Loading...
13-1056-014SHEATHING, SEE NOTE 3/S -2 NYHTAI6 BY NU -I UE BY us \ �R LEDGER HANGER SEE =CTION 2/8-4 EL.+S' -2' TOP OF EXIST'G BEAM M 5 DOWELS x 5' -O' — DRILLED THRU EXISTING GONG. BEAM t SET W/ EPDXY. REMOVE EXISTING S' GMU WALL EXTERIOR FACE SHELL TO INSTALL NO. 5 VERT- REBARS_ M 5 DOWELS x 3' -0' DRILLED INTO EXISTING CONC. FOOTING FOR 4' t t SET W/ EPDXY. TOP OF EXIST'G SLAB EL. V.1 F. TOP OF EXIST'G_ FTG. C 1 &C I ION 5-1 SCALE: 3/4' = 1' -0' 12 4BF- PREFAB WD. TRUSSES 6 24' O.G. TB 90° STD. HOOK EXISTING GONG. BEAM TO REMAIN EXISTING ON CMU WALL TO REMAIN J' P/M EXP. JT. MATERIAL EXISTING GLAB TO REMAIN EXISTING: CONCRETE FTG. SPREAD FOOTING SCHEDULE MARK SIZE L X W X TI- fIGGENESS REINFORCEMENT MARKS BOTTOM TOP SHRT. BAR. LONG. BAR SHRT, BAR LONG. BAR W= -16 CONT.16 x 12 4 205 5 * 32' O.C.. R_ TO 5 WF -20 CONT. 20 x L 2 FOUNDATION 2 0 5 • 4 s 48' O.C. TO ROOF WF -24 CONT. 24 x 12 04 i 36' 305 ALL BENTS t CORNERS_ REMAINDER ZONE Q F -36 3'- 6'x3'- 6'x14' 4" 5 405 4 0 5 405 F -40 41- 0'x4' - 0'x14' 4" 5 405 4 0 5 405 F -50 5'- 0'x5'- 0'x16' 6 •5 6 05 605 605 GROUND FLOOR 4 FOUNDATION NOTES Ia SOIL STATEMENT SOIL AT THIS SITE IS SAND t ROCK ADEQUATE TO SUPPORT THE DESIGN LOAD OF 2000 PSF AFTER EXCAVATION. SIGNED 4 SEALED LETTER WILL BE SUBMITTED BY THE ARCHITECT OR THE ENGINEER ATTESTING THAT THE SITE HAS BEEN OBSERVED AND THE FOUNDATION CONDITIONS ARE SIMILAR TO THOSE UPOM WHICH THE DESIGN IS BASED ON. 2a TOP OF ALL FOOTINGS s -2' -S' NLGY.D. 3a PLACE ALL NEW GONG_ SLABS OVER S MIL VAPOR BARRIER, OVER WELL COMPACTED, CLEAN t TERMITE TREATED FILL. 4a DENOTES Of MASONRY BEARING WALL REINFORCED W/ OS CzALV. LADDER TYPE HORIZONTAL JOINT REIN. 0 1r&' O.C. FOR VERT_ REIN. SEE SCHEDULE THIS SHEET, 5.1 C,J_ DENOTES I/8' x 2' SAW -CUT CONTROL .JT. TO TAKE PLACE 24 HOURS AFTER SLAB HAS BEEN CAST_ 6 3 A S' CMU STEM WALL, FOR REIN. SEE NOTE 4 / 8-1 A n Z Q i O -1 Q �r u- 0 Z Ill d l� 1� N EXISTING CBS STRUCTURE POOL EQUIPMENT TO REMAIN w r ry JOSEPH CHAN, PE, PSM, CGC P.E. # 40587 LS # 6821 — STATE OF FLORIDA MINCE PLAN cD S" CMU WALL VERTICAL REINFORCEMENT SENT SCHEDULE FLOOR TO ZONE WALL VERTICAL REINFORCEMENT IN FLOOR THICKNESS FULLY GROUTED BLOCK CELL FOUND. TO ROOF 4 8' 5 * 32' O.C.. R_ TO 5 8' « 5 , 24' O.G. FOUNDATION INTERIOR • 4 s 48' O.C. TO ROOF WALLS ZONE Q IS DEFINED AS i' -0' EACH SIDE OF ALL BENTS t CORNERS_ REMAINDER ZONE Q GROUND FLOOR 4 FOUNDATION NOTES Ia SOIL STATEMENT SOIL AT THIS SITE IS SAND t ROCK ADEQUATE TO SUPPORT THE DESIGN LOAD OF 2000 PSF AFTER EXCAVATION. SIGNED 4 SEALED LETTER WILL BE SUBMITTED BY THE ARCHITECT OR THE ENGINEER ATTESTING THAT THE SITE HAS BEEN OBSERVED AND THE FOUNDATION CONDITIONS ARE SIMILAR TO THOSE UPOM WHICH THE DESIGN IS BASED ON. 2a TOP OF ALL FOOTINGS s -2' -S' NLGY.D. 3a PLACE ALL NEW GONG_ SLABS OVER S MIL VAPOR BARRIER, OVER WELL COMPACTED, CLEAN t TERMITE TREATED FILL. 4a DENOTES Of MASONRY BEARING WALL REINFORCED W/ OS CzALV. LADDER TYPE HORIZONTAL JOINT REIN. 0 1r&' O.C. FOR VERT_ REIN. SEE SCHEDULE THIS SHEET, 5.1 C,J_ DENOTES I/8' x 2' SAW -CUT CONTROL .JT. TO TAKE PLACE 24 HOURS AFTER SLAB HAS BEEN CAST_ 6 3 A S' CMU STEM WALL, FOR REIN. SEE NOTE 4 / 8-1 A n Z Q i O -1 Q �r u- 0 Z Ill d l� 1� N EXISTING CBS STRUCTURE POOL EQUIPMENT TO REMAIN w r ry JOSEPH CHAN, PE, PSM, CGC P.E. # 40587 LS # 6821 — STATE OF FLORIDA MINCE PLAN cD