BLOCK
MILD
MOLDING, MOULDING
WO WITHOUT
ADJ
ADJACENT
ORR
DISPENSER
GB
GRAS BAR
MR
MOISTURE RESISTANT
S
WD WOOD
ADJT
ADJUSTABLE
DO
DITTO
GRO
GROUND
MT
MOUNT (ED), (ING)
WDB WOOD BASE
ADMIN
ADMINISTRATOR
DIV
DIVISION
GT
GROUT
MOV
MOVABLE
SAN
SANITARY SEWER
A/C
AIR CONDITIONING
OR
DOOR
GYP /D GYPSUM BOARD
MUL
MULLION
SON
SCREEN
ALT
ALTERNATE
OIL
DOUBLE
GWI
GYPSUM WALL BOARD
SCHED
SCHEDULE (D)
ALUM.
ALUMINUN
DTA
DOVETAIL ANCHOR
N
SNT
SEALANT
ANC
ANCHOR (AGE), (ED)
DST
DOVETAIL ANCHOR SLOT
H
SEC
SECRETARY
AI
ANCHOR BOLT
ON
DOWN
NL
NAILABLE
SECT
SECTION (S)
ANOD
ANODIZED
DS
DOWNSPOUT
HC
HANDICAP (RED)
NAT
NATURAL
SHT
SHEET
APX
APROXIMATE
D
DRAIN
HOW
HARDWARE
NGVD
NATIONAL GEODETIC
SIT
SHELF, SHELVING
ARCH
ARCHITECT (URE), (URAL)
DWR
DRAWER
HWD
HARDWOOD
VERTICAL DATUM
SH & R
SHELF 1t ROD
ASSIST
ASSISTANCE
DWG
DRAWING
HVAC
HEATING /VENTILATING /AIR
NOM
NOMINAL
SD
SIDE LIGHT
AUTO
AUTOMATIC
DF
DRINKING FOUNTAIN
CONDITIONING
N
NORTH
Sim
SIMILAR
HOY
HEAVY DUTY
NIC
NOT IN CONTRACT
SL
SLEEVE
B
E
HGT
HEIGHT
NTS
NOT TO SCALE
SC
SOLID CORE
HP
HIGH POINT
SP
SOUNDPROOF
IM
TEAM
EA
EACH
HM
HOLLOW METAL
0
S
SOUTH
■RG
TEARING
EF
EACH FACE
HOR
HORIZONTAL
SPK
SPEAKER
SPL
SEARING PLATE
EW
EACH WAY
HI
HOSE S[BS
CBS
OBSCURE
SPL
SPECIAL
■LW
BELOW
ELEC
ELECTRICAL (AL)
HD
HOT DIPPED
OC
ON CENTER (S)
SPEC
SPECIFICATION
BET
BETWEEN
EP
ELECTRICAL PANELBOARD
HWH
HOT WATER HEATER
OR
OPAQUE
SPR
SPRINKLER
BVL
BEVELED
EWC
ELECTRIC WATER COOLER
HR
HOUR
ORG
OPENING
SQ
SQUARE
TLK
:LOCK
EWH
ELECTRICAL WATER HEATER
OJ
OPEN -WEB■ JOIST
SS
STAINLESS STEEL
ILKG
BLOCKING
EL
ELEVATION
I
OPR
OPPOSITE
STD
STANDARD
ID
BOARD
ELEV
ELEVATOR
OD
OUTSIDE DIAMETER
SSMR
STANDING SEAM
BL `
BORROWED
EMER
EMERGENCY
INCL
INCLUDE (D), (ING)
OA
OVERALL
METAL ROOF
■LT
BUILT
ENC
ENCLOSE (URE)
INFO
INFORMATION
OH
OVERHEAD
STA
STATION
IS
BOTH SIDES
EQ
EQUAL
ID
INSIDE DIAMETER
STL
STEEL
BW
BOTH WAY
EQUIP
EQUIPMENT
INSUL
INSULATE (D). (ION)
P
STO
STORAGE
BOT
BOTTOM
EXH
EXHAUST
INT
INTER;OR
STR
STRUCTURE (AL)
Boll
BOTTOM OF BEAM
EXIST
EXISTING
PNT
PAINT (ED)
STUC
STUCCO
BLDG
SUILDING
ES
EXPANSION BOLT
