Loading...
09-836R-003L I GENERAL PLUMBING NOTES 1. ALL WORK SHALL- CONFORM WITH ALL LOCAL, STATE, FEDERAL 7. PROVIDE MEANS "FURNISH AND INSTALL ". ORDINANCES AND BUILDING CODES GOVERNING THE INSTALLATION of THE PLUMBING SYSTEM. IF WORK AS LAID S. DO A COMPLETE JOB, EVERYTHING CONNECTED, READY FOR USE, OUT, INDICATED OR SPECIFIED IS CONTRARY TO OR CONFLICTS U WITH LOCAL ORDINANCES, BUILDING CODES AND REGULATIONS, 9. SHOP DRAWINGS: CONTRACTOR SHALL FURNISH THE ENGINEER THE CONTRACTOR SHALL REPORT IN WRITING TO THE WITH SHOP DRAWINGS OF EQUIPMENT PRIOR TO PURCHASE ARCHITECT /ENGINEER BEFORE SUBMITTING A BID. THE FOR APPROVAL. ARCHITECT /ENGINEER WILL THEN ISSUE INSTRUCTIONS AS W HOW TO PROCEED, 10. AT COMPLETION OF JOB THE PLUMBING CONTRACTOR SHALL z GIVE THE OWNER AN AS -BUILT SET OF REPRODUCIBLE SEPIAS 2, THE DRAWINGS ARE TO BE CONSIDERED DIAGRAMMATIC, NOT SHOWING THE EXACT LOCATION OF ALL INSTALLATIONS. NECESSARILY SHOWING IN DFTAIL OR TO SCALE ALL OF THE MINOR ITEMS. UNLESS SPF_CIFIC DIMENSIONS ARE SHOWN, THE 11. PLUMBING CONTRACTOR SHALL PRESSURE TEST ALL PIPING AS STRUCTURAL, ARCHITECTURAL AND SITE CONDITIONS SHALL REQUIRED BY CODE. TEST SHALL BE WITNESSED AND APPROVED GOVERN THE EXACT LOCATIONS. CONTRACTOR SHALL FOLLOW BY PROPER AUTHORITIES. DRAWINGS IN LAYING OUT WORK, CHECK DRAWINGS OF ALL r TRADES TO VERIFY SPACES IN WHICH WORK WILL BE INSTALLED 12. THE PLUMBING CONTRACTOR SHALL WARRANT ALL AND MAINTAIN MAXIMUM HEAD ROOM, AND SPACE CONDITIONS WORKMANSHIP AND MATERIALS FOR ONE YEAR FROM THE DATE AT ALL POINTS. WHERE HEAD ROOM, OR SPACE CONDITIONS OF FINAL WORK ACCEPTANCE GY OWNER. ANY BREAKDOWN APPEAR INADEQUATE, ARCHITECT/ ENGINEER SHALL BE OCCURRING IN FIRST YEAR SHALL BE REPAIRED AT NO EXPENSE NOTIFIED BEFORE PROCEEDING WITH INSTALLATION. THIS TO THE OWNER. CONTRACTOR SHALL. WITHOUT EXTRA CHARGE, MAKE FIELD 0000 MODIFICATION IN LAYOUT AS NEEDED TO PREVENT CONFLICT 13, PROVIDE BATHROOM FIXTURES AS SPECIFIED. WITH WORK OF VARIOUS TRADES OR FOR PROPER EXECUTION m OF THE WORK . 