13-706-014` = 1 l '• FOM GENERAL CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT SHOWN OR INDICATED FOR A COMPLETE PLUMBING SYSTEM IN ACCORDANCE WITH THESE PLANS, GOVERNING AGENCIES AND THE BUILDING CODE. IT IS NOT THE INTENT OF THESE PLANS TO SHOW EVERY MINOR DETAIL OF THE PLUMBING SYSTEM. THE CONTRACTOR IS EXPECTED TO FURNISH A ND INSTALL ALL ITEMS FOR A COMPLETE PLUMBING SYSTEM AND PROVIDE ALL THE REQUIREMENTS NECESSARY FOR THE EQUIPMENT TO BE PLACED IN PROPER WORKING ORDER. FO-21 PLANS AND SPECIFICATIONS THE PLUMBING SUB - CONTRACTOR SHALL OBTAIN A COMPLETE SET OF CONSTRUCTION DOCUMENTS SO THAT THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL REQUIREMENTS EFFECTING THIS WORK CAN BE FULLY REVIEWED AND INCLUDED WITHOUT INSTALLATION CONFLICTS. Q3 SITE VISIT PRIOR TO BIDDING OR SUBMITTING ANY PROPOSAL THE PLUMBING SUB - CONTRACTOR SHALL VISIT THE JOB SITE AND VERIFY ALL OF THE CONDITIONS UNDER WHICH THIS WORK WILL BE PERFORMED. FO-41 BIDDING THE PLUMBING SUB - CONTRACT BID SHALL INCLUDE: 1.) A COPY OF THE CONTRACTOR'S CERTIFICATION AND /OR LICENSE. 2.) PROOF OF INSURANCE. 3.) FIXTURES AND FITTINGS INCLUDED OR EXCLUDED. 4,) TOTAL COST OF THIS WORK. 05 FEES THE PLUMBING CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES AND TESTING RELATED TO THIS PORTION OF THE WORK. 06 COORDINATION THE CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL TRADES IN ORDER TO AVOID INTERFERENCE WITH THE PROGRESS OF THE CONSTRUCTION OR CONFLICTS. IF REQUIRED BY PROJECT CONDITIONS, THE CONTRACTOR SHALL COORDINATE HIS WORK WITH CORRESPONDING UTILITY COMPANIES IN ORDER TO VERIFY THE POINTS OF CONNECTION, METER LOCATION, ETC. NO CHANGES WILL BE ACCEPTED UNLESS A PRIOR WRITTEN APPROVAL HAS BEEN ISSUED BY STEVEN B. SCHWORTZ, ARCHITECT AND /OR ENGINEER. Fo-7-1 INSURANCE THIS CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK. PROOF OF INSURANCE SHALL BE SUBMITTED TO THE OWNER PRIOR TO COMMENCEMENT OF WORK, FO-81 GUARANTEE THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FREE OF DEFECTS FOR A PERIOD OF NO LESS THAN ONE YEAR FROM THE DATE OF ACCEPTANCE. CORRECTION OF DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND SHALL INCLUDE REPLACEMENTS OR REPAIR OF ANY OTHER PHASE OF INSTALLATION THAT MAY HAVE BEEN DAMAGED. Q9 TEMPORARY WATER THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY WATER SERVICE TO THE JOB SITE WHEN REQUIRED BY PROJECT CONDITIONS. THE COST OF THIS TEMPORARY SERVICE INCLUDING UTILITY CHARGES FOR WATER USE ONLY SHALL BE PART OF THE PLUMBING SUB - CONTRACT, 10 EXISTING PIPING THE PLUMBING SUB - CONTRACTOR SHALL VERIFY THE LOCATION, ELEVATION AND SIZE OF ALL EXISTING WATER AND SANITARY PIPING PRIOR TO THE COMMENCEMENT OF WORK ON THIS PROJECT. 0 W d O 0 O w 00 (b Z 'm IL r- 11 CL co z m 0 o N h N rr a N W N z N r w �Q �a J 0. 0. [TI-1 EQUIPMENT CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL EQUIPMENT PRIOR TO ROUGH -IN. WHEN PROVIDED OR REQUIRED THE CONTRACTOR SHALL VERIFY DETAILS AND SPECIFICATIONS CONTAINED IN SHOP DRAWINGS. SEE EQUIPMENT MANUFACTURER'S REPRESENTATIVE FOR ALL EQUIPMENT SPECIFICATIONS, REQUIREMENTS, TEMPLATES AND SYMBOLS NOT NOTED OR SCHEDULED ON THE PLANS. 12 SANITARY PIPING ALL SANITARY DRAIN, WASTE, VENT PIPES AND FITTINGS SHALL BE (TYPE DWV) SCHEDULE 40 P.V.C. (ASTM D 2665; D 2949; D 3311; F 1866). 13 SANITARY LINE PITCH HORIZONTAL BUILDING DRAINAGE PIPING OF 2" DIAMETER AND SMALLER SHALL HAVE A LINE PITCH OF 1/4 " PER FOOT. HORIZONTAL BUILDING DRAINS 3" DIAMETER OR LARGER SHALL BE INSTALLED WITH A LINE PITCH OF NOT LESS THAN 1/8" PER FOOT. FI-41 SANITARY CLEANOUTS AND ACCESS LOCATE CLEAN -OUTS ON WALLS AND /OR FLOORS AS NECESSARY FOR ACCESS AND EASE OF USE. INTERIOR CLEANOUTS SHALL BE PROVIDED WITH A CHROME FINISH COVER PLATE TO COMPLETELY CONCEAL THE WALL PENETRATION. ACCESS PANELS SHALL BE PROVIDED FOR ALL CONCEALED PARTS OF THE PLUMBING SYSTEM REQUIRING ACCESSIBILITY OR AS INDICATED ON DRAWINGS. PANELS SHALL BE STAINLESS STEEL, COMPLETE WITH FRAMES, HINGES AND LOCKS. SEE ARCHITECTURAL NOTES FOR ACCESS PANEL SPECIFICATIONS. FI-5-1 AIR ADMITTANCE VALVES AIR ADMITTANCE VALVES SHALL BE "STUDOR" MINI -VENT FOR SIZES 1 -1/4 " THROUGH 2" AND "STUDOR " MAXI- VENT" FOR VENT SIZES 2" THROUGH 411. VALVES SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND COMPLY WITH F.B.C.