Loading...
13-1126-003P.I.P. BM. - BY OTHERS (TYP.) P.I.P. BM. – SY OTHERS (TYP.) STEEL ANGLE BY 5PJ tt ARC, ENG, G.G. NOTE: P.I.P. BM. – 4' MIN. REQ'D. BETWEEN `\ BY OTHERS BOTTOM OF JOISTS t (TYP.) SEE BOTTOM OF BEAM (TYP.) p� //-- PLAN \ V, SE CT I ON BY 5P.1. SECTIO � PLYWOD 2: Inqu H kL OIL CONT. NAILER FORMING DETAIL 5" 2° 211 2' -0' r EXTENDS TO BOTT. OF (TYP-) T.B. FORMING BY OTHER5 # GR cola SHEAR FRICTION CONNECTION DETAIL 12" JOIST SLAB – BY OTHERS SECTION B ^ICv ° e - c=lap 4 .AN� SEE PLAN SE CT I ON SHORING NO TES G.C. NOTES: 1 –THE SOIL SHOULD BE PREPARED & COMPACTED TO SUPPORT SHORING LOADS INDICATED (BY G.C.) SEE SHORING DETAIL. 2– MAINTAIN SHORING LAYOUT IN DWG. SEE SHORING DETAIL. 3 –END SHORES WILL BE REMOVED BY SPI ONE DAY AFTER SLAB PLACEMENT (TYP.). 4– SCAFFOLDING FOR FORMING BM. MUST SUPPORT JOIST, SLAB AND CONSTRUCTION LOAD APPLIED TO BM. WHEN END SHORES ARE REMOVED. 5– SINGLE STORY SHORES MAY BE REMOVED 7 DAYS AFTER CONCRETE POUR OR AFTER 3 DAYS WHEN SLAB HAS ATTAINED 3/4 OF DESIGN STRENGTH. NOTIFY S.P.I. ENG. BEFORE REMOVAL AT 7 DAYS IF SLAB IS NOT AT 3/4 STRENGTH. 6– SHORING DESIGN ALLOWS FOR JOIST WITH SHIMS MADE OF CONCRETE, STEEL OR REBAR ALONG WITH BOTTOM NOTCHES (DAPPED ENDS) AND STANDARD ENDS THAT HAVE CONTANCT SURFACES WHICH ARE DIRECTLY ABOVE THE PRECAST SECTION OF THE SOFFIT BEAM. THESE JOIST DO NOT REQUIRED END SHORES AT THEIR APPROPIATE JOIST END. THE SHORING DESIGN FOR THE SOFFIT BEAMS HAVE ACCOUNTED FOR THE LOADS APPLIED DUE TO THE OMISSION OF THE END SHORES OF THE JOIST. THUS, THE END SHORES FROM THE JOIST ARE NOT REQUIRED. (SEE SKETCH) r :: It ::::::::::::::::::::::::::::::: r°IcA r.......... ::: S.P.I. STD. SEE PLAN SECTION C SLA BY OTI sEcT�o p S.P.I. RECOMMENDS LONGITUDINAL REINF. IF REQ'D. BY E.O-R. (15Y OTHERS) SLAB – BY OTHERS o, L COL. BY OTHERS SECTION OE SLAB - B.O. P.I.P. BM. - BY OTHERS (TYP.) sEc-rio F J O f S T S C H E 1) U L E SHT # 1 (SECOND FL00R PULL = 0.65 (12'J) CONIC. = 6,000 PSI MARK QTY. LENGTH TYPE STRAND PATTERN REL. CROWNSHORE EQUAL LOAD (K) S.I.L. SLAB Vu SPECIAL CONDITION SPECIAL SHEAR STEEL ONE END OTHER END OCHER J1 12 19' -0' 811 281-1 -PL 2,4 3,500 liz' 1 WFS 3-ro 10 4' 1B STD. STD. OTYPE II .1101 2 31' -9' 121J 5814- 2PTA'Pro 2.5, 45, 6.5, 85, 10.5(515) +l+r°�31�z� MID SPAN X301-0 3,100 2' 2 WPS ml /3PT 5.8 -i0 4' 15B STD. SF. TYPE 1 OR TYPE II J102 3 38' -0' + 1 STD. STD. J103 2 31' -0' 48H -lPT 2.5, 4.5, 6.5, 8.5(6.0) 3,500 11/4' 1 /3PT 4.8 13.1 STD. STD. J104 4 23' -1' 28H -PL 2.5, 6.5 3 /0, 1 WPS tv 4.8 9.4 STD. STD. J105 3 32' -0' 48H -lPT 2.5, 4.5, 6.5, 8.5(6.0) 3,500 13/8' F1 /3PT 13.1 STD. STD. J10 1 31' -9' STD. SP. J101 1 19' -10' 2814-PL 2.5, 6.5 1/4' 1 �S 4.5 9.4 STD. STD. SHORING BEAM (1) WPS a SIDE BY OTHERS (TYP.) SHORE (TYP.) SNORING LA T QUT J1, J104, J101 WFS = WOOD POST SHORE 71fl -0' -T EQUAL EQUAL -0' -T EQUAL EQUAL . ' -0' -TO ' -0' -TO 2' -0" 1 ii�r�c lip 21-0' 2'— 0 I WPS SN0t2E a 2' -0' 21-OVI SHORING BEAM (1) WPS a SIDE BY OTHERS (TYP.) SHORE (TYP.) SNORING LA T QUT J1, J104, J101 WFS = WOOD POST SHORE I/ SNORING BEAM —� (1) WPS 'a SIDE BY OTHERS (TYP.) &PORING