06-0001-016GENERAL PLUMBING NOTES
1. ALL WORK TO BE DONE IN ACCORDANCE WITH THE FLORIDA
BUILDING CODE AND LOCAL ORDINANCES.
2. BUILDING DRAINAGE SYSTEM TO BE SLOPED AT 1/8" PER FT. MIN. FALL. ANY
DEVIATIONS SHALL BE APPROVED BY ARCHITECT /ENGINEER.
3. PROVIDE CLEANOUTS EVERY 75 FT. AND AT BASE OF EVERY WASTESTACK.
ALL CLOSEOUTS TO BE FLUSH MOUNTED.
4. MATERIALS SHALL BE ALL NEW AND AS FOLLOWS:
A. DRAINAGE WASTE AND VENT PIPING INCLUDING GREASE
WASTE; PVC DRAINAGE WASTE AND PIPING (DWV) CONFORMING TO
ASTM D -2665, NO HUB CAST IRON CISPI STANDARD 301 ABOVE
GROUND AND CAST IRON HUB, PLAIN END ASTM A -74 WITH NEO-
PRENE GASKETS UNDERGROUND.
B. WATER PIPING: COPPER TYPE "L" ASTM B -88 ABOVE GROUND AND
COPPER TYPE "K" ASTM B -88 UNDERGROUND.
C. CONDENSATE DRAIN PIPING: COPPER TYPE "M" ASTM B -88 INSIDE
THE BUILDING AND PVC SCHEDULE 40 ABOVE ROOF AND UNDERGROUND.
PROVIDE 1/2" ARMAFLEX PIPE INSULATION TO ALL CONDENSATE DRAIN
PIPING.
D. FLOOR DRAINS (IF REQUIRED): JOSAM SERIES 30,000 OR EQUAL EXCEPT AT
TRANSFORMER VAULT WHICH SHALL BE JOSAM SERIES 32,000 OR EQUAL.
KITCHEN FLOOR DRAIN: JOSAM 35420 -50, 12" SQUARE NIKALOY TOP, SATIN
FINISH, 1/2" PRIMER CONNECTION, BRONZE SEDIMENT BUCKET.
E. FLOOR CLEANOUTS: JOSAM SERIES 56020 OR EQUAL.
F. WALL CLEANOUTS: JOSAM SERIES 58750 WITH ACCESS COVER OR EQUAL.
G. VALVES: 125 PSI NIBCO SCOTT, STOCKHAM OR EQUAL.
H. HOSE BIBBS: CHICAGO 837 OR EQUAL WITH VACUUM BREAKER.
I. ELECTRIC WATER HEATER: GLASS – LINED, P k T RELIEF VALVE, 5 YEAR
WARRANTY MINIMUM.
5. PERFORM THE FOLLOWING TEST:
A. WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF
100 PSIG FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE ENTIRE SYSTEM
BUT NOT LESS THAN ONE HOUR.
B. DRAINAGE SYSTEM: BEFORE INSTALLATION OF ANY DRAINS, THE END OF THE
SYSTEM SHALL BE CAPPED k ALL LINES FILLED WITH WATER TO HIGHEST
POINT k ALLOWED TO STAND UNTIL INSPECTION IS MADE AND WATER LEVELS
REMAIN CONSTANT.
C. CORRECT ALL DEFECTS DISCLOSED BY ABOVE TESTS.
D. COMPLETE SYSTEM FIXTURE do EQUIPMENT SHALL BE GIVEN AN IN– SERVICE
TEST AFTER COMPLETION OF THE INSTALLATION.
E. STERILIZE ALL WATER LINES WITH A MIXTURE OF (2) POUNDS OF CHLORINATED
LIME TO EACH 1000 gal. OF WATER (50 PPM OF AVALIBLE CHLORINE.) RETAIN
MIXTURE IN PIPES FOR 24 HOURS AND FLUSH THROUGHLY WITH POTABLE WATER
BEFORE PLACING IN SERVICE.
8. PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING
WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD
OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE, AND THAT HE WILL, AT HIS EXPENSE,
REPAIR AND REPLACE ALL WORK WHICH BECOMES DEFECTIVE DURING GUARANTEE PERIOD.
7. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING UTILITIES AND POINTS OF
CONNECTION BEFORE COMMENCING ANY WORK.
8. PLUMBING CONTRACTOR SHALL PAY ALL FEES, INSPECTION AND CONNECTION
CHARGES REQUIRED.
9. SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL OF ALL EQUIPMENT,
MATERIALS AND LAYOUTS PRIOR INSTALLATION.
10.OFFSET PIPING AS REQUIRED TO CLEAR BUILDING STRUCTURE, DUCTWORK, ETC.
AS SHOWN ON DRAWINGS AND AS REQUIRED BY FIELD CONDITIONS.
11. PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL A/C CONDESATE DRAIN
AND TRAP. SEE A/C PLANS FOR LOCATION OF UNITS AND DRRINS.
12.PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND DIMENSIONS
AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF MATERIALS AND EQUIPMENT.
13.COORDINATE WORK WITH OTHER TRADES.
14. FURNISH AND INSTALL FIX'T'URES AS SPECIFIED IN SCHEDULE IF PROVIDED, OTHERWISE
PROVIDE SHOP DRAWINGS.
15.EACH BATHROOM GROUP AND KITCHEN SHALL BE PROVIDE WITH AIR CHAMBERS OR SHOCK
ABSORBER AS PER S.F.B.C.
16. PROVIDE SHUT –OFF VALVE FOR EACH FIXTURE, JUST BEFORE CONNECTING TO FIXTURE.
17.WHEREVER DISSIMILAR METALS ARE TO BE JOINED, A DIELECTRIC FITTING
SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES.
18. MECHANICAL CONTRACTOR SHALL COORDINATE AND VERIFY HEIGHT AND LOCATION OF
STUB --UPS.
19.REFER TO SUPPLIER DRAWING AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND COORDINATION OF EQUIPMENT TERMINATION DETAILS.
20. PROVIDE AT REFRIGERATOR LOCATION: 3/8" C.W. LINE TO 1/4" PETCOCK 6" ABOVE
FLOOR . FURNISH 48" OF 1/4" SOFT COPPER TUBING FOR CONNECTION TO REFRIGERATOR
21. PROVIDE ANTI SCALD AT ALL TUB AND SHOWERS,
1
1
i w C G �
PROVIDE EXTRA HEAVY PATTERN )'ULt OPENING-
IRON BODY TRAP SCREW FERRULE & ALL BRASS FINISH GRADE
CLEANOUT WITH COL'. 1TERSUNK MEAD • • • •
w ■ f • • • ■
FINISH GRADE P!, OPDE�77P+�G*ITJR/�E/D� -*CONC. MINIMUM 1"
SYMBOLS T BL'U VX ix... ,a C. . ,TSJ % Y
PLUMBING SYMBOLS NOT IN PAVED AREA
is �+ ��i 1,.� ?,•�S..�t, «�, y.. �.',1 �.,L�.t
S i COLD WATER PIPE ,/ .< ,+ , \� .o •, a . , a ., a
PERFORATED CAP DRAIN PAN
S _ ...5 HOT WATER PIPE 12 "a12 "x8"
POURED CONC. LONG SWEEP. USE SHORT
PITCH DOWN BLOCK WHEN SWEEP WHERE REQUIRED SAME SIZE AS
I WATER HAMMER ARRESTOR TOWARD DRAIN CLEANOUT IS COMBINATION "Y" do SIZE 4 "
I1 AIR CHAMBER - MAX
NOT IN
z PAVED AREA 1/8" BEND --�`
1113 " �� HOSE BIBB W / VACUUM BREAKER
AND SHUT -OFF VALVE
SEE MECHANICAL DRAWINGS
` S SANITARY LINE FOR UNIT SUPPORTS. GCO FCO
f-- C.D. •---� CONDENSATE LINE DRAIN LINE SHALL BE AT LEAST THE
SAME SIZE AS THE NIPPLE ON THE
DRAIN PAN
WCO WALL CLEANOUT
STAINLESS STEEL COVER
Jc 1/2" + TOTAL AHU PLUMBIN MECHANICAL I C 0 EP UGTO THREADED
FCO FLOOR CLEANOUT TOTAL STATIC PRESSURE.
