06-01R-007GENERAL PLUMBING NOTES
1. ALL WORK TO BE DONE IN ACCORDANCE WITH THE FLORIDA
BUILDING CODE AND LOCAL ORDINANCES.
2. BUILDING DRAINAGE SYSTEM TO BE SLOPED AT 1 /8" PER FT. MIN. FALL. ANY
DEVIATIONS SHALL BE APPROVED BY ARCHITECT /ENGINEER.
3. PROVIDE CLEANOUTS EVERY 75 FT. AND AT BASE OF EVERY WASTESTACK.
ALL CLOSEOUTS TO BE FLUSH MOUNTED.
4. MATERIALS SHALL BE ALL NEW AND AS FOLLOWS:
A. DRAINAGE WASTE AND VENT PIPING INCLUDING GREASE
WASTE; PVC DRAINAGE WASTE AND PIPING (DWV) CONFORMING TO
ASTM D -2665, NO HUB CAST IRON CISPI STANDARD 301 ABOVE
GROUND AND CAST IRON HUB, PLAIN END ASTM A -74 WITH NEO-
PRENE GASKETS UNDERGROUND.
B. WATER PIPING: COPPER TYPE "L" ASTM B -88 ABOVE GROUND AND
COPPER TYPE "K" ASTM B -88 UNDERGROUND.
C. CONDENSATE DRAIN PIPING: COPPER TYPE "M" ASTM B -88 INSIDE
THE BUILDING AND PVC SCHEDULE 40 ABOVE ROOF AND UNDERGROUND.
PROVIDE 1/2" ARMAFLEX PIPE INSULATION TO ALL CONDENSATE DRAIN
PIPING.
D. FLOOR DRAINS (IF REQUIRED): JOSAM SERIES 30,000 OR EQUAL EXCEPT AT
TRANSFORMER VAULT WHICH SHALL BE JOSAM SERIES 32,000 OR EQUAL.
KITCHEN FLOOR DRAIN: JOSAM 35420 -50, 12" SQUARE NIKALOY TOP, SATIN
FINISH, 1/2" PRIMER CONNECTION, BRONZE SEDIMENT BUCKET.
E. FLOOR CLEANOUTS: JOSAM SERIES 56020 OR EQUAL.
F. WALL CLEANOUTS: JOSAM SERIES 58750 WITH ACCESS COVER OR EQUAL.
G. VALVES: 125 PSI NIBCO SCOTT, STOCKHAM OR EQUAL.
H. HOSE BIBBS: CHICAGO 837 OR EQUAL WITH VACUUM BREAKER.
I. ELECTRIC WATER HEATER: GLASS- LINED, P & T RELIEF VALVE, 5 YEAR
WARRANTY MINIMUM.
5. PERFORM THE FOLLOWING TEST:
A. WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF
100 PSIG FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE ENTIRE SYSTEM
BUT NOT LESS THAN ONE HOUR.
B. DRAINAGE SYSTEM: BEFORE INSTALLATION OF ANY DRAINS, THE END OF THE
SYSTEM SHALL BE CAPPED & ALL LINES FILLED WITH WATER TO HIGHEST
POINT & ALLOWED TO STAND UNTIL INSPECTION IS MADE AND WATER LEVELS
REMAIN CONSTANT.
C. CORRECT ALL DEFECTS DISCLOSED BY ABOVE TESTS.
D. COMPLETE SYSTEM FIXTURE & EQUIPMENT SHALL BE GIVEN AN IN- SERVICE
TEST AFTER COMPLETION OF THE INSTALLATION.
E. STERILIZE ALL WATER LINES WITH A MIXTURE OF (2) POUNDS OF CHLORINATED
LIME TO EACH 1000 gal. OF WATER (50 PPM OF AVALIBLE CHLORINE.) RETAIN
MIXTURE IN PIPES FOR 24 HOURS AND FLUSH THROUGHLY WITH POTABLE WATER
BEFORE PLACING IN SERVICE.
6. PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING
WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD
OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE, AND THAT HE WILL, AT HIS EXPENSE,
REPAIR AND REPLACE ALL WORK WHICH BECOMES DEFECTIVE DURING GUARANTEE PERIOD.
7. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING UTILITIES AND POINTS OF
CONNECTION BEFORE COMMENCING ANY WORK.
8. PLUMBING CONTRACTOR SHALL PAY ALL FEES, INSPECTION AND CONNECTION
CHARGES REQUIRED.
9. SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL OF ALL EQUIPMENT,
MATERIALS AND LAYOUTS PRIOR INSTALLATION.
