06-0001-016GENERAL PLUMBING NOTES 1. ALL WORK TO BE DONE IN ACCORDANCE WITH THE FLORIDA BUILDING CODE AND LOCAL ORDINANCES. 2. BUILDING DRAINAGE SYSTEM TO BE SLOPED AT 1/8" PER FT. MIN. FALL. ANY DEVIATIONS SHALL BE APPROVED BY ARCHITECT /ENGINEER. 3. PROVIDE CLEANOUTS EVERY 75 FT. AND AT BASE OF EVERY WASTESTACK. ALL CLOSEOUTS TO BE FLUSH MOUNTED. 4. MATERIALS SHALL BE ALL NEW AND AS FOLLOWS: A. DRAINAGE WASTE AND VENT PIPING INCLUDING GREASE WASTE; PVC DRAINAGE WASTE AND PIPING (DWV) CONFORMING TO ASTM D -2665, NO HUB CAST IRON CISPI STANDARD 301 ABOVE GROUND AND CAST IRON HUB, PLAIN END ASTM A -74 WITH NEO- PRENE GASKETS UNDERGROUND. B. WATER PIPING: COPPER TYPE "L" ASTM B -88 ABOVE GROUND AND COPPER TYPE "K" ASTM B -88 UNDERGROUND. C. CONDENSATE DRAIN PIPING: COPPER TYPE "M" ASTM B -88 INSIDE THE BUILDING AND PVC SCHEDULE 40 ABOVE ROOF AND UNDERGROUND. PROVIDE 1/2" ARMAFLEX PIPE INSULATION TO ALL CONDENSATE DRAIN PIPING. D. FLOOR DRAINS (IF REQUIRED): JOSAM SERIES 30,000 OR EQUAL EXCEPT AT TRANSFORMER VAULT WHICH SHALL BE JOSAM SERIES 32,000 OR EQUAL. KITCHEN FLOOR DRAIN: JOSAM 35420 -50, 12" SQUARE NIKALOY TOP, SATIN FINISH, 1/2" PRIMER CONNECTION, BRONZE SEDIMENT BUCKET. E. FLOOR CLEANOUTS: JOSAM SERIES 56020 OR EQUAL. F. WALL CLEANOUTS: JOSAM SERIES 58750 WITH ACCESS COVER OR EQUAL. G. VALVES: 125 PSI NIBCO SCOTT, STOCKHAM OR EQUAL. H. HOSE BIBBS: CHICAGO 837 OR EQUAL WITH VACUUM BREAKER. I. ELECTRIC WATER HEATER: GLASS – LINED, P k T RELIEF VALVE, 5 YEAR WARRANTY MINIMUM. 5. PERFORM THE FOLLOWING TEST: A. WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF 100 PSIG FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE ENTIRE SYSTEM BUT NOT LESS THAN ONE HOUR. B. DRAINAGE SYSTEM: BEFORE INSTALLATION OF ANY DRAINS, THE END OF THE SYSTEM SHALL BE CAPPED k ALL LINES FILLED WITH WATER TO HIGHEST POINT k ALLOWED TO STAND UNTIL INSPECTION IS MADE AND WATER LEVELS REMAIN CONSTANT. C. CORRECT ALL DEFECTS DISCLOSED BY ABOVE TESTS. D. COMPLETE SYSTEM FIXTURE do EQUIPMENT SHALL BE GIVEN AN IN– SERVICE TEST AFTER COMPLETION OF THE INSTALLATION. E. STERILIZE ALL WATER LINES WITH A MIXTURE OF (2) POUNDS OF CHLORINATED LIME TO EACH 1000 gal. OF WATER (50 PPM OF AVALIBLE CHLORINE.) RETAIN MIXTURE IN PIPES FOR 24 HOURS AND FLUSH THROUGHLY WITH POTABLE WATER BEFORE PLACING IN SERVICE. 8. PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE, AND THAT HE WILL, AT HIS EXPENSE, REPAIR AND REPLACE ALL WORK WHICH BECOMES DEFECTIVE DURING GUARANTEE PERIOD. 7. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING UTILITIES AND POINTS OF CONNECTION BEFORE COMMENCING ANY WORK. 8. PLUMBING CONTRACTOR SHALL PAY ALL FEES, INSPECTION AND CONNECTION CHARGES REQUIRED. 9. SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL OF ALL EQUIPMENT, MATERIALS AND LAYOUTS PRIOR INSTALLATION. 10.OFFSET PIPING AS REQUIRED TO CLEAR BUILDING STRUCTURE, DUCTWORK, ETC. AS SHOWN ON DRAWINGS AND AS REQUIRED BY FIELD CONDITIONS. 11. PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL A/C CONDESATE DRAIN AND TRAP. SEE A/C PLANS FOR LOCATION OF UNITS AND DRRINS. 12.PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND DIMENSIONS AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF MATERIALS AND EQUIPMENT. 13.COORDINATE WORK WITH OTHER TRADES. 14. FURNISH AND INSTALL FIX'T'URES AS SPECIFIED IN SCHEDULE IF PROVIDED, OTHERWISE PROVIDE SHOP DRAWINGS. 15.EACH BATHROOM GROUP AND KITCHEN SHALL BE PROVIDE WITH AIR CHAMBERS OR SHOCK ABSORBER AS PER S.F.B.C. 16. PROVIDE SHUT –OFF VALVE FOR EACH FIXTURE, JUST BEFORE CONNECTING TO FIXTURE. 