-PLUMBING SECTION 917, VALVES FOR INDIVIDUAL FIXTURES, VENT STACKS AND BRANCHES SHALL CONFORM TO "ASSE /ANSI" 1050 & 1051 AND BEAR THE OFFlCAL "ASSE" SEAL OF APPROVAL Fi-61 SANITARY SYSTEM TESTING THE COMPLETE SANITARY SYSTEM SHALL BE TESTED IN ACCORDANCE WITH F.B.C- PLUMBING SECTION 312.1 THROUGH 312.4 AND SHALL BE DONE WITH WATER FOR PLASTIC PIPING AND AIR FOR ALL OTHER PIPING MATERIALS. A MINIMUM 5 -FEET OF HEAD PRESSURE SHALL BE APPLIED FOR PLASTIC PIPING AND 5- P.S.I. OF AIR PRESSURE FOR OTHER MATERIALS. PRESSURE SHALL BE MAINTAINED FOR A MINIMUM OF 15- MINUTES. THE SYSTEM SHALL BE VISUALLY INSPECTED FOR ANY LEAKAGE. PROVIDE ALL NECESSARY TEST EQUIPMENT AND PLUG ALL PIPE OPENINGS PRIOR TO THE COMMENCEMENT OF SANITARY SYSTEM TESTING. REPEAT TESTING WHEN NECESSARY TO ASSURE A LEAK FREE SYSTEM. 17 WATER SYSTEM PIPING PIPING SHALL BE RUN IN CEILINGS, WALLS OR ATTIC SPACES AND ISOLATED FROM CONTACT WITH OTHER METALS OR MASONRY. POTABLE WATER LINES SHALL BE COPPER (ASTM -B -88) USING TYPE "M" WITH LEAD FREE COPPER SOLDER AND FITTINGS. PROVIDE DIELECTRIC COUPLINGS, AS REQUIRED, FOR CONNECTION TO DISSIMILAR MATERIALS, SHUT -OFF VALVES AT FIXTURES AND WATER SUPPLIED EQUIPMENT. FLUSH LINES AND MAKE CLEAR OF DEBRIS, SCALE, GREASE, ETC. PRIOR TO CONNECTION WITH EQUIPMENT. Fl -81 BELOW FLOOR WATER PIPING BELOW FLOOR WATER LINES ARE NOT PERMITTED EXCEPT WHERE ESSENTIAL FOR EQUIPMENT HOOK -UPS. BELOW FLOOR PIPE RUNS SHALL BE AS SHORT AS CONDITIONS PERMIT. LINES SHALL BE MADE OF CONTINUOUS SEAMLESS COPPER (ASTM -B-88) USING TYPE "K" FLEXIBLE TUBING FOR ALL WORK, BELOW FLOOR PIPING SHALL BE ENCASED IN A MINIMUM 1/32" THICK FULL LENGTH CONTINUOUS BLACK PLASTIC SLEEVE. SLEEVES SHALL TERMINATE AT 6" ABOVE FINISHED FLOOR LEVEL- FI-91 WATER HAMMER ARRESTORS WATER- HAMMER ARRESTORS SHALL BE INSTALLED WHERE QUICK - CLOSING OR SOLENOID OPERATED VALVES ARE UTILIZED. THE ARRESTOR SHALL BE LOCATED WITHIN AN EFFECTIVE RANGE OF THE QUICK - CLOSING VALVE. WATER - HAMMER ARRESTORS SHALL CONFORM TO ASSE 1010. ACCESS SHALL BE PROVIDED TO WATER- HAMMER ARRESTORS. WATER- HAMMER ARRESTORS SHALL BE "PRECISION" MODEL PPP -D OR EQUAL" 20 HOSE BIBBS PROVIDE A SHUT -OFF VALVE AND VACUUM BREAKER AT ALL HOSE BIBBS. PROVIDE A VA GUUM BREAKER AT FAUCETS WITH HOSE-END CONNECTIONS. F2-11 FULL -OPEN VALVES FULL-OPEN VALVES SHALL BE INSTALLED ON THE TOP OF EVERY WATER DOWN -FEED PIPE AND THE WATER SUPPLY PIPE TO EVERY WATER HEATER. (F.B.C• P606.1 #4, AND #7) F2-2-1 EXPOSED PIPING EXCEPT FOR COPPER SUPPLY STUBS, ALL EXPOSED WATER SUPPLY JOINTS AND CONNECTIONS AT FIXTURES AND EQUIPMENT SHALL BE CHROME PLATED, PROVIDE CHROME