J
PNL
PANEL
SA
SUPPLY AIR
It
BUILT -IN
EJ
EXPANSION JOINT
PI
PANIC BAR
SUSP
SUSPENDED
EXP
EXPOSE (D)
JC
JANITOR'S CLOSET
PTD
PAPER TOWER DISPENSER
SAT
SUSPENDED ACOUSTICAL
C
EXT
EXTERIOR
JT
JOINT
PTR
PAPER TOWER RECEPTOR
TILE
EYEW
EYE WASH
JF
JOINT FILLER
RID
PARTICLE BOARD
SYM
SYMETRY (ICAL)
CAB
CABINET
JST
JOIST
RED
PEDESTAL
SYS
SYSTEM
CRT
CARPET (ED)
F
JD
JUNCTION BOX
PER[
PERIMETER
CIPC
CAST -IN -PLACE CONCRETE
PLAS
PLASTER
T
CK
CALK (ING). CAULK (ING)
FWC
FABRIC WALL COVERING
K
PLAM
PLASTIC LAMINATE
CLG
CEILING
FOS
FACE OF STUDS
PL
PLATE
TKBD
TACKBOARD
CHT
CEILING HEIGHT
FCU
FAN COIL UNIT
KGPL
KEENE'S CEMENT PLASTER
PG
PLATE GLASS
TEL
TELEPHONE
CPLP
CEMENT PLASTER (PORTLAND)
FAS
FASTEN (ER)
KPL
KICKPLATE
PLYWD
PLYWOOD
TV
TELEVISION
CEM■
CEMENTITIOUS BOARD
FT
FEET. FOOT
KIT
KITCHEN
PT
PRESSURE TREAT (ED)
TEMP
TEMPERED
CTR
CENTER
FID
FIBERBOARD
KO
KNOCKOUT
PVC
POLYVINYL CHLORIDE
TH
THICK (ENED), (NESS)
(_L
CENTER LINE
FGL
FIBERGLASS
PCF
POUNDS PER CUBIC FOOT
THR
THRESHOLD
CER
CERAMIC
FIN
FINISH (ED)
L
PSF
POUNDS PER SQUARE INCH
TILT
TOILET
CT
CERAMIC TILE
FF
FINISH FLOOR
PEN
PREFINISHED
TPTN
TOILET PARTITION
CMT
CERAMIC MOSAIC TILE
FEE
FINISHED FLOOR ELEVATION
LBL
LABEL
PSX
PULL BOX
TPID
TOILET PAPER DISPENSER
CHID
CHALKBOARD
FFL
FINISHED FLOOR LINE
LAB
LABORATORY
R■
RUSH BUTTOM
TOIL
TOLERANCE
CO
CLEAN OUT
FA
FIRE ALARM
LAM
LAMINATE (D)
T & G
TONGUE AND GROOVE
CLR
CLEAR (ANCE)
FEX
FIRE EXTINGUISHER
LAUN
LAUNDRY
0
T & ■
TOP AND BOTTOM
CLO
CLOSET
FEC
FIRE EXTINGUISHER CABINET
LAV
LAVATORY
TOD
TOP OF BEAM
CRC
COLD ROLLED CHANNEL
FHC
FIRE HOSE CABINET
LSW
LEAD SHIELDED WINDOW
QT
QUARRY TILE
TOR
TOP OF ROOF
CW
COLD WATER
FP
FIREPROOF (ED), (ING)
LH
LEFT HAND
TOS
TOP OF SLAB
Cc
COLOR CODE
ELAM
FLAMMABLE
L
LENGTH
R
To
TOWEL BAR
COL
COLUMN
FLG
FLASHING
LT
LIGHT
T
TREAD
3N,
COMM
COMMUNICATIONS
FLX
FLEXIBLE
LC
LIGHT CONTROL
RAD
RADIUS
COMPO
COMPOSITE (ION)
FLR
FLOOR (ING)
LW
LIGHTWEIGHT
RL
RAIL (ING)
U
COMDR
COMPRESS (ED), (ION), (IBLE)
FLCO
FLOOR CLEANOUT
LIN
LINEN
RWL
RAINWATER LEADER
COMP
COMPUTER
FD
FLOOD DRAIN
LTL
LINTEL
RECEP
