Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
13-1162-001
w t-aC:NCQAt nCRAnt iTIM11 nlnT�:e 1. THE SCOPE OF WORK HAS GENERALLY BEEN INDICATED ON THE DRAWING Y FOR CONTRACTOR'S INFORMATION. IT SHALL BE THE CONTRACTOR'S E RESPONSIBILITY TO DETERMINE THE FULL SCOPE EXTENT, NATURE AND I F MANNER OF DEMOLITION REQUIRED. 2. ONLY WORKMEN SKILLED AND KNOWLEDGEABLE IN THEIR RESPECTIVE I TRADES SHALL BE EMPLOYED IN THE DEMOLITION OF ANY WORK. 3. CONTRACTORS SHALL TAKE SPECIAL CARE TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED AND NOT TO DISTURB ANY WORK WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION A CONTRACTOR DESTROYS OR DISTURBS ANY WORK WHICH IS TO REMAIN, THEN HE SHALL, AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH WORK AS NECESSARY. 4. ANY CUTS AND PENETRATIONS IN EXISTING WORK REQUIRED TO ACCOMPLISH f! • NEW WORK SHALL. BE KEPT TO AN ABSOLUTE MINIMUM. 5. ALL DEMOLITION WORK TO BE DONE" DURING THOSE HOURS DESIGNATED BY OWNER, OWNER REPRESENTATIVE OR ASSOCIATION. 6. REMOVE AND DISCARD ALL DEMOLISHED ITEMS IN A MANNER FULLY APPROVED • BY THE CITY OF MIAMI AND ANY OTHER GOVERNMENT AGENCY. 7. DO NOT SCALE DRAWINGS, E. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO THE OWNER'S REPRESENTATIVE ANY DISCREPANCIES OR OMISSIONS WHICH WOULD INTERFCRE WITH SATISFACTORY COMPLETION OF WORK. ALL BUILDING DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION WORK. 9. IN ALL CASES, THE CONTRACTOR SHALL PATCH ALL DISTURBED EXISTING STRUCTURES (WALLS, COLUMNS, ETC.) WHICH ARE TO REMAIN TO MATCH ADJACENT CONDITIONS AND PREPARE THEM FOR THE RECEPTION OF NEW FINISHES. 10. MECHANICAL DUCTWORK AND PIPING DEMOLITION TO BE DONE BY THE MECHANICAL CONTRACTOR. 11. CONTRACTOR SHALL PROTECT, PATCH AND REPAIR ALL EXISTING WORK ADJACENT TO HIS WORK OR DAMAGED AS A RESULT OF HIS WORK. 12. CONTRACTOR SHALL PROTECT FROM DAMAGE ALL EXISTING MATERIALS TO BE REUSED AND SHALL ALSO PROTECT ALL TRAFFIC AREAS OF BUILDING HE USES DURING THE EXECUTION OF WORK PERTAINING TO THIS CONTRACT. CONTRACTOR SHALL REPAIR ANY DAMAGE ATTRIBUTABLE TO HIS OPERATION. 13, CONTRACTOR'S ATTENTION IS DIRECTED TO REQUIREMENTS FOR PROTECTION OF PRESENT WORK, EQUIPMENT AND OCCUPIED SPACES AS PER FBC 2010. 14, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PERFORMANCE OF ALL CUTTING AND PATCHING MADE NECESSARY BY THE WORK OF ALL TRADES INVOLVED IN THIS ALTERATION. 15, ELECTRICAL DEMOLITION TO BE DONE BY QUALIFIED ELECTRICAL CONTRACTOR AND COORDINATED WITH ELECTRICAL DRAWINGS 16, PLUMBING DEMOLITION TO BE DONE BY QUALIFIED PLUMBING CONTRACTOR AND COORDINATED WITH PROPOSED PLUMBING DRAWINGS C No. Y � E � I F • W I � I •Y•• ii• U Y • • i14•• lY• Y • W W• • v 4 i • f! • Y • W V � • Soo • • U • • W 0:60 • • • U • Y Y UY• Y K<• PARTIAL DEMOLITION FLOOR PLAN SCALE: 1/4'=1'-O' 54" A13UVt THE FINISHED FLOOR. 3.) GENERAL CONTRACTOR TO VERIFY AND COORDINATE ACTUAL WINDOW / DOOR DIMENSIONS AND MASONRY OPENINGS PRIOR TO CONSTRUCTION. 4•) ANY CHANGE OF INTERIOR FINISHES BY OWNER/G.C. SHALL BE COORDINATE WI THE ARCHITECT. 5.) INTERIOR PARTITION OF 3 5/8" -5 5/8" METAL STUDS @u 24" O.C. REFER TO FLOOR PLAN FOR DIM. /LOCATION, 6.) CLOSET DOORS SHALL BE OPERABLE BY CHILDREN FROM INSIDE. 7,) SEPARATE PERMIT REQUIRED FOR ROOFING, WINDOWS AND DOORS. 8.) FOR SECURITY ENTRY NOTES REFER TO SECURITY NOTES ON SHEET A -1. CO �,/ E co 0 4a co CD CD �► r N 0 U - - X�01 •U � V � c 0 13 13 00 CN 0)[3 Q � nomn,, 00 c: W -�•-- r wrY: L0 C CD 0 CY7 CL x 0 7C) Lj.. 1r...r W > 0 0*1. • c) �0 "j ©0 qz �rw�www�r�r 04 rww�rr�r� 1. A w� wrrrM > < cy) cyp) y- � p L0 Z c Z F 9 u LL < - CO Q � Q 1A 0 ©c0 Z 0 L `eLmc w [/0 � �-- 0 C M W to —c 0 z W 0 �, ❑ CO C� CL CA "'"' �: W W -, W 0 0 N v SHEET INDEX PROPOSED FLOOR PLAN SHEET NUMBER A-2 of 3