Loading...
06-0001-030IRRIGATION HEAD EG D Key Qty Manufacturer Body Nozzle Radius Pattern PSI GPM Total GPM • py including notifying Sunshine State One Call G. As -Built Drawings - The Contractor shall record all changes from the plans in red on F- .r MNEL PGP H Duration - Work shall be completed within 30 days from notice to proceed issylbd in GEARED R•T•R WH 3 Hunter INST- 00- CV -17H 17H 17' Half 25 2.7 6.1 0 P•LY RIPE under contract or subcontract to a general contractor, building owner, or government (LENGTH AS REOUIREO) entity. Supervision - All irrigation work shall be performed by personnel experienced i8" irrigation installation, under the supervision of a qualified superintendent R foreman. POLY ELL Pvc TEE • PVC LATERAL LINE ,,. 1 Hunter INST- 00- CV -17Q 170 17' Quarter 25 1.1111 1.9 O these specifications. B. Plastic Pipe Lines a. Pressure Pi - All pressure pipe shall be rigid unplasticized, bell end, PVC type, C: 0 Schedule 40 (ASTM D -1735) extruded from virgin parent material of the type lit specified on the drawings The pipe shall be homogeneous throughout and free from Pc. -za 3 Hunter INST- 04- 10V- PC8-25 PCR -25 (SDR 26) extruded from virgin parent material ofthe type specified on the Flood 30 0.25 0.75 Z c. Remaining Lateral Pipe shall be rigid unplasticized, bell end, PVC type, Class 160 Ox (SDR 21) extruded from virgin parent material of the type specified on the drawings. The pipe shall be homogeneous throughout and free from visible cracks, J holes, foreign materials, blisters, deteriorations, wrinkles, and dents p o d. Fittings - All plastic pipe fittings to be installed shall be Schedule 40 PVC (ASTM ,O 2 Hunter INST -06-CV -100 100 10' Quarter 25 0.4 0.9 D. Control Wire - Shall be 14 gauge single strand wire as manufactured by Paige or approved equal. Splices shall be enclosed in a 3M Splice Kit. E. Remaining Materials - Remaining materials shall conform to the material schedule on the plans. IV. INSTALLATION A. 12H 5 Hunter INST- 06- CV -12H 12H 12' Half 25 1.3 65 handling and installation of the pipe. The backfill shall be thoroughly compacted el ery three inches and evened off with the adjacent soil level. Compaction of eacb lift shall be equal to 100% of maximum density as determined by AAS11TO Specification T -99 The fill dirt or sand shall be used in filling four inches above the pipe The remainder of the backfill shall be free of rocks over one inch, subsoil or trash. The All trenches that are 17F 2 Hunter INST- 06- CV -17F 17F 17' Full 25 4.3 9.6 O9 services and be responsible for their replacement if damaged by him, or to make necessary adjustments in their location 1f required in order to complete the work of this contract. Minor adjustments in the system will be permitted to clear existing fixed obstructions subject to the approval or the Owner and /or Landscape Architect. The contractor shall verify at this time the gallonage and pressure to be expected from the Hunter INST- 069- CV -171-1 17H 17' Half 25 2.7 243 100 degrees or when raining. E. Flush Lines & Pressure Test - Prior to installing heads, flush all lines with the maximum water pressure. Pressure test lines for 4 hours at 150 %(75 PSI) of the system's operating pressure. F. Heads - Set sprinkler heads perpendicular to finished grade. Heads adjacent to curbs 1O 9 Hunter INST -06-CV -170 170 17' Quarter 25 1.i 16.2 access box with model 10- 130-041 cover and positioned over the valve so that all parts of the valve can he reached for service. H. Controller Nk Wirint - Install controller as per manufacturer's specifications Wire connections to remote control electric valves, and splices of wire in the field shall be made only in valve boxes in the following manner, using Rainbird Pentite Connectors R 1 Hunter INST -04-CV -RCS RCS -515 5'x15' Right Corner Strip 30 0.65 0.65 4. Apply sealer to Inside of base socket and fill cavity completely. 