13-706-001E3 W a w cn w t- n r CL 0 i in w L) 0 Z i O I H a tt N a ED z Q m 0 a az 1° 0 r iil W CL a GENERAL NOTES + SPECIFICATIONS THESE CONSTRUCTION DOCUMENTS REQUIRE LARGER SIZES, GREATER QUANTITIES, MORE PROTECTION AND REQUIREMENTS THAN THE GOVERNING BUILDING CODES. THE CONTRACTOR IS RESPONSIBLE FOR CARRYING OUT ALL OF THE PROVISIONS AND REQUIREMENTS INCLUDED IN THESE PLANS AND SPECIFICATIONS. SUBSTITUTIONS, ALTERNATES OR CHANGES REQUESTED TO MATCH LOWER STANDARDS PERMITTED BY THE BUILDING CODE WILL NOT BE ACCEPTED. NO ADDITIONAL PAYMENTS SHALL BE MADE TO THE CONTRACTOR TO CORRECT WORK THAT DOES NOT MEET ALL OF THE REQUIREMENTS SET FORTH IN THESE CONSTRUCTION DOCUMENTS. 02 DEFINITIONS AS USED THROUGHOUT THESE DOCUMENTS THE FOLLOWING DEFINITIONS SHALL APPLY- OWNER: .................. C. BOB, D.M.D. ARCHITECT .............STEVEN. B. SCHWORTZ, ARCHITECT, P.A. CONTRACTOR: ........ THE GENERAL CONTRACTOR, PERSON, FIRM OR RESPONSIBLE ENTITY PRODUCING THE WORK DESCRIBED IN EACH SECTION OF THESE DOCUMENTS. LANDLORD: ............ THE BUILDING OWNER, MANAGEMENT FIRM OR ENTITY THAT IS A PARTY TO THE LEASE AND CONTROLS OR APPROVES WORK DONE IN THE AREA OF THE BUILDING DESCRIBED IN THESE DOCUMENTS. 03 A.I.A. DOCUMENT A -201 THE LATEST EDITION OF THE "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION ", AIA DOCUMENT A -201, IS HEREBY MADE A PART OF THESE PLANS AND SPECIFICATIONS. COPIES ARE AVAILABLE FOR INSPECTION AT THE ARCHITECT'S OFFICE. THESE GENERAL NOTES AND SPECIFICATIONS SHALL NOT BE CONSTRUED TO VOID ANY PORTION OF AIA DOCUMENT A -201. 04 CONSTRUCTION DOCUMENTS THESE BOUND PLANS AND SPECIFICATIONS FORM A COMPLETE SET OF CONSTRUCTION DOCUMENTS AND SHOULD NOT BE SEPARATED FOR USE BY THE VARIOUS SUB - TRADES EMPLOYED TO PROVIDE BID PROPOSALS OR EXECUTE THIS PROJECT. A COMPLETE SET OF CONSTRUCTION DOCUMENTS IS REQUIRED SO THAT EACH TRADE CAN COORDINATE THEIR BIDS AND WORK WITH THE TOTAL PROJECT. CONSTRUCTION DOCUMENTS STAMPED "NOT FOR CONSTRUCTION' SHALL NOT BE USED FOR BIDDING OR CONSTRUCTION AND ARE NOT PERMITTED ON THE JOB SITE. THE CONTRACTOR SHALL MAINTAIN A COMPLETE UP TO DATE SET OF CONSTRUCTION DOCUMENTS AND SHOP DRAWINGS ON THE JOB SITE AT ALL TIMES DURING THE CONSTRUCTION PERIOD. THESE DOCUMENTS SHALL BE SECURED AGAINST ALL FORMS OF DAMAGE OR THEFT. 05 CONSTRUCTION DOCUMENT REPRODUCTIONS NO PORTION OF THESE CONSTRUCTION DOCUMENTS MAY BE REPRODUCED BY ANY MEANS OR METHODS WITHOUT THE EXPRESS PRIOR AUTHORIZATION OF STEVEN. B. SCHWORTZ, ARCHITECT. P.A. COPIES OF THE PLANS AND SPECIFICATIONS ARE AVAILABLE FROM THE ARCHITECT. UNAUTHORIZED COPIES OF THESE PLANS MAY NOT PROVIDE CURRENT PROJECT INFORMATION AND MAY RESULT IN BID OR CONSTRUCTION DEFICIENCIES. 06 SITE VISIT PRIOR TO BIDDING OR SUBMITTING ANY PROPOSAL THE GENERAL CONTRACTOR AND EACH SUB - CONTRACTOR SHALL VISIT THE JOB SITE AND VERIFY ALL OF THE CONDITIONS UNDER WHICH THIS WORK WILL BE PERFORMED. THE CONTRACTORS SHALL EXAMINE ADJOINING SPACES AND BUILDING ELEMENTS ABOVE AND BELOW UPON WHICH THE WORK INCLUDED IN THE CONSTRUCTION DOCUMENTS ARE DEPENDANT. DISCREPANCIES SHALL BE REPORTED TO STEVEN B. SCHWORTZ, ARCHITECT FOR RESOLUTION PRIOR TO THE START OF CONSTRUCTION 07 BIDDING - TO OWNER PROPOSALS SHALL BE SUBMITTED TO THE OWNER ON THE CONTRACTOR'S LETTERHEAD STATIONERY AND SHALL INCLUDE THE FOLLOWING: 1.) A COPY OF THE CONTRACTOR'S CERTIFICATION AND /OR LICENSE. 