PLATED ESCUTCHEONS AT EXPOSED THROUGH THE WALL PIPE PENETRATIONS. WATER SUPPLY PIPES FOR TOILETS, LAVATORIES AND SINKS SHALL BE "WATTS- FLEXIBLE PVC" OR EQUAL. P.V.C. "P- TRAPS" AND UNIONS SHALL BE USED AT ALL SINKS AND LAVATORIES UNLESS SPECIFIED OTHERWISE. F251 SHUTOFF VALVES PROVIDE AN IN DE P ENDEN T SHUT - OFF VALVE FOR EACH WATER SUPPLY LINE AT EACH FIXTURE. EXPOSED VALVES AT FIXTURES SHALL BE "BRASSCRAFT' (OR EQUAL) QUARTER -TURN STOP WITH CLEAR ACRYLIC PLASTIC HANDLE. ALL VALVES SHALL BE OF THE SAME MANUFACTURER THROUGHOUT. VALVES CONNECTED TO A DRINKING WATER SUPPLY SHALL MEET THE REQUIREMENTS OF "NSF -61" (F.B.C.- P605.7) 24 BACKFLOW PREVENTOR CONDITIONS GOVERNING WATER SERVICE SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO OBTAINING A BUILDING PERMIT. IF REQUIRED BY PROJECT CONDITIONS, THE WATER SERVICE MAIN LINE SHALL HAVE AN APPROVED BACK -FLOW PREVENTOR ASSEMBLY AS DESIGNATED BY THE WATER PURVEYOR OR PLUMBING OFFICIAL. 25 SYSTEM STERILIZATION STERILIZE WATER PIPING WITH SOLUTION CONTAINING NOT LESS THAN 50 PARTS PER MILLION OF CHLORINE AND ALLOW TO REMAIN IN SYSTEM FOR A PERIOD OF EIGHT (8) HOURS. FLUSH SYSTEM AFTER STERILIZATION. ALL COSTS FOR STERILIZATION AND EQUIPMENT SHALL BE PAID BY THE CONTRACTOR. F2-61 WATER CONSERVATION PLUMBING FIXTURES AND FITTINGS, AS SPECIFIED, SHALL BE LOW WATER CONSUMPTION, "WATER SAVER" TYPE AS REQUIRED BY THE BUILDING CODE. WATER CLOSETS mo 1.6 GALLONS PER FLUSH LAVATORY FAUCETS 0.5 GALLONS PER MINUTE SINK FAUCETS op 2.0 GALLONS PER MINUTE F2-71 WATER SYSTEM TESTING THE WATER SUPPLY AND DISTRIBUTION SYSTEM SHALL BE TESTED IN ACCORDANCE WITH F.B.C.- PLUMBING SECTION 312.5 AND AS MODIFIED HEREIN. AIR PRESSURE SHALL BE APPLIED AT MINIMUM HYDROSTATIC PRESSURE OF 75 P.S.I. AND THE SYSTEM SHALL REMAIN LEAK FREE FOR A MINIMUM OF 24 HOURS. PROVIDE ALL NECESSARY TEST EQUIPMENT AS REQUIRED, F2-81 PIPE HANGERS AND SUPPORTS HANGERS SHALL BE LOOP TYPE, ADJUSTABLE, SWIVEL RINGS THREADED TO RECEIVE STANDARD HANGER RODS. USE PLASTIC COATED HANGERS FOR UN- INSULATED COPPER PIPING AND CLEVIS HANGERS FOR SOIL PIPES. PLASTIC PIPING SHALL BE SUPPORTED AT INTERVALS NOT TO EXCEED 4' -0" ON CENTER. VERTICAL SUPPORT RISER CLAMPS SHALL BE EQUAL TO GRINNEL NO. 261. STRAP HANGERS WILL NOT BE PERMITTED. HANGER RODS SHALL BE STEEL, THREADED NOT