5. Push sealing plug into base socket, using a slight twisting motion, until it bottoms. f. Push wires down into the base socket as far as they will go, without unseating the sealing plug. This assures the sealer completely sealing and waterproofing the connection. I. Cleaninc -Keep premises clean during construction and after completion remove all 2 Hunter INST- I2- CV -17H 17H 17' Half 25 2.7 5.4 Substantially complete, will issue a punch list of items to be completed prior to final acceptance. Punch list. Items must be completed within two weeks of their issuance. Once completed a final inspections shall be scheduled by the Owner or Landscape Architect. VI. WARRANTIES A. Guarantee --The Contractor shall guarantee all irrigation work for a period of one (1) A 5 Hunter PGJ -04 1 19, Quarter 40 1 5 ofthe nearest official U.S. Weather station, which shall substantiate the occurrence of the above phenomena. C. Damate 411; 'theft - Any damage or theft to the irrigation work beyond the contractor's control shall be bourn by the Owner. 10 Hunter PGJ -04 2 25' Half 40 2 20 3 Hunter PGPADJ 4 34' Quarter 50 2.7 9.1 pP4 Pic 3 Hunter PG16ADJ 6 35 Half 50 2.7 111.1 PT 1 Hunter PGPADJ 7 35' Two- ThirOls 50 3.4 3.4 59 117.7 IRRIGATION MATERIAL LEGEND (eye Qty Manufacturer 1 Berkley LT2 - 1.5 HP Pump Station P 1 Hunter Pro C 6 Zone Controller - Outdoor 1 Miniclik Rain Sensor 4 1 1/2" Hunter ICV Control Valve 2" Schedule 40 PVC Mainline 2 1/2" Class 160 PVC Laterals 2" Class 160 PVC Laterals 1 1/2" Class 160 PVC Laterals 1 1/4" Class 160 PVC Laterals 1" Class 200 PVC Laterals 3/4" Class 200 PVC Laterals NOTES: 1.ALL PIPE UNDER PAVING SHALL BE ENCLOSED IN A SCHEDULE 40 PVC SLEEVE TWICE THE SIZE OF THE PIPE UNLESS OTHERWISE INDICATED. 2, VERIFY AVAILABLE ELECTRICAL INFORMATION PRIORT TO ORDERING PUMP. (LEN PVC LATERAL LINE Controller Relief Vilve 5a1NOr Pressure Gauge •• K-: 1 S HP 1 PumR 1 v, 12" V AC Water Level Punp Notes: 1. Enclssure to be a Cutil Screen Ei6wylass Enclosure or A&R Cone Enclosure Controller 1 1.5 HP Pump Station Not to Scale IRRIGATION SPECIFICATIONS L SCOPE A. Scone of Work -Work under this contract consists of furnishing and installing all materials as specified on these plans dated 2/10/06 including the material schedule, details, and these specifications. B. City 4E County Ordinances - All work under this contract is to be done in full accord with the building code as established by the city or county in which the work is to be. done. Hose Nb C. Chanfes in Work -The Owner without invalidation of the contract may order extra work or make changes to the work by written agreement between Owner and Contractor. PVC Pipe and D. Claims for Extra Work - The Contractor shall not be entitled to any claim for extra Fittings Above Ground work as a result of existing conditions except as may be specifically identified in others sections of these specifications Vilve U•x E. Protection of Existing Site - The Contractor shall ensure that the existing site including Fuushed Grade existing plant material is protected from his operations and is responsible for 4, replacement or repairs to any damage resulting from these operations. Route pipe around existing trees and plants where trenching could effect growth and viability. r- Schedule 40 Suction Line F The Contractor must come' with all laws associated with locating existing utilities Strataflow Check Valve Suction Line Check Valve • Discharge TO Valves 6- 1 /2 "rla. (licm) HINGE PIN CLEARANCE FOR DOOR REMOVAL ICC CONTROLLER /PLASTIC CABINET U 13 "min (33 cm) DOOR CLEARANCE 3/4 "(19mm) CONDUIT FOR 120/230 VAC 1 -1/4 1 -1/2" OR 2" (32, 40 OR 50rn CONDUIT FOR VALVE WIRES 2 HUNTER ICC CONTROLLER Not To Scale PLASTIC VALVE BOX WITH COVER \ t- FINISH GRADE REGULATOR CONTROLLME/ _ 10' ELL -PVC TO SPRINKLERS SCHEDULE 90 PVC NIPR MAIN LINE FITTING MAIN SUPPLY LINE --"---, 3 Hunter ICV Angle Valve Not To Scale FINISH GRADE - SIDE INLET MODEL INST- I2 -SJ- SI RAY HEAD POLY RIPE POLY ELL (LENGTH AS REQUIRED) POLY ELL PVC TEE \ �Y PVC LATERAL LI 4J 1 Hunter Institutional t... 4 12" Pop Up Spray FINISH GRADE i• Not To Scale INST HEAD h Hunter Institutional Spray 5 411 & 6" Pop Up Not To Scale DNISH GRADE py including notifying Sunshine State One Call G. As -Built Drawings - The Contractor shall record all changes from the plans in red on F- .r MNEL PGP H Duration - Work shall be completed within 30 days from notice to proceed issylbd in GEARED R•T•R II. QUALM ASSURANCE A. Irritation Contractor Qualification - No individual, company or corporation will he POLY ELL permitted to perform any work under this Section by contract or sub- Coniract unless such Individual, Company or Corporation is registered as an Irrigation Contractor In C] � Miami -Dade County. The Contractor, if requested, shall provide List of not less Cyan STREET ELL three (3) similar projects which the individual, company or corporation performed P•LY RIPE under contract or subcontract to a general contractor, building owner, or government (LENGTH AS REOUIREO) entity. Supervision - All irrigation work shall be performed by personnel experienced i8" irrigation installation, under the supervision of a qualified superintendent R foreman. POLY ELL Pvc TEE • PVC LATERAL LINE responsible for verifying existing conditions prior to mobilization and shall not be Lawn Application entitled to any claim for extra work as a result of existing conditions. III. MA'1"ERIAL w, 1 ""' A. 6 Hunter PGP Rotor Z this project for approval as specified in this Section. Owner or Owner's Representative Not To Scale these specifications. B. Plastic Pipe Lines a. Pressure Pi - All pressure pipe shall be rigid unplasticized, bell end, PVC type, C: 0 sD SR w1w•; Ilb M ,*r • STAKE KIT GEARED SHRU• ROTOR • 1/2" X 3/4" THD REDUCER BUSHING (USE WITH 1/2" THD RISER ONLY) NOTE : NOZZLE MUST BE HYDRAULICALLY COMPATIBLE WITH 4VER SIZE FINISH GRADE 1 N 1/2" DR 3/4" PVC RISER (LENGTH AS REQUIRED) PVC TEE PVC LATERAL LINE Shrub Application Hunter PGP Rotor Not to Scale M 11 py including notifying Sunshine State One Call G. As -Built Drawings - The Contractor shall record all changes from the plans in red on F- .r the original irrigation drawing. 4 H Duration - Work shall be completed within 30 days from notice to proceed issylbd in writing by the Owner. " II. QUALM ASSURANCE A. Irritation Contractor Qualification - No individual, company or corporation will he r permitted to perform any work under this Section by contract or sub- Coniract unless such Individual, Company or Corporation is registered as an Irrigation Contractor In C] � Miami -Dade County. The Contractor, if requested, shall provide List of not less Cyan i three (3) similar projects which the individual, company or corporation performed 0 under contract or subcontract to a general contractor, building owner, or government B. entity. Supervision - All irrigation work shall be performed by personnel experienced i8" irrigation installation, under the supervision of a qualified superintendent R foreman. C. Verification of Existing Site Conditions A Claims for Extra Work - The Contractor is responsible for verifying existing conditions prior to mobilization and shall not be a entitled to any claim for extra work as a result of existing conditions. III. MA'1"ERIAL w, 1 ""' A. Submittals -Provide 2 copies Or manufacturer's cuts sheets of the proposed for. uye in Z this project for approval as specified in this Section. Owner or Owner's Representative reserves the right to reject materials or work not in conformance with the drawings or these specifications. B. Plastic Pipe Lines a. Pressure Pi - All pressure pipe shall be rigid unplasticized, bell end, PVC type, C: 0 Schedule 40 (ASTM D -1735) extruded from virgin parent material of the type lit specified on the drawings The pipe shall be homogeneous throughout and free from rz visible cracks, holes, foreign materials, blisters, deteriorations, wrinkles, and dents. z TO. '1411 & I" Lateral Pine shall be rigid unplasticized, bell end, PVC type, Class 200 (SDR 26) extruded from virgin parent material ofthe type specified on the co drawings The pipe shall be homogeneous throughout and free from visible cracks, holes, foreign materials, blisters, deteriorations, wrinkles, and dent.