06-0001-002GENERAL NOTES: 1, THE CONTRACTOR SHALL VISIT THE PREMISES AND THOROUGHLY FAMILIARIZE HIMSELF WITH ALL DETAILS OF THE WORK AND WORKING CONDITIONS. vERIFY ALL DIMENSIONS IN THE FIELD, AND ADVISE THE ARCHITECT / ENGINEER OF ANY DISCREPANCY BEFORE PERFORMING THE WORK, 2. THE CONTRACTOR SHALL PERFORM ALL WORK REQUIRED UNDER THIS CONTRACT FOR A COMPLETE INSTALLATION AND IN SUCH MANNER THAT SURFAGES NOT AFFECTED BY REMOVAL OF EXISTING OR FROM NEW WORK SHALL REMAIN UNDISTURBED AND NORMAL ACTIVITIES AT THE INSTALLATION MAY CONTINUE WITH THE LEAST F06515LE INTERFERENCE, ALL DEBRIS SHALL BE REMOVED FROM THE 51TE OF THE WORK AT THE END OF EACH WORKING DAY. MATERIALS AND EQUIPMENT SHALL BE STORED ONLY AT LOCATIONS APPROVED BY THE ARCHITECT / ENGINEER AND OWNER'S REPRESENTATIVE. 3, THE GONTRA�:TOR SHALL BE RESPONSIBLE FOR THE SAFETY OF THE STRUCTURES AND PERSONNEL DURING THE WORK UNDER THIS CONTRACT. ALL ALTERING, CUTTING, DRILLING OF PAVEMENT, FLOOR AND OTHER MODIFICATIONS SHALL BE NEATLY AND CAREFULLY DONE BY SKILLED MECHANICS. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO EXISTING WORK, MATERIALS, AND EQUIPMENT AS A RESULT OF H15 OPERATIONS, ALL DAMAGED WORK SHALL BE REPAIRED OR REPLACED WITH MATERIALS OF LIKE TYPE, QUALITY AND FINISH BY SKILLED MECHANICS OF THE TRADES INVOLVED AT NO ADDITIONAL COST TO THE OWNER AND TO THE FULL SATISFACTION OF THE ARCHITECT / ENGINEER. S. DISPOSAL OF ALL MATERIAL NOT SPECIFIED OR SHOWN TO BE SALVAGED AND / OR REUSED RESULTING FROM REMOVAL OPERATIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL COSTS IN CONNECTION WITH DISP051NG OF THE MATERIALS WILL BE AT THE CONTR,4CTOR'5 EXPENSE. ALL LIABILITY OF ANY NATURE RESULTING FROM THE DISPOSAL OF THE MATERIALS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. G. CONTRACTOR SHALL PROVIDE AND MAINTAIN 4CCE55 TO ALL EXISTING FACILITIES AND TH05E UNDER CONSTRUCTION IN THE IMMEDIATE VICINITY, AT ALL TIMES DURING CONSTRUCTION OF PROPOSED PROJECT. CONTRAACTOR SHALL INSTALL SECURITY FENCING AND BARRICADES AS REQUIRED BY THE LOCAL AUTHORITIES, AND /OR DIRECTED BY ARCHITECT / ENGINEER. 