RECEPTACLE, RECEPTION
UC
UNDERCUT
" CONE
CONCRETE
FLUOR
FLUORESCENT
LL
LIVE LOAD
REF
REFERENCE
LINE
UNFINISHED
CMU
CONCRETE MASONRY UNIT
FS
FOOT BOLT
LVR
LOUVER
REFIT
REFRIGERATOR
UR
URINAL
CONN
CONNECT (ED), (ION)
FTC
FOOTING
LP
LOW POINT
REG
REGISTER
UL
UNDERWRITERS LABORATORY
CONST
CONSTRUCT (ED), (ION)
FR
FRAME (D), (ING)
RAID
RADIUS
CONT
CONTINUE, CONTINUOUS
FZR
FREEZER
M
RL
RAIL (ING)
LION
UNLESS OTHERWISE NOTED
CONTR
CONTRACT (OR)
FA
FRESH AIR
RWL
RAINWATER LEADER
CJ
CONTROL JOIN
FS
FULL SIZE
MFR
MANUFACTURE (ER)
RECEP
RECEPTACLE, RECEPTION
SITE PLAN
SCALE NTS
i
GENERAL NOTES
1. THE BIDDER IS REQUIRED, BEFORE SUBMITTING HIS PROPOSAL, TO EXAMINE 9. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY
5. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO
THE CONTRACT DOCUMENTS AND FAMILIARIZE HIMSELF WITH THE NATURE AND DEMOLITION WORK. AVOID INTERFERENCE WITH THE PROGRESS OF CONSTRUCTION AND IN
EXTENT OF THE WORK, ANY LOCAL CONDITIONS THAT MAY IN ANY MANNER STRICT COMPLIANCE WITH LL APPLICABLE L CABLE CODE$ AND STANDARDS,
AFFECT THE WORK TO BE DONE, AND EQUIPMENT, MATERIALS AND LABOR 10. THE CONTRACTOR SHALL FURNISH ALL MATERIAL, EQUIPMENT, LABOR AND
REQUIRED TO PERFORM THE WORK. OTHER FACILITIES NECESSARY FOR THE EXECUTION OF THE WORK. GENERAL 6. WHEN A DETAIL, DIMENSION, OR REFERENCE IS, INDICATED AS
CONTRACTOR IS TO REVIEW THE EXISTING SPACE AND FAMILIARIZE THEMSELVES TYPICAL' IT APPLIES TO ALL SIMILAR LA SITUATIONS, WHETHER
2. SINCE THE WORK INVOLVES EXISTING BUILDINGS, SYSTEMS AND FACILITIES, WITH ALL EXISTING CONDITIONS AND FINISHES. INDICATED OR NOT:
SPECIAL CONSIDERATION SHALL BE GIVEN TO EXAMINATION OF WORKING
CONDITIONS, EXISTING FACILITIES AND ALL BUILDING STRUCTURES. HE IS TO 11. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS. THE CONTRACTOR SHALL 7, SECTIONS EC ONS OR DETAILS SHAWN, APPLY TO ALL SIMILAR SITUATIONS,
FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS, LIGHT VARIATION OF NOTIFY THE ARCHITECT OF ANY ERRORS, INCONSISTENCIES OR OMISSIONS HE WHETHER INDICATED OR NOT AND UNLESS OTHERWISE NOTED.
