Loading...
09-667-007FOOTING SCHEDZILE MARK SIZE DEPTH LONGITUDINAL REINF. TRANSVERSE REINF. REMARKS TOP BOTTOM UIFIS 18' 12' — REPORT DESCREPANCIES FOR 2 5 CONCR IUALL FOOTING UJF22 22' 12' 4 305 04 A 24' 50TT. 1005 UF36 36' 12' & 4 "o /c 0 ALL EDGES. 445 04 0 18' BOTT. NOTED) U1F54 54' 12' 6 5 6 5 04 • 18' TOP. 4 BOTT. 9— ELEVATIONS 1. VERIFY FOOTING REQUIREMENTS: ;O` ELEVATION i BELOW ` # • BELOW SLAB; • • O TO :fir DESCREPENCIES COLUMN SCHEDULE MARK TYPE SIZE REINFORCEMENT #3 TIES @ REMARKS I CONCR 8' x 12' 405 8' — REPORT DESCREPANCIES FOR 2 CONCR 8' x 24'1 805 8' - 2 SETS AT EACH TRUSS INTERSECTION, UNLESS OTHERWISE NOTED 0 GABLE ENDS. 4 CONCR 8' x 42'1 1005 8' - 2 SETS 5— ROOF SHEATHING: 5/8" CD EXTERIOR GRADE PLYWOOD WITH 8d RING SHANK NAILS 6" ON CENTER. & 4 "o /c 0 ALL EDGES. 6— ALL INDICATED TRUSS ATTACHMENT HARDWARE BY "NU —VUE" (ALL NAILS — 16d) UNLESS OTHERWISE NOTED) 7— GENERAL CONTRACTOR TO VERIFY THAT THE TRUSS ENGINEER UPLIFT LOADS DO NOT EXCEED THOSE INDICATED ON THESE DOCUMENTS. 8— DO NOT CHANGE THE DIRECTION OF TRUSSES WITHOUT AUTHORAZATION OF ENGINEER. SECTION B -B 9— 1. CONTRACTOR TO VERIFY COLUMN SIZES WITH ARCHITECTURAL DRAWINGS PRIOR TO ANY WORK. — REPORT ANY DESCREPENCIES VERIFY 1. 77ONS, SIZES, ETC. WTH ARCH17EC7ZIRAL PLANS r .I r TO ANY W r REPORT DISCREPANCIES 2. DROP BOTTOM OF BEAUS TO THE TOP OF OPENING, ADD 2 f 5 FOR EVERY 8- OF DROP. uy ROOF CONNECTORS SCHEDULE ,ry ■ 1 EXIST 8 "02" TIE BEAM I�I ■1 � 11 DESIGN LOADS: 3— 2 "x12" P.T. JOISTS (SCREW TOGETHER W/ r c 0 LL =30 P.S.F. / DL =25 P.S.F. / NET UPL. = 44 P.S.F. (OVERHANGS 96/166 & END ZONES & 82 P.S.F. 2— FOR DIMENSIONS, ELEVATIONS, SLOPES, TRUSS PROFILES, BEAMS SIZES, ECT., SEE ARCH. DRAWINGS. — REPORT DESCREPANCIES FOR ACTION. PLATE W/ 3/4 "0 ANCHOR 3— MINIMUM PERMANENT BRACING: 2 "x 4" ® 6' -0" MAXIMUM ON CENTER AT TRUSS WEB AND BOTTOM CHORD (2 -16d COMMON NAILS) AT EACH TRUSS INTERSECTION, UNLESS OTHERWISE NOTED 0 GABLE ENDS. i 4— NEW BLOCK WA NEW STARTER 4 c ♦- DO 4 HOOKS I ZMA rr- 1 <,CE DETAIL "II" 3/4"= 11 -0" NEW EXIST. CONT. 2 "x4" W/ 1/4 "x3 -1/2" WD. f SCREWS 0 6" o/c t TYP. SECTION "A -A" (N.T.S.) ROOF FRAMING PLAN GENERAL NOTES EXIST 8 "02" TIE BEAM 1— DESIGN LOADS: 3— 2 "x12" P.T. JOISTS (SCREW TOGETHER W/ r c 0 LL =30 P.S.F. / DL =25 P.S.F. / NET UPL. = 44 P.S.F. (OVERHANGS 96/166 & END ZONES & 82 P.S.F. 2— FOR DIMENSIONS, ELEVATIONS, SLOPES, TRUSS PROFILES, BEAMS SIZES, ECT., SEE ARCH. DRAWINGS. — REPORT DESCREPANCIES FOR ACTION. PLATE W/ 3/4 "0 ANCHOR 3— MINIMUM PERMANENT BRACING: 2 "x 4" ® 6' -0" MAXIMUM ON CENTER AT TRUSS WEB AND BOTTOM CHORD (2 -16d COMMON NAILS) AT EACH TRUSS INTERSECTION, UNLESS OTHERWISE NOTED 0 GABLE ENDS. i 4— INDICATED IN CONSTRUCTION DOCUMENTS TRUSS UP LIFT AND FORCES, BRACING AND ANCHORAGE, REQUIRED VERIFICATION WITH TRUSS MANUFACTURES, SHOP DRAWINGS AND CALCULATIONS PRIOR TO ANY CONSTRUCTION. 