1O.OFFSET PIPING AS REQUIRED TO CLEAR BUILDING STRUCTURE, DUCTWORK, ETC.
AS SHOWN ON DRAWINGS AND AS REQUIRED BY FIELD CONDITIONS.
11. PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL A/C CONDESATE DRAIN
AND TRAP. SEE A/C PLANS FOR LOCATION OF UNITS AND DARINS.
12.PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND DIMENSIONS
AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF MATERIALS AND EQUIPMENT.
13.COORDINATE WORK WITH OTHER TRADES.
14.FURNISH AND INSTALL FIXTURES AS SPECIFIED IN SCHEDULE IF PROVIDED, OTHERWISE
PROVIDE SHOP DRAWINGS.
15.EACH BATHROOM GROUP AND KITCHEN SHALL BE PROVIDE WITH AIR CHAMBERS OR SHOCK
ABSORBER AS PER S.F.B.C.
16. PROVIDE SHUT -OFF VALVE FOR EACH FIXTURE, JUST BEFORE CONNECTING TO FIXTURE.
17.WHEREVER DISSIMILAR METALS ARE TO BE JOINED, A DIELECTRIC FITTING
SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES.
16.MECHANICAL CONTRACTOR SHALL COORDINATE AND VERIFY HEIGHT AND LOCATION OF
STUB -UPS.
19.REFER TO SUPPLIER DRAWING AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND COORDINATION OF EQUIPMENT TERMINATION DETAILS.
20. PROVIDE AT REFRIGERATOR LOCATION: 3/8" C.W. LINE TO 1/4" PETCOCK 6" ABOVE
FLOOR . FURNISH 48" OF 1/4" SOFT COPPER TUBING FOR CONNECTION TO REFRIGERATOR .
21. PROVIDE ANTI SCALD AT ALL TUB AND SHOWERS.
PLUMBING SYMBOLS
` COLD WATER PIPE
HOT WATER PIPE
I WATER HAMMER ARRESTOR
T AIR CHAMBER
HB HOSE BIBB W / VACUUM BREAKER
AND SHUT -OFF VALVE
SANITARY LINE
y- C.D. -i CONDENSATE LINE
WCO WALL CLEANOUT
FCO FLOOR CLEANOUT
GATE VALVE ( SHUT -OFF
VALVE )
THERMAL
EXPANSION BY
AMTROL MODEL GATE VALVE
ST -5.
(1800- 736 -1149)
s CW HEAT TRAP
UNION FITTING
(TYPICAL)
DIELECTRIC FITTIG
(TYPICAL)
WATER HEATER T
120 GALS. WITH
2- SIMULTANEUS
6.0 KW HEATING ELEMENTS
0.90 EF
DRAIN PAN i .
EMERGENCY DRAIN
FLOOR
18' MIN.
PERFOR'""°"
TO COLD WATER
SYSTEM
�- CW
v HW
1/2" + TOTAL AHU /
TOTAL STATIC PRESSURE. -/
PITCH DOWN
TOWARD DRAIN
DRAIN PAN
SEE MECHANICAL DRAWINGS
FOR UNIT SUPPORTS.
DRAIN LINE SHALL BE AT LEAST THE
SAME SIZE AS THE NIPPLE ON THE
DRAIN PAN
TYPICAL CONDENSATE DRAIN TRAP
N.T.S.
HOT WATER SYSTEM TO
BE FULLY INSULATED.
• THE TANK OR WATER HEATER SHALL BE Q
INSTALLED IN A GALVANIZED STEEL OR OTHER
METAL PAN OF EQUAL CORROSION RESISTANCE
HAVING A MINIMUM THICKNESS OF 24 GAGE,
0.0276 INCH (0.70 mm). ELECTRIC WATER
HEATHERS SHALL BE INSTALLED IN A METAL PAN
AS HERE IN REQUIRED OR IN A HIGH -WACT
PLASTIC PAN OF AT LEAST 0.0625 INCH (1.59
mm) THICKNESS.
THE PAN SHALL NOT BE LESS THAN 1 j INCHES
(38 mm) DEEP AND SHALL BE OF SUFFICIENT
SIZE AND SHAPE TO RECEIVE ALL DRIPPING OR
CONDENSE FROM THE TANK OR WATER HEATHER.
THE PAN SHALL BE DRAINED BY AN INDIRECT
WASTE PIPE HAVING A MINIMUM DIAMETER OF
INCH.
TEMPERATURE & PRESSURE
RELIEF VALVE
AIR GAP FITTING
(GAP ®2xO OF DRAIN PIPE)
3/4" MIN.