14. PROVIDE SHUT -OFF VALVE FOR EACH FIXTURE. J. EXAMINE ALL DRAWINGS CAREFULLY PRIOR TO SUBMITTING A BID. CONTRACTOR WILL BE REQUIRED TO FURNISH, INSTALL AND /OR 15. WHEREVER NOT SIMILAR METALS ARE TO BE JOINED, A DI- ELECTRIC FITTING SHALL BE PROVIDED TO CONNECT BOTH CONNECT WITH APPROPRIATE SERVICES ALL PLUMBING ITEMS TYPES OF PIPES. SHOWN ON ANY OF THE ARCHITECTURAL, AIR CONDITIONING, 16. PLUMBING CONTRACTOR SHALL PROVIDE AIR CONDITIONING ELECTRICAL AND SPRINKLER DRAWINGS WITHOUT ADDITIONAL EXPENSE TO THE OWNER. IF DISCREPANCIES CONFLICTS , CONDENSATE DRAIN AND TRAP_ SEE AIR CONDITIONING PLANS , INTERFERENCE OR OMISSIONS OCCUR BETWEEN DRAWINGS, FOR LOCATION OF UNITS AND DRAINS. NOTIFY IN WRITING THE ARCHITECT/ ENGINEER IN AMPLE TIME 17, MATERIALS TO PERMIT REVISIONS BEFORE THE LIDS ARE SUBMITTED. < 0 ! A. COLD WATER PIPING DOWNSTREAM OF WATER METER SHALL BE 4. INSTALL MATERIALS AND EQUIPMENT IN A NEAT AND FIRST TYPE "L" COPPER BELOW GROUND AND TYPE AA" COPPER ABOVE CLASS WORKMANLIKE MANNER. THE OWNER RESERVES THE GROUND. RIGHT TO DIRECT REMOVAL AND REPLACEMENT OF ITEMS WHICH, 15, COLD WATER PIPES INSIDE OF SLAT, SHALL BE TYPE "K" SOFT IN HIS OPINION, DO NOT PRESENT A NEAT AND WORKMANLIKE COPPER INSTALL INSIDE POLYETHYLENE CONDUIT. NO JOINTS APPEARANCE. REMOVAL AND REPLACEMENT IS TO BE DONE PERMITTED INSIDE SLAB. IMMEDIATELY WHEN DIRECTED BY THE OWNER IN WRITING. AT C SANITARY WASTE AND VENT 4 "0 AND SMALLER SHALL BE P.V.C., THE SOLE EXPENSE OF CONTRACTOR. SCHEDULE 40. 5. START OF WORK BY CONTRACTOR SHALL BE CONSIDERED AS D, STORM LINES INSIDE BUILDING SHALL BE P.V.C. SCHEDULE 40 ACCEPTANCE BY HIM OF ALL CLAIMS OR QUESTIONS AS TO SUITABILITY OF THE WORK OF OTHER. TRADES OR OTHER E. IN COASTAL AREAS ALL SANITARY AND STORM PIPING OUTSIDE OF CONTRACTORS TO RECEIVE HIS WORK, THIS CONTRACTOR BUILDING SHALL BE SCHEDULE 40, PVC. SHALL REMOVE AND REPLACE AT HIS EXPENSE, ALL PLUMBING F. CONDENSATE DRAIN PIPE SHALL BE SCHEDULE 40, PVC PIPE WORK WHICH MAY HAVE TO BE REMOVED BECAUSE OF AND FITTINGS. INTERFERENCE WITH OTHER TRADES. G. WATER HEATER RELIEF AND DRAIN LINE SHALL BE TYPE '1" COPPER, 6. THIS CONTRACTOR SHALL OBTAIN AND PAY ALL INSURANCE, MIN 314" DIA. FEES, PERMITS , ASSOCIATION DUES, ROYALTIES AND TAXES OF WHATEVER NATURE SHALL APPLY TO THIS WORK. HE SHALL ALSO FIRE RATED PENETARATION NOTE PAID ALL THE INSPECTION FEES AS MAY REQUIRED BY LAW OR WHEN FIRE PENETRATION OF PIPING OCCUR, SHALL BE PROTECTED ORDINANCE AND SHALL KEEP THE OWNER HARMLESS FROM ANY DAMAGE AND EXPENSE ARISING FROM ANY VIOLATION OF LAWS, BY ASSEMBLY N•. W-L- -2088, UL APPROVED RULES OR