2.) PROOF OF INSURANCE. 3.) A LOCAL BANK REFERENCE. 4.) A LIST OF ALL BUILDING COMPONENTS INCLUDED OR EXCLUDED FROM THE PROPOSAL. 5.) ITEMS OF THE WORK INCLUDED AS AN "ALLOWANCE ". 6.) TOTAL PROJECT COST. 7.) A CONSTRUCTION TIME SCHEDULE FROM THE DATE OF COMMENCEMENT TO THE DATE OF COMPLETION. 08 CONTRACT FOR CONSTRUCTION THE CONTRACTOR SHALL PROVIDE A COMPLETE LINE ITEM COST BREAKDOWN FOR ALL ITEMS OF THE WORK INCLUDED IN THE BID PROPOSAL. THIS UST SHALL BE INCORPORATED INTO THE CONTRACT FOR CONSTRUCTION AND SHALL AT THE MINIMUM SHOW THE VALUES OF THE FOLLOWING: 1.) LABOR 2.) BUILDING COMPONENTS AND MATERIALS 3.) ALTERNATES 4.) ALLOWANCES 5.) HOURLY WAGE RATES 6.) TOTAL OVERHEAD 7.) TOTAL PROFIT 8.) TOTAL PROJECT COST 09 EXCLUSIONS UNLESS SPECIFIED OTHERWISE, THE FOLLOWING ITEMS ARE NOT INCLUDED IN THIS CONTRACT. SEE OWNER FOR ALL APPLICABLE REQUIREMENTS AND CONTRACT ADJUSTMENTS 1.) CABINETRY 2.) CARPETING 3.) WALL COVERINGS 4.) MUSIC SYSTEMS 5.) TELEPHONE SYSTEMS 6.) FIRE ALARM + SECURITY SYSTEMS 7.) PAGING SYSTEMS 8.) ILLUMINATED EXTERIOR SIGNS 10 SUBSTITUTIONS SUBSTITUTIONS OR DEVIATIONS FROM THE PLANS AND SPECIFICATIONS DURING BIDDING OR CONSTRUCTION ARE NOT PERMITTED WITHOUT PRIOR WRITTEN AUTHORIZATION FROM THE OWNER AND /OR ARCHITECT, FAILURE TO COMPLY WITH THIS PROVISION WILL RESULT IN THE REJECTION OF THE WORK IN QUESTION. THE CONTRACTOR WILL NOT BE COMPENSATED FOR UNAUTHORIZED SUBSTITUTIONS OR DEVIATIONS FROM THE PLANS AND WILL HAVE TO TAKE CORRECTIVE MEASURES AT HIS OWN EXPENSE. 11 ALTERNATES REQUESTS FOR PRODUCT ALTERNATES OR SUBSTITUTIONS WILL ONLY BE CONSIDERED BY THE ARCHITECT WHEN SUBMITTED WITH A LETTER OF EXPLANATION. WHEN APPLICABLE THE REQUEST SHALL INCLUDE; A COST COMPARISON; AVAILABILITY; TIME SCHEDULE COMPARISON: DRAWINGS AND /OR BROCHURE CUT SHEETS DEMONSTRATING THAT THE SUBSTITUTION OR ALTERNATE MEETS THE INTENDED PERFORMANCE AND QUALITY OF THE ORIGINAL SPECIFICATION. 12 CHANGE ORDERS ALL CHANGE ORDERS SHALL BE SIGNED BY THE OWNER PRIOR TO COMMENCEMENT OF THE WORK TO BE CHANGED. 13 REQUEST FOR PAYMENT THE CONTRACTOR'S "REQUEST FOR PAYMENT" SHALL INCLUDE RELEASES OF LIEN FROM ALL MATERIAL SUPPLIERS AND SUBCONTRACTORS FOR SUPPLIES AND WORK RELATING TO THE REQUEST FOR PAYMENT. 14 OVERHEAD + PROFIT THE MAXIMUM PERCENTAGE OF OVERHEAD AND PROFIT WHICH MAY BE ADDED TO THE ACTUAL COST OF CHANGES IN THE WORK DONE UNDER COST AND PERCENTAGE SHALL BE AS FOLLOWS: A.) FOR ALL WORK DONE BY HIS OWN ORGANIZATION, THE CONTRACTOR; MAY ADD_ TEN PERCENT (10%) OF HIS ACTUAL COST FOR COMBINED OVERHEAD AND PROFIT. B.) FOR ALL WORK DONE BY HIS SUB - CONTRACTORS THE RESPECTIVE SUB- CONTRACTORS MAY ADD TEN PERCENT (107.) OF THEIR ACTUAL COST FOR COMBINED OVERHEAD AND PROFIT: AND THE GENERAL CONTRACTOR MAY ADD FIVE PERCENT (57.) OF THE SUB - CONTRACTOR'S TOTAL FOR HIS OVERHEAD AND PROFIT. THE ABOVE PERCENTAGES BASED UPON THE ACTUAL COST SHALL BE CONSIDERED REASONABLE ALLOWANCE FOR OVERHEAD AND PROFIT DUE TO THE CONTRACTORS. 