PRESSURE RELIEF & DRAIN PAN LINES
TO BLDG. EXTERIOR, 6" ABOVE GRADE
AND TURNED DOWN
WATER HEATER DIAGRAM FOR GARAGE
N.T.S.
PLUMBING FIXTURE CONNECTION SCHEDULE
MARK
DESCRIPTION
FU'S
WASTE
C.W.
H.W.
REMARKS /SPECS
P -1
WATER CLOSET
3
3"
1/2"
-
FLOOR MOUNTED, FLUSH TANK
P -2
BATHTUB
2
2"
1/2"
1/2"
5 FT. LONG. PRESSURE BALANCING FAUCET
P -2A
SHOWER
2
2"
1/2"
1/2"
PRESS. BALANCING FAUCET.
P -3
LAVATORY
1
1 1/2"
1/2"
1/2"
COUNTER TOP
P -4
KITCHEN SINK
2
1 1/2"
1/2"
1/2"
COUNTER TOP
P -5
DISH WASHER
1 1/2"
1/2"
1/2"
--------
P -6
WASHER
2
2"
1/2"
1/2"
-- - - - - --
P-7
REFRIGERATOR
--
--
1/2"
--
---- - - - - --
P-8
LAUNDRY SINK
2
1 1/2"
1/2"
1/2"
---- - - - - --
P -9
BIDDET
2
2„
1/2"
1/2"
---- - - - - --
NOTE CONTRACTOR TO COORDINATION PLUMBING FDM`URE SELECTION, WITH OWNER/ ARCHITECT FOR FDffURE AND
FAUCET STYLE & COLOR.
METER
0
PLAN VIEV
NTS
PROVIDE EXTRA HEAVY PATTERN FULL OPENING
IRON BODY TRAP SCREW FERRULE & ALL BRASS
CLEANOUT WITH COUNTERSUNK HEAD
FINISH GRADE PROVIDE POURED CONC.
BLOCK WHEN C.O. IS
NOT IN PAVED AREA
0 o a
00 oQ o0
12 "x12 "x8"
POURED CONC. LONG SWEEP. USE SHORT
BLOCK WHEN SWEEP WHERE REQUIRED
CLEANOUT IS
NOT IN COMBINATION "Y" &
PAVED AREA 1/8" BEND -------�
GCO
WCO
FINISH GRADE
- MINIM�JM ? " - -
r.T6
o°�
0 °o °o 1
0
FCO
SAME SIZE AS
SEWER - MAX.
SIZE 4"
STAINLESS STEEL COVER
SCREWED TO THREADED
C.O. PLUG
FACE OF WALL
TYPICAL CLEANOUT DETAIL
N.T.S.
WATER BACKFLOW PREVENTOR DETAIL
N.T.S.
•fF
URE
ENTION
•ISH
ODE
t7ANIFT, F. tz UTIF'l?RP
P E
�
'336
30 CO. ': WAY
I;T( 0490
U-
a "t?.T`i'E; UTA If'T .T't.: X1.1 45
z
W
W
(L
T'H, (36)461 .317£3
z
to
0
s
�
W
m
f:C3Rr::i ULTI"P+ G .I. R ,
1A'G,.
wcoz
rIy1'taryll�'.a�`,�,
Z
H
z
.. °aT
----
..f �. t ^,.T +.�"....i ..t7...:..a
CONSULTING:
aL
�
00
U
U-
z
W
W
(L
2
2
z
to
0
s
�
W
m
V o
y�
wcoz
v Lyj
Z
H
z
a_
�i
W
o
vi
a
2
a
i d
n±
co
CONSULTING:
11
V
N
W
W
H W
mo
t7
J ,*
Q W c
W =
0:3
PUAAW 0
NOTES AND WrALS
WALE AS 84OWN
DRAWN OFG
im
DATE 1F'p
SHEET:
P -6
aL
�
00
U
U-
W
W
(L
2
2
z
to
0
U
�
W
wh_`^°
�
0
V o
y�
wcoz
v Lyj
Z
i-00
a_
�i
W
�
o
yNy
W
0
a
i d
11
V
N
W
W
H W
mo
t7
J ,*
Q W c
W =
0:3
PUAAW 0
NOTES AND WrALS
WALE AS 84OWN
DRAWN OFG
im
DATE 1F'p
SHEET:
P -6
M
M
to
Lo
m
W
o�
t
co
_
Lo
r`
3
z
cn
p
Lo
=
0_
00
00
11
V
N
W
W
H W
mo
t7
J ,*
Q W c
W =
0:3
PUAAW 0
NOTES AND WrALS
WALE AS 84OWN
DRAWN OFG
im
DATE 1F'p
SHEET:
P -6