FACE OF WALL
GATE VALVE c SHUT -OFF TYPICAL CONDENSATE DRAIN TRAP
N.T.S. WCO
5 CW -
UNION FITTING
(TYPICAL) -
DIELECTRIC FITTIG
(TYPICAL)
ATE VALVE
TYP. )
� HEAT 7
TO COLD WATER
SYSTEM
-><� cuu
_i`r Hw
U HOT WATER SYSTEM T6'
BE FULLY INSULATED.
WATER HEATER
120 GALS. WITH TEMPERATURE do PRESSURE
2– SIMULTANEUS RELIEF VALVE
6.0 KW HEATING ELEMENTS
*DRAIN PAN
FLOOR
3/4" EMERGENCY DRAIN
- AIR GAP FITTING
(GAP02xO OF DRAIN PIPE)
3/4" MIN.
PRESSURE RELIEF & DRAIN PAN LINES
—~ TO BLDG. EXTERIOR, 6" ABOVE GRADE
AND TURNED DOWN
* SECOND FLOOR ONLY
WATER NEATER DIAGRAM
N.T.S.
PLUMBING FIXTURE CONNECTION SCHEDULE
MARK
DESCRIPTION
FU'S
WASTE
C.W.
H.W.
REMARKS /SPECS
r -1
WATER CLOSET
3
3"
1/2"
-
FLOOR MOUNTED, FLUSH TANK
P -2
BATHTUB
2
2"
1/2"
1/2"
5 FT. LONG. PRESSURE BALANCING FAUCET
P -2A
SHOWER
2
1 2"
1/2"
1/2"
1 PRESS. BALANCING FAUCET.
P -3
LAVATORY
1
1 1/2"
1/2"
1/2"
COUNTER TOP
P -4
KITCHEN SINK
im
1 1/2"
1/2"
1/2"
COUNTER TOP
P -5
DISH WASHER
1 1/2"
1/2"
1/2"
--------
P-6
WASHER
2
32-
1/2"
1/2"
--------
P-7
REFRIGERATOR
__
__
1/2"
--
----------
P -B
LAUNDRY SINK
2
1 1/2"
1/2"
1/2"
- __-___ - --
P-9
BIDDET
1 2
1 2..
1/2"
1/2"
1 ---- - - - - --
NOTE : CONTRACTOR TO COORDINATION PLUMBING FDCPURE SELECTION, WITH OWNER/ ARCHITECT FOR FD{TURE AND
FAUCET STYLE k COLOR.
Vi
PLAN VIEV
NTS
rA
TYPICAL CLEANOUT DETAIL
N.T.S.
T2 A T T ZT A T 'CrW
WATER BACKFLOW PREVENTOR DETAIL
N.T.S.
URE
ENTION
'ISH
kDE
DAA7[:r.1, F. iF(f.i IE L.iLF2,, . E', alJ .fy r Alolt rA .!'1. rill
LIC #049'086 CORAL GABLES, fil 33134
D tmw czi
2 6 3 j' 7
CONSULTING:
V
W
ILK,
En
0
3
o
r
Z
o
.c
Vf
'�
CONSULTING:
M
H ca
U ti (10
m W 0)
I
cn
~ to
_ u
rn
0
00
Lo
oc
V
W
ILK,
En
0
3
o
r
IL
o
.c
M
H ca
U ti (10
m W 0)
I
cn
~ to
_ u
rn
0
00
Lo
oc
�f
N01B AFD DETAIU
t
OCALE A$ BFIdM
mvm Dm
JN
RAT
SHEET:
P—"6
6 OF: 4
En
�f
N01B AFD DETAIU
t
OCALE A$ BFIdM
mvm Dm
JN
RAT
SHEET:
P—"6
6 OF: 4