05-1487-024:j
w
3�4' NOUBE t
Wi vAc. BF
I ;" WATER MAIN FROM
PUBLIC WATER LINE
PEN VALVE
FIRST FLOOR PLUMBING PLAN
TO MAIN SEWER
SERVICE. SEE
SITE f'LAN FOR
CONTINUATION.
.UELL FOR
:ONDENSATE
UA"' FROM BLDG
A,
_ s
LLJ�IEINSINO7 e
GENERAL
PROVIDE ( 1=UR ISH AND INSTALL ) ALL NECESSARY
MATERIALS AND LABOR FOR A COI" IPLETELI' OPERATIONAL
FILUMBING S'I'ST M AS SHOWN ON THE DRAWINGS AND
HEREIN SPECIFI D. INSTALL IN ACCORDANCE WITH THE
SOUTH FLORIDA BUILDING CODE AND LOCAL ORDINANCES.
SCOPE OF WORK :
PROVIDE THE FOLLOWING COMPLETE SYSTEMS :
A. SANITARY COLLECTION.
B. DOi" IESTIGC T ANDCOLD WATER.
C. AIR CONDI1�IONING CONDENSATE-
FA'T' FOR ALL FEES, INSPECTIONS AND CONNECTION
CHARGES REQU RED
VERIFY AT JOB 51TE ALL SPACE CONDITIONS, DIMENSIONS
WITH PIPE, FIXTURES, AND EQUIPi"IENT SIZES PRIOR TO
FA BRICATIONOIR ;INS7,4LLA7ION_COORDINA7E REQUIREMENTS
TO AVOID INTE FERENCE WITH OTHER TRADES.
SUBMIT SHOP D AWINGS FOR ARCHITECT / ENGINEER
APPROVAL BEFORE PROCEEDING WITH THE PURCHASE OR
INSTALLATION O EQUIPMENT AND MATERIALS.
GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS
AND WORKI"IANS IF= FOR A PERIOD OF ONE `PEAR FROM
DATE OF ACCEPTANCE.
MATERIALS
PROVIDE SHUT-OFF vALvES FOR EACH FIXTURE AND AIR
CHAMBERS WHERE SHOWN AND W#4ERE REQUIRED FOR
PROPER PERFO ANGE OF THE 5 'STEM.
PROVIDE DIEL r!'ITIRIC FITTINGS TO CONNECT PIPING TO
EQJIPI"IENT OF ISSIMILAR METALS. USE CLAMPS AND
FASTENERS OF SIMILAR METALS OR ISOLATE THEM FROM
PIPING AND SLA S TO PREVENT CORROSION.
PIPING
DOMESTIGOT AN COLD WATER: COPPER TUEMV1 FFE
"K" OR "L" WITH OLDER JOINTS. WOG BRONZE vALvES
125 P.S.I. MIN. PR VIDE PRE - MOLDED FIBERGLASS
INSULATION FOR HOT WATER LINES.
SANITARY WASTE AND VENT: CAST IRON PIPING UNDER
SLABS, GAST IR N NO -HUB OR COPPER D.W.v. ABOVE
P_V.C. DRAIN PIP AND FITTINGS MAY BE USED WHEN
ALLOWED BY TH LOCAL JURISDICTION.
A/C CONDENSAT : PVC SCEDULE 40 PIPE AND FITTINGS,
STORM DRAINAGE NOTiE
IN COMPLIANCE WITH 1101.2 (F.B.C.), ALL STORM WATER FROM ROOFS,
PAVED AREAS ETC, WI —L DISCHARGE INTO THE LAWNS.
CONTRACTOR SHALL ROVIDE SWALES AS TO RETAIN ALL WATER WITHIN
THE PROPERTY.
SEE SITE PLAN FOR A , D17IONAL INFORMATION.
WATER HEATER NOTE
TWO SEPARATE TANK ESS ELECTRIC WATER HEATER SHALL BE
INSTALLED (SEE P1 F R LOCATION).
THE RELIEF VALVE IS NOT REQUIRED FOR THIS KIND OF WATER
EQUIPMENT_
z
- —
U
ui
W
x
P _Q
IAA
U
W
>/fy O N
0 N
D r
F_- N
Q T N
N J
UW
I
20 �
z
Q Z
Q�NN
Q
�0N�
a
N
J
0
ZLL�?�?
m
`v
0
NQJX
J
>
�
NCI
z
-LPL
\�
•ice/
momm
we
U N
IIIIIIIIIA��
�G
O
Z�
W
u�
/_
Q o
wr
J
c��
O
T
T LL
z�a
co
M
1 )
\ /
w�
4�a
LoC
uiG
co
Lo
N 2 U
Y �
o
W
tz3
�w
W =
�zY
t
cwc ,n
NSV
t2�
U
0
C
O
v
L
U
drawing TitIQ
FIRST FLOOR
PLUMBING PLAN
R*viSit�n
date
1
BLDG. DEPT.
COMMENTS
11-10-05
Scale= As Shown
data
S-114-OS
dwg =
P
-1