15 NOTICE OF COMMENCEMENT THE CONTRACTOR SHALL ASSIST THE OWNER IN THE PREPARATION AND FILING OF A NOTICE OF COMMENCEMENT. HE SHALL INSURE THAT SAID NOTICE IS PROMINENTLY POSTED AN THE PROPERTY AND PROTECTED FROM ALL FORMS OF DAMAGE. ALL SUB- CONTRACTORS AND MATERIAL SUPPLIERS SHALL BE MADE AWARE OF THE POSTING OF THIS DOCUMENT AND ARE REQUIRED TO SUBMIT A "NOTICE TO OWNER" BY CERTIFIED MAIL. ■ 16 DISCREPANCIES WHEN IN THE OPINION OF THE CONTRACTOR A DISCREPANCY EXISTS, HE SHALL PROMPTLY REPORT IT IN WRITING TO THE ARCHITECT PRIOR TO THE COMMENCEMENT OF THE WORK IN THE AREA OF QUESTION. NO ADDITIONAL PAYMENTS SHALL BE MADE FOR THE CONTRACTOR'S FAILURE TO CORRECT CONFLICTING FIELD CONDITIONS, 17 HIDDEN CONDITIONS EXISTING UNOBSERVABLE COVERED, BURIED OR OTHERWISE HIDDEN CONDITIONS WHERE IN CONFLICT WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO'THE ARCHITECT AS SOON AS THEY ARE UNCOVERED. ADDITIONAL COSTS OR MODIFICATIONS OF THE WORK TO ACCOMMODATE THESE CONDITIONS SHALL BE APPROVED BY THE OWNER AND /OR ARCHITECT PRIOR TO PERFORMANCE OF THIS WORK. WHEN HIDDEN CONDITIONS ARE FOUND TO BE IN VIOLATION OF ANY GOVERNING CODE IN FORCE AT THE TIME OF CONSTRUCTION THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND /OR OWNER. CORRECTION OF EXISTING HIDDEN CODE MOLA11ONS SHALL BE APPROVED AND PAID FOR BY THE OWNER. 18 SAFETY AND SECURITY THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO ENSURE THE SAFETY OF THE WORK FORCE AND PUBLIC EXPOSED TO THE CONSTRUCTION PERFORMED UNDER THIS CONTRACT. HE SHALL SECURE THE WORK SITE AGAINST UNAUTHORIZED ENTRY AND MAINTAIN ALL SAFETY AND SECURITY MEASURES THROUGHOUT THE DURATION OF THE WORK. 19 SAFEGUARDS THE GENERAL CONTRACTOR SHALL PROVIDE GUARDRAILS, HANDRAILS, AND COVERS FOR ALL FLOOR, ROOF AND WALL OPENINGS. HE SHALL MAINTAIN AND RELOCATE ALL SAFEGUARDS AND PROTECTIVE FACILITIES AS REQUIRED BY SUBCONTRACTORS OR JOB CONDITIONS. F261 CONSTRUCTION MEANS AND METHODS STEVEN B. SCHWORTZ, ARCHITECT, AND /OR ENGINEER(S) SHALL NOT HAVE CHARGE, CONTROL OR BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, SEQUENCES, PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS. IT IS UNDERSTOOD AND AGREED THAT THE ARCHITECT HAS NO CONSTRUCTIVE USE OF THE OWNER'S SITE; HAS NO CONTROL OR AUTHORITY OVER THE MEANS, METHODS, AND SEQUENCES OF CONSTRUCTION; AND THEREFORE HAS NO ONGOING RESPONSIBILITY WHATSOEVER FOR CONSTRUCTION SITE SAFETY, A RESPONSIBILITY THAT HAS BEEN WHOLLY VESTED IN THE GENERAL CONTRACTOR. NOTWITHSTANDING THE ABOVE, THE ARCHITECT HAS A DUTY TO PRESERVE AND PROTECT PUBLIC HEALTH, SAFETY, AND WELFARE. ACCORDINGLY, IT IS STEVEN B. SCHWORTZ, ARCHITECT'S PROFESSIONAL RESPONSIBILITY TO TAKE WHAT HE BELIEVES ARE PRUDENT MEASURES SHOULD THE ARCHITECT ENCOUNTER SITUATIONS THAT HE BELIEVES CREATE A DANGER TO PUBLIC HEALTH, SAFETY, OR WELFARE. THE CLIENT /OWNER UNDERSTANDS THIS SITUATION AND AGREES TO DEFEND STEVEN B. SCHWORTZ, ARCHITECT AND HOLD THE ARCHITECT HARMLESS FROM CLAIMS ARISING FROM THE ARCHITECT'S EXERCISE OF PROFESSIONAL RESPONSIBILITY IN THIS REGARD. F2--il LICENSES + PERMITS THE GENERAL CONTRACTOR AND ALL SUB - CONTRACTORS SHALL SECURE THE REQUIRED CITY, COUNTY, STATE LICENSES OR PERMITS AND SPECIAL PERMITS, WHEN REQUIRED, PRIOR TO COMMENCING ANY WORK ON THIS PROJECT. PERMITS SHALL BE PROTECTED AND DISPLAYED IN ACCORDANCE WITH THE LOCAL GOVERNING AGENCY REQUIREMENTS. ® PERMIT FEES IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PAY FOR ALL BUILDING PERMITS REQUIRED BY LOCAL CODE OR ORDINANCE, THESE COSTS SHALL BE INCLUDED IN THE "SCOPE OF WORK" FOR EACH SUB - CONTRACT. 