0, vERIFICATION OF EXISTING CONDITIONS: EACH CONTRACTOR SHALL DETERMINE AND VERIFY ALL DIMENSIONS AND CONDITIONS AT THE BUILDING SITE AND SHALL BE RESPONSIBLE FOR SAME BEFORE COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT AND/OR ENGINEER AND SHALL BE RE5OLVED BEFORE RESUMING THE WORK. DIMEN51ON5 SHALL BE READ AND NEVER SCALED OR ESTIMATED FROM THE ARCHITECTURAL DRAWINGS. g. CODE COMPLIANCE: EACH CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE 2001, AND WITH ALL OTHER CODES AND GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER HIS PORTION OF THE WORK_ EACH CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES AND FOR SAFETY PRECAUTION AND PROGRAMS IN CONNECTION WITH HI5 PORTION OF THE WORK. 10, EXAMINATION OF THE CONTRACT DOCUMENTS AND SITE: EACH CONTRACTOR FOR THIS PROJECT SHALL STUDY AND FAMILIARIZE HIMSELF WITH THE SITE AND WITH ALL THE DRAWINGS FOR ALL TRADES AND PARTS OF THE WORK. SHOULD ANY CONTRACTOR HAVE THE OPINION THAT THERE EXISTS IN THE ARCHITECTURAL DRAWINGS ANY ERRORS OR DISCREPANCIES, OR THAT CONDITIONS OF THE WORK OF ANY OTHER CONTRACTOR IS SUCH THAT IT WILL PREVENT HIM FROM COMPLETING HIS WORK IN A COMPETENT MANNER, HE SHALL NOTIFY THE ARCHITECT OF SUCH BEFORE PROCEEDING WITH HIS WORK. THE CONTRACTOR SHALL HAVE AT THE BUILDING 51TE, FROM START TO FINISH OF CONSTRUCTION, A RESPONSIBLE FOREMAN. IN ADDITION, THE CONTRACTOR SHALL GIVE HIS PER50N4L SUPERVISION TO THE WORK. THE FOREMAN SHALL BE ON DUTY DURING ALL WORKING HOURS. ANY INSTRUCTIONS OR NOTICES GIVEN TO HIM SHALL HAVE THE SAME IMPORTANCE AS IF GIVEN TO THE CONTRACTOR IN PERSON_ THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TEMPORARY PROVISIONS SUCH 45 TOILETS, WATER SUPPLY, LIGHT AND POWER AS WELL AS ANY OTHER DEEMED NECESSARY FOR THE COMPLETION OF THE BUILDING_ ANY ITEM OF WORK NECESSARY TO THE PROPER COMPLETION OF CONSTRUCTION WHICH 15 NOT SPECIFICALLY COVERED IN THESE DOCUMENTS SHALL BE PERFORMED IN A MANNER DEEMED GOOD PRACTICE OF THE TRADE INVOLVED. TERMITE PROTECTION NOTES TERMITE PROTECTION. TERMITE PROTECTION SHALL BE PROVIDED BY REGISTERED TERMITICIDES OR OTHER APPROVED METHODS OF TERMITE PROTECTION LABELED FOR USE AS A PREVENTATIVE TREATMENT TO NEW CONSTRUCTION. IF SOIL TREATMENT IS USED FOR SUBTERRANEAN TERMITE PREVENTION, THE INITIAL CHEMICAL 501L TREATMENT INSIDE THE FOUNDATION PERIMETER SHALL BE DONE AFTER ALL EXCAVATION, BACKFILLING AND COMPACTION IS COMPLETE. IF SOIL TREATMENT IS USED FOR SUBTERRANEAN TERMITE PREVENTION, SOIL AREA DISTURBED AFTER INITIAL CHEMICAL SOIL TREATMENT SHALL BE RETREATED WITH A CHEMICAL SOIL TREATMENT, INCLUDING SPACES BOXED OR FORMED, IF SOIL TREATMENT 15 USED FOR SUBTERRANEAN TERMITE PREVENTION, SPACE IN CONCRETE FLOORS BOXED OUT OR FORMED FOR THE SUBSEQUENT INSTALLATION OF PLUMBING