ORDINANCES. FIN ITEM WATER C TUB WHI RLPO BIDET LAVATOR' KITCHEN DISHWAS CLOTHES HOSE BI FLOOR C SHOWER REFRIGE NOTE: PROVIDE ANTI SCALD VALVE ® EACH SHOWER AND TUB NOTE: ALL TRAOS SHALL BE CONSISTENT WIFIXTURE OUTLET SIZE. 0 0 ♦ RINNAI see JOB: 1 d `O 314" Hot Water Supply Line WATER PIPING SIZE -2 C71 112 "0 CW /HW Q 112 "0 CW Q 314 "0 CW, 112 "0 HW ® 314 "0 CW /HW Q 314"0 HW ® 314 "0 CW (2) 1 "o Cw ® 314 "0 HWS Q 1"0 CWS, 112 "0 HWS ® 1 -114 "0 CWS 1 -114 "0 CW, 112"0 HW Q -A< PRESSURE RELIEF VALVE DRAIN VALVE © I (5 3/4" BALL VALVE Q = 314" UNION INSTANT HWH. (QUANTITY 2) IN COMPLIANCE F.B.0 2004 199 MBTUH CAPACITY MODELS AS FOLLOW. MODEL RINNAI (R75LS1- VA2528FFUD) DIMENSIONS: 9.6" DEPTH x 14.0" WIDTH x 22.9" HEIGHT ENERGY EFFICIENCY: UP TO 84.OX NOTE: OUTDOOR EQUIPMENT REQUIRED. © Lo 314" Gas Supply L-0© u 314" Cold Water Supply Line HOT WATER HEATER DETAIL N.T.S. HAMMER ARRESTOR: - AMTROL, MODEL 500 - INSTALL IN ACC. LOCATION. - CONNECTION SIZE: 112" NPT - HEIGHT: 4 -112" - DIAMETER: 3 -318" MAX. PRESSURE: 150 PSI MAX. TEMP: 200' F MAX. SHOCK PRESSURE: 200 PSI TO BE INSTALLED IN CWS AND HWS HIGH POINT FOR EACH GROUP OF FIXTURE SERVICING. NOTE: ALL HOT WATER LINE SHALL BE INSULATED TO MINIMIZE HOT LOSS. NOTE: ALL PLUMBING WATER DEVICE PROVIDE SHUTT -OFF VALVE. NOTE: ALL SANITARY PIPE 2 112 "0 OR SMALLER SHALL RUN 0 114" SLOPE PER L.FT. 3" AND LARGER 0 1/8" SLOPE PER L.FT. NOTE: SHOWERS AND TUB /SHOWER COMBINATIONS SHALL BE EQUIPPED WITH CONTROL VALVES OF THE PRESSURE BALANCE. THE HIGH LIMIT STOPS SHALL BE SET TO LIMIT WATER TEMPERATURE TO A MAXIMUM 120 F(49 C) NOTE: ALL TUB AND SHOWER SHALL BE ANTISCALDING VALVE 0 110% (TYPICAL) • ♦ •r•t• r♦r see JOB: 1 U 7 /OB /l0 • u • ♦ • u • • i V Y ('v O U W o z u "3! z J N 0' 0) <L "O r p • .. r N ry_ Z CD • ^ •U) 0 Q) 3 U) • ♦ • 00 10 0000 N 000 V • m Q ♦ W 4 Q r • • • • • • r IV_ L J O W N ' u► REVISIONS: JOB: 1 U 7 /OB /l0 on. O U W o z u "3! z J N 0' 0) <L "O Q) W N ry_ Z CD ^ •U) 0 Q) 3 U) l� w�• 00 10 N . > *LG C� IV_ L J O W N ' u► • JOB: 1 U on. O U W o z z J N 0' 0) <L "O Q) W N ry_ Z CD ^ •U) 0 Q) U) l� Ld 00 10 N . > *LG C� m Q W ' u► . JOB: 1 vtf on. M.. U Q) ^ •U) 0 Q) Z_ 0� W 0 O 0 U O W 4 Q Q L 0 < 0 ! 4-j z cn �1 0 CD O E n N U [a �' 00 •- DRAW' BY- M. D ' SCALE...,, � . AS SHOWN,:.; � v %k. e,�r . JOB: 1 on. M.. W51