& Z c. Remaining Lateral Pipe shall be rigid unplasticized, bell end, PVC type, Class 160 Ox (SDR 21) extruded from virgin parent material of the type specified on the drawings. The pipe shall be homogeneous throughout and free from visible cracks, J holes, foreign materials, blisters, deteriorations, wrinkles, and dents p o d. Fittings - All plastic pipe fittings to be installed shall be Schedule 40 PVC (ASTM D2466) molded fittings manufactured of the same material as the pipe, and shall be suitable for solvent weld connections. C. Valve Boxes -. Valve boxes shall Ametek model 10 -130 -001 with model 10 -130 -041 cover, with a tensile strength of 3400 PSI, an impact strength of.6 ft. Ilk /in., and a deflection temperature of 230 degrees F. D. Control Wire - Shall be 14 gauge single strand wire as manufactured by Paige or approved equal. Splices shall be enclosed in a 3M Splice Kit. E. Remaining Materials - Remaining materials shall conform to the material schedule on the plans. IV. INSTALLATION A. L. ayout - All heads and piping will be laid out according to the irrigation plans Adjust 4 pipe layouts as required due to site conditions prior to excavation. Locate valves to assure ease of access for maintenance. It Trenching - Pressure pipe will be buried li" below grade and circuit pipe will be buried 12" below grade. Trenches shall be excavated of sufficient width to permit proper handling and installation of the pipe. The backfill shall be thoroughly compacted el ery three inches and evened off with the adjacent soil level. Compaction of eacb lift shall be equal to 100% of maximum density as determined by AAS11TO Specification T -99 The fill dirt or sand shall be used in filling four inches above the pipe The remainder of the backfill shall be free of rocks over one inch, subsoil or trash. The All trenches that are opened during any particular working day shall be closed and backfilled the same day. No open trenches shall be left overnight. C. Existing Utilities and Structures- The contractor shall determine the exact location of all existing utilities, structures and underground utilities that may not be indicated on the drawings. The contractor shall conduct his work so as to prevent interruption of service or damage to them. The contractor shall protect existing structures and utility services and be responsible for their replacement if damaged by him, or to make necessary adjustments in their location 1f required in order to complete the work of this contract. Minor adjustments in the system will be permitted to clear existing fixed obstructions subject to the approval or the Owner and /or Landscape Architect. The contractor shall verify at this time the gallonage and pressure to be expected from the city water meter. D. Fastening rye - Clean fitting and pipe end. Apply primer and then two coats of cement to both. Force pipe into fitting and rotate one quarter turn. Hold in place one minute and cure for 30 minutes Do not fasten pipe when temperatures are not between 60 to 100 degrees or when raining. E. Flush Lines & Pressure Test - Prior to installing heads, flush all lines with the maximum water pressure. Pressure test lines for 4 hours at 150 %(75 PSI) of the system's operating pressure. F. Heads - Set sprinkler heads perpendicular to finished grade. Heads adjacent to curbs and walks shall be from one halrto one inch away from the curb or walk. Risers shall b1 set at specified height above finished grade. Pop Up sprinklers shall be set 4" above finished grade and adjusted to finished grade after all planting is complete. Adjust