06-0001-008T. BEAM
LEA v. + 21' -0
SECOND FL.
ELEV. + 12' -0'
T, BEAM
ELEV. y
ELEV. + 107-0
FIRST FL.
ELEV, 0' 0
ELEV.+ 29' -2'
--- - - - - -- .- ---- --- ---- -- --- ---
T. BEAM
12
5�
ELEV.+ 10' -0'
T. BEAM
FOAM 4 STUCCO
CONC. BEAM / \
SEE STRUC. DWaS. / \ 5 WALL
FOR 51ZE AND REINF.
CB5 WALL
CONC.5LAB \
SEE STRUC. DWG5, \ /
FOR SIZE AND REINF. GUEST RM. \ /
ELEV. 0' -0"
FIRST FL. - -
CONC. FTG.
SEE 5TRUC, D1165.
FOR 61ZE AND REINF.
2 SECTION
1/4" = V -011
SECTION
FLAT CEMENT TILE
PREFAB WOOD TRUSSES
AS PER MANUFACTURER TYPICAL
SUBMIT SHOP DRAWINGS.
o� CONC. BEAM
SEE STRUC, DWGS.
FOR 51ZE AND REINF,
FOAM 4 STUCCO
T�I�ING
4" 0 Ct.
��II❑
i CEMENT TILE
=AB WOOD TRUSSES
'ER MANUFACTURER TYP.
11T SHOP DRAWINGS,
T. BEAM
ELEV. + 21' -0'
r T, BEAM
`IELEv. + 16' -0'
FOAM 4 STUCCO
CONC, BEAM
SEE STRUC, DWGS.
FOR SIZE AND REINF
#L FIRST FL.
" r ELEV. 0' -0'
••
_
Ix3 P.T. FIRE STOP (TYP)
AT ALL EXTERIOR WALLS
co
O
_ - GALV. LADDER TYPE � 9
O
fir.,
• Y
i
•
Y
Y
0
y �
r 6 Y r•
••r
••• •
i
Y
6666
6 •
•
•
u •••
z
O
•
i
Ere
0
•
• •
r
• Y u
A5 36'
41MNET k
••
0
F-
U
w
0
a
w
z
SHALL
.L. RATE
o
i
*
\89ba B
PERIOR/
••Y•
0•600
Z
666
••r•
• 6
rY YY
"
•
�
FLAT CEMENT TILE
• "
"•
LIVI
Li
OVER (1) COURSE 30 * ROOFING FELT
12 :6060
Y r: 6 6 Y
•
• `
CONC. SLAB
r • "
SEE STRUC, DWGS.
5
FOR SIZE AND REINF.
i CEMENT TILE
=AB WOOD TRUSSES
'ER MANUFACTURER TYP.
11T SHOP DRAWINGS,
T. BEAM
ELEV. + 21' -0'
r T, BEAM
`IELEv. + 16' -0'
FOAM 4 STUCCO
CONC, BEAM
SEE STRUC, DWGS.
FOR SIZE AND REINF
#L FIRST FL.
" r ELEV. 0' -0'
••
_
Ix3 P.T. FIRE STOP (TYP)
AT ALL EXTERIOR WALLS
co
O
_ - GALV. LADDER TYPE � 9
O
fir.,
• Y
i
•
Y
Y
0
y �
r 6 Y r•
••r
••• •
i
Y
6666
6 •
•
•
u •••
z
O
•
u
Ere
0
•
• •
r
• Y u
r
•
••
0
F-
U
w
0
a
w
z
V1
V)
w
r
0
N_
o
i
w
••Y•
0•600
Z
666
••r•
• 6
rY YY
"
•
�
FLAT CEMENT TILE
• "
"•
OVER (1) COURSE 30 * ROOFING FELT
12 :6060
Y r: 6 6 Y
•
• `
00 Y
r • "
OVER (1) COURSE tO * MINERAL SURFACE
5
ROOFING OVER 6 /b' CDX. EXT,
GRADE PLYWOOD SHEATING,
TRU55 METAL ANCHOR
EMBEDDED IN CONCRETE
REFER TO 5TUCT, DWGS.
T.T.B.
PREFAB WOOD TRUSSES ELEV, + 21' -0'
j
AS PER MANUFACTURER TYP.
SUBMIT SHOP DRAWINGS. 2 1/2" GALV. MTL. DRIP
ON 1'x2' P.T. NAILER
R -30 BATTEN - 2'x6' WOOD
INSULATION - 2' -0" FASCIA
4' SCREENED VENT. TYP.
I/2' DRYWALL
ON 1x3 CEILING WOOD FOAM 4 STUCCO
FURRING 'R 16" O.C, --
V CMU REINFORCED M45ONRY WALL
3 CONT. P.T. FIRE STOP (TYP) SEE STRUC. DWCsa FOR REINFORCING. CONCRETE BEAM
AT ALL EXTERIOR WALLS
SEE STRUC. DW55.