5— ROOF SHEATHING: 5/8" CD EXTERIOR GRADE PLYWOOD WITH 8d RING SHANK NAILS 6" ON CENTER. & 4 "o /c 0 ALL EDGES. 6— ALL INDICATED TRUSS ATTACHMENT HARDWARE BY "NU —VUE" (ALL NAILS — 16d) UNLESS OTHERWISE NOTED) 7— GENERAL CONTRACTOR TO VERIFY THAT THE TRUSS ENGINEER UPLIFT LOADS DO NOT EXCEED THOSE INDICATED ON THESE DOCUMENTS. 8— DO NOT CHANGE THE DIRECTION OF TRUSSES WITHOUT AUTHORAZATION OF ENGINEER. SECTION B -B 9— TRUSS TO GIRDER ATTACHMENT — RESPONSIBILITY OF TRUSS DESIGN ENGINEER X a 10— NOT SHOWN TRUSS ATTACHMENT — "NVHTAI6" y 2 "x8" MID BRACING 2—#5 " o/ 11— FOR ROOF TRUSSES & GIRDERS PROFILES, ROOF SLOPES, BEAMS SIZES & ELEVATIONS —SEE ARCH. DRAWINGS / REPORT DICREPENCIES FOR ACTION. < 12— PROVIDE REQUIRED VENTS BETWEEN EXISTING & NEW ROOF —SEE ARCHITECTURAL DRAWINGS. I 13— ROOF LEDGER #1: 2— 2 "x6" P.T. BOTTOM & TOP (RAKED) W/ 3/4 "0 GALV. A. BOLTS ® 24" o/c a w , NEW BLOCK WA NEW STARTER 4 c ♦- DO 4 HOOKS I ZMA rr- 1 <,CE DETAIL "II" 3/4"= 11 -0" NEW EXIST. CONT. 2 "x4" W/ 1/4 "x3 -1/2" WD. f SCREWS 0 6" o/c t TYP. SECTION "A -A" (N.T.S.) 1 i 01 CV 101-0" REVISIONS: NEW 7" SLAB W/ #4 0 8" O/C TOP & BOTT. (EACH WAY), 1 -1 /9" rnmrprTF rnv;7p FILLED CELLS I 1 EXIST 8 "02" TIE BEAM • W/ 2 #5 T. &B. 3— 2 "x12" P.T. JOISTS (SCREW TOGETHER W/ r c 0 LL �c ® NEW 10 "x5/8 "x8" —long STL. w PLATE W/ 3/4 "0 ANCHOR #4 ® 12" o/c s BOLTS 0 12" o/c (6" EMB.) VERT. DOWELS i -3" VERTICALY STAGGERRED (" . IN 5 EMB • • EPDXY INTO NEW CONC. POUR W/ 2# 5 EXIST. BM.) i CONT. (EMB. INTO END COL'S.) STANDARD HOOK onw SECTION B -B X a 1 i 01 CV 101-0" REVISIONS: NEW 7" SLAB W/ #4 0 8" O/C TOP & BOTT. (EACH WAY), 1 -1 /9" rnmrprTF rnv;7p FILLED CELLS I 1 • 'I 3— 2 "x12" P.T. JOISTS (SCREW TOGETHER W/ r LL " R p v 1/4 "x4 -1/2" GALV. SCREWS 0 6 "o /c —4" I F " "JUS212 s y 3 -8 1 i � VERT. STAGGERED) -USE -3 HANGAR a i —TYP. DADE COUNTY, FL 01- 0417 -11 i onw e..t X a y 2 "x8" MID BRACING 2—#5 " o/ • 4 " < VET.. IN . #5 VERT. CELLS Z I < i a w , 0 Q ° W W I ®E= EXIST. SPREAD FOOTING -VEREFY NEW 8 "x8" CONC. CAP W/ 2 #5 CONT. AND NEW OF GIRDER - x I 3 o I CONC. BLOCK WALL " I ABOVE 2 M I-t U3 L -t w .` BELOW W/ #5 ® 24 o/c ROOF r . LEDGER #1 _ 2 "x4" X— BRACING 0 48" o/c MAX. W/ 2 -16d N. TO TRUSSES & LEDGER PIGGY BACK TRUSSES — ATTACHMENT BY MANUFACTURER Ing VERT. IN FILLED CELL i I �6 f + FILLED CELLS 1/4" = 1' -0" 1 1 • 'I B N LL " SA i=e s i i i C i onw e..t .Hn .t • i < r W Z I < i a w , i (954) 922-8845 r► TO THE BEST OF ENGINEER .- <. M < 4 EII 51.1 OF: S2.1 i • nX n LL SA i=e '• i i i C i onw e..t .Hn .t • i < r W Z > < i a w , 0 Q ° W W � M n _ 0 ° N < < 51.1 OF: S2.1 i • . LL '• i i i C i .t • i i , 51.1 OF: S2.1