TRAPS, DRAINS OR ANY OTHER PURPOSE SHALL BE CREATED BY USING PLASTIC OR METAL PERMANENTLY PLACED FORMS OF SUFFICIENT DEPTH TO ELIMINATE ANY PLANNED SOIL DISTURBANCE AFTER INITIAL CHEMICAL SOIL TREATMENT. IF SOIL TREATMENT IS USED FOR SUBTERRANEAN TERMITE PREVENTION, CHEMICALLY TREATED SOIL SHALL BE PROTECTED WITH A MINIMUM & MIL VAPOR RETARDER TO PROTECT AGAINST RAINFALL DILUTION. IF RAINFALL OCCURS BEFORE VAPOR RETARDER PLACEMENT, RETREATMENT IS REQUIRED. ANY WORK, INCLUDING PLACEMENT OF REINFORCING STEEL, DONE AFTER CHEMICAL TREATMENT UNTIL THE CONCRETE FLOOR IS POURED, SHALL BE DONE IN SUCH MANNER AS TO AVOID PENETRATING OR D15TUE31NG TREATED 501L. IF SOIL TREr','MENT IS USED FOR SUBTERRANEAN TERMITE PREVENTION, CONCRETE OVERPOUR OR MORTAR ACCUMULATED ALONG THE EXTERIOR FOUNDATION PERIMETER SHALL BE REMOVED PRIOR TO EXTERIOR CHEMICAL SOIL TREATMENT, TO ENHANCE VERTICAL PENETRATION OF THE CHEMICALS. IF SOIL TREATMENT IS USED FOR SUBTERRANEAN TERMITE PREVENTION, CHEMICAL SOIL TREATMENTS SHALL ALSO BE APPLIED UNDER ALL EXTERIOR CONCRETE OR GRADE WITHIN 1 FOOT (305 MM) OF THE PRIMARY STRUCTURE SIDEWALLS. 4L60,4 VERTICAL CHEMICAL BARRIER SHALL BE APPLIED PROMPTLY AFTER CONSTRUCTION 15 COMPLETED, INCLUDING INITIAL LANDSCAPING AND IRRIGATION /SPRINKLER INSTALLATION. ANY SOIL DISTURBED AFTER THE CHEMICAL VERTICAL BARRIER 15 APPLIED SHALL BE PROMPTLY RETREATED. PERMITS, FEE5 AND TAXES: THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, FEES L ICENSES AND DEPOSITS AND BE L I,ABLE FOR ALL STATE AND FEDERAL SALES TAXES, AND ALL OBLIGATION UNDER THE FEDERAL SECURITY ACT. UPON COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL OBTAIN CERTIFICATES OF COMPLIANCE, APPROVAL OR ACCEPTANCE FROM ALL AUTHORITIES HAVING JURISDICTION OVER THE WORK AND DELIVER THESE CERTIFICATES TO THE OWNER ALONG WITH OFFICIAL RECEIPTS FOR SAME. 12. PERFORMANCE OF WORK: NO SUBCONTRACTOR SHALL BEGIN HIS WORK UNLESS THE PREVIOUS TRADES, UPON WHOM HE IS DEPENDENT, HAS PERFORMED THEIR WORK SATISFACTORILY ACCORDING TO THE PLANS AND SPECIFICATIONS_ ONCE THE CONTRACTOR HAS STARTED H15 WORK, HE ASSUMES FULL RESPONSIBILITY FOR THAT WORK, BOTH FOR MATERIALS AND LABOR PERFORMED. ALL SUBCONTRACTORS ARE RESPONSIBLE FOR REMOVING DEBRIS RESULTING FROM THEIR WORK FROM THE PREMISES. 