Loading...
05-1487-024:j w 3�4' NOUBE t Wi vAc. BF I ;" WATER MAIN FROM PUBLIC WATER LINE PEN VALVE FIRST FLOOR PLUMBING PLAN TO MAIN SEWER SERVICE. SEE SITE f'LAN FOR CONTINUATION. .UELL FOR :ONDENSATE UA"' FROM BLDG A, _ s LLJ�IEINSINO7 e GENERAL PROVIDE ( 1=UR ISH AND INSTALL ) ALL NECESSARY MATERIALS AND LABOR FOR A COI" IPLETELI' OPERATIONAL FILUMBING S'I'ST M AS SHOWN ON THE DRAWINGS AND HEREIN SPECIFI D. INSTALL IN ACCORDANCE WITH THE SOUTH FLORIDA BUILDING CODE AND LOCAL ORDINANCES. SCOPE OF WORK : PROVIDE THE FOLLOWING COMPLETE SYSTEMS : A. SANITARY COLLECTION. B. DOi" IESTIGC T ANDCOLD WATER. C. AIR CONDI1�IONING CONDENSATE- FA'T' FOR ALL FEES, INSPECTIONS AND CONNECTION CHARGES REQU RED VERIFY AT JOB 51TE ALL SPACE CONDITIONS, DIMENSIONS WITH PIPE, FIXTURES, AND EQUIPi"IENT SIZES PRIOR TO FA BRICATIONOIR ;INS7,4LLA7ION_COORDINA7E REQUIREMENTS TO AVOID INTE FERENCE WITH OTHER TRADES. SUBMIT SHOP D AWINGS FOR ARCHITECT / ENGINEER APPROVAL BEFORE PROCEEDING WITH THE PURCHASE OR INSTALLATION O EQUIPMENT AND MATERIALS. GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKI"IANS IF= FOR A PERIOD OF ONE `PEAR FROM DATE OF ACCEPTANCE. MATERIALS PROVIDE SHUT-OFF vALvES FOR EACH FIXTURE AND AIR CHAMBERS WHERE SHOWN AND W#4ERE REQUIRED FOR PROPER PERFO ANGE OF THE 5 'STEM. PROVIDE DIEL r!'ITIRIC FITTINGS TO CONNECT PIPING TO EQJIPI"IENT OF ISSIMILAR METALS. USE CLAMPS AND FASTENERS OF SIMILAR METALS OR ISOLATE THEM FROM PIPING AND SLA S TO PREVENT CORROSION. PIPING DOMESTIGOT AN COLD WATER: COPPER TUEMV1 FFE "K" OR "L" WITH OLDER JOINTS. WOG BRONZE vALvES 125 P.S.I. MIN. PR VIDE PRE - MOLDED FIBERGLASS INSULATION FOR HOT WATER LINES. SANITARY WASTE AND VENT: CAST IRON PIPING UNDER SLABS, GAST IR N NO -HUB OR COPPER D.W.v. ABOVE P_V.C. DRAIN PIP AND FITTINGS MAY BE USED WHEN ALLOWED BY TH LOCAL JURISDICTION. A/C CONDENSAT : PVC SCEDULE 40 PIPE AND FITTINGS, STORM DRAINAGE NOTiE IN COMPLIANCE WITH 1101.2 (F.B.C.), ALL STORM WATER FROM ROOFS, PAVED AREAS ETC, WI —L DISCHARGE INTO THE LAWNS. CONTRACTOR SHALL ROVIDE SWALES AS TO RETAIN ALL WATER WITHIN THE PROPERTY. SEE SITE PLAN FOR A , D17IONAL INFORMATION. WATER HEATER NOTE TWO SEPARATE TANK ESS ELECTRIC WATER HEATER SHALL BE INSTALLED (SEE P1 F R LOCATION). THE RELIEF VALVE IS NOT REQUIRED FOR THIS KIND OF WATER EQUIPMENT_ z - — U ui W x P _Q IAA U W >/fy O N 0 N D r F_- N Q T N N J UW I 20 � z Q Z Q�NN Q �0N� a N J 0 ZLL�?�? m `v 0 NQJX J > � NCI z -LPL \� •ice/ momm we U N IIIIIIIIIA�� �G O Z� W u� /_ Q o wr J c�� O T T LL z�a co M 1 ) \ / w� 4�a LoC uiG co Lo N 2 U Y � o W tz3 �w W = �zY t cwc ,n NSV t2� U 0 C O v L U drawing TitIQ FIRST FLOOR PLUMBING PLAN R*viSit�n date 1 BLDG. DEPT. COMMENTS 11-10-05 Scale= As Shown data S-114-OS dwg = P -1