ROUTING AND OR CONSTRUCTION SHOULD BE ANTICIPATED BY THE CONTRACTOR MAY DISCOVER ON THESE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR
TO AVOID CONFLICTS WITH OTHER TRADES. THESE ARE EXPRESSLY INCLUDED AS CORRECTING ANY ERROR AFTER THE START OF THE CONSTRUCTION WHICH HAS
$. BATHROOM FIXTURES TO BE SELECTED AND PROVIDED BY PARTIES �
PART OF THE WORK WHENEVER REQUIRED AT NO ADDITIONAL COST TO THE NOT BEEN BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE MEANS OF
INDENTIFIED WITHIN. G.C. TO COORDINATE INSTALLATION WITH PARTIES,
OWNER. IGNORANCE. ON THE PART OF THE CONTRACTOR WILL IN NO WAY CORRECTING ANY ERROR SHALL BE APPROVED BY THE ARCHITECT. DESCRIBED WITHIN.
RELIEVE HIM OF THE OBLIGATIONS AND RESPONSIBILITIES ASSUMED UNDER THIS
CONTRACT, 12. THE CONTRACTOR SHALL VERIFY ALL EXISTING SITE CONDITIONS PERTINENT 9. ALL CLOSETS AND BATHROOMS ARE TO RECEIVE 2x6 BACKING AS
3. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY CITY, COUNTY AND STATE TO HIS CONTRACT PRIOR TO CONSTRUCTION, NECESSARY TO SUPPORT ALL WALL MOUNTED ITEMS. PROVIDE 112"
LICENSES PRIOR TO COMMENCING CONSTRUCTION. IF SPECIAL PERMITS ARE 13. THE CONTRACTOR SHALL PROTECT ALL EXISTING CONCRETE CURBS AND PLYWOOD BEHIND DRYWALL AT ALL SHELF WALLS IN CLOSETS,
REQUIRED FOR ANY OF THE WORK, THEY SHALL BE OBTAINED AND EXHIBITED. ASPHALT FROM DAMAGE FROM CONSTRUCTION AND HEAVY EQUIPTMENT.
THE CONTRACTOR .SHALL GIVE ALL NOTICES AND COMPLY WITH THE LAWS, 10. VERIFY HEIGHT AND LOCATION OF WALL MOUNTED LIGHTS WITH
THE OWNER PRIOR ORDINANCES, CODES, AND REGULATIONS BEARING ON THE CONDUCT OF THE 14. ALL LANDSCAPED AREAS AFFECTED BY CONSTRUCTION IS TO BE RESTORED E R OR TO INSTALLATION OF ELECTRICAL BOXES.
WORK AS DRAWN AND SPECIFIED, WHEN WORK IS COMPLETED. 11. SMOKE DETECTORS ARE TO BE HARDWIRED AND
4, ALL ELECTRICAL WORK TO BE PERFORMED BY A STATE LICENSED ELECTRICAL INTERCONNECTED WITH A BATTERY BACKUP,
CONTRACTOR. ALL ELECTRICAL WORK TO BE REMOVED, INCLUDING ALL WIRES NOTES FOR G.C#
AND FEEDS, SHALL BE DISCONNECTED FROM CORRESPONDING ELECTRICAL 12. DOOR AND WINDOW OPENINGS ARE NOMINAL SIZES, REFER TO
PANEL. OR JUNCTION BOX. THE DOOR AND WINDOW SCHEDULES do SHOP DRAWINGS FOR EXACT
1. VERIFY ALL DIMENSIONS ON DRAWINGS AND CONDITIONS AT JOB SITE DIMENSIONS,
5. ALL DEBRIS SHALL BE REMOVED FROM THE PREMISES BY CONTRACTOR AND PRIOR TO COMMENCING WORK. NOTIFY ARCHITECT OR OWNER REPRESENTATIVE
ALL AREAS SHALL BE LEFT IN A BROOM CLEAN CONDITION AT ALL TIMES, ANY OF ANY DISCREPANCIES AND SECURE AN INTERPRETATION OR DECISION FROM 13. ALL CERAMIC INSTALLATION SHALL BE DONE IN ACCORDANCE
DAMAGE TO EXISTING BUILDING EXTERIOR IS THE RESPONSIBILITY OF THE THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. WITH THE "Handbook of Ceramic Tile Installation" PUBLISHED BY .