SMALLER THAN SCHEDULED: PIPE TYPE PIPE SIZE SUPPORT ROD DIAMETER MAXIMUM SUPPORT SPACING COPPER 1/2'" TO 1 1/2" 3/8" W -0" COPPER 2" AND LARGER 3/8" W -0" P.V,C. PLASTIC I ALL 3/8" 4 ° -0" 29 t INSULATION ACOUSTIC ISOLATION HOT WATER LINES SHALL BE CLAD WITH A MINIMUM 5/8" CLOSED -CELL SELF- SEALING JACKET* HALSTEAD INSUL -LOCK OR UAL. ALL PIPING SEALING INSULATEO J EQUAL SHALL BE ISOLATED FROM OTHER CONSTRUCTION COMPONENTS TO PREVENT THE TRANSMISSION OF SOUND INTO THE OCCUPIED SPACES OF THE BUILDING. 3-0 CONDENSATE DRAINS THE H.V.A.C. CONTRACTOR SHALL SUPERVISE THIS CONTRACTOR'S INSTALLATION OF THE MAIN AND AUXILIARY CONDENSATE DRAIN(S) FOR ALL AIR CONDITIONING SYSTEM(S). PIPING AND FITTINGS SHALL BE P.Y.C. DRAIN TO EXTERIOR OR AS SHOWN ON THE PLANS. ALL INTERIOR CONDENSATE PIPING IN UN -AIR- CONDITIONED SPACES SHALL BE WRAPPED WITH A MINIMUM 1/2" THICK SELF - SEALING INSULATING FOAM JACKET. 31 MAIN A/C CONDENSATE DRAIN / THE MINIMUM INSIDE DIAMETER OF ANY MAIN CONDENSATE DRAIN PIPE SHALL BE 1 -1/4" (ONE AND ONE QUARTER INCH). SEE H.V.A•C. PLAN FOR ALL SIZES, CONFIGURATION, AND CONNEC11ON POINTS. 32 AUXILIARY A/C CONDENSATE DRAIN AUXILIARY CONDENSATE DRAINS SHALL BE A MINIMUM OF 3/4" FOR ALL SYSTEMS. SEE H.V,A.C. PLAN FOR ALL TERMINATION POINTS. 0 CONDENSATE DRAIN TRAP SEAL A WATER SUPPLY SHALL BE PROVIDED FOR CLEANING, FLUSHING AND RESEALING THE CONDENSATE TRAP, AND THE TRAP SHALL DISCHARGE THROUGH AN AIR GAP IN ACCORDANCE WITH F.B.G. - PLUMBING SECTIONS 608 AND 609,7. 34 MEDIAL GAS SYSTEM TESTING THE COMPLETE MEDICAL GAS DISTRIBUTION SYSTEM SHALL BE TESTED TO A HYDROSTATIC PRESSURE OF 100 PSI AND REMAIN LEAK FREE FOR A MINIMUM TIME PERIOD QF24- HOURS. THE PLUMBING SUB - CONTRACTOR SHALL PROVIDE ALL NECESSARY TEST EQUIPMENT AND INITIATE TESTING IN THE PRESENCE OF THE OWNER'S REPRESENTATIVE OR MEDICAL GAS EQUIPMENT SUPPLY REPRESENTATIVE. 5-51 EXCAVATIONS AND BACKFILL ALL EXCAVATION AND BACKFILL REQUIRED FOR INSTALLATION OF THE PLUMBING SYSTEM SHALL BE PROVIDED BY THIS SUB - CONTRACTOR. THE BOTTOM OF ALL TRENCHES SHALL BE CLEARED OF ALL DEBRIS, TAMPED AND EVENLY GRADED WITH CLEAN SAND FILL TO PROVIDE SUPPORT AND THE REQUIRED PITCH. AFTER COMPLETION, TESTING AND INSPECTION, EXCAVATIONS SHALL BE BACKFILLED WITH CLEAN SAND FILL 36 CERTIFICATIONS: THE PLUMBING SUB - CONTRACTOR SHALL HAVE ALL REQUIRED MEDICAL GAS AND MEDICAL PLUMBING CERTIFICATES REQUIRED IN PLACE AND CURRENT AT THE TIME OF PLUMBING PERMITTING. ALL CERTIFICATIONS SHALL BE MAINTAINED ACTIVE AND CURRENT THROUGHOUT THE CONSTRUCTION PROCESS UP TO FINAL PROJECT APPROVAL AND ISSUANCE OF A CERTIFICATE OF OCCUPANCY. 