23 PERMANENT UTILITY FEES IMPACT FEES, WATER AND SEWER CONNECTION FEES AND DEPOSITS FOR PERMANENT UTILITY SERVICES SHALL BE PAID FOR BY THE OWNER. THE CONTRACTOR SHALL N011FY THE ARCHITECT, AND /OR OWNER WHEN THESE FEES APPLY PRIOR TO THE START OF CONSTRUCTION. 24 TEMPORARY UTILITY FEES FEES FOR TEMPORARY CONSTRUCTION RELATED USE OF UTILITY SERVICES SUCH AS WATER; ELECTRIC; TRASH DISPOSAL; PORTABLE TOILETS: JOB SITE PHONES AND OTHER SUCH SERVICES THAT ARE PRIMARILY UTILIZED BY THE CONTRACTOR IN PERFORMANCE OF THE WORK UNDER THIS CONTRACT SHALL BE INCLUDED IN THE COST OF THE JOB AND PAID FOR BY THE CONTRACTOR. 2S INSURANCE THE CONTRACTOR SHALL PROVIDE ALL REQUIRED INSURANCE FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK, PROOF OF INSURANCE SHALL BE SUBMITTED TO THE OWNER PRIOR TO COMMENCEMENT OF WORK. THE CONTRACTOR AND HIS SUBCONTRACTORS ARE NOT TO COMMENCE WORK UNDER THIS CONTRACT UNTIL REQUIRED INSURANCE 1S OBTAINED AND APPROVAL RECEIVED FROM THE OWNER. INSURANCE TYPE MINIMUM LIMITS OF LIABILITY WORKMAN'S COMPENSATION: STATUTORY CONTRACTOR'S PUBLIC LIABILITY: BODILY INJURY. $100,000 EACH PERSON $300,000 EACH ACCIDENT PROPERTY DAMAGES: $ 10,000 EACH ACCIDENT $ 25,000 AGGREGATE CONTRACTOR'S LIABILITY FOR SUBCONTRACTED WORK: BODILY INJURY: $100,000 EACH PERSON $300,000 EACH ACCIDENT PROPERTY DAMAGES: $ 10,000 EACH ACCIDENT $ 25,000 AGGREGATE AUTOMOBILE PUBLIC LIABILITY: BODILY INJURY: $100,000 EACH PERSON $300,000 EACH ACCIDENT PROPERTY DAMAGES: $ 10,000 EACH ACCIDENT 26 INDEMNITY CONTRACTOR SHALL PROTECT, DEFEND, SAVE HARMLESS AND INDEMNIFY OWNER; ITS EMPLOYEES, AGENTS AND PUBLIC FROM CLAIMS, DEMANDS, OR EXPENSE ON ACCOUNT OF INJURY TO PERSON OR DAMAGE TO PROPERTY, ALLEGED OR REAL, ARISING FROM ANYTHING DONE OR NOT DONE UNDER THIS AGREEMENT BY CONTRACTOR, SUBCONTRACTOR, OR ANYONE DIRECTLY EMPLOYED BY EITHER. 27 GUARANTEE THE CONTRACTOR SHALL GUARANTEE ALL WORK UNDER THIS CONTRACT TO BE FREE FROM DEFECTS IN MATERIALS OR WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OR CERTIFICATE OF OCCUPANCY. HE SHALL REPLACE ANY WORK THAT FAILS TO CONFORM TO THE DRAWINGS OR DETAILS AS SHOWN IN THESE CONSTRUCTION DOCUMENTS. HE SHALL DELIVER TO THE OWNER ALL WRITTEN WARRANTIES OR GUARANTEES OFFERED BY THE MANUFACTURERS FOR ALL COMPONENTS. EQUIPMENT AND FIXTURES. COPIES OF INVOICES, BILLS OR PURCHASE ORDERS SHALL BE GIVEN TO THE OWNER WHEN REQUIRED TO ENFORCE GUARANTEES AND WARRANTS. THESE PROVISIONS SHALL APPLY TO ALL VENDORS OR OTHERS WHO MAY BE EMPLOYED BY THE CONTRACTOR IN PRODUCING THIS WORK. 28 PROJECT TIMETABLE IT IS UNDERSTOOD BY ALL PARTIES CONCERNED THAT COMPLETION OF THIS PROJECT IN AN EXPEDITIOUS MANNER IS BENEFICIAL TO THE OWNER. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION TIME LINE TO THE OWNER. DURING THE COURSE OF CONSTRUCTION HE SHALL MAINTAIN A SUFFICIENT WORKFORCE ON THE JOB SITE TO COMPLETE THE WORK WITHIN THE PROPOSED PROJECT TIME LINE. 27 COORDINATION OF THE TRADES THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF EVERY ASPECT OF THE WORK AS DESCRIBED IN THE CONTRACT FOR CONSTRUCTION INCLUDING ALL OF THE REQUIREMENTS OF THE "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION ", AIA DOCUMENT A -201. HE SHALL VERIFY ALL DRAWINGS AND COORDINATE THE WORK OF ALL TRADES AT THE TIME THE WORK IS PERFORMED ON THIS STRUCTURE. NO ADDITIONAL PAYMENTS SHALL BE MADE FOR THE CONTRACTOR'S FAILURE TO COORDINATE THE WORK AND CORRECT CONFLICTING FIELD CONDITIONS. 