14-145-014PIPE
S
i
,r
U.G. REFRIGERATION LINES
TO AIR • • •
■ r
ULAXIVIUM 45"' ELBOWS
`EN`�IN
..............
N.
I T
T Ix
A LL TI Oi\\]
plim
P AL
N.T.S.
'w�
RIGID FIBER —GLASS DUCT
(R -6)
r
r
liwo UNION
�Msjl
r
r
Dll'_FU'l")ER CONNEC'.TION
m E (1 "' A N In I (o A L N - 0 UO' T I
1. ALL WORK SHALL CONFORM TO THE 2010 FLORIDA BUILDING •i RESIDENTIAL
OTHER APPLICABLE rr r r•r
2. CONTRACTOR SHALL WARRANT ALL WORK TO BE FREE OF DEFECTS IN WORKMANSHIP
AND MATERIALS FOR A PERIOD OF ONE OF ••
3. BALANCE ALL SYSTEMS TO PROVIDE AIR QUANITIES AND CAPACITIES INDICATED
ON DRAWINGS.
4. ALL WORK SHALL BE FIELD CHECKED BEFORE • AND COORDINATED
NTH ALL OTHER TRADES.
CONTRACTOR IS RESPONSIBLE FOR OBTAINING HIS OWN PERMIT
. r i ' DUCTBOARD ACCORDANCE
SMACNAS FIBROUS DUCT CONSTRUCTION r .r
7. PROVIDE • r AMPERS TURNING VANES, ETC., IN DUCTWORK FOR PROPER
AIRFLOW i BALANCE. P`ROV`IDE r• • `•
RODS AT ALL OUTLETS CONNECTED CLOSER THAN TWO DUCT DIAMETERS TO
MAIN SUPPLY DUCT, r WHERE SHOWN ON
FLEXIBLE 8. DUCTS SHALL BE r TYPE SUPPORTED AND INSTALLED TO AVOID
SAGS AND KINKS. ALL FLEXABLE DUCTS SRALL BE SIMILAR IN LENGTH TO AVOID
DISSIMILAR DROPS.
9. REFRIGERANT PIPING SHALL BE SEAMLESS COPPER TYPE L HARD OR SOFT DRAWN
OR ACR COPPER : •• UGHT COPPER SOLDER • SOLDER
SHALL BE • i NTH SUITABLE FLEX.
• INSULATE REFRIGERANT SUCTION CLOSED CELL POLYETHYLENE
PREMOLED PIPE INSULATION. • -• i TO
PROVIDE . • CONDITIONING UNITS NTH MATCHING HEAT—COOL • r ON—
OFF AUTO i BY EQUIPMENT
12. ALL AIR TERMINALS SHALL BE
O • i i r
-i ri DEFLECTION • i OPPOSED i DAMP NTH
PROVIDE i t i CONDENSATE DRAIN, i
.. i
• •
'_ #ki 1..
• i
Ir -
• i •
STL. A.H.U. SL
• • c
`••
•
101
mai •.wim
/'-"\IR HAN-I)LER U
HNSTAL L /6-\,T 10 1\1 D E T A I L
A
m
MANUFACTURER
COOLING CAP. s/T
& 67- WFNWxLxH
DIMENSIONS
(IN.)
ELE T. SERVICE
VOLTS/PH/H
:2
208-230/l/60
. •
'
• , •
r
.
�.
t� N .r
• 1TZ►i>:�►IiII:IVky
FIM
z
r
E`
z
z
ZD
V)
z
0
Q
z
Q
E-
E-4
U)
z
0
w
F-
m
U
X
Q
w
_
t-
m
w
w
V)
w
Ir
w
Q
F-
J
a
a
Z
Q
LL
0
w
a
0
cr
a
J
a
J
w
htl
w
cr
Q
emu"
w
7
X.-:
ZVI- 'fal