37 WATER SOLENOID AND FILTER THE COLD WATER MAIN SHALL BE CONNECTED TO THE WATER SHUT -OFF SOLENOID AND FILTER (SUPPLIED BY OWNER; INSTALLED BY CONTRACTOR), THE BOTTOM OF THE FILTER SHALL BE MOUNTED AT 6' -0" ABOVE THE FINISHED FLOOR. SEE PLUMBING PLAN FOR LOCATION AND PIPING. 38 VACUUM UNIT BACKFLOW PREVENTOR VACUUM UNIT COLD WATER SUPPLY LINE SHALL BE FITTED WITH AN APPROVED BACK FLOW PREVENTOR ASSEMBLY. VERIFY SIZE REQUIREMENTS WITH THE LOCAL GOVERNING AGENCY. PREVENTOR SHALL BE "WATTS 9090T" OR EQUAL 34 DENTAL CHAIR BACKFLOW PREVENTORS DENTAL CHAIR COLD WATER SUPPLY LINE SHALL BE FITTED WITH AN APPROVED BACK FLOW PREVENTOR ASSEMBLY. PREVENTOR SHALL BE "WATTS 7U2 -2" OR EQUAL 0 N DENTAL CHAIR INSTALLATION 1.) DENTAL CHAIRS ARE NOT CONSIDERED TO BE FIXED EQUIPMENT. THE INSTALLATION OF DENTAL CHAIRS IS NOT INCLUDED IN THE WORK DESCRIBED IN THESE DOCUMENTS. 2.) THESE PLANS ONLY REQUIRE THE INSTALLATION OF THE ILLUSTRATED UTILITIES FOR EACH DENTAL CHAIR. 3.) INSTALLATION OF ANY DENTAL CHAIR IS AT THE SOLE DISCRETION OF THE OWNER AND SHALL BE PERFORMED BY THE CHAIR MANUFACTURER'S REPRESENTATIVE UNDER SEPARATE CONTRA T VACUUM PIPING ALL VACUUM PIPING AND JOINTS SHALL BE 2` I.D. GPVC. EXCEPTION: USE 2' I.D. COPPER WHERE VACUUM LINES ARE INSTALLED IN A RETURN AIR PLENUM CEILING. w z LAV / SINK DRAIN: — o SEE DETAIL U-1 P -5 cn ? TURNED DOWN VENT - OUTLET PIPE WITH INSECT SCREEN COVER AT 10' -0' A.F.F. 2'- C.P.V.C. --- DENTAL VACUUM EXHAUST LINE IN CEILING SINK W/ PIASTER -- TRAP 4 MODEL TRIMMER: SEE DETAIL 3 P -4 VACUUM EXHAUST DISCHARGE FROM OCATAWRY -3' VACUUM SOURCE SMALL BE PIPED TO THE OUTSIDE AS PER N.F•P.A. 9q- 5.3.6.3.11 PIPING LAYOUT THE LOCATION AND LAYOUT OF PIPING ON THIS PLAN IS FOR ILLUSTRATION PURPOSES ONLY. VERIFY FIELD CONDITIONS AND SEE EQUIPMENT MANUFACTURER'S REPRESENTATIVE FOR SPECIAL CONSIDERATIONS OR APPLICATIONS. UTILITY CENTERS UTILITY CENTER INSTALLATIONS MAY VARY FROM ROOM TO ROOM, SEE EQUIPMENT MFG'S REP. FOR INDIVIDUAL UTILITY CENTER REQUIREMENTS BEFORE PROCEEDING WITH THIS WORK, EXISTING WINDOW DR'S OFF. - 2,e PLUMBING OCCUPANT COUNT BUSINESS OCCUPANCIES F.B.G. - BUILDING: TABLE 1003.1 - BUSINESS AREAS AT 100 SQ.FT. (GROSS) PER OCCUPANT: 1,082 SQ.FT.= 10 PEOPLE 100 SQ.FT, PLUMBING FIXTURE COUNT: F,B.C.- PLUMBING: TABLE 403.1 - BUSINESS WATER CLOSETS = 1 PER 25 FOR THE FIRST 50 AND 1 PER 50 FOR THE REMAINDER EXCEEDING 50. LAVATORIES = 1 PER 40 FOR THE FIRST 50 AND 1 PER 80 FOR THE REMAINDER EXCEEDING 50, DRINKING FOUNTAINS = 1 -PER 100 PEOPLE F.B.C.- PLUMBING: 403.2 SEPARATE FACILITIES: EXCEPTIONS: 4.) SEPARATE FACILITIES (FOR EACH SEX) SHALL NOT BE REQUIRED IN BUSINESS AND MERCANTILE OCCUPANCIES WITH A TOTAL FLOOR AREA OF 3,000 SQUARE FEET OR LESS. CATEGORY 3 GAS AND VACUUM SYSTEMS CODE COMPLIANCE FOR THE GAS POWERED DEVICES AND VACUUM SYSTEM ILLUSTRATED HEREIN ARE GOVERNED BY THE 2012 EDITION OF THE "N.F.P.A. qq HEALTH CARE FACILITIES CODE' FOR 'CATEGORY 3' FACILITIES AS DEFINED IN CHAPTER 4. 4.1.3: FACILITIES SYSTEMS IN WHICH FAILURE OF SUCH EQUIPMENT IS NOT LIKELY TO CAUSE INJURY TO PATIENTS OR CAREGNERS, BUT CAN CAUSE PATIENT DISCOMFORT, SHALL BE DESIGNED TO MEET SYSTEM CATEGORY 3 REQUIREMENTS AS DEFINED IN TINS .CODE, EXISTING SANITARY DRAIN LINE DOCUMENTS INDICATING THE POSITION OF THE EXISTING SANITARY DRAIN LINE WERE NOT AVAILABLE TO THE ARCHITECT AT THE TIME OF DESIGN. THE POSITION INDICATED IN PLAN IS AN ESTIMATE BASED UPON OBSERVED CONDITIONS AT THE SITE. CONTRACTOR SHALL VERIFY EXACT DRAIN LINE LOCATION PRIOR TO COMMENCEMENT OF ANY PLUMBING WORK. WALL CLEAN OUT: SEE DETAIL 3 EXISTING P -5 EXISTING WINDOW WINDOW wf: LAV EXAM #2 'HANDICAPPED - EQUIPPED' DRINKING 2" FOUNTAIN: SEE DETAIL P -5 --�v v v — WALL v UTILITY CENTER LAV EXAM #1 VACUUM LINE SWEEPS SHALL BE 45 DEGREES (TYPICAL) V-7— v V 14 WALL N UTIUTY CENTER DRINKING `--- SANITARY LINES: SAN LINE PITCH: --f ; FOUNTAINS 'HANDICAPPED- SEE 'PLUMBING SEE 'PLUMBING 2 —FU i EQUIPPED' TOILET: NOTES' Fl 21 NOTES' 13 MMI 1- ? SEE DETAIL 5 N P -4 PIPING SYMBOL LEGEND- hw SCHEDULE 40 PVC SANITARY DRAIN LINE TO SEWER. NOTE: USE D.W.V. CAST IRON NO--140 SANITARY LINES WHEN PIONIC IS , INSTALLED IN A RETURN wAIR PLENUM CEILING. -- V — V -- 2' SCHEDULE 40 P.V.G. VACUUM LINES AND JOINTS. NOTE: USE 2' COPPER VACUUM LINES WHEN PIPING IS INSTALLED IN A RETURN AIR PLENUM CEILING. ----------- - - - --- SANITARY VENT LINE NOTES: 1,) SEE PLUMBING PLAN AND RISER DIAGRAMS FOR PIPE SIZES NOT INDICATED. 2.) SEE MANUFACTURER'S SPECIFICATIONS FOR FINAL CONNECTION SIZES AND VALVE REQUIREMENTS. 3.) THE LOCATION AND LAYOUT OF PIPING ON THIS PLAN IS FOR ILLUSTRATION PURPOSES ONLY. VERIFY FIELD CONDITIONS AND SEE MANUFACTURER'S REPRESENTATIVE FOR SPECIAL CONSIDERATIONS OR APPLICATIONS. SANITARY PIPE SLOPES 2" I.D. OR LESS = 1/4" PER FOOT 3" I.D. OR LARGER= 1/8" PER FOOT SEPARATE SUB- PERMIT REQUIRED FOR PLUMBING WORK FINAL CONNECTION NOTE PLUMBING SUB - CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FINAL CONNECTIONS TO VACUUM 4 COMPRESSOR UNITS, EXISTING WINDOW WALL UTILITY CENTER > WALL IUTILITY CENTER HYG #2 - AIR ADMITTANCE VALVE. SEE DETAIL 4 P -5 HYG #1 t 2'" > TOILET LAV LAVATORY:, N20 wATER 3 "VTR SEE DETAIL PLASTER CLOSET I - �- X -RAY CL TRAP 1 P- LAB TIE INTO I I Fl Ex STING VTR 2 -FU Iii -- SUSPENDED SANITARY I VENT PIPES- 0i 3 SEE DETAIL N s "" 4-FU - - - -�' BUS. OFF. P -5 EQUIPMENT 9-Fu : PLACEMENT: VACS SEE 'PLUMBING " %COM 0 ; -•, EQUIP. 18-FU .,UNIT° NOTES' i 1 RECEPTION r _ TAP INTO EXISTING - 4" t , i• .t 't ` •i.••.•'' •EXISITNG• ~ - !' t` . - I` ` `3 0SANITARY DRAIN 1U UNIT; •-"x7_ 0 SYSTEM. VERIFY r : �• S DETAIL . ' Do DR EXACT LATI '04f r r` ► IN FIELD. 4- VACUUM UNIT, • ° a ON STEEL RACK .f .E?CISIIHG'PIPING ABOVE AIR'" 'SEE rPLUhBING COMPRESSOR UNIT.`,- ExiSnNG 'EXISTING SEE DENTAL SUPPLY_ --WINDOW'WINDOW:. ' NOTES 10 :REPRESENTATIVE• FOR DETA I LS 7YP. WALK -WAY (INSIDE TO INSIDE) 36` -5" (INSIDE TO INSIDE) 0� LA W 0 fA N Z W � PLUMBING PLAN - BELOW FLOOR (SANITARY & VACUUM LINES) SCALE: 'I /4" _ "I' - O" PROJECT FLOOR AREA = 1,081.67 SQ.FT. 0 oa O w^ Z 0 W 0 z J a > o°a i m T N ! M Tfc V X U. Q w �✓ IA _ ai 6V m 0 m CC cc m �. r N ; 1 0 Z .. `V-, N Ix �Y COPYRIGHT 2013 STEVEN B. SCHWORTZ ARCHITECT, P.A. ALL RIGHTS RESERVED NO PART OF THESE PLANS MAY BE REPRODUCED OR USED IN ANY WAY OR FORM WITHOUT THE EXPRESS WRITTEN CONSENT OF STEVEN B. SCHWORTZ ARCHITECT, P.A. PLANS MUST BE RETURNED UPON REQUEST. d • W Q O O Lu et cYs u O cn M CJ) U 1 G W cr- O OQ W � = 'a O > Z 4 u.r � cv W � fF- ocrao W acc O w0 rCOM : 2012 -17 REVISIONS: AUEN ARMTECTURE DATE: 02 -25 -2013 BY: s.B.s. TOTAL NUMBER OF DRAWINGS IN SET: 21 P�l OF : 6