FOR 51ZE AND REINFORCING,
LIGHT TEXT. 5TUCCO FINISH
w"
Ix3 P.T. FIRE STOP (TYP)
AT ALL EXTERIOR WALLS
co
O
_ - GALV. LADDER TYPE � 9
O
= HORZ. JOIN REINFORCING * 16 O.C.
- STARTING AT FIRST COURSE.
1/2' DRYWALL ON I6x2" -
0
P.T. WD. FURRING --
STRIPS Q le' ac. - �n
R -4.2 FOIL INSULATION -
1x2 P.T NAILER =
3 /4 'xa' WOOD BASE BOARD
HE
REFER TO FINISH SCHEDULE
w
z
O
FLOOR FINISH
REFER TO FIN15H SCHEDULE.
0
rii
v
%" TY .6LAB-// -
t
U
cc
10"X10'
CAST STONE COL.
42" HIGH MTL. RAILING
TO REJECT 4' OBJECT.
MANUR TO SUBMIT SHOP DWG5.
FLOOR FIN15H
m
REFER TO FINISH SCHEDULE
CONIC. SLAB
SEE STRUC. DW55.
FOR SIZE AND REINF.
- - -� 2ND FLOOR
- - - - ELEV. + 12' -0"
- CONTRACTOR TO PROVIDED
_ ALL RAILINGS SHOP DWG6
FOR ARCHJENG. APPROVAL
SEPARATE PERMIT REQUIRE,
CONCRETE SLAB -
SEE STRUC. DWG5. HE
FLAT CEMENT TILE FOR 517E AND REINFORCING.
PREFAB WOOD TRUSSES I/2" DRYWALL BALCONY UNDERSIDE
12 AS PER MANUFACTURER TYPICAL ON MTL. DROPPED CEILING STUCCO FIN15H
-75 SUBMIT SHOP DRAWINGS. -
E' CMU REINFORCED MASONRY WALL
16 CONT, P.T. FIRE STOP (TYP) - SEE STRUC. DWGS, FOR REINFORCING,
AT ALL EXTERIORS WALLS. -
-- - - - - ELEV. + 21' -0'
---------------- --�- -- R- 4.2 FOIL INSULATION
T. BEAM -
FOAM 4 STUCCO
-- SMOOTH STUCCO FINI5H
1/2' DRYWALL ON I "x26
SEE STRUC. DWCsS.
/ CONC. BEAM P.T. WD. FURRING STRIPS A 16' O.C.
/ -
/ FOR SIZE AND REINF.
/ FLAT CEMENT TILE
HER'S = 12 A5 PER MANUFACTURER TYP. PREFAB WOOD TRUSSES GALV. LADDER TYPE * 9
- HORZ. JOIN REINFORCING " 16 O.G.
\ .....� � --
\ CONC. 5LAB SUBMIT SHOP DRAWINGS, _ STARTING AT FIRST COURSE.
1RRID0 SEE STRUC, D HIS -
FOR 51ZE AND INF. 1x3 CONT. P.T, FIRE STOP (TYP)
- - - - - - - - - - - - EV. �L2' -0' AT ALL
- EL EXTERIORS WALLS
FIRST
AT MID, OF SPAN
ELEV. + 10-0"
CR WN MOLD. RIR5T FL,
2 0'
1x2 P.T NAILER - -
/ FOAM 4 STUCCO
GONG. BEAM 3 /4'xV WOOD BASE BOARD -
/ \ SEE STRUC. pWGS. REFER TO FIN15H SCHEDULE
m FOR SIZE AND REINF.
FLOOR FINISH
REFER TO FIN15H SCHEDULE.
KITCHEN FAMILY RM. LIJ 0, - - - - - - __
- --- _.._ - - - -- - - - - ---
1ST FLOOR
FIRST FL. ELEV. + 0 0
CONCRETE SLAB
SEE STRUC. DWG5.
FOR SIZE AND REINFORCING.
2' PREMOLDED CONT, EXP. JOIN - A CONCRETE FTG.
SEE STRUC, DWG5.
FOR SIZE AND REINFORCING,
CLEAN COMPACTED FILL
SECTION
3/411 1' -011
CONSULTING:
w"
co
O
O
J
0
�
J
z
w
HE
Z
W
w
z
O
�
0
rii
z
t
U
cc
0
F-
U
w
0
a
w
z
V1
V)
w
r
0
N_
o
i
w
Z
CONSULTING:
J
W
I
O~ Q cD
_ L(�
C�Ucn�
O � o
Q �
cn
cn
L0
CC
Lc)
n..
IECTIOI�M
SCALE AS *TOWN
DRAWN LD
JOB -
.ATE 10/20/05
SHEET:
A -7
7 OF: 9
s
co
O
J
�
J
W
w
HE
Z
W
GC
z
O
�
W
�
W
t
U
cc
Z
F-
U
w
0
a
w
z
V1
V)
w
r
0
iL
o
i
J
W
I
O~ Q cD
_ L(�
C�Ucn�
O � o
Q �
cn
cn
L0
CC
Lc)
n..
IECTIOI�M
SCALE AS *TOWN
DRAWN LD
JOB -
.ATE 10/20/05
SHEET:
A -7
7 OF: 9