17.WHEREVER DISSIMILAR METALS ARE TO BE JOINED, A DIELECTRIC FITTING SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES. 18. MECHANICAL CONTRACTOR SHALL COORDINATE AND VERIFY HEIGHT AND LOCATION OF STUB --UPS. 19.REFER TO SUPPLIER DRAWING AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND COORDINATION OF EQUIPMENT TERMINATION DETAILS. 20. PROVIDE AT REFRIGERATOR LOCATION: 3/8" C.W. LINE TO 1/4" PETCOCK 6" ABOVE FLOOR . FURNISH 48" OF 1/4" SOFT COPPER TUBING FOR CONNECTION TO REFRIGERATOR 21. PROVIDE ANTI SCALD AT ALL TUB AND SHOWERS, 1 1 i w C G � PROVIDE EXTRA HEAVY PATTERN )'ULt OPENING- IRON BODY TRAP SCREW FERRULE & ALL BRASS FINISH GRADE CLEANOUT WITH COL'. 1TERSUNK MEAD • • • • w ■ f • • • ■ FINISH GRADE P!, OPDE�77P+�G*ITJR/�E/D� -*CONC. MINIMUM 1" SYMBOLS T BL'U VX ix... ,a C. . ,TSJ % Y PLUMBING SYMBOLS NOT IN PAVED AREA is �+ ��i 1,.� ?,•�S..�t, «�, y.. �.',1 �.,L�.t S i COLD WATER PIPE ,/ .< ,+ , \� .o •, a . , a ., a PERFORATED CAP DRAIN PAN S _ ...5 HOT WATER PIPE 12 "a12 "x8" POURED CONC. LONG SWEEP. USE SHORT PITCH DOWN BLOCK WHEN SWEEP WHERE REQUIRED SAME SIZE AS I WATER HAMMER ARRESTOR TOWARD DRAIN CLEANOUT IS COMBINATION "Y" do SIZE 4 " I1 AIR CHAMBER - MAX NOT IN z PAVED AREA 1/8" BEND --�` 1113 " �� HOSE BIBB W / VACUUM BREAKER AND SHUT -OFF VALVE SEE MECHANICAL DRAWINGS ` S SANITARY LINE FOR UNIT SUPPORTS. GCO FCO f-- C.D. •---� CONDENSATE LINE DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS THE NIPPLE ON THE DRAIN PAN WCO WALL CLEANOUT STAINLESS STEEL COVER Jc 1/2" + TOTAL AHU PLUMBIN MECHANICAL I C 0 EP UGTO THREADED FCO FLOOR CLEANOUT TOTAL STATIC PRESSURE. FACE OF WALL GATE VALVE c SHUT -OFF TYPICAL CONDENSATE DRAIN TRAP N.T.S. WCO 5 CW - UNION FITTING (TYPICAL) - DIELECTRIC FITTIG (TYPICAL) ATE VALVE TYP. ) � HEAT 7 TO COLD WATER SYSTEM -><� cuu _i`r Hw U HOT WATER SYSTEM T6' BE FULLY INSULATED. WATER HEATER 120 GALS. WITH TEMPERATURE do PRESSURE 2– SIMULTANEUS RELIEF VALVE 6.0 KW HEATING ELEMENTS *DRAIN PAN FLOOR 3/4" EMERGENCY DRAIN - AIR GAP FITTING (GAP02xO OF DRAIN PIPE) 3/4" MIN. PRESSURE RELIEF & DRAIN PAN LINES —~ TO BLDG. EXTERIOR, 6" ABOVE GRADE AND TURNED DOWN * SECOND FLOOR ONLY WATER NEATER DIAGRAM N.T.S. PLUMBING FIXTURE CONNECTION SCHEDULE MARK DESCRIPTION FU'S WASTE C.W. H.W. REMARKS /SPECS r -1 WATER CLOSET 3 3" 1/2" - FLOOR MOUNTED, FLUSH TANK P -2 BATHTUB 2 2" 1/2" 1/2" 5 FT. LONG. PRESSURE BALANCING FAUCET P -2A SHOWER 2 1 2" 1/2" 1/2" 1 PRESS. BALANCING FAUCET. P -3 LAVATORY 1 1 1/2" 1/2" 1/2" COUNTER TOP P -4 KITCHEN SINK im 1 1/2" 1/2" 1/2" COUNTER TOP P -5 DISH WASHER 1 1/2" 1/2" 1/2" -------- P-6 WASHER 2 32- 1/2" 1/2" -------- P-7 REFRIGERATOR __ __ 1/2" -- ---------- P -B LAUNDRY SINK 2 1 1/2" 1/2" 1/2" - __-___ - -- P-9 BIDDET 1 2 1 2.. 1/2" 1/2" 1 ---- - - - - -- NOTE : CONTRACTOR TO COORDINATION PLUMBING FDCPURE SELECTION, WITH OWNER/ ARCHITECT FOR FD{TURE AND FAUCET STYLE k COLOR. Vi PLAN VIEV NTS rA TYPICAL CLEANOUT DETAIL N.T.S. T2 A T T ZT A T 'CrW WATER BACKFLOW PREVENTOR DETAIL N.T.S. URE ENTION 'ISH kDE DAA7[:r.1, F. iF(f.i IE L.iLF2,, . E', alJ .fy r Alolt rA .!'1. rill LIC #049'086 CORAL GABLES, fil 33134 D tmw czi 2 6 3 j' 7 CONSULTING: V W ILK, En 0 3 o r Z o .c Vf '� CONSULTING: M H ca U ti (10 m W 0) I cn ~ to _ u rn 0 00 Lo oc V W ILK, En 0 3 o r IL o .c M H ca U ti (10 m W 0) I cn ~ to _ u rn 0 00 Lo oc �f N01B AFD DETAIU t OCALE A$ BFIdM mvm Dm JN RAT SHEET: P—"6 6 OF: 4 En �f N01B AFD DETAIU t OCALE A$ BFIdM mvm Dm JN RAT SHEET: P—"6 6 OF: 4