LAYOUT J103, J105, J106 WPS = WOOD POST SNORE -0' -T EQUAL EQUAL EQUAL ' -0' -TO EQUAL EQUAL ' -0' -TO 2' -0" 1 ii�r�c lip 21-0' I/ SNORING BEAM —� (1) WPS 'a SIDE BY OTHERS (TYP.) &PORING LAYOUT J103, J105, J106 WPS = WOOD POST SNORE (1) WPS a SIDE SNORING BEAM —� (TYP.) BY OTHERS (TYP.) 5HOfRING LAYOUT J101, J102 WPS = WOOD POST SNORE eVIEWEb & APPA&lo �Ua MPLIANCE THE DESIGN CONCEPT ONLY NO DETAILED CHECK OF CALCULATIONS MADE ❑ SEE NOTES IN DRAWINGS ❑ REVISE & RESUBMIT Checking is only for conformance with the design concept of The project and compliance with the information given in the Structural Drawings. Contractor Is responsible for dimensions To be confirmed and correlated at the job site; for means and Methods of construction; for information that pertains solely to fabrication processes and coordination of all trades. Any conflict found in the contract Documents during the Attention of the A/E of Record. Any deviation from the Contract Documents (or proposed sub- stitution) must be clearly noted and highlighted in these Sop Drawings in order to receive specific consideration. Any such item not dyarly noted is to be considered relected. PNIM ENGINEERS, CORP. �I13 r'(at rY OF SOUTH H NIJIANli CUILDI?'IG DEPT. STrtiJ, ^., ' L SECTION FOR ,4FIFIWVAL ;1 Denis K. Solano J P.E. 56902 S.I.204G C.0 -A. 00009095 , f� Solver Structural Partnership, Inc. It 7500 N.W. 25th ST Phone:(305) 592 -9396 Miamii,, Florida 33122 Fax: (305) 599 -9347 E -Mail: solverstruct @cs.com 94 Partnerahl Inc. DESIGN - INSPECTION - INVESTIGATION - REPORTS SUBMITTED FOR APPROVAL OCT 8 1 2013 STRUCTURAL PRESTRESSED INDUSTRIES N • • U tip a v ' -0' -T EQUAL EQUAL EQUAL ' -0' -TO 21-OVI , (7) Illi=C, 0 1/-A 2 -0 (1) WPS a SIDE SNORING BEAM —� (TYP.) BY OTHERS (TYP.) 5HOfRING LAYOUT J101, J102 WPS = WOOD POST SNORE eVIEWEb & APPA&lo �Ua MPLIANCE THE DESIGN CONCEPT ONLY NO DETAILED CHECK OF CALCULATIONS MADE ❑ SEE NOTES IN DRAWINGS ❑ REVISE & RESUBMIT Checking is only for conformance with the design concept of The project and compliance with the information given in the Structural Drawings. Contractor Is responsible for dimensions To be confirmed and correlated at the job site; for means and Methods of construction; for information that pertains solely to fabrication processes and coordination of all trades. Any conflict found in the contract Documents during the Attention of the A/E of Record. Any deviation from the Contract Documents (or proposed sub- stitution) must be clearly noted and highlighted in these Sop Drawings in order to receive specific consideration. Any such item not dyarly noted is to be considered relected. PNIM ENGINEERS, CORP. �I13 r'(at rY OF SOUTH H NIJIANli CUILDI?'IG DEPT. STrtiJ, ^., ' L SECTION FOR ,4FIFIWVAL ;1 Denis K. Solano J P.E. 56902 S.I.204G C.0 -A. 00009095 , f� Solver Structural Partnership, Inc. It 7500 N.W. 25th ST Phone:(305) 592 -9396 Miamii,, Florida 33122 Fax: (305) 599 -9347 E -Mail: solverstruct @cs.com 94 Partnerahl Inc. DESIGN - INSPECTION - INVESTIGATION - REPORTS SUBMITTED FOR APPROVAL OCT 8 1 2013 STRUCTURAL PRESTRESSED INDUSTRIES N • • U tip a v