30 QUESTIONS AND INSTRUCTIONS SUB - CONTRACTORS SHALL DIRECT QUESTIONS FOR THE ARCHITECT TO THE GENERAL CONTRACTOR FOR REVIEW. THE GENERAL CONTRACTOR SHALL NOT ACCEPT INSTRUCTIONS FROM THE OWNER, BUILDING INSPECTOR ,SUB - CONTRACTORS, LANDLORD OR OTHERS, WHEN IN CONFLICT WITH THE APPROVED CONSTRUCTION DOCUMENTS, WITHOUT NOTIFYING AND OBTAINING APPROVAL FROM STEVEN B. SCHWORTZ, ARCHITECT. THE CONTRACTOR SHALL BE LIABLE FOR ANY AND ALL EXPENSES INCURRED AS A RESULT OF WORK PERFORMED WITHOUT VERIFICATION AND FOR COSTS ASSOCIATED WITH THE CORRECTION OR REMOVAL OF ALL SUCH WORK. F3_11 WORKMANSHIP ALL WORK SHALL BE PERFORMED IN A FIRST CLASS WORKMAN LIKE MANNER IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS, THE BUILDING CODE AND THE STATE ENERGY EFFICIENCY CODE. WORKMANSHIP QUALITY SHALL STRICTLY CONFORM TO THE INDUSTRY STANDARD AND APPLICABLE NATIONAL, STATE AND LOCAL CODES, ORDINANCES AND RULES. 32 MATERIALS UNLESS SPECIFIED OTHERWISE, ALL CONTRACTOR SUPPLIED MATERIALS, FIXTURES, FITTINGS OR COMPONENTS SHALL BE NEW AND DELIVERED TO THE JOB SITE IN THE MANUFACTURER'S ORIGINAL SEALED CARTONS OR PACKAGING. 33 MANUFACTURER'S INSTRUCTIONS MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION, APPLICATION, OR METHODS SHALL BE STRICTLY ADHERED TO AND BY REFERENCE ARE MADE A PART OF THESE PLANS AS IF FULLY WRITTEN HEREIN. FAILURE OF THE CONTRACTOR TO OBTAIN MANUFACTURER'S INSTRUCTIONS SHALL NOT RELIEVE HIM FROM PERFORMING ALL OF THE REQUIREMENTS OF' THE WORK. 34 SHOP DRAWINGS THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL PRE - FABRICATED ITEMS OF THE WORK AND OBTAIN STEVEN B. SCHWORTZ- ARCHITECT, P.A. OR OWNER'S WRITTEN APPROVAL OF SHOP DRAWINGS PRIOR TO FABRICATION. SAMPLES SHALL BE SUBMITTED UPON REQUEST. WHERE INSTALLATIONS REQUIRING SHOP DRAWINGS HAVE BEEN MADE WITHOUT APPROVED DOCUMENTS THE OWNER AND OR ARCHITECT MAY REJECT THE WORK. REPLACEMENT ADDITIONS OR MODIFICATIONS TO ALL SUCH WORK SHALL BE MADE AT THE CONTRACTOR'S EXPENSE. EACH SYSTEM SUB - CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING SHOP DRAWINGS, INCLUDING PLANS, DETAILS, AND SPECIFIAATIONS AS REQUIRED FOR THE INSTALLATION AND COMPLETION OF THEIR RESPECTIVE WORK. THE COSTS ASSOCIATED WITH PROVIDING THESE SUBMITTALS SHALL BE BORNE BY THE SYSTEM SUB - CONTRACTOR AND INCLUDED IN THE "CONTRACT FOR CONSTRUCTION" BETWEEN THE OWNER AND GENERAL CONTRACTOR. F37il COMPUTER AIDED DRAWINGS (CAD) STEVEN B. SCHWORTZ- ARCHITECT,- P.A. WILL NOT PROVIDE NOR BE OBLIGATED TO PROVIDE "BACKGROUND" DRAWINGS OR SUPPLY ANY COMPUTER GENERATED PLANS, DETAILS OR DOCUMENTS FOR USE BY THE GENERAL CONTRACTOR, SYSTEM DESIGN ENGINEER AND /OR SYSTEM SUB - CONTRACTOR IN THE PREPARATION, CREATION OR PRODUCTION OF SHOP DRAWINGS OR ANY SYSTEM SUBMITTAL. F3-6-1 ACTIVE SERVICES EXISTING ACTIVE SERVICES: WATER, GAS, SEWER, ELECTRIC, ETC., WHEN ENCOUNTERED, SHALL BE PROTECTED AGAINST DAMAGE. DO NOT PREVENT OR DISTURB OPERATION OF ACTIVE SERVICES WHICH ARE TO REMAIN. IF ACTIVE SERVICES ARE ENCOUNTERED WHICH REQUIRE RELOCATION, MAKE REQUEST TO AUTHORITIES WITH JURISDICTION FOR DETERMINATION OF PROCEDURES. WHERE EXISTING SERVICES ARE TO BE ABANDONED, THEY SHALL BE TERMINATED IN CONFORMANCE WITH