Loading...
14-145-014PIPE S i ,r U.G. REFRIGERATION LINES TO AIR • • • ■ r ULAXIVIUM 45"' ELBOWS `EN`�IN .............. N. I T T Ix A LL TI Oi\\] plim P AL N.T.S. 'w� RIGID FIBER —GLASS DUCT (R -6) r r liwo UNION �Msjl r r Dll'_FU'l")ER CONNEC'.TION m E (1 "' A N In I (o A L N - 0 UO' T I 1. ALL WORK SHALL CONFORM TO THE 2010 FLORIDA BUILDING •i RESIDENTIAL OTHER APPLICABLE rr r r•r 2. CONTRACTOR SHALL WARRANT ALL WORK TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE OF •• 3. BALANCE ALL SYSTEMS TO PROVIDE AIR QUANITIES AND CAPACITIES INDICATED ON DRAWINGS. 4. ALL WORK SHALL BE FIELD CHECKED BEFORE • AND COORDINATED NTH ALL OTHER TRADES. CONTRACTOR IS RESPONSIBLE FOR OBTAINING HIS OWN PERMIT . r i ' DUCTBOARD ACCORDANCE SMACNAS FIBROUS DUCT CONSTRUCTION r .r 7. PROVIDE • r AMPERS TURNING VANES, ETC., IN DUCTWORK FOR PROPER AIRFLOW i BALANCE. P`ROV`IDE r• • `• RODS AT ALL OUTLETS CONNECTED CLOSER THAN TWO DUCT DIAMETERS TO MAIN SUPPLY DUCT, r WHERE SHOWN ON FLEXIBLE 8. DUCTS SHALL BE r TYPE SUPPORTED AND INSTALLED TO AVOID SAGS AND KINKS. ALL FLEXABLE DUCTS SRALL BE SIMILAR IN LENGTH TO AVOID DISSIMILAR DROPS. 9. REFRIGERANT PIPING SHALL BE SEAMLESS COPPER TYPE L HARD OR SOFT DRAWN OR ACR COPPER : •• UGHT COPPER SOLDER • SOLDER SHALL BE • i NTH SUITABLE FLEX. • INSULATE REFRIGERANT SUCTION CLOSED CELL POLYETHYLENE PREMOLED PIPE INSULATION. • -• i TO PROVIDE . • CONDITIONING UNITS NTH MATCHING HEAT—COOL • r ON— OFF AUTO i BY EQUIPMENT 12. ALL AIR TERMINALS SHALL BE O • i i r -i ri DEFLECTION • i OPPOSED i DAMP NTH PROVIDE i t i CONDENSATE DRAIN, i .. i • • '_ #ki 1.. • i Ir - • i • STL. A.H.U. SL • • c `•• • 101 mai •.wim /'-"\IR HAN-I)LER U HNSTAL L /6-\,T 10 1\1 D E T A I L A m MANUFACTURER COOLING CAP. s/T & 67- WFNWxLxH DIMENSIONS (IN.) ELE T. SERVICE VOLTS/PH/H :2 208-230/l/60 . • ' • , • r . �. t� N .r • 1TZ►i>:�►IiII:IVky FIM z r E` z z ZD V) z 0 Q z Q E- E-4 U) z 0 w F- m U X Q w _ t- m w w V) w Ir w Q F- J a a Z Q LL 0 w a 0 cr a J a J w htl w cr Q emu" w 7 X.-: ZVI- 'fal