13_ CLEANUP: IN ADDITION TO THE REMOVAL OF ALL CONSTRUCTION DEBRIS FROM THE PREMISES, IT IS THE FINAL RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ALL SMUDGES, 5POT5 OF PLASTER, PUTTY, CAULKING COMPOUND, ADHESIVE, PAINT AND PENCIL MARKINGS, TAGS AND DESTINATION LABELS NOT CALLED FOR AS BEING PERMANENT. THE CONTRACTOR SHALL ',ALSO CLEAN EACH AREA SEPARATELY, INCLUDING THE WASHING OF ALL WINDOWS AND VACUUMING OR WAXING OF ALL FLOORS, PRIOR TO HANDING THE COMPLETED PROJECT OVER TO THE OWNER, 14. MATERIALS: ALL MATERIALS SHALL BE NEW, 45 CALLED FOR IN THE DRAWINGS, AND THE BEST OF THEIR RESPECTIVE KINDS. NO SUBSTITUTIONS SHALL BE MADE BY THE CONTRACTOR WITHOUT PRIOR WRITTEN APPROVAL BY THE OWNER, UNLE55 SPECIFIED OTHERWISE ON THE DRAWINGS. FOR PORTIONS OF THE WORK NOT SHOWN IN DETAIL, BUT WHICH ARE SHOWN G=ENERALLY, OR ARE REASONABLY INFERABLE AS BEING REQUIRED FOR A COMPETENT AND COMPLETE INSTALLATION, THE MATERIAL METHODS AND WORKMANSHIP SHALL CONFORM AS A MINIMUM TO THE TYPICAL OR REPRE5ENT,4TIvE. I 15. FIRE RE515TANGE / UNDERWRITERS LABORATORY RATINGS: WHERE ASSEMBLIES OR THEIR VARIOUS COMPONENTS, MATERIALS OR CONSTRUCTION SYSTEMS ARE INDICATED TO HAVE FIRE RESISTANCE RATINGS / UNDERWRITERS LABORATORY RATINGS., ALL SUCH SHALL BE COMPOSED OF MATERIALS AND BE ASSEMBLED 50 45 TO CONFORM TO THE STANDARDS ESTABLISHED IN GOVERNING CODES IN ORDER TO ACHIEVE THE REQUIRED RATING IN THE COMPLETED WORK 1(o. CUTTING AND PATCHING: EACH CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CUTTING, FITTING, PATCHING AND MATCHING OF HIS NEW WORK TO EXISTING WORK WHERE APPLICABLE AND INDICATED IN THE DRAWINGS. NO CONTRACTOR SHALL ENDANGER ANY WORK OF ANY OTHER CONTRACTOR BY EXCAVATING CUTTING OR OTHERWISE ALTERING ANY WORK OF ANY OTHER CONTRACTORS. li. DEMOLITION: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF DEBRIS REQUIRED TO COMPLETE THE CONSTRUCTION AS SPECIFIED ON THE DRAWINGS. EXISTING UNUSED ELECTRIC AND PLUMBING SHALL BE REMOVED OR ADEQUATELY CAPPED AS ALLOWED BY CODE, TERMITE PROTECTION. ALL BUILDINGS SHALL HAVE PRE - CONSTRUCTION TREATMENT PROTECTION AGAINST SUBTERRANEAN TERMITES. THE RULES AND LAWS 45 ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES SHALL BE DEEMED AS APPROVED WITH RESPECT TO PRE - CONSTRUCTION 501L TREATMENT FOR PROTECTION AGAINST SUBTERRANEAN TERMITES. A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED TO THE BUILDING DEPARTMENT BY THE LICENSED PEST CONTROL COMPANY THAT CONTAINS THE FOLLOWING STATEMENT: "THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. TREATMENT 15 IN ACCORDANCE WITH RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES." ', PENETRATION. PROTECTIVE SLEEVES AROUND METALLIC PIPING PENETRATING CONCRETE SLAB -ON -GRADE FLOORS SHALL NOT BE OF CELLULOSE- CONTAINING MATERIALS AND SHALL RECEIVE APPLICATION OF A TERMITIGIDE IN ANNULAR SPACE between sleeve and pipe. SECURITY NOTES: APPLICABLE ITEMS FBC RE: INTRUSION AND BURGLARY SECURITY 1.) ALL LOGKS ON EXTERIOR DOORS SHALL BE CAPABLE OF RESISTING A FORGE OF 300 LB. APPLIED IN ANY MOVABLE DIRECTION AND IN ACCORDANCE WITH RESISTANCE STANDARDS SET FORTH IN METRO CODE 30C. 2.) ALL SINGLE EXTERIOR SWING DOORS SHALL HAVE A LOCK TO BE KEY OPERATED FROM EXTERIOR WITH A MIN_ OF 6,000 POSSIBLE KEY CHANGES OR LOCKING AUXILIARY 3.) THE ACTIVE LEAF OF PAIRS OF EXTERIOR SWING DOORS SHALL HAVE SAME LOCKS AS REQUIRED FOR SINGLE EXTERIOR SWING DOORS. THE INACTIVE LEAF OF THESE PAIRS OF DOORS SHALL HAVE MULTIPLE POINT LOCKS WITH 3/8" MIN. THROW BOLTS WITH INSERTS, 4,) HINGES ON EXTERIOR OUT - SWINGING DOORS SHALL HAVE NON - REMOVABLE PINS. 5.) JAMBS OF ALL EXTERIOR OFFSET TYPE IN -SWING DOORS BE RABBETED, OR OF SIMILAR FABRICATION, TO PREVENT DEFEATING THE PURP05E OF THE STRIKE AND THE INTEGRITY OF LOCKS AND LATCHES. 6, SINGLE, SWINGING, EXTERIOR DOORS, IF USED SHALL BE SOLID CORE OF NO LESS THAN 1 3/4" TRICK. l.) GLASS AND EXTERIOR DOORS SHALL COMPLY WITH THE AMERICAN NATIONAL STANDARDS INSTITUTE'S STANDARD 297.E 8_) VISION PANELS IN EXTERIOR DOORS OTHER THAN GLAZING WITHIN 40" OF THE INSIDE LOCKING ACTIVATING DEVICE OF LOOSE AND SWINGING DOORS SHALL COMPLY WITH AMERICAN NATIONAL STANDARDS INSTITUTE'S- STANDARD 297.1. 9.) SLIDING GLASS DOORS AND WINDOWS SHALL BE INSTALLED AND CONSTRUCTED SO THAT NO PANEL CAN BE LIFTED FROM THE TRACKS WHEN IN THE LOCKED POSITION AND 50 AS TO COMPLY WITH THE ARCHITECTURAL ALUMINUM MFG'S ASSOCIATION STANDARDS FOR FORCED ENTRY RE515TANCE, AAMA 13033. 10.) FRONT MAIN ENTRANCE DOORS SHALL BE PROVIDED WITH A DOOR SCOPE OR VISION PANEL. 11.) DOOR AND WINDOWS BY GARADCO PRODUCTS (OR EQUAL) ABBREVIATIONS: A ANCHOR A/C AIR CONDITIONING ACOUST ACOUSTICAL AGP ACOUSTICAL CEILING PANEL A.F.F. ABOVE FINISH FLOOR AL OR ALUM ALUMINUM ANOD. ANODIZE BD BOARD B.F.F. BELOW FIN15H FLOOR BLK'G BLOCKING BLK BLOCK GEM CEMENT CER CERAMIC C_F.v. CONTRACTOR FIELD VERIFY G.J. CONTROL JOINT CLG CEILING COL COLUMN CONC CONCRETE CONT CONTINUOUS COVER'G COVERING DBL DOUBLE DIM DIMENSION DTL /DTLS DETAILS E.A. EACH ELECT /ELEC ELECTRICAL EL, ELEVATION ELEV, ELEVATOR EXH. EXHAUST