head patterns and radius for proper distribution and coverage. G. Control Valves - Control Valves shall be installed in an Ametek model 10- 130 -001 access box with model 10- 130-041 cover and positioned over the valve so that all parts of the valve can he reached for service. H. Controller Nk Wirint - Install controller as per manufacturer's specifications Wire connections to remote control electric valves, and splices of wire in the field shall be made only in valve boxes in the following manner, using Rainbird Pentite Connectors and Sealer: 1. Strip ends of wirer and push wires through the holes of the base socket. 2. Twist wires together and mechanically bond together, using crimp sleeve and . crimping pliers 3. Pull wire connection back into base socket as afar as possible. 4. Apply sealer to Inside of base socket and fill cavity completely. 5. Push sealing plug into base socket, using a slight twisting motion, until it bottoms. f. Push wires down into the base socket as far as they will go, without unseating the sealing plug. This assures the sealer completely sealing and waterproofing the connection. I. Cleaninc -Keep premises clean during construction and after completion remove all debris from the site and appropriately dispose. ,a V. SUBSTANTIAL COMPLETION A. Substantial Completion -At completion of the installation, the Owner or Landscape Architect shall schedule a Inspection of the work and Ifthe work is determined to be Substantially complete, will issue a punch list of items to be completed prior to final acceptance. Punch list. Items must be completed within two weeks of their issuance. Once completed a final inspections shall be scheduled by the Owner or Landscape Architect. VI. WARRANTIES A. Guarantee --The Contractor shall guarantee all irrigation work for a period of one (1) year alter Substantial Completion. Provisional acceptance shall be issued in writing by the Owner or his designated representative upon completion of all irrigation work. +r. R. ,!Lets of God - Irrigation work, which is damaged by Acts of God, is not subject to the above warranties. Such Acts of God shall include hurricanes, tornadoes, or freeze. In order to claim such warranty exceptions, the Contractor shall submit published record ofthe nearest official U.S. Weather station, which shall substantiate the occurrence of the above phenomena. C. Damate 411; 'theft - Any damage or theft to the irrigation work beyond the contractor's control shall be bourn by the Owner. • STAKE KIT GEARED SHRU• ROTOR • 1/2" X 3/4" THD REDUCER BUSHING (USE WITH 1/2" THD RISER ONLY) NOTE : NOZZLE MUST BE HYDRAULICALLY COMPATIBLE WITH 4VER SIZE FINISH GRADE 1 N 1/2" DR 3/4" PVC RISER (LENGTH AS REQUIRED) PVC TEE PVC LATERAL LINE Shrub Application Hunter PGP Rotor Not to Scale M 11 'IF t Q O p t► E... fie r� u� w w z ...:'k 0 o .°c W QC 0 H - x � i r4 c) O Ln at• OG .. oa Ln "o } • • • rsm IRRIGATION PLAN SCALE I" - 10' DRAWN SFN jot Wat -06 -09 DATE 02 -10 -06 SHEET. L -2 2 OF:2 IZId A` w 1 •" 4 F- .r CNI* ` n fir,• CD Zo.N.NP r o.- w» C] � F- i g in r 0 z p Cr7 Lu a (/7 Z C.a L=L N_ o W C: 0 M_,,.. lit ' rz C1tC; z M. co 'IF t Q O p t► E... fie r� u� w w z ...:'k 0 o .°c W QC 0 H - x � i r4 c) O Ln at• OG .. oa Ln "o } • • • rsm IRRIGATION PLAN SCALE I" - 10' DRAWN SFN jot Wat -06 -09 DATE 02 -10 -06 SHEET. L -2 2 OF:2 IZId A` 1 •" 4 CNI* ` 1Z r� 1� W fir,• CD Zo.N.NP E C] � F- CU g in r 0 � p Cr7 Lu CU LL L=L W C: 0 M_,,.. L ' rz w u7 c,`? co eNU 0) 'Q Z = Ox Q m J J p o a- M 'IF t Q O p t► E... fie r� u� w w z ...:'k 0 o .°c W QC 0 H - x � i r4 c) O Ln at• OG .. oa Ln "o } • • • rsm IRRIGATION PLAN SCALE I" - 10' DRAWN SFN jot Wat -06 -09 DATE 02 -10 -06 SHEET. L -2 2 OF:2 IZId A` 1 •" 4 ` 1Z r� 1� W fir,• 'IF t Q O p t► E... fie r� u� w w z ...:'k 0 o .°c W QC 0 H - x � i r4 c) O Ln at• OG .. oa Ln "o } • • • rsm IRRIGATION PLAN SCALE I" - 10' DRAWN SFN jot Wat -06 -09 DATE 02 -10 -06 SHEET. L -2 2 OF:2 IZId A`