CONTRACTOR TO RESTORE TO ORIGINAL CONDITION, THE TILE COUNCIL OF AMERICA.
2. G.C. TO EXAMINE AND COORDINATE STRUCTURAL, MECHANICAL, ELECTRICAL
6. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE & PLUMBING PLANS FOR VERIFICATION OF LOCATIONS AND DIMENSIONS OF 14, ALL GYPSUM WALLBOARD SHALL BE INSTALLED AND FINISHED IN
THE SAFETY OF THE OCCUPANTS AND WORKERS AT ALL TIMES, AND BE ALL PROJECT REQUIREMENTS, REPORT ANY DISCREPANCIES TO THE ARCHITECT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND IN
RESPONSIBLE FOR THE SECURITY OF THE SITE WHILE THE JOB IS IN PROGRESS PRIOR TO PROCEEDING WITH WORK IN AREA OF CONFLICT. PROPOSE AND COMPLIACE WITH THE F.B.C.
AND UNTIL ITS COMPLETION. CONTRACTOR AND SUBCONTRACTORS SHALL COORDINATE SOLUTION FOR AREA OF CONFLICT. f�.
CARRY WORKMAN'S COMP, INSURANCE AS WELL AS GENERAL LIABILITY 15. VERIFY ALL DIMENSIONS iN FIELD BEFORE FABRICATION OF ANY
3. EVEN THOUGH THE DRAWINGS ARE TO SCALE, DO NOT SCALE ANY OF
INSURANCE AND SHALL MAINTAIN SUCH INSURANCE THROUGH COMPLETION OF CABINET .WORK, OR BUILT -IN EQUIPMENT.
THEM, FOLLOW THE DIMENSIONS, ELEVATIONS AND SPECIFICATIONS SHOWN ON �-
JOB. SUBMIT PROOF. OF INSURANCE TO OWNER, r v ,., -, „� �••
THE PLANS. 16. BATHROOM FLOORS AND BASE TO BE OF IMPERVIOUS MATERIAL �.• ""
7. GENERAL CONTRACTOR SHALL EXERCISE CARE DURING DEMOLITION AND AS PER F.B.C.
REMOVAL TO ASSURE THAT ITEMS SCHEDULED FOR DEMOLITION ARE PROPERLY `1 OBTAIN FULL INFORMATION REGARDING PECULIARITIES AND LIMITATIONS OF `r►. ^
SPACE AVAILABLE FOR INSTALLATION OF THE EQUIPMENT AND MATERIALS�.A'a'
REMOVED AND ITEMS TO REMAIN ARE PROTECTED FROM DAMAGE. 17. ALL GLASS USED INSIDE DWELLING SHALL BE TEMPERED.
UNDER CONTRACT AND PROVIDE READY ACCESSIBILITY TO DAMPERS, VALVES i AND OTHER APPARATUS, INCLUDING ANY PART OF SYSTEM REQUIRED TO BE -
8. ALL FINISHES AND SURFACES WHICH ARE DAMAGED DURING DEMOLITION REACHED FOR MAINTENANCE AND P %; TI R
SHAI_:L BE REPAIF:D AND OR REPLACED TO THE SATISFACTION OF THE OWNER f A ONS.
AT NO ADDITIONAL COST TO THE OWNER.
yl