EXIST. EXISTING EXP. EXPANSION EXT. EXTERIOR F.D. FLOOR DRAIN F.E. FIRE EXTINGUISHER FIRE EXT. CAB. FIRE EXTINGUISHER CABINET F.O.I.C. FURNISHED BY OWNER, Pi INSTALLED BY CONTRACTOR FLUOR FLUORESCENT FIN, FINISH GA GAUGE GWB GYPSUM WALL BOARD GYP. BD. GYPSUM BOARD GALV. GALVANIZED GS GALVANIZED STEEL GL GLASS HM HOLLOW METAL SYMBOLS: (I NORTH ARROW A COLUMN REFERENCE GRIDS A WALL SECTION AR A1.1 • • • Y • • 0000• •i• ••• • • • 0000 • Y • DETAIL NO. 1 All 5HT. ON WHICH DETAIL 15 SHOWN OR SHT, ON WHICH DETAIL 15 CALLED OUT SECTION NO. Ax BUILDING SECTION A A1.1 SHT. ON WHICH SECTION SHOWN OR A1.1 SHT. ON WHICH SECTION IS CALLED OUT (PLAN, ELEVATION) WT -1 WALL TYPE 4 ELEVATION NO. 3 1 2 SHEET ON WHICH ELEVATION IS SHOWN DOOR No, O WINDOW TYPE ROOM NAME Room NAME 101 • • • • Y • r i i Y • V •• Y Y • u • 090 Soo 0 0 •000 •000• 00.0 •••• 0000 i•••r • 1,4T.,:••• • • Y • •Y �I•G4�Tu•••• • HORIZ HORIZONTAL H.B. H05E BIBS Z I.D. INTERIOR DIMENSION INSUL. INSULATION L INTERM INTERMEDIATE JAN. JANITOR Z MANUF. MANUFACTURER W' MAT MATERIAL MAX MAXIMUM 0 MIN MINIMUM 0 MTL METAL W NIC NOT IN CONTRACT � NEOPR NEOPRENE O.D. OUTSIDE DIMENSION Z O.G. ON CENTER Z 0.5. OVERFLOW SCUPPERS U W PTN PARTITION r Pi PANEL JOINT OL PL PLATE L.P. LIGHT POLE PLYWD PLYWOOD PNL PANEL PLAM PLASTIC LAMINATE P.T. PRESSURE TREATED RE INF. RE INFORC ING REQ'D REQUIRED RM ROOM R.D. ROOF DRAIN SHT SHEET SCH SCHEDULE 5.5, STAINLESS STEEL 5TL STEEL STD_ STANDARD SECT SECTION SIM SIMILAR SPEC'S SPECIFICATIONS STRUCT STRUCTURE 5C SOLID CORE WOOD PH, TELEPHONE TEMP TEMPERED vCT VINYL COMPOSITION TILE VERT VERTICAL VEST. VESTIBULE DETAIL NO. 1 All 5HT. ON WHICH DETAIL 15 SHOWN OR SHT, ON WHICH DETAIL 15 CALLED OUT SECTION NO. Ax BUILDING SECTION A A1.1 SHT. ON WHICH SECTION SHOWN OR A1.1 SHT. ON WHICH SECTION IS CALLED OUT (PLAN, ELEVATION) WT -1 WALL TYPE 4 ELEVATION NO. 3 1 2 SHEET ON WHICH ELEVATION IS SHOWN DOOR No, O WINDOW TYPE ROOM NAME Room NAME 101 ROOM No, i A t ELEVATION NGVD RELATED NOTE: ALL SYMBOLS AND ABBREVIATIONS MAY NOT BE USED. h CONSULTING: W A t D O 0 W Z L O Z z W' 0 0 L 0 W W W w � U Z ` CONSULTING: Lo Mw O~ _Q coo V U r O V cn vn 00 00 ui i J� 0 CdBVERAL NOTES SCALE AS &MN DRAWN LD JOB P0" DATE 10/20/05 SHEET: A -1 1 OF:9 O W O Z I- W' Cla W W W � U W ` M u' Z 3(S U W N V) r zW 3 `� 0 E OL o ( 9L Lo Mw O~ _Q coo V U r O V cn vn 00 00 ui i J� 0 CdBVERAL NOTES SCALE AS &MN DRAWN LD JOB P0" DATE 10/20/05 SHEET: A -1 1 OF:9