REQUIREMENTS OF THE LANDLORD, OWNER, SPECIFICATIONS, UTILITY COMPANIES AND /OR GOVERNING AGENCIES HAVING JURISDICTION. F3­71 SANITATION FACILITIES THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE TEMPORARY TOILET FACILITIES ON THE JOB SITE, 3g DRINKING WATER THE GENERAL CONTRACTOR SHALL PROVIDE POTABLE DRINKING WATER FOR THE USE OF ALL TRADESMEN. THE WATER SUPPLY SHALL BE FREE OF CHARGE, CONVENIENTLY LOCATED AND MAINTAINED THROUGHOUT THE DURATION OF THE WORK. 39 FIRE PROTECTION THE.CONTRACTOR SHALL PROVIDE GENERAL FIRE PROTECTION THROUGHOUT THE JOB FOR THE DURATION OF THE WORK. EACH SUBCONTRACOR SHALL BE RESPONSIBLE FOR PROVIDING FIRE PROTECTION FOR THEIR OWN SPECIALTY. 40 OPERATING INSTRUCTIONS THE OWNER SHALL BE FURNISHED WITH THE ORIGINAL OPERATING INSTRUCTIONS, REPAIR AND MAINTENANCE MANUALS AS SUPPLIED BY THE MANUFACTURER FOR ALL EQUIPMENT INSTALLED UNDER THE CONTRACTOR'S SUPERVISION. F4-11 FINAL CLEANING THE CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL CONSTRUCTION CLEAN -UP INCLUDING THE REMOVAL OF ALL TEMPORARY CONSTRUCTION, SUPPORTS, LIGHTING, BARRIERS, BARRICADES, ETC. USING MANUFACTURERS RECOMMENDED CLEANING AGENTS THE CONTRACTOR SHALL CLEAN AND POLISH ALL GLASS SURFACES: FINISH HARDWARE: CERAMIC AND VINYL. TILE FLOORING; MIRRORS; WOODWORK; BASEBOARDS AND WALL SURFACES. REMOVE ALL FINGERPRINTS, STAINS, MARKINGS, DUST, DIRT, PUTTY AND OVER PAINTING IN PREPARATION FOR USE AND OCCUPANCY. 42 SITE CLEAN -UP GARBAGE RECEPTACLES SHALL BE ON SITE AT ALL TIMES, THE JOB SITE SHALL BE KEPT FREE OF ACCUMULATED TRASH AND WASTE MATERIALS WHICH SHALL BE REMOVED WEEKLY. "BROOM CLEANING' SHALL BE DONE ON AN AS NEEDED OR DAILY BASIS FOR THE DURATION OF CONSTRUCTION. THE CONTRACTOR SHALL CLEAN ALL AREAS OF THE WORK AFTER CONSTRUCTION IS COMPLETED. ALL TRASH, DEBRIS, IMPLEMENTS, AND SURPLUS MATERIALS SHAM BE REMOVED FROM THE JOB SITE AT THE CONTRACTOR'S EXPENSE. ALL WASTE SHALL BE LEGALLY DISPOSED OF AT PUBLIC OR PRIVATE DUMPING FACILITIES. 43 FINAL INSPECTION THE OWNER AND CONTRACTOR SHALL PERFORM A FINAL "WALK THROUGH" INSPECTION OF THE WORK PRIOR TO THE OWNER'S FINAL ACCEPTANCE. THE CONTRACTOR SHALL PREPARE AND SUBMIT A WRITTEN "PUNCH LIST" TO THE OWNER OF THE ITEMS OF THE WORK THAT REQUIRE ADJUSTMENT, CORRECTION OR REPLACEMENT. PUNCH LISTED EQUIPMENT, FEATURES OR FINISHES SHALL BE REPAIRED TO THE OWNER'S SATISFACTION WITHIN FIVE WORKING DAYS. ® FINAL ACCEPTANCE THE CONTRACTOR SHALL DEMONSTRATE TO THE OWNER THE USE AND VERIFY THE PROPER FUNCTION OF ALL OPERATING FEATURES INCORPORATED INTO THE PROJECT. THE OWNER SHALL REVIEW, VERIFY AND APPROVE THE COMPLETENESS OF ALL "PUNCH LIST" WORK. RE CERTIFICATE OF OCCUPANCY UPON FINAL ACCEPTANCE AND COMPLETION, THE CONTRACTOR SHALL OBTAIN AND DELIVER TO THE OWNER OR OWNER'S AGENT A "CERTIFICATE OF OCCUPANCY" OR "CERTIFICATE OF USE" FROM THE LOCAL GOVERNING AGENCY. F4-6-1 PERMANENT ELECTRIC SERVICE IN THE EVENT A "CERTIFICATE OF OCCUPANCY" OR "CERTIFICATE OF COMPLETION" IS A PREREQUISITE TO OBTAINING AN ELECTRIC METER AND /OR PERMANENT ELECTRIC SERVICE THE CONTRACTOR SHALL HAVE THE LOCAL ELECTRIC UTILITY INSTALL ALL THE REQUIRED COMPONENTS TO PROVIDE THE ELECTRIC SERVICE SPECIFIED IN THE PLANS. THEREAFTER HE SHALL TEST AND DEMONSTRATE TO THE -OWNER THE USE AND VERIFY THE PROPER FUNCTION OF ALL COMPONENTS AND OPERATING FEATURES OF THE ELECTRICAL SYSTEM. 47 TESTING ALL REQUIRED TESTS SHALL BE PERFORMED BY AN APPROVED TESTING LABORATORY AT THE CONTRACTOR'S EXPENSE. TEST RESULTS SHALL BE SUBMITTED TO ARCHITECT, AND /OR ENGINEER. 48 DAMAGE THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL AREAS IN AND AROUND THE SITE INCLUDING CORRIDORS, STAIRS, ELEVATOR(S), PUBLIC SPACES, ETC., AGAINST DAMAGE DURING THE CONSTRUCTION PROCESS. ANY DAMAGE TO THESE AREAS SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER AND LANDLORD AT THE CONTRACTORS EXPENSE. 49 CLEARANCES THE CONTRACTOR, SUB - CONTRACTORS AND VENDORS ARE TO VERIFY ALL BUILDING CLEARANCES (CORRIDORS, STAIRS, ELEVATORS, ETC.) REQUIRED FOR DELIVERIES OF JOB MATERIALS OR EQUIPMENT. THE OWNER SHALL BE INFORMED OF ANY PROBLEMS WHICH MIGHT AFFECT THE PROGRESS OF THE WORK. ARCHITECTURAL A-1 ..... GENERAL NOTES + SPEC'S A-2 ..... DEMOLITION PLAN A-3 ..... FLOOR SLAB CUTTING PLAN A - 4..... FLOOR PLAN A - 5..... LAYOUT PLAN A-6 ..... REFLECTED CEILING PLAN A - 7..... WALL DETAILS A-8 ..... ARCHITECTURAL DETAILS A-9 ..... FLORIDA ADA REQUIREMENTS OCCUPANCY CALCULATION GROSS FLOOR AREA - 1,082 SO, FT. OCCUPANT LOAD FACTOR 1- PERSON PER 100 SQ.FT OCCUPANT COUNT --- ---• -- 10 PEOPLE ALTERATION LEVEL OF WORK 1.) WORK DESCRIBED IN TFIESE DOCUMENTS SHALL CONFORM TO THE REQUIREMENTS OF F.B.C. EXISTING BUILDING- SECTION 404 'ALTERATION LEVEL -2'. 2.) EXISTING ELEMENTS AND FEATURES OF FIRE PROTECTION SHALL BE MAINTAINED. ADA "HANDICAPPED" COMPLIANCE THE LAYOUT AND DESIGN OF THE 'WORK AREA" DEPICTED IN THESE DOCUMENTS COMPLY WITH ALL OF THE REQUIREMENT'S OF THE '2012 FLORIDA ACCESSIBILITY CODE FOR BUILDING CONSTRUCTION' SECTIONS: 202 - EXISTING BUILDINGS AND FACILITIES 207 - ACCESSIBLE MEANS OF EGRESS 211 - DRINKING FOUNTAINS 213 - TOILET FACILITIES AND BATHING FACILITIES 404 - DOORS, DOORWAYS, AND GATES NOTHING IN THESE PLANS, WRITTEN SPECIFICATIONS, SHOP DRAWINGS AND /CO2 OTHER CONTRACT DOCUMENTS SHALL, UNDER ANY t ALL CIRCUMSTANCES, RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF FULL COMPLIANCE WITH ALL CURRENT '2012 FLORIDA ACCESSIBILITY CODE FOR BUILDING CONSTRUCTION". BUILDING IS NOT EQUIPPED WITH A FIRE ALARM SYSTEM X -RAY PROCESSING F) 2. DENTAL X -RAYS ARE COMPUTER GENERATED AND DIGITALLY PROCESSED NO DARKROOM OR DEVELOPMENT EQUIPMENT IS REQUIRED. CHEMICALS AND HAZARDS FLAMMABLE OR COMBUSTIBLE MEDICAL GASES ARE NOT USED IN THIS PROJECT. HAZARDOUS CHEMICALS ARE NOT USED IN THIS PROJECT. M.S.D. SHEETS ARE NOT REQUIRED. I N D E X OF D R A W I N G S ELECTRICAL E-1 ..... ELECTRIC PLAN E-2 ..... ELECTRIC CEILING PLAN E-3 ..... ELECTRIC DERTAILS ACCESSIBLE PUBLIC ENTRANCES INTO A BUILDING:: I.) PUBLIC ENTRANCES AT PEDESTRIAN TUNNELS, PARKING GARAGES, SKY BRIDGES AND ELEVATED WALKWAYS CAN NOT BE INCLUDED AS PART OF THE MINIMUM NUMBER OF ACCESSIBLE ENTRANCES REQUIRED. 2.) LOADING AND SERVICE ENTRANCES ARE NOT CONSIDERED TO BE PUBLIC ENTRANCES. IF A SERVICE ENTRANCE IS THE ONLY ENTRANCE INTO A BUILDING IT MUST BE ACCESSIBLE. 3.) IF ACCESS IS PROVIDED DIRECTLY FROM A PARKING GARAGE, PEDESTRIAN TUNNEL, SKY BRIDGE, OR ELEVATED WALKWAY INTO A BUILDING, AT LEAST ONE ENTRANCE FROM EACH MUST BE ACCESSIBLE, 4.) MULTIPLE OCCUPANCY STRUCTURES, SUCH AS STRIP MALLS, AN ACCESSIBLE ENTRANCE MUST BE PROVIDED INTO EACH TENANT'S SPACE. *REFERENCE FEDERAL REGISTER /VOL. 56 NO. 144 / FRIDAY, JULY 26, 1991 / RULES AND REGULATIONS �[iJa�.L.iJ�ll PLUMBING H. V. A. C. P-1 ..... PLUMBING PLAN -BELOW SLAB AC -1.... H.V.A.C. PLAN P - 2..... PLUMBING PLAN -ABOVE CEILING AC-2 .... H.V.A.C. DETAILS P-3 ..... PIPING DIAGRAMS P - 4.. _ PLUMBING DETAILS P-5 ..... PLUMBING DETAILS LIFE SAFETY P-6 ..... NITROUS OXYIDE SYSTEM DETAILS .. LS -1.. ,UFE SAFETYf'LA'I+I EXISTING BUILDING WORK AREA DEFINED F.B.C. - EXISTING BUILDING- 202- GENERAL DEFINITIONS: 'WORK AREA' ". THAT PORTION OR PORTIONS OF A BUILDING CONSISTING OF ALL RECONFIGURED ELEMENTS, SYSTEMS OR SPACES AS INDICATED ON THE CONSTRUCTION DOCUMENTS. WORK AREA' EXCLUDES OTHER PORTIONS OF THE BUILDING WHERE INCIDENTAL WORK ENTAILED BY THE INTENDED WORK MUST BE PERFORMED AND PORTIONS OF THE BUILDING WHERE WORK NOT INTENDED BY THE OWNER IS SPECIFICALLY REQUIRED BY THIS CODE. THESE CONSTRUCTION DOCUMENTS ARE NOT REQUIRED TO AND DO NOT INCLUDE ILLUSTRATIONS, DETAILS, SPECIFICATIONS ETC. FOR AREAS OF THE EXISTING BUILDING WHICH FALL OU +SIDE OF THE DEFINED "WORK AREA". PROJECT SCOPE OF WORK THIS PROJECT INCA L DES THE FOLLOWING WORK AND CONSTRUCTION COMPONENTS: 1•) INTERIOR BUILD -OUT OF A 'DENTAL OFFICE'. 2. INSTALLATION OF NEW WALLS AND DOORS. 3. ELECTRICAL: NEW ELECTRICAL SYSTEMS. 4. LIGHTING. NEW LIGHTING WIRING AND FIXTURES. 5. PLUMBING: NEW DRAINAGE AND SUPPLY PIPING. 7. H.V.A.C.: NEW DUCT WORK SUPPLIES AND RETURNS. S. INS T A LLA TION OF NEW CABINETRY AND FINISHES. FIRE EXTINGUISHERS FIRE EXTINGUISHER LOCATIONS SHALL BE COORDINATED WITH AND APPROVED BY THE FIRE MARSHAL. OBTAIN FIRE MARSHAL APPROVALS PRIOR TO ORDERING OR PLACING ANY FIRE EXTINGUISHING EQUIPMENT. BUILDING IS NOT EQUIPPED WITH A SUPERVISED FIRE SPRINKLER SYSTEM EXISTING PARKING AND ROADWAY N T A t t PROJECT DATA F051 CODES & STANDARDS: BUILDING - 2010 EDITION - FLORIDA BUILDING CODE PLUMBING -. 2010 EDITION - FLORIDA BUILDING CODE MECHANICAL --- -+- 2010 EDITION - FLORIDA BUILDING CODE ENERGY - ----+- 2010 EDITION - FLORIDA BUILDING CODE HANDICAPPED 2010 EDITION - FLORIDA BUILDING CODE 2012 EDITION - AMERICANS WITH DISABILITIES ACT (ADA) 1986 EDITION - A.N.S.I.- A117.1 ELECTRIC ---y- 2011 EDITION - NATIONAL ELECTRIC CODE LIFE SAFETY - 2009 EDITION - NFPA 1, UNIFORM FIRE CODE 2009 EDITION - NFPA 101, LIFE SAFETY CODE 2010 EDITION - FLORIDA STATE STATUTES 2010 EDITION - FLORIDA FIRE PREVENTION CODE: EFFECTIVE DECEMBER 31, 2011 (WITH BROWARD COUNTY AMENDMENTS WHEN APPLICABLE.) FIRE RESISTANCE --•°- 1982, 1989, 1994 & 1999 EDITIONS U.L. "FIRE RESISTANCE DIRECTORY" CODE REQUIREMENTS SHALL BE INCLUSIVE OF ALL ADDENDUMS AND CLARIFICATIONS ISSUED UP TO THE TIME WHEN THE BUILDING PERMIT IS GRANTED. THE LISTED CODES AND STANDARDS SHALL NOT BE CONSTRUED TO BE THE ONLY APPLICABLE CODES AND STANDARDS GOVERNING THIS PROJECT. THE GENERAL CONTRACTOR, ALL SUB - CONTRACTORS AND SUPPLIERS SHALL VERIFY AND ADHERE TO THE REQUIREMENTS OF ALL OF THE CODES AND STANDARDS THAT GOVERN AND PERTAIN TO THEIR PRESCRIBED SCOPE OF WORK. FO-21 CODE OCCUPANCY: GROUP "B "- BUSINESS (F.B.C. BUILDING - SECTION 304) TYPE "DENTAL OFFICE" ® FLOOR AREA: GROSS 1,082 SQ.FT. (INCLUDES EXTERIOR WALLS) [bil CONSTRUCTION TYPE: W -B" (F.B.C. BUILDING -TABLE 503) (F.B.C. BUILDING - SECTION 603) ( E ISTIN G PARKING